16725 POST THIS CARD NEAR FRONT OF BUILDING PERMIT NUNIRER
CITY OF CUPERTINO 16725
INSPECTION DIVISION
JOB INSPECTION RECORD
[ n � PERMIT EXPI R,A/TION
JOB ADDRESS r (-6—L n6 /3 UNIT# _LOT# PERMIT=EXP4'ES-IF WORK
OWNER C'.� D L4 a CONTRACTOR IS NOT STARTED WITHIN
INSPECTION DATE INSPECTOR • INSPECTION RECORD 180 DAYS OF PERMIT ISSU
ANCE OR 180 DAYS FROM
FOUNDATION NOTE: LAST CALLED INSPECTION.
UFER ALL GRADING AND DRAINAGE SHALL BE INSTALLED
TO COMPLY WITH THE APPROVED PLANS AND CITY OF PE RnIn VALIDATION
PREGUNITE CUPERTINO STANDARDS.
GARAGESLABS
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED,_ -r--
UNDERGROUND /SLAB
PLUMBING !
SSUANELECTRICAL J ELECT.CE DATE
SLUG ELECT. PLG. MECH
MECHANICAL El x 0
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING PERMIT
.,.'y:: INFORMATION
WOOD FLOOR VALUATION
PLUMBING
MECHANICAL PERMIT To � ��
ELECTRICAL MID
a G't'r �r-1 uce
FRAMING sroRlEs TYPE CONSTR.
INSULATION im 21988
V71IT-Unpertino OCC.GHOUP RES UNITS
PLACE NO SUBFLOOR UNTIL"ABOVE.HAS.BEEN SIGNED sD ET FLOORAReA TOTAL ACREAGE
:`• ROOF NOTE:NO FINAL INSP.SHALL BE MADE BEFORE
DIAPHRAGM THE CONSTRUCTION TAX IS PAID
euuowG usE
ROOF SHEATHING
RES El 3IND COEl N PR olD
APPLY NO ROOFING UNTIUABOVEMAS BEEN SIGNED r` FINALS " DATE INSP.
ASSESSORS PARCEL NO
ROUGH SAN.#
PLUMBING ELECT.ENERGY IRACI NO, PARCEL NO.
TUBS 8 SHOWER PAN PLUMBING ENERGY
MECHANICAL MECH.ENERGY
ACC DATE ACC FILE NO.
ELECTRICAL BUILDING ENERGY
FRAMING ELECT.FINAL TEST zomwc ENG SITE No.
INSULATION PLUMBING
GAS TEST GAS / FIRE sPRiNK ENERGY T 2a
MECHANICAL
v El N11 10 N[3
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING FLOOD ZONE AL UC.
EXTERIOR SHEAR ELECTRICAL RELEASE
N❑
INTERIOR SHEAR FIRE DEPT.
SHEETROCK GRADE FEE SUMMARY x-
EXTERIOR LATH BUILDING BUILDING
INTERIOR LATH TEMPORARY APPROVALS
SCRATCH COAT ELECTRIC PLAN CHECK
F
GAS EE
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE
OCCUPANCYOF BUILDING IS NOT PERMITTED UNTIL BUILDING FINALISSIGNEDBY BUILDING INSPECTOR. MICROFILM
ARRANGE FOR INSPECTION BY PHONING 252-4505, ELECTRIC
Lu ARRANGE
WORKING DAY BEFORE REQUIRED INSPECTION. PLUMBING 00
Z PLEASE GIVE JOB ADDRESS WHEN PHONING. MECHANICAL
— SEE PERMIT FOR EXPIRATION DATE —
NST.TA%
IMPORTANT! [!TOTAL
PLEASE READ REVERSE SIDE BEFORE U0
CALLING FOR FINAL INSPECTION.
OFFICE COPY