Loading...
08080011 CITY OF CUPERTINO 777777= 7= BUILDING DIVISION PE ; , NTRACTOR.I�NIOR0INWTATIN BtBLpltAcngpgRFs3PERMIT NO. YRNE CT RIGHT ROOFING 08080011 OWNER'S NAME: PERMIT ISSUE DATE SM I'I'H MARCIE L 467 SARATOGA AVE STE 1460 08/01/2008 uNE; (408) 254-4439 SANITARY NO. CONTROL NO. ARCHI'IECfrENGINEER: BUILDING PERMnINFO BLDG ELECT PL"JMB MECH saes LICENSED CONTRACTOR'S DECLARATION IObDCSCTI IIOn C I bertbY.((lose Nat 1 am Ihxnsed umber proverload of Chapter 9(commencing P G wiNseeuon�aDB)nroivise.3.1tCBusne Lftfusinme,m/e.ammyliaveu RE—RF RMV WDSHNGLS& INSTL 1/2"PLYWD ON GRG/HSE N k full fora and efhxt C-WY j'A� Lke ma Clan — Lk.N g INSTL Da¢ d Ceruse_ Z, /rzy ARCHITECTS DECLARATION 30LB FLT NEWRF MTL&PRES TL SHNNNNGLS CLS A 22SQ 2< 1 understand my plans shall be used a public records OdU EG Licensed Professional a OWNER-BUILDER DECLARATION i hereby&Rem that I am exempt from the Contractees License Law for dee cc fallowing reason.(Section 70713,Bust.and Proftm..Cade:Any city or county S$ which requires a Permit m ena struct,aikn improve,demolish,or mini,any.wmure prior u its issuuue,also requires the applicant(orsuch permitmfil...igacd suMo.., < this he is licensed Pa.(to the Provisions of the Contractors License Law(Chaplct 9 Sq.Ft. Floor Area Valuation x�$ (commencing with Section 7000)of Division 7 of the Bucirmer and Professions Code)or $10800 Nal he is exempt therefrom and Ne basis for the alleged eaempdon.Any violation of Section 7071.5 by any applicant for a permit subjects the applicant to a civil Penalty of y,p�Number Occas Type and seam Nan five hundred dollars(0011). 35716141 .'l7V' Occupancy YFe I,u ewncr of Ua Nopc+tY,a my wployces with wages u da'vsak cempensstion, will do the wort.and thestruc,um Is nos intended oroffertd Imsale(Sec,7DW,Business and Inamoiom Cade:The Commuter's License Law dace not apply to an owner of Required Inspections Property wW build er improves dares.,and who doessuchwork himselfmihmugh his own employees,provided that such improvements tie rot imedd oraQertl tensile.K. however,Ne Wilding mimprovement is said within ane yea of completion,the uwoa- builder will have dee Wrdem of proving W,k did not build or improve for purpose of ask.). ❑1.as owmr of the profanity.am exclumvely convecting with licensed Cont aeurt no conswct the project(Sec.TWA,Business and Professions Code;)The Contramrs Li- cense Law does not apply be an owner of property,who Wilds or improves desmon.and, who contracts for such projects wits a conlncer(s)licensed purauam as the Conuanors Irma Law. El I sm ucmpa undm See ,B k PC for this reason Owns Date WORKER'S COMPENSATION DECLARATION 1 hereby afB,m under penalty of perjury arc of the following declarations: 1 him and will maintain•Cenifiate of Carmen,in self-insure for Workers Compen- ' sauan,as provided far by Section 3700 of tis Labor code.for lite performance of the work for which this permit is issued ❑I have and will maintain Workers Compensation Insurance,as required by section 77W of Ne Labor Code,for NC Performance of the work for which this permit Is issued ' My Wmluss' Coy pains i".b/u+euu¢a.nior W Polity mmoaW�r ase: - Caner.;/ /-7C' ZX/V Polity No.: IR:;Ly3L - CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE intersection need not keomplemd if the permit Is farms hundred dollars(SIW) or lou) 1 cvruC- umt in the Mr..nce of the work for which this permit is issued I shall raw employ any Person in any manmrso as to become subject a the Wortut Compensation Laws of Califon..Due Appli., NOTICE TO APPLICANT.If,u)cr making this Certificate of Exemption,you should became subject he the Workers Compensation provisions of the Labor Cede,you muss .,O foMwith comply with inch pnevidmm or Nis permit shall k dcemed revoked. 'z CONSTRUCTION LENDING AGENCY IWreb .rase,that lkrt u a construction Imnim a Y g gem for Ne performance of rL Nc work for which Nis permit Is Iaslaed(Sec.7091,Ci,CJ W Q lenders Name Z;)z Landers Address ' U O 1 m,ify 0.11 hire mad Nis.PplieaWn ad sate Nu the shove lad.ien is Iy ^ Correct-1+Era N comply with all city and county ordinances and sum laws relating N .C) rV" Wilding conswction,and hereby authorise repmmentlim of this city u enter upon Ne aWve-mentioned gm property for inspection Purposes pW, (We)agree a save.indemnify and keep ha mless the City of cupc lino again, In inconseque consequence of the licensing expenses which may in enYw'+Yamue against said City U z APPLICANTeUNDegMmNDSng of this NO WILL COMPLY WITH ALL N0 -0 In Issued by: Date SOURCE REGU �� Re-roofs Signature of IianVC er .Date HAzARDOUS MATERIALS DISCLOSURE Type of Roof Will the applicant or futum Wilding aavpant mm se Wdle banrdous mauaiai as defined by Ne Cupertino Municipal Cade.Chapter 9.13,and da Health and Safety code,Adan 15572(.)7 All roofs shall be inspected prior to any roofing material being installed. Yes kA No r/� If a roof is installed without firs[obtainingan inspection,I agree to remove Will nhc applicant m num Wilding by ft Bt use Area Air Qu or Mann which P i,hvArgoas air conuminanu u defined by Nc Bay Arta Air Quality Management all new materials for inspection. uicG ❑Yes IRINu , Ihatsmad NehvSucumaatM requirements under Unite,M93of Ne Wilding stun asncm Safety Cade,4cho,dmaitz337 J2353A.I undcnunde occup Wilding dao not cuncndY ha din it pof8 Certificate ic mtify da lmaCy. of tea myuircmcm,,.hkh Iii cera Ccrtifaate of Occupancy. Sign4oplicant Date Owner ar..th. Cftjn, Date' All roof coverings to be Class'%Q."or better CITY OF CUPERTINO • 2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 35716141 . 00 DATE ISSUED. . . . . . . : 08/01/2008 RECEIPT #. . . . . . . . . : BS000005665 REFERENCE ID # . . . : 08080011 SITE ADDRESS . . . . . : 21884 BYRNE CT SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : SMITH MARCIE L ADDRESS . . . . . . . . . . : 21884 BYRNE CT CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-1156 RECEIVED FROM . . . . : RIGHT ROOFING CONTRACTOR . . . . . . . : LOSTRIE, JEFFREY LIC # 20696 COMPANY . . . . . . . . . . : RIGHT ROOFING ADDRESS . . . . . . . . . . : 467 SARATOGA AVE STE 1460 CITY/STATE/ZIP . . . : SAN JOSE, CA 95129 TELEPHONE . . . . . . . . : (408) 254-4439 • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- -- ----- ---- ---------- ---------- ---------- ----------- 1BSEISMICR VALUATION 10, 800 . 00 1 . 10 0 . 00 1 . 10 0 . 00 1REROOFRES SQ FEET 22 . 00 286 . 00 0 . 00 286 . 00 0 . 00 ---------- ---------- ---------- ------ ---- TOTAL PERMIT 287 . 10 0 . 00 287 . 10 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER --------- --------------- -------------------- CHECK 287 . 10 #3872 --------------- TOTAL RECEIPT 287 . 10 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- --------- ------------------ -------- ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF • 0 0 i CITY OF CUPERTINO p� REROOF •CUPEI�TINO PERMIT APPLICATION APN # 2�5 , // � Date: C 7 Building Address: o w blAe Owner's Name: Phone #: YOB-2r_3 - SS90 Contractor:1�)Xll /�au�/ Phone #: YOu -Z YY-1119 J Fax #: YOB- ZX - 63 0 ;2' Cupertino Business License #: Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles >d- Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes 41 qf_ Wood Shingles a Wood Shingles ❑ Other(Specify) ❑ Other (Specify) Number of existing coverings / ❑ Provide I.C.B.O. Report # _ To be Removed ❑ Provide Mfgr. Installation Specs. Job besc/ript n:k11wdv-? woo Siplot// . fa/S/n��[ lA /XWj //�" �S f/ K�JyS�3�� 70Y // f Aes-,'XP4h1 _ T L . Se�il pJ Residential Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or it, there are any restrictions: ❑ applicable, include in plan set & the sheet index. Valuatio /D I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: . • Signatur Revised 6/16/08 1 CITY OF CUPERTINO REROOF CUPEkT`INO FEE SCHEDULE • Number of Fee ID Fee Description Fee Permit Type Squares Group 1REROOFCOM Re-roof Commercial B 1COMMLROOF 1BSEISMIC0 Seismic Commercial B 22— 1RER00FRES Re-roof Residential B 1SFDWLROOF / 1BSEISMICRE Seismic Residential B 1REROOFMRES Re-roof Multi-Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 Community Development Department Building Division City of Cupertino 10300 Torre Avenue • Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards and manufacturers specifications on re-roofing. All roofs are Class "A"per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. • a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/ " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: �+r(i c/iyy Job Site Address: _21(99Y ,B rfte Cf. Roofing Company Name; f i Applicant's Signature: Date: • Greg Casteel Building Official Revised 07/30/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points .41 Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1 1. List Green Features on Plans A-1 1 point TOTAL POINTS c! 40 points • • Plan Review Process Work Book Page-12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendty is • not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for"greening'your project. A.Site -® 11.Recycle Job Site Construction 8 Demolition Waste i 650/, =1 point;75%- 2 points,80%=4 points - up to 4 Resource pts 0 2.Salvage Reusable Building Materials 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction.Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 6.Design Resource-Ef icient Landscapes and Gardens _ 4 Resource pts y=yes D 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes D 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 1 1 1 B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every D% increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0 1 1 C.Structural Frame 1 .1.Substitute Solid Sawn Lumber with Engineered Lumber _ J 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 B.Use Recycled Content Steel Studs for Intedor Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes p b.Wall 3 Ener is c.Roof gyp y-yes 0 3 Energy pts y=yes D 10,Apply Advanced Framing Techniques 4 Resource pts y=yes D 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pis y=yes D 112.Use 6—SB a.Subfloors 1 Resource of y=yes 0 • b.Sheathing 1 Resource pt y=yes D 1 1 1 .Exterior Frmsh INPUT ResDurces Energy [AWHeafth 1.Use Sustainable Decking Materials a.Recycled content 3.Resource pts y=yes 0 . J.FSC Certified Wood 3 Resource pts y=yes 0 '2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAO/Health pt y=yes 0 13.Install House Wrap under Siding 1 IAC/Health pt y=yes p 14.Use Fiber-Cement Siding Materials i 1 Resource pt Y--yes 0 1 1 1 E.Plumbing 1.Install Water Heater Jacket - _ - L_-------- --- - -' 1 Energy pt Y=Yes 0 I 2.Insulate Hol and Cold Water Pipes 2 Energy pts y=yes 0 �3.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) i Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 I4.Replace Toilest with Ultra-Low Flush Toilets i I(1 point each,up to 3 points) _ _ Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showarhead ' 1 IAO/Health pt y--yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 41A0/Health pts. 0 S.Install On-Demand Hot Water Circulation Pump 4 Resource pts y--yes 0 1 1 i r.trecmcai I1 Install Compact Fluorescent Light Bulbs(CFLs) (6 bulbs=2 points,10 bulbs�points,12 bulbs=4 points) ( Up to 4 Energy pts. 0 L��- --- - — — — • Y.Install[C_AT Recered Fixtures with CFLs(1 point each,up to­ 5 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 f 1 1 G.Appliances 11.Install Eneigy'SarDishwasfiei 1 Energy pt y=yes 0 2.Install Washing Machine with Water and Energy 1 (Conservation Features t 1 Energy pt y=yes 0 I3.Install Energy Star Refrigerator i 1 Energy pt y=yes 0 4.Install Built-In Recycling Center 3 Resource pts y=yes 0 1 1 1 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Wails 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor insulation over Crawl Space 4 Energy pts y=yes 0 r3.Install Recycled-Content,Fiberglass Insulation with No Added Formaldehyde 3 IAO/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y=yes 0 • 6.Alternative Insulation Products(Cotton,spray-ioam) a.Walls 4 Resource pts y=yes 0 D,t;emngs 4 Resource pts y=yes 0 1 1 • .Widows •' i1.Install Energy-Efficient Windows • I a.Double-Paned 1 Energy pt y--yes 0 b.Low-Emissivity(Low-E) I 2 Energy pts Y--yes0 c.Low.Conductivity Frames 2 Energy pts y=yes 0 P.Install Low Heat Transmission Glaiing 1 Energy of y=yes D 1 1 1 J.Heating Ventilation and Air Conditioning 1.Use Dud Mastic on All Duct Joints _ _ 2 Energy pts Y--yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAO/Health pt y--yes 0 4.Clean all Ducts Before Occupancy 2 IAO/Health pts y--yes 7 0 5.Install Solar Attic Fan 2 Energy pts y=yas 0 6. Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 B.Install Sealed Combustion Units - a.Furnaces 31AQ/Health pts y--yes D b.Water Heaters 31AQ/Health pts y--yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 1 D.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes D 11,Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes D 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burring Fireplaces • a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt Y--yes p c.Install Airtight Doors 1 Energy pt y=yes D 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes D 15.Install High Efficiency Filter 41AQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes D 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts yeses 0 . 1 1 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pis y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes D 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points)_ _ Up to 16 Energy pts D 16.Select Safe and Durable Roofing Materials -_ 1 Resource pt y=yes 0 7.Install Ralant Barrer 3 Energy pts y=yes p 1 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yas 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes D 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0 • INPUT Resc,urces Energy [AWHealth M.Indoor Air Quality andFinishes 1.Use LowMo-VOC Paint - 1 IAQ/Health pts y--yes D 2.Use Low VOC,Water-Based Wood Fnishes 2 IAQ/Health pts y=yes D • i3.Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Fjnishes 3 Resource pts y--yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 ;7.Sealall Exposed Particleboard or MDF 4 IAO/Health pts y=yes - D B.Use FSC Cert fled Materials for Inte or Finish 4 Resource pts y=yes D 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource Pts y=yes D 10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 1 1 1 N.Flooring 1.Select FSC Certified Wood Flooring B Resource pts y=yes0 2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes D 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=Yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 1 Total Points A 1 1401 130 57 Total Points Project R 1 01 0 0 C:datalprogslgreenbuildngguidelines/ramodalemlgmenpointsfmal27 2.D4prote.ted.xls • :b. Community Development r iss 10300 Torre.Avenue G' Cupertino CA 95014 ~^ Telephone(408)777-3228 CITY OF Fax(408) 717-3333 LO-UPEkTINO _ Building Department JOB ADDRESS:2/8oy � oytP PERMIT # 6d�2d�-41Dl OWNER'S NAME: PHONE # GENERAL CONTRACTOR: If 41 AAkf FAX # yog --2 yy-W I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing— ;!�,/ _ O ""4,1 a 0 Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date