28400 POST HIS CARD NEAR FRONT OF BUILDING 7 7—JZ Z r ^ l ^ D
CITY(TF CUPERTINO PBRM�ND 28400
'' BUILDING DIVISIONF;E} NTJF
SANITARYNO. APPLICATION SUBMn7AL DATE
BUBDRIO AOORB55: ..ee
V. �
5 NAME: PHON/E: CO 7 RB NAME: LIC NO: N/C CONPRO M
AR / 11N LIC NO: ❑
3a4 sSP G`GI �n. , i TE� INSPECTION RECORD BLDO MB
FOUNDATION/PIERS/H.D.S. ��.64NOTE: ALL GRADING AND DRAINAGE CD' ❑
UFER GROUND SHALL BE INSTALLED TO COMPLY WITH , JOBDESCRUMON. ,
THE APPROVED PLANS AND CITY OF ..
PAD/SET BACK-CERT CUPERTINO STANDARDS.
GARAGE SLABS/PREGUNITE
!' " ' " " INSPECTION SPECIAL INSPECTION DATE NSP.
ro'..
BEES I
URNOCOt`ICRETL'UNClF.AB-.Ytr_.,.. ._..._ _� ,. RE U D ❑
UNDERGROUND/SLAB
PLUMBING / v
ELECTRICAL to cl-
DONOT�,PdI.fR_i"I.00R
PLUMBING 7,
Ulr f7
MECHANICAL icy-E' ,L 0 0
ELECTRICAL
FRAMING VENTS
INSULATION _
. }O.SLA'AIM _.:
ROOF SHEATWDIAPHRAM
PLUMBING �./AA (�
S&SHOWER PAN ,v
;HANICAL /��' J-9 TIG
F,LECIRICAL/POOL BOND G/— D - "P
FRAMING/STAIRSX.EGRESS?/- D S r'G e/,
INSULATIONIVENTILATION !�
EXTERIOR SHEAR/HOLD DOWN
INTERIOR SHEAR/HOLD DOWN
SHEETROCK/SHEETROCK SHEAR/
EXTERIOR LATH/W-SCREEN
SHOWER LATH
OI?E:HA�`IBPy,P,SI'$)'Cr.,
SCRATCH COAT
SEWER/WATER ww�NN
.::, rxdv Y .. ESi' s;.�E ieP�zy#zN. Ttai e{y'*g 2
BUILDING
ELECTRICAL
GAS
GAS TEST 7 P64 �+
�. GRADE APPROVED FOR OCCUPANC
FIRE
TO ARRANGE INSPECTION ISSUANCE DATE
HANDICAP CALL AFTERNOONS(12:30 PM-4:00 P ) * >• 1 . w �
.CTRICAL/ENERGY 252-4505 MONDAY TO FRIDAY 24 HO S `"
BING/ENERGY BEFORE REQUIRED INSPECTION. JOB AD-
DRESS AND PERMIT#ARE NEEDED WHEN ���+ 1
MECHANICAL/ENERGY PHONING.
BUILDINGIENERGY ATTENTION CONTRACTORS:
NO PER SHALL PERFORM WORK ON
ELECTRICAL FINAL TEST - THIS JOB SITE WITHOUT WORKER'S
OF BUILD] I$.NOT.PER MITTED COMPENSATION INSURANCE,
UNTIL BUILDING FINAL IS SIGNED B_Y BUILDING IMPORTANT!
PLEASE READ REVERSE SIDE BEFORE
INSPECTOR:'.. CALLING FOR FINAL INSPECTIONII MSUEDBY.-
l r
• NOTICE. . .
When calling for FINAL INSPECTIONS, the following occurs prior to the release of utilities:
The Building Department coordinates the request for final inspection with the following City depart-
ments, as required, to assure that the site/building complies with the requirements of these depart-
ments.
1. BUILDING: Complies with all building code requirements.
2. ENGINEERING: a. New driveways, sidewalks, curbs, gutters completed.
b. Lot fine grading to drain or bond posted.
c. New water system in operation.
d.. New sewer system in operation (Sanitary District).
e. New streets paved, with sewer manhole and valve boxes raised to
grade. Sewer cleanout at property line to grade.
f. New subdivision lot corners set.
3. FIRE: a. Fire hydrants properly installed and operating.
b. Fire sprinkler system properly installed and tested.
c. Fire alarm systems completed and tested.
d. Fire extinguishers installed, dated and tagged.
e. No parking signs in required fire lanes.
f. Restaurants, hood fire extinguishing systems operating and tested.
4. PLANNING: a. Required landscaping and irrigation system installed.
b. Paved parking. trash enclosures, exterior light fixtures, etc.
c. Documents (CC & Rs, easements, etc.)
5. HEALTH: All food handling facilities must meet the requirements of the Santa Clara
County Health Department.
Upon receipt of approvals in the Inspection Division from all the above departments, gas and
electric utilities will be released, and you may then occupy your building.
If new owners are attempting to occupy the building for the first time and the utility release has
been delayed, check with the contractor who is responsible for meeting all the above requirements
of the various departments.
BUILDING INSPECTION DIVISION
• CITY OF CUPERTINO
(
i
Lewis kesidetice Addition Final Check
• 10181 Camino Vista Drive CUPERTTNO
August 30, 1995 Page 2
3. In an effort to expedite the approval of this project we have taken the liberty to annotate
the following items directly onto the plan sheets In "red" ink:
h5 t i We have clatifled (1) Minimum 3" concrete cover at tebar in footings; (2)
noted the 1/2" CD-X ply shear at typical new extetior walls; (3) noted required doweling
of rib* footings to existing; and (4) shown the locatiiitis bf Sinipsbh PA28 holdowns in
accordance with faxed instructions from Melvin Hill; project soils'and civil engineer.
hS t 3• We have clarified (1) the locations of PAJ8 holdowns required by the soil
etigineet; and(2)with the designet%applicant's permission, specifidd d new 4 ft wide 1/2"
ply latetal btachig element at the GARAGE front centet Wall (NOTE: The existing
GARAGE trout wall is a nori-cotiforniing lateral braced wdil 'section; tht• additional
proposed rine-car GAPAGE ividehitig Mould make it more nontonfritmhig. We had
odgitially asked tot Atuttural talculations til design a lateral bracing system for the
tie* ata a oddltioti but the designer has ptoprised the specified 4 ft wide
g g
"tonVetitional btated" wall section In-lieu of calculations: As the widening is only
12 ft; *6 feel the hew 4 ft braced wall section meets the Intent of the "conventional
bracitig'i pidtislohs of CJBC 2517: City to c0nfit7ti)s
•_ ht 4 We have clarified the typical (N) exterior wall is 7/8" stucco on 1/2" shear ply.
ht 5. With the permission of the designer/applicant; We have tpecified certain new
Sihipson T822 strap ties which will provide "collectors froth the small extended roof
diaphragtn to the existing exterior wall double plates beyond. Although we had
brigindlly tequesied that lateral force calculations be provided fot this small LIVING
ROOM enlargement; it appears that there are sufficient exteriot'and cross-wall sections
beyond the LIVING ROOM which tender the home In compliance with 'conventional
bracing" provision's of CIBC 2517; the strap ties .(collectors) are pfdvided to drag the
bi:tended diaphtagin to the existing braced wall sections.,
Enclosed for yout use are the above referenced revised documents beating the LP2A plan review
approval stamps. Let us know if you have any questions. 'Thank you.
Sincerely,
UNHHA�RT PETERSEN POWERS ASSOCIATES
Kevin M. PoWets; P.E.
• l.C.$.o. Plans Exdmiher
Principal
KCP/nc
Enclosures
• CUPERTA- F1NAL C14ECK
August 30; 4995 Jutlsdictibn No. N/A
• MA JobNo. 95115.001
ATTN: Dave
Mr. Joe Antonucci
Building official
City of Cupertino
10300 Torte Avenue
Cupertino, CA 95014
Re: . 1 Tari Review: Lewis Residence Addition
Address: 10181 Camino nista Drive
Dear Dave:
Linhart Petersen Powers Associates (LP2A) has completed a Third Party final review on behalf
of the City of Cupertino based on the following resubmitted documents:
i. Pians; two (2) copies of sheets i through 5 cover sheet dated INovember 9, 1994, by
Ray Lewis.
2. Ener Ry Documents: Two (2) copies dated July 9, 1995, by Melvin Hill.
• 3.' Soil Report and Plan Review Letter: One (i) copy report dated July 6, 1995; and plan
review li=tter dated August 24, 1995, by Melvin Hill.
4. Additional Info from Soil Engineer: One (i) copy of a faked cover sheet and diegrams
showing *herd the soil engineer is tequiring holdowtls to occur (per recommendations
in soil report),
5. Truss Calculatioits: One (1) copy dated July, 11, 1995; by Walker Lftbet.
6. Original Plan Check List plus Responses: One (i) copy of blit original plan check list
with the designer's responses written in margins.
These documents wete reviewed for their conformance to the 1991 Editloh (as indicated on letter
of ttansmittal) of the Califothia Building Code. NOTE TIiAt TIMP, AAE NO FURTHER
COMM INTS: However, We present the following items for your information; consideration;
and/ot action, as noted:
1. ' In an effort to expedite the approval of this project we have taken the liberty to affix
energy forths CP-1R and MF-IR directly to the plan cttver sheets. Note that the
designet of offer ha`s not yet signed the forth CF-ilt attd Will need to do so at City
Hall lirlbr to petttlit isstiatioe:
2. Note that only one (i) copy of truss balculations is enclosed: The designer/applicant has
indicated that the City already hag two (2) additional copies which can be used. City to
cbnfit�tt:
LINHART PETERSEN POWERS ASSOCIATES
5798 Stoneridge Mntl Road, Suite 201 & Pleasanton, CA 94588
(510) 463-4775 + FAX (516) 463-9796