Loading...
R-5137• • OFFICE COPY PERMIT R_ 5137 APPLICATION FOR CITY OF CUPERTINO NUMBER INSPECTION DIVISION PERMIT EXPIRATION REROOF PERMIT (408)777-3228 PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 100 DAYS OF PERMIT ISSUANCE OR - 100 DAYS FROM LAST CALLED INSPECTION. BUILDING ADDRESS //� LI`�+ /� \1 /�, Zm Co t, / V V V ry RESIDENTIl COMMERCIAL OTHER OWNER'S - HAZARDOUS FIRE AREA M �s A r� 121 YES E]If yes - I understand that a Class A NAME - roof assembly Is required. NO Initial I.C.B.O. g C_LtliFt�6r) WKY EXISTING ROOF COVERING ADDRESS -039b NUMBER OF EXISTING COVERINGS C U P i 0 CITY OF CUPERI i0 BUILDINGDMSION 403-777-3223 RE -ROOF TEAR OFF POLICY 1. You must schedule an insp=don for the tear off the day be.°ore the date you wish the ins on to be made. The procedure is to call the Building Division (777-3723) between the hours of 12:30 and 4:00 p.m. for neva day inspection. 2. When the roof is tom o$ the nails removed or driven in and all of the dry rotted wood has been replaced, TfiMN YOU NfUST CAU THE CITY BUMDDIG DIVISION. An inspctnr will be notified that the roof is ready, and he will respond to do the inspe ion as soon as his schedule will allow. There are serial hours for this service between 3:00 a.m. and 11:00 am., and between 1:00 and 3:00 p.m • IF YOU CALL FOR THE TB kR-OFr INSPECTION AND THE 70B IS NOT READY, THE-rZE WU-L BE A RE -INSPECTION FEE OF 569.00 MkRGED, WHICH MUST BE PAID BE -'ORE kN, Oj rIER INSPECTION IS MADE• reroof/winword - I: --sr ----- • • .-.-4 r�L SUBIECT: REROOFING POLICY FOR THE CITY OF CUPERTINO BUILDING DEPARTMENT PRIOR TO ISSUANCE OF PERMIT AND INSPECTION PHASE. e, yu must agree to comply with U.E.C. standards and manufacturers spec's 1. Prior to permit issuanco on rercofing. 2. New roof coverings shall not be applied without from the building inspector. A final inspection inspector when the rercofing is completed. first obtaining all inspection and written approval and approval shall be obtained from the building 3. Ali types of roof shall be inspected prior to any roof being installed. 4. In order to receive a final, you must complete steps 1, 2, and 3. 1,) Preinspection or tear off approval. 2.) In progress insoec ion approval. 3.) Final inspection approval. a.) Ouemble smoke detector ve incaticn b.) Spark arrestor installation 5. If plywood is installed, a plywcod nail inspecdoa is required. 6. If any roof is applied without first ootaining an inspec ion you will be required to remove all new rnatenal down to the sheathing and a building inspector will inspect all sheathing at that time. WE UNDERSTAND TF3E ABOVE POLICY ON REROOFING AND WILL COvfPLY WITH TIzF POLICY HONIEOWNERS NAME: ADDRESS:` ` REROOFING CONIPAYY NAME: APPLICANTS SIGNATURE: CITY OF CUPERTINO BUILDING DEPARTMENT Reroof/winword MSS Amki CL+FbG-N WAY IM A®I�sA���}E� /2Po t�6 Co• Iwd � • / (l�-Ny