06050106 Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
�UPEkTINO
Building De artment
JOB ADDRESS- PERMIT' \-1 PERMIT #49 Z�Q r U /
OWNER'S NAME. HONE # 6
GENERAL CONTRACTOR-';F. S ,Q FAX #
I am not using any subcontractors:
gnature Date
Please check applicable subcontractors and complete the following information
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
• Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
er/Contractor Signature Date
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
• Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
• 6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name:10 1 1—�Y�Z� ,�, \1 V� p�• (�
Job Site Address: n12 03.2f C( 1C\C>P�
Roofing Company Name:
Applicant's Signature: E Date: f—�rj Z—0(0
• Greg Casteel
Building Official
Revised 11/2/04