Loading...
08050057 CITY OF CUPERTINO aulLmnc DlVlSlOf4 PERMIT CO INT(?RMATIQN ;�Wc 7 � ERIN WAY CASTO ROOFING P08050057 ER'SS NA�t$SME: PERMIT LSSIM DAISDAVIS BARBARA J 1938 OLD MIDDLEFIELD WAY 05/05/2008 NE: SANITARY NO. CONTROL NO. R (650) 961-8922 HSCT(FNGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH X00 LICENSED CONTRACTOR'S DECLARATION u 1 hereby affirm Nal l wo document under provisoes of Chapter 9(commencing Job Description wiNS don)OW)ofDiviuon3ofN BudnmmdProfessionsCoder,andmyliccnsek RE—RF, RMV EX SHAKE RF & RPLC W 40YR COMP, CLS A in full force and effect Z-772 - Lt....License Cl s-y-��Lic 22SQ =p Date ZSZT Connanor £77WW ARCHITECTS DECLARATION W U 1 umlerananJ my plans shall W:used act public necomb _ s LLo Licensed Professional OWNER-BUILDER DECLARATION 1 hemhy affirm that 1 am exempt from the Cwnumcmr'.License Law for the i O o following moan.(Section 1031.5,Business and Profee uct Code:Any city or county $ri which mquims a permit to crnsrom alter•improve,demolish,or miser any stmctum prior N its issuanc,aku requires the applicant for such permit to rile a signed suament N i o atheislicroudpmm nantNepmaisonsofinentact cnor,LocnseLaw(Chapter9 Sq.Ft. Floor Area Valuation x�8 (commencing with Section 7")of Division 3 of the Busoess and Professions Coda)Or $9000 Q than W is mampt therefrom and the basis for the alleged nempdon Any AoUdno of Section 7031.5 by any applicant for a permit subjects the applicant N a Civil penalty ofNumber Occas am mme Nan five hundred dollar.(15M. 3 592102 0�J Occupancy Type ❑1,u owner o!the property,or my employees wvh regi a.thelrcok cmmpewtion, will de theworL and due strucuve u nc,ktended sur offered Tarsale(Sec.R)a,Business and professions oma:The eontraeNrs L.immse Law ones not apply te an owner of Required Inspections property who b W Ids or imgosea Nvmn,am who docs such wok hkvelf or through his ower employru,provided thusuch improvemrnu are not intended motioned forsale R. howevm-the building or impwommot is cold within one year of complow n.the owner. builder will have t ire burden of proving Nat Ito did not Wild or improve for purpose of ale.). ❑I,as owner of due property.am=elusively connecting with licensed conuacums N Construct the projen(Sec.IOM,Bush.and professions Code:)The Coermmor'.U. come law oma not apply te an owner clinometry who builds or improves thereon,and who cents ate fur sw:h projects withaconussbru)ficetued pursuant N the Convenor's Lice.Law. ❑l am exempt under See ,B&PC fm this maven Owner Data WORKERS COMPENSATION DECLARATION 1 hereby affirm under penalty of perjury,one of the fallowing declananiwas: haw and will maintain a Cenificateof Consent te calf-insere fm Wmamt sCompere on.as provided for by Section TIDO of the Labor Code.for the Performance of the work for which this permit is issued. 0have and will maintain Worker's Compensation resonances,as required by Section of the ubwr Cade,far the pedarmance of the wort fwrwhich Nis permit u ivncQ My Wa roar rax:e��a/r/5yr and Policy numtber art: Cartier. P�^�f� 1kyNo.: 2 Lc&? CERTIFICATE OF EXEMPTION FROM WORKERS COMPENSATION INSURANCE (Thisseetlon need not comnplcu:l dthe Permit is frown hundred dollars(SIM) or kis) 1 certify then in the performance of the work for which this perm,u issued.I small am employ any person in any m=mran as In become subject to the WorkersCompeasation Laws of CahfomiL Date Applicant NOTICE TO APPLICANT:If,at making this CaniEcate of Eampuon,you should become Subject N the Worker's Compensation previsions of the Law Code,you must .J z fo d with comply with such provisions m thk permit shall W deemed revaked. z O CONSTRUCTION LENDING AGENCY [-s r l hereby affirm that Nem u a construction lending agency for the performance of a> the went for which this pammit k issued(sec.3097.Civ.Q 0 undoes Name . ]z Lender's Add. V Q 1 certify that 1 have seed this application and sate Net due above information u {T+ r'�. COMM I agree m comply with all City and county ordinances and sum Jews miming N -Q trJ" building construction,and hcrobyauNouae minomnuuvra of this city a enterupnn the r V) men en Licrnuoncd promc a fan hupcorms purymes t--,a (We)agme N-tett indemnify and kecp h.read.the City of Cepeninw agsnst Z Iiabilmiu.-I''th- oorting du'pa niich may io any wayamue aPinu aid City V z inconsequence of Ne tanun6 of Nis permit " APPLICANT UNDERSTANDS ND W WITH ALL NON-POINT Issued by: Date tet$ SOURCEREGULA NS. si m / Re-roofs g � FIAlARDOUSMATERIALSDISCLOSURE ale Type of Roof dl the Pliantmfutum WtllNng mcupantsmm mlundk hevrdovs matesil as dermad by the Cumeman Municipal Codc.Chapter 9.11,and the Hdand d Safety trek,sermon zs532(a)+ 0y. All roofs shall be inspected prior to any roofing material being installed. Will the applicant 0, oncNo e building weapon,use equipment m devices which If a roof is installed without first obtaining an inspection,I agree to remove dhcCudnm sur contaminants a defined by the Bay Area Air Quality Management all new materials for inspection. ❑Yes 1 have owl the haraNmk data numMinents under Chapter 6.95 ofdw Cairo, niaH [Lh&SafetYCme,Swc Om5505.15533md155N.iundcrsundthaniftho building dna not currently haw a muni,out it u mpoasihiliry N nml'y the occupant of the no uimmen It It muss met psi z of a Certificate of CC Signature of Applicant Date Ownerurauthw' gem Date 11 All roof coverings to be Class'W'or better CITY OF CUPERTINO • 2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . . 35921020 . 00 DATE ISSUED. . . . . . . : 05/05/2008 RECEIPT # . . . . . . . . . : BS000004672 REFERENCE ID # . . . : 08050057 SITE ADDRESS . . . . . : 7608 ERIN WAY SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . .. DAVIS BARBARA J ADDRESS . . . . . . . . . . : 7608 ERIN WY CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-4343 RECEIVED FROM . . . . : LINDSEY CASTO CONTRACTOR . . . . . . . : CASTO, LINDSEY LIC # 21324 COMPANY . . . . . . . . . . : CASTO ROOFING ADDRESS . . . . . . . . . . : 1938 OLD MIDDLEFIELD WAY CITY/STATE/ZIP . . . : MOUNTAIN VIEW, CA 94043 TELEPHONE . . . . . . . . : (650) 961-8922 • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- IBSEISMICR VALUATION 9, 000 . 00. 0 . 90 0 . 00 0 . 90 0 . 00 1REROOFRES SQ FEET 22 . 00 286.. 00 0 . 00 286 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 286 . 90 0 . 00 286 . 90 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 286 . 90 MC --------------- TOTAL RECEIPT 286. 90 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF • �o s 00.5 7 -� CITY OF CUPERTINO REROOF • OF CUPERTINO PERMIT APPLICATION APN # Date: 2�9?, o/ /s/off Building Address: -�/ �a 6t,%4Wa Owner's Name: Phone #: L5:( CY 4V •S Contractor: Phone #: (�10 56 C_ $iZ Z C_ ��M`.i Fax #: 9a/ - 2-y 0 Cupertino Business License #: Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof Asphalt Shingles )C Asphalt Shingles Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings a Provide I.C.B.O. Report # o To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: / _ V�� 1'� e Ql�c�e tJ Flo y r how.. Pb ckv A Residential Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the there are any restrictions: ❑ application or if applicable, include in plan set & the sheet index. Valuation: ^OO� I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: • �g a, - CITY OF CUPERTINO REROOF CITY OF *CUPERTINO FEE SCHEDULE Number of Fee ID Fee Description Fee Permit Type Squares Group 1REROOFCOM Re-roof Commercial B 1COMMLROOF IBSEISMICO Seismic Commercial B IREROOFRES Re-roof Residential B 1SFDWLROOF 22-- / IBSEISMICRE Seismic Residential B IREROOFMRES Re-roof Multi-Family B 1MFDWLROOF IBSEISMICRE Seismic Residential B 1BUSLIC Business License B • Community Development Department Building Division City of Cupertino 10300 Torre Avenue • Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject- Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards and manufacturers specifications on re-roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. • 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/4"per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Q Homeowner's Name: �L Y- lti t--\. 5 J; Job Site Address: 7(o ✓ . 1ti (.y 1 , Roofing Company Name: C 4 l+u 49�0 L Applicant's Signatu aDate: 6 �O • Greg Casteel Building Official Revised 11/2/04 Green Building Plan Check rIndex of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points Plan Review Process Work Book Page-12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered environmentally friendly is • not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for"greening'your project. A.Site E le Job Site Const uct on&Demolition Waste point;75%= 2 points;80%=4 points up to 4 Resource pts 0 e Reusable Building Materials 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y--yes 0 4.Protect Native Soil 2 Resource pts y--yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt Y--yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 B.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0 9.Reuse Matedals/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes . 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment!Retention 2 Resource pts y=yes 0 1 1 1 B.Foundation 1.Incorporate Recycled Flyash in Concrete . 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0 C.Structural Frame 1 1 1 Sewn Lumber with Engineered Lumber 3 Resource pts y=yes 0 F.Subs'�tuteSorld 2.Use FSC Certified Wood for framing (For every 10°/of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts Y--yes 0 5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0 B.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource p!s y--yes p 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes p 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes I b.Wall 0 3 Energy pts y=yes 0 c.Roof 3 Energy pts y--yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resourceis p . y=yes 0 a.Subfloors i`J 1 Resource pt y=yes 0 • b.Sheathing _ 1 Resource pt y=yes 1 1 1 D.Exterff imsh !1.Use Sustainable Decking Materials a.Recycled content j 3.Resource pts y=yes 0 e 1 b.FSC Certified Wood 3 Resource pts y=yes 0 �2.Use Treated Wood That Does Not Contain Chmmium/Arsenic 1 IAQ/Health pt y=yes 0 3.Install House Wrap under Siding 1 IAQ/Health pt y=yes 0 14.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 E.Plumbing 1 .Install Water Hester Jacket 1 Energy pt y--yes 0 2.Insulate Hot and Cold water Pipes 2 Energy pts y=yes 0 3.Retrofit all Faucetsand Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAO/Hsalth pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0 B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes D 1 1 1 r-.rreccrmar 1.Install Compact Fluorescent Light Bulbs(CFLs) (6 bulbs=2 points,l0 bulbs points,l2 bulbs=4 points) Up to 4 Energy pis. 0 • 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to 5 points) - Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per nature,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 1 1 ! G.Appliances 1.Install Energy Star Drish;;iiheF 1 Energy pt y--yes 0 2,Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes 0 3.lnstall Energy Star Refrigerator 1 Energy pt y=yes 0 4.Install Built-In Recycling Center 3 Resource pts y=yes 0 w_.—_ __-_— 1 1 1 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Wallis 2 Energy pts y=yes 0 b.Ceilings 2 Energy pis y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 3.Install Recycled-Content,Fiberglass Insulation with No Added Formaldehyde 3 IAQ/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pis y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y=yes 0 • 6.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes D o.cenings 4 Resource pts y=yes 0 1 1 Windows ;7.Install Energy-Efficient Windows - I . i a.Double-Paned 1 Energy pt y--yes 0 b.Low-Emissivity(Low-E) R 2 Energy pts y=yes 0 a.Low.Conductivity Frames _ _ j 2 Energy pts y--yes 0 2 Install Low Heat Transmission Glazing_ 1 Energy pt Y=yes 0 1 1 1 J.Heating Ventilation and Air Conditioning F.Use Duct Masticon All Duct Joints - 2 Ener is � 9Y P Y=Yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yas 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y--yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=Yes 0 6.Install Attic Ventilation Systems 1 Energy pt Y--yes 0 7.Install Whole House Fan 4 Eneroy pts Y--yes 0 B.Install Sealed Combustion Units a.Furnaces 3 IAQ/Health pts y=yes p b.Water Heaters 3 IAQ/Health pts y=yes 0 9. Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts Y--yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y_y es 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces - • a.Install EPA certified wood stovesfinserts 1 lAQ/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy of y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts Y=yes 0 15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 1 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y--yes - 0 3.Pre-VJre for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=16 points) Up to 16 Energy pts 0 j6:Select Safe and Durable A-0-0fi ng Mate als �� 1 Resource pt y=yes 0 7 Instal)Radiant Barrier 3 Energy pts y=yes 0 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes p 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0 3,Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p 1 1 1 M.Indoor Air Qua ity and Finishes 1 ri.Use Low/No-VOC Paint _ _ __ _ _i 1 IAQ/Health pts y--yes 0 Z.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y--yes 0 • rr3.Use Lowl—No VOC Adhesives _ 3 IAQ/Health pts y=yes 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61A0/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 L3eal all Exposed Pa t cleboa d or MDF �; 4 IAQ/Health.pts y--yes 0 B.Use FSC Certified Materials for Interior Finish 4 Resource pts y--yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10,Install Whole House Vacuum System 3 IAO/Health pts y=yes 0 1 { 1 N.Flooring 1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0 r Use Rapidly Renewable Rooring Matedals _L t 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts Y--yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 ! 1 Total Points Available: 1 1401 1301 57 Total Points Project Received: / 01 01 0 • G:datarprogslgreenbuilSngguidelinestremodelerslgreenpointsfinal212.04prmealed.zls • • Community Development a 10300 Torre Avenue Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 •CUPEI�TINO Building Department JOB ADDRESS: PERMIT # O� 7 7Y ` �� OWNER'S NAME: PHONE # GENERAL CONTRACTOR: y L FAX # I am not using any subcontracto - Siat gnure Date Please check applicable subcontractors an complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date