08040116 •
CITY OF CUPERTINO
BUILDING DIVISION' PERMIT zewe Wizs 'x* ks40" " �To,,,•,,,ars.,e,
fCOgRACTOAyNFRMATIO�Sye
BUILO3tdG,[,QDRFS$ARGO DRIVE TBD — TO BE DETERMINED PERMIT08040116
OWNER'SL'SNAME:5U4P PERMITISUEDATE
DENNIS YE 04/16/2008
1111NE: SANITARY NO. CONTROL NO.
ARCHITECT/ENGINEER: BUILDING PERMIT INFO
. 0 ELECTO PLUMB0
a o o LICENSED CONTRACTOR'S DECLARATION Job Description
1 u I hereby affirm that I ern licensed under provisions of Chapter 9(commencing p
Sj wiNSectlen7glU)ofoiviNon]oflheBusiness and Professions Code,and mylicense is RMDL EXSTNG KTCHN,NONSTRCTRL(100SQ)
^ In full force and a@eL
▪ Z Lkense Class Lk.L
DateContractor
q 1 ARCHITECTS DECLARATION
iO I understand my plans shall be used as public records
k Its Licensed Professional
y 3 OWNER-BUILDER DECLARATION
Fe X I hereby affirm that I am exempt from the Contractor's License Law for the
O O following mason,(Section 7011,5.Business and Professions Code:Any city or county
91 which requires a permit to construct,alter,improve,demolish,or repair any structure
Z i prior 10 its issuance,also requires the applicant for such permit to file a signed statement
P e that he is licensed pursuant to the provisions of the Contractor's License Law(Chapter 9 Sq.Ft. Floor Area
$8000 Valuation
$ (commencing with Section 7000)of Division 3 of the Business and Professions Code)or.. thatis
� heexempt therefrom and the basis for the alleged exemption.Any violation of
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty ofNumber Occupancy Type
not mom than five hundred dollars(S500). 32630122 isev
•
❑I,es owner of the property,or my employees with wages as their sole compensation.
will do the work and the annum is not intended or offered for sale(See.7044,Business
and Professions Code:The Contractor's License Law does not apply to an owner of Required Inspections
property who builds or improves thereon,and who does such work himself or through his
awn employees,provided that such improvements are not intended or offered for sale.If.
however,the building or Improvement is sold within one year of completion,the owner-
builder will have the burden of proving that he did not build or improve for purpose of
sak,).
I,as owner of the property,am exclusively contracting with licensed convenors to
'co truer the project(Sec.7044.Business and Professions Code:)The Contractor's U-
cense Law does not apply to an owner of property who builds or improves Demon,and,
who contracts for such projects with a convector(%)licensed pursuant to Bre Contractor's
License Law.
❑l en exempt under o. .B&PC for this mason
Owner .� ' Date Y/f4/W' •
KER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:.
•
hare and will maintain a Certificate of Cannot to self-insure for Worker's Compen-
n,as provided for by Section 3700 of the Labor Code,for de performance of the
work for which this permit is issued. '
❑I have and will maintain Worker's Compensation Insurance,us required by Section
3700 of the Labor Code.for the performance of the work for which this permit is Issued. '
My Worker's Compensation Insurance carrier and Policy number ore:
Cankr: Policy No.:
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE .
(Itis section need not be completed if the permit is for one hundred dollen($100)
or less.) ,
I certify that in the performance of the work for which this permit is issued.I shall not ,
employ any person in any manner so as to become subject to the Workers'Compensation
' Laws of California,Paan_ -
Applicant rj'[ASP' e b
NOTICE TO APPUCANT:If after making this Ceninate of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Code,you must
Z forthwith comply with such provisions or this permit shall be deemed revoked.
Z v'" CONSTRUCTION LENDING AGENCY
l-t- I hereby affirm that there is a construction lending agency for the performance of
Ix C the work for which this permit is issued(Sec.3097,Civ,C.) .
LI] 0 Lender's Name
12
Z Lender's Address '
(,)p I certify that I have read this application and stale that the above information is '
Iy E correct I agree to comply with all city and county ordinances and stale laws relating to
.O E.
building construction,and hereby authorize representatives of this city to enter upon the
W above-mentioned property for inspecdan purposes friar/
G (We)agree to ave,indemnify and keep harmless the City of Cupenins agCit %
-G liabilities,judgments,of the granting
and expenses which mryin any way accrue aLsiostsaid City V z in consequence of the granting of this preemie ,1-1 APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: .. )VII Date 41-76-z- �.
SOURCE LATIONS. t/ �//p�
SiL�u t�ppl'tanUContractor + riii76I Re-roofs ' —
HAZARDOUS MATERIALS DISCLOSURE •
tf Type of-Roof .
Will the applicant or future building occupant store or handle hazardous material
as defined by the Cupertino Municipal Code.Chapter 9,11.and the Health and Safety
Cale,Section 25532(a)? All roofs shall be inspected prior to any roofing material being installed.
oyes
PAC
Will the applicant or future building occupant use equipment or devices which If a roof is installed without first obtaining an inspection,I agree to remove
hazardous air contaminants as defined by the Bay Area Air Quality Management all new materials for inspection.
ie?
['Yes j2 No
I have read the hazardous materials requirements underChapter 6.95 of the Califor-
nia Health&Safety Code,Sectimss 75505,15533 anti 75534.1 undcntand duff the building
does not currently have a tenant,that it is my responsibility to notify the occupant of the
requiremen h must be met prior to issuance of a Certificate of Occupancy. Signature of Applicant Date
All roof coverings to be Class ngar or better
Owner or authorized agent Date
' 3 ITEMS OF 3
•
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot.:
APN ........: 32630122.00
DATE ISSUED.......: 04/16/2008
RECEIPT #.........: BS000004496
REFERENCE ID # ...: 08040116
SITE ADDRESS .....: 20804 FARGO DRIVE
SUBDIVISION .......
CITY .............: CUPERTINO
IMPACT AREA
OWNER ............: DENNIS YE
ADDRESS 2.0804 FARGO DR
CITY/STATE/ZIP ...: CUPERTINO, CA 95014
OPERATOR: patg
COPY # : 1
METHOD OF PAYMENT
-----------------
CREDIT CARD
TOTAL RECEIPT
AMOUNT
---------------
551.80
---------------
551.80
REFERENCE NUMBER
--------------------
MC
RECEIVED FROM ....:
STEVEN CHUNG CHU
CONTRACTOR .......:
TBD - TO
BE
DETERMINED
LIC # 00096
COMPANY ..........:
TBD - TO
BE
DETERMINED
ADDRESS ..........:
CITY/STATE/ZIP ....
,
TELEPHONE ........:
FEE ID
----------
UNIT QUANTITY
-------------
AMOUNT
PD -TO -DT
THIS REC NEW
BAL
1BSEISMICR
----------
VALUATION 8,000.00
----------
0.80
----------
0.00
---------- ----------
0.80
0.00
1REMRESKIT
SQ FEET 100..00
429.00
0.00
429.00
0.00
1STPLNCK
HOURS 1.00
122.00
0.00
122.00
0.00
TOTAL PERMIT
----------
551.80
----------
• 0.00
---------- ----------
551.80
0.00
METHOD OF PAYMENT
-----------------
CREDIT CARD
TOTAL RECEIPT
AMOUNT
---------------
551.80
---------------
551.80
REFERENCE NUMBER
--------------------
MC
CUPERTINO
, alo
CITY OF CUPERTINO
ADDITION/REMODEL
PERMIT APPLICATION FORM
APN #
Date:
Building Address:
Mailing Address (if diffe ent from building address):
bo v -t_
Owner's Name:
Phone(#
4e.h e.
\U / -Da
Contractor:
Phone #:
i7
Fax #:
Contractor Lic nse #:
Cupertino Business License #:
Contact:
Phone #: U 444
5
Fax #: 2,f= )mom -z
Building Permit Info:
Bldg. �_ Elect. Plumb. Mech. ❑ Hillside ❑
Job Description:
Addition (adding sq footage):
What is being remodeled?
% (/
R��P✓1 G'klJ�l� 1'-11���. a hU1^ �itl�Q�
Remodel Includes Re -Roof: Yes ❑ No If yes list number of squares
Remodel Includes Structural: Yes ❑ No
Square Footage:
Addition: •6- Porch: c6�—Dcck: Fs Garage: Detached �4–_ Attached
Remodel: Kitchen (pa sf Bath Other
Type of Construction (Usage Class):
Occupancy Type:
1 FR, I lFR ❑ 11, 111, V -IHR ❑ 11, 111, IV V -N
1R_ _rl
Valuation:
Please check this box if the project is a
second -story addition ❑
Green Building Check list must be completed and
ttached to the plans.
Green Building Points Achieved:
BW VI1MV Ubc ""IY" ,
Over -the -Counter ❑
0
CUPERTINO
CITY OF CUPERTINO
ADDITION/REMODEL
FEE SCHEDULE
Quantity
Sq Ft
Fee ID
Fee Description
Fee Group
Permit Type
ADDITIONS
1R3SFDADD
PLLONGRNGR
Long Range
Plannin esidential
PL
1R3INSP
Dwellings Inspections
B
1R3PLNCK
Dwellings plan check
B
1R3REPINSP
Dwellings Repeat
Ins ection
B
1R3REPPLNC
Dwellings Repeat Plan
Check
B
IR3HINSP
Dwellings Hillside
ins ection
B
1R3HPLNCK
Dwellings Hillside plan
check
B
1R3HREINSP
Dwellings Hillside
Repeat Inspection
B
1R3HREPLNC
Dwellings Hillside
Re eat Plan Check
B
1R3ALTINSP
Dwellings Alternate
Materials Inspection
B
1R3ALTPLNC
Dwellings Alternate
Materials Plan Check
B
1PCESS
Cesspool
P
1PPRSEWG
Ea. Private Sewage
Disposal System
P
1PRSEWER
Sewers
P
113PSP UNK
Lawn Sprinkler/Backflow
P
1BPWSVCS
Main Water Service
P
1BSEISMICRE
SeismicResidential
B
DECKS
1R3SFDADD OR
1R3SFDREM
IDECKWOOD
Each
Deck (Wood) -Each
B
1DECKRAIL
Each
Deck Railing -Each
B
0
•
0
n
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE
Quantity
Sq Ft
Fee ID
Fee Description
Fee Group
Permit Type
GARAGES
1R3SFDADD OR
1R3SFDREM
1GARDTW<=1K
Wood Frame up to
1,000 SF
B
1GARDTM<=1K
Masonry up to 1,000 SF
B
BCONSTAXR
Construction Tax Res
new detached garage)
PATIO'S OPEN
1R3SFDADD OR
1R3SFDREM
1PATIOWOOD
Wood Frame up to 300
SF
B
1PATIOMETAL
Metal Frame up to 300
SF
B
1PATIOOTHER
Other Frame up to 300 SF
B
PATIO'S CLOSED
1R3SFDADD OR
1R3SFDREM
1PATIOENCLW
Enclosed Wood up to 300
SF
B
1PATIOENCLM
Enclosed Metal up to 300
SF
B
1PATIOENCLO
Other Enclosed Patio up
to 300 SF
B
1COVPORCH
(Each)
Porch Covered -Each
B
1REROOFRES
Residential Re -roof Each
100 SF
B
REMODELS
1R3SFDREM
�� D
1REMRESKIT,
Kitchen Remodel up to
300S
B
(Deduct "Vfor ea plan .
check
1REMRESBAT
Bath Remodel up to 300
SF
B
C[
1REMREOTH
Other Remodel up to 300
SF .
B
«
REMODEL PLNCK
1
ISTPLNCK (1-3 for
remodel)
Standard Plan Check
B
NOT FOR OVER THE
COUNTER PLAN CKS.
3 of 3
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE
Quantity
Sq Ft
Fee ID
Fee Description
Fee Group
Permit Type
WINDOW/SLIDING
1R3SFDREM
GLASS DOOR
1 WINREP
Replacement windows
ea 8 windows
B
1 WINNEWNSTR
New Window (non-
structural
B
1WINMEWSTR
New Window (Structural
Shear Wall/Masonry)
B
1WRMAYSTR
Bay Window (Structural)
B
SKYLIGHTS
1R3SFDREM
1SKYL<10 SF
Skylight less than 10 sf
B
1 SKYL>10SF
Skylight greater than 10
sf or structural
B
1STAIRS
Stairs -first flight/ea addt'l
B
IEPERMITFEE
Electrical Permit Fee
E
1MPERMTTFEE
Mechanical Permit Fee
M
IPPERMITFEE
Plumbing Permit Fee
P
IELCPLNCK
Stand Alone Electric Pln
Ck(hourly)
E
1 MECPLNCK
Stand Alone Mechanical
Pin Ck(hourly
M
1 PLMPLNCK
Stand Alone Plumbing
Pln Ck (hourl
P
1BSEISMICRE
Seismic Residential
B
1TRAVDOC
Travel & Documentation
B
1BUSLIC
Business License
B
4 of 3
0
0
0
0
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types, assigning a "total points' value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for "greening" your project.
I65%=1 point; 75%= 2 points; 80%= 4 points
2. Salvage Reusable Building Materials
3. Remodel for Mixed Use, Adaptive Reuse, and
Historic Preservation
4. Protect Native Soil
5. Minimize Disruption of Existing Plants & Trees
6. Implement Construction Site Stormwater Practices
7. Protect Water Quality with Landscape Design
LB. Design Resource -Efficient Landscapes and Gardens
9, Reuse Materials/Use Recycled Content Materials
for Landscape Areas
10. Install High -Efficiency Irrigation Systems
11. Provide for On -Site Water Catchment / Retention
S. Foundation
1. Incorporate Recycled Flyash in Concrete
25% Recycled Flyash = 2 points; Add 1 point for every 10%
increase of flyash, up to 5 points
2. Use Recycled Content Aggregate
3. Insulate Foundation/Slab before backfill
C. Structural Frame
1. Substitute Solid Sawn Lumber with Engineered,Lumber
2. Use FSC Certified Wood for framing R
(For every 10% of FSC lumber used = 2 points, up to 10)
3, Use Wood I -Joists for Floors and Ceilings
4. Use Web Floor Trusses
up to 4 Resource
4 Resource pts y
up to 5 Resource
2 Resource pts y
3 Enerav ots v
3 Resource pts
up to 10 Resource pts.
2 Resource pts y=yes
2 Resource pts y=yes
5. Design Energy Heels on Trusses 6" or more 2 Energy pts y=yes
6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes
7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes
8. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes
9. Use Structural Insulated Panels (Sips)
a. Floors 3 Ener is
9Y P y=yes
b. Wall
c. Roof 3 Energy pts y=yes
3 Energy pts y=yes
10. Apply Advanced Framing Techniques 4 Resource pts y=yes,
11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes
12. Use _5S
a. Subfloors
1 Resource pt y=yes
® b. Sheathing y _ 1 Resource pt y=yes
33
1. Use Sustainable Decking Materials
U
a. Recycled content
3 Resource pts
b. FSC Certified Wood
3 Resource pts
2. Use Treated Wood That Does Not Contain Chromium/Arsenic
1 IAQ/Hsalth pt
3. Install House Wrap under Siding
1 IAQ/Health pt
4. Use Fiber -Cement Siding Materials
1 Resource pt
E. Plumbing
U
1. Install Water Heater Jacket
1 Energy pt y=yes
2. Insulate Hot and Cold Water Pipes
2 Energy pts y=yeE
3. Retrofit all Faucets and Showerheods with Flow Reducers
a. Faucets (1 point each, up to 2 points)
Up to 2 Resource pts
b. Showerheads (1 point each, up to 2 points)
Up to 2 Resource pts
4. Replace Toilest with Ultra -Low Flush Toilets
(1 point each, up to 3 points)
Up to 3 Resource pts
5. Install Chlorine Filter on Showerhead
1 IAO/Health pt y=ye:
6. Convert Gas to Tankless Water Heater
4 Energy pts y=ye:
7. Install Water. Filtration Units at Faucets
(2 points each, up to 4 points)
Up to 4 IAQ/Health pts
B. Install On -Demand Hot Water Circulation Pump
4 Resource pts y=ye
r, eracmcai
1. Install Compact Fluorescent Light Bulbs (CFLs)
(6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points)
2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to
5 points)
3. Install Lighting Controls (1 point per fixture, up to 4 points)
4. Install High Efficiency Ceiling Fans with CFLs
(1 point each, up to 4 points)
G. Appliances
-1. Install Energy Star Dishwasher
2. Install Washing Machine with Water and Energy
Conservation Features
3.Install Energy Star Refrigerator
4, Install Built-ImFiecycling Center
H. Insulation
1. Upgrade Insulation to Exceed Title 24 Requirements
a. Walls
b. Ceilings
2. Install Floor Insulation over Crawl Space
3, Install Recycled -Content, Fiberglass Insulation with
-No Added Formaldehyde
4. Use Advanced Infiltration Reduction Practices
5. Use Cellulose Insulation
a. Walls
b. Ceilings
6. Alternative Insulation Products (Cotton, spray -foam)
a. Walls
o. Ceumgs
Up to 4 Energy pts.
Up to 5 Energy pts
Up to 4 Energy pts
Up to 4 Energy pts
1 Energy pt
U
r
U
U
:01E
Up to 4 Energy pts.
Up to 5 Energy pts
Up to 4 Energy pts
Up to 4 Energy pts
1 Energy pt
1 Energy pt Y_—Yes
1 Energy pt y=yes
3 Resource pts y=yes
2 Energy pts
2 Energy pts
4 Energy pts
31AQ/Health pts y=yes
2 Energy pts y=yes
4 Resource pts
4 Resource pts
4 Resource pts y=yes
4 Resource pts y=yes
Pi
1
:01E
1 Energy pt Y_—Yes
1 Energy pt y=yes
3 Resource pts y=yes
2 Energy pts
2 Energy pts
4 Energy pts
31AQ/Health pts y=yes
2 Energy pts y=yes
4 Resource pts
4 Resource pts
4 Resource pts y=yes
4 Resource pts y=yes
Pi
Vit. Install Energy -Efficient Windows � -
2 Energy Pts
• a. Double -Paned
1 Energy pt y=yes
b. Low -Emissivity (Low -E)
2 Energy pts y=yes
c. Low. Conductivity Frames
2 Energy pts y=yes
2.Install Low Heal Transmission Glazing
1 Energy pt y=yes
J. Heating Ventilation and Air Conditioning
1. UseDuct Maslic on All Duct Joints
--- - -
2 Energy Pts
Y=Yes
--
2. Install Ductwork within Conditioned Space
-
3 Energy pts
y=yes
3. Vent Range Hood to the Outside
1 IAQ/Health pt
y=yes
4. Clean all Ducts Before Occupancy
2IAQ/Health pts
y=yes
5. Install Solar Attic Fan
2 Energy pts
y=yes
6. Install Attic Ventilation Systems
1 Energy pt
y=yes
7. Install Whole House Fan
4 Energy pts
y=yes
8. Install Sealed Combustion Units
5 IAQ/Health pts
y=yes
a. Furnaces
31AOJHealth pts
y=yes
b. Water Heaters
3 IAQ/Health pts
y=yes
9. Replace Wall -Mounted Electric and Gas Heaters with
3 Energy pts
y=yQs
Through -the -Wall Heat Pumps
3 Energy pts
y=yes
10. Install 13 SEER/11 EER or higher AC with a TXV
3 Energy pts
y=yes
11. Install AC with Non -HCFC Refrigerants
2 Resource pts
y --es
12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace
2 Energy pts
y=yes
13. Retrofit Wood Burning Fireplaces
4 Energy pts
yges
• a. Install EPA certified wood stovesfinserts
1 IAQ/Health pt
y=yes
b. Install/Replace Dampers
1 Energy pt
y=yes
c. Install Airtight Doors
1 Energy pt
y=yes
14. Install Zoned, Hydronic Radiant Heating
3 Energy pts
y=yes
15. Install High Efficiency Filter
41AO/Health pts
y=yes
16. Install Heat Recovery Ventilation Unit (HRV)
5 IAQ/Health pts
y=yes
17. Install Separate Garage Exhaust Fan
31AQ/Health ots
v=ves
K. Renewable Energy and Roofing
1. Pre -Plumb for Solar Water Heating
4 Energy pts
yges
2. Install Solar Water Heating System
10 Energy pts
y=yes
3. Pre -Wire for Future Photovoltaic (PV) Installation
4 Energy pts
y=yes
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points)
Up to 18 Energy
pts
- I Sect Safe and Durable Roofing Materials_ J
1 Resource pt
y=yes
7. Install Radiant Barrier
3 Energy pts
y=yes
L. Natural Heating and Cooling
1, Incorporate Passive Solar Heating
5 Energy pts
y=yes
2. Install Overhangs or Awnings over South Facing Windows
3 Energy pts
y=yQs
3. Plant Deciduous Trees on the West and South Sides
3 Enerav ots
v=ves
U
1. Use Low/No-VOC Paint
1 IAQ/Health pts
y=yes
2. Use Low VOC, Water -Based Wood Finishes
2 IAQ/Health pts
y=yes
3. Use Low/No VOC Adhesives
3 IAQ/Health pts
y=yes
4. Use Salvaged Materials for Interior Finishes
3 Resource pts
y --yes
5. Use Engineered Sheet Goods with no added Urea
4 Resource pts
Formaldehyde
61AQ/Health pts
y=yes
6. Use Exterior Grade Plywood for Interior Uses
1 IAQ/Health pts
y=yes
7. Seal all Exposed Particleboard or OF
4 IAQ/Health pts
y --yes
B. Use FSC Certified Materials for Interior Finish
4 Resource pts
y --yes
9. Use Finger -Jointed or Recycled -Content Trim
1 Resource pts
y=yes
10. Install Whole House Vacuum System
3 IAQ/Health pts
y --yes
N. Flooring
1. Select FSC Certified Wood Flooring
8 Resource pts
2. Use Rapidly Renewable Flooring Materials
4 Resource pts
3. Use Recycled Content Ceramic Tiles
4 Resource pts
4. Install Natural Linoleum in Place of Vinyl
51AQ/Health pts
S. Use Exposed Concrete as Finished Floor
4 Resource pts
6. Install Recycled Content Carpet with Low VOCs
4 Resource pts
Total ointsvat a e:
Total Points Project Received:
4 1 1401 130 57
1 01 01 0 •
G:datalprogsrgreenbuildingguidelineslremodelersrgmnpoinisfnal21204protected.ds
0
Y
Of
O
W
O
W
a-
0
U
N
Y
N
W
0
Y
W
0
V ,Gil a9p�'ry?G a,Ef
Gp%p l�Ja phi %
G� %lA� 4jsG✓ia�saG��a°. Goo a'Gg
GP a%9 s?4 GJ EGa ° PCO GQ I V^'
l
�p .aa �p has .bad 4 p4/OTIi
� J'rG O
J
d rlpJlJ4i��//Ga�J ��,:/paO ,�G,a�y P'p�ag./1
,a0y. 40
o19
pt oGa 90� � 91'2j °i�' a ys
JO
W �- ��0+� � � sp�d4a�G•cy� p
LJ
co
Li
H Z 6
W W Q _Z . ✓e
U COdZw !V!
`L U Q J U
UCD0�z
ZZZ(; �l
F-1-F-ZL �.
Vl LA (n HX Qi
X X X ( W
W W W x
Ld
J W W W I—
W U U O Q o
O J J Z U N
m d d H 4 -
Li W WXW
K W f)f3
-
Nrod N y� e
),4LNVd I N3A0
3
W
Z
O
I
u
0
II
0
0
m
vU
}au uo!}on }suo00S®VOS DW -3
0WI-9ZL (9010 :xOJ 9266-909 (801) lal
IAli �b
608E-186-804 �3NOHd
o
1
0
Y
=
1IO96 VO 'oui}aadn0 _ADM uyop SI90I
* dx 3
M -OS -M 'ON NdV
N
V)
saaaui6u3 6ui}Insuoo
�
0929'oN f°
VINaOdIlVO 'ONI1213dno
M
a
`fir
Z
o
anlaa OOavd
n
rn
��
Jl��✓�JJ
� �
V *a
MA SINN34 'S21W �B '21W
W
a
�,� N�il�ls
3
Q)
�
�SS3A
3 111 133M' Jd
O
o
U
m
o
°
N o
o s
o
P
0
f°
o
PROJECT TITLE:
QAC N�S�(�,,
STE!/EN CHof
m
m
m
'
MR. & MRS. DENNIS YEN
G
—
— ASSOC/.9TES
`�
O
m D
20804 FARGO DRIVE
012/208 0
Z
N
m ��
N
u
CUPERTINO, CALIFORNIA
Exp
Consulting Engineers
m
y
i
a
APN NO. 526-90-122
*
S Q
10615 John Way. Cupertino, CA 95014
?
0
PHONE- 408-981-7509
q� �IVI�
Tel: (408) 505-9985 Fax: (408) 725-1350
0
m
z
0
\F
E—Mail: SCAOSCConstruction.net
1
4 0 •
0 7
0
0-
0
�
oo
PROJECT TITLE:
(SES$/
"�
S'TE!/EN ChU
D<
A
m
0
a�
MR. & MRS. DENNIS YEN
—
A.SS'OC/RTES'
0
ED N
y
u
w
20804 FARGO DRIVEZ
CUPERTINO, CALIFORNIA
No. 52160
Consulting Engineersineers
N
ExP'12/08
10615 John Way. Cupertino, CA 95014
n
=
APN NO. 326-30-122
PHONE- 408-981-7309
rI CSV I �Q
q��
Tel: (408) 505-9985 Fax: (408) 725-1350
m
o
CA`�F
E—Mail: SCA@SCConstruction.net
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
CITY OF Fax (408) 777-3333
•CUPEkTINO
Building Department
JOB ADDRESS:
4
PERMIT #
OP046ct
OWNER'S NAME: r J
PHONE # — '77 0
GENERAL CONTRACTOR:
FAX #
I am not using any subcontractors: '7—/9D
Signature Date
Please check applicable subcontractors and complete the following information:
W
Owner/ Contractor Signature
Date
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
W
Owner/ Contractor Signature
Date