08060179 CITY.OF CUPERTINO '.�' ^R3cw a.wa�+'tts.+3 cox '� '"` °a"
BUILDING DIVISION PERMIT C0NTRACTpR4NFORMATION "-
DR
BUIL 1 ESS: PERMIT NO.
R.� B FLOWER CT M C ROOFING 08060179
OWNER'S NAME: PERMIT ISSUE DATE
SCOTT THURLOW P AND VERA C 14800 MCVAY AVE 06/24/2008
IFNgpts (408) 729-3436 SANITARY NO, CONTROL NO.
ARCHITECT/ENGINEER:
BUILDING PERMIT INFO
BLDG EIEC? PLUMB MECH
0 0 0 0
sop
LICENSED CONTRACTOR'S DECLARATION IobDDSCiDescription
rd 1 hereby affirm wt 1 an licensed under previsions of Chapter 9(commenciIng P
viNSauonTO(IlnafDirision]ofwBusircssamlProfesswnsCade.arWmyliccnscu RE-RF T/O 2 RF LYRS INSTL 7/160SB W/30LB FLT&50YR
full forte and eff
�'qi LiEenm Cl � `�-' 13e.g PRES SHK COMP CLS A 30SQ. M C ROOFING RENEWED BUS
=F�^y�,uuuyp��� Dare A CHRECTS DECLARA ' LIC 6-24-8
W< 1 undcrsun l my plans shall W used EVA
me rda
s
a G H Licensed Professional
OWNER-BUILDER DECLARATION
.� y I hereby aRrm Nat 1 am escmpt from Ne Cam o nu Law for the
O O fallowing reason.(Sation]831.3.Business and Pmfassim.om Cook:Any city or county
y9 which requires a permit to continues,spar.improve,demolish,or repair any swcturo
_Z< print m its issuance.also reqes fors
tach tW applicant forch permit to file a signed summcnl
col he is licensed purvant to provisions of w Commclar's license law(Chapter 9 ,"Sq.Ft. Floor-Area Valuation
Y�o (commencing with Section 7000)of Division 3 of NC Business and Professions Code)or $13000
i
that W Is eumpt therefrom and the basis for the,alleged e,empdan.My violation of
Section 7031.5 by any applicant fm a Wish subjects the applicant to a civil penalty of �,r)7sr Number Occupancy
not mere than Bae hundred dallars(S500). 36618042 .•l7V' TyPe
❑Las owner of Uie property.army employees with wages ss wirank compensstion,
will do w war,and wawmurt u not intended oraRete i forWe(Sec.]014,Busihess
and Profession"Cede:The Commutes Liccve Law does not apply m an owner of Required Inspections
property tubo builds orimpmvu Nerton,and whodorusah work himselforwough his
owo employees,provided wLLueh improvements art not intended orortated far We.IL
howew n.the Wilding or impmmnenl"sold within arc year of co spredon.w owhes-
builder w10 have Bre When of proving Nat W did not Wild or improve for purpose of
um.).
❑1,as awry of she pmperty,am exclusively conuuvng wish licensed cunuctoss in
construct she project(Sec.7066,Business and Rvfessions Code:)The Contraries Li- .
Eaton law closer not apply 0 an owner of property who Wilds or improv carton.and
who contracts for such projects wish a concomitants)licensed pursuant to IW ConuMoh
Licatue law.
❑l cam esempt under Sea .B&P C for this manon
Owner Data
WORKER'S COMPENSATION DECLARATION
1 hereby affirm under penally of perjury ane of the following declarations:
1 ham and will maintain a Ccrtiecate of Consent to self-inure for Worher's Compen-
virion,as provided for by Section 37W of w Labor Code.for the performance of she
wort for which this permit is issued.
❑1 have and will maintain Wars Compemation Inwana.it;required by Section
37W ofw labor Code.for w performance of Ute wort far which Nu permit is issued.
My Womkcea Com roti n insure ee carti end Polity number are:
Cartier.=5�PTION FROM
1�S0'
CERTIFICATE O^EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
fr asectimn heed.,Nc.,kmd ifrhe .is is fore.hunthed dollan(SIM)
or leu.)
1 certify that in the performance of unit,work for which this permit u issued.l shall not
employ any person in any ma amerso as in become subject to IN Workers'Compensation
Laws of Califamia.Dam
Applicant
NOTICE TO APPLICANT:If,after making this Cenincam of Exemption,you should
become subject m w Workels Comperwuon provisions of Ne labor Code,you muse
.J O forthwith comply wish such provisions or this permit shall M domed revoked.
z
u a' CONSTRUCTION LENDING AGENCY
by
[••i IWr Ihich rnthssshertu Wood
(So,.nn lending .) for wperformance u(
6i r�r Le work for which shin permit is Tuned(gee.W.Civ.C.j
�W Q laName
z Lomme,nde/s Aedtev
U O 1 certify Nat 1 have mad this application and sure Nu the&howe information is
[L. P correct.l agree m comply wish all city and county ordinances and sum laws relating be
OU Wilding cmWruaion,and hereby mthori,e representatives of this it,m Ener open IN
aabove-mentioned propcny for inspection puryosea
(We)agree to save,indemnify and keep bafmlens IN City of Cupertinoerg casI
fn Iiabilides,jWgmcnu.cosuandexpanscswhichmayinanywayacfueagaimt Wd City
UZ inconsequcnmofwgnntingofthapermil.
APPLICANT UNDEPTANDS AND WIL PLY WITH ALL NON-POINT Issued by:9 Date 2'
SOURCE MUNS.'
�l 6 �
Signature,of A Mcmanalso, � Data Re-roofs
HAZARDOUS MATERIALS DISCLOSURE Type of Roof
Will NE applicant or future building acupantsWm or handle hours sposerial
as dc0ad by Um Cupertino Municipal Code.Chapter 9.12,and Bre Health and Safely
Cale, y25532(a)?
El . All roofs shall be inspected prior to any roofing material being installed.
❑Ye
PIIhaWill Nc applicant or future Wilding acupant sex Equipment or devices which If a roof is installed without first obtaining an inspection,I agree to remove
1=c air communities as defined byw Bay Area Air Quality Management all new materials for inspection.
Pis,.
c? P
❑Yes L>
I have said thehVardWa materials requirements under Chapter 6.95 of the Califor-
niaHealth hSafety Code,Suctions 25515.25533 and 25534.1 undemand that if NE Wilding
does rat c.ntiy h ve a mnaml but il' y responsibility b Unify she acupanr of the
requireme muse bete pri Cerdriamof Occupeay.
� Signature of Applicant Date
canernr, seaeenl Dam A] roof coverings to be Class'%? or better
CITY OF CUPERTINO
• 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN 36618042 . 00
DATE ISSUED. . . . . . . : 06/24/2008
RECEIPT # . . . . . . . . . : BS000005202
REFERENCE ID # . . . : 08060179
SITE ADDRESS . . . . . : 1320 FLOWER CT
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : SCOTT THURLOW P AND VERA C TRU
ADDRESS . . . . . . . . . . : 1320 FLOWER CT
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-5302
RECEIVED FROM . . . . : MIGUEL CASTILLO
CONTRACTOR . . . . . . . : MIGUEL CASTILLO LIC # 24741
COMPANY . . . . . . . . . . : M C ROOFING
ADDRESS . . . . . . . . . . : 14800 MCVAY AVE
CITY/STATE/ZIP . . . : SAN JOSE, CA 95127
TELEPHONE . . . . . : . . : (408) 729-3436
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 13 , 000 . 00 1 . 30 0 . 00 1 . 30 0 . 00
1BUSLIC FLAT RATE 1 . 00 110 . 00 0 . 00 110 . 00 0 . 00
IREROOFRES SQ FEET 30 . 00 390 . 00 0 . 00 390 . 00 0. 00
---------- ---------- ---------- ----------
TOTAL PERMIT 501 . 30 0 . 00 501 . 30 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 501 . 30 VISA
---------------
TOTAL RECEIPT 501 . 30
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
a
•
CITY OF CUPERTINO 0(, w79
REROOF
CITY OF
•CUPEkTINO PERMIT APPLICATION
APN # �1 Date:
Building Address
Cjj ev
Owner's Name: Phone #:
X53 - Fso a
Contractor: Phone MI-log- 7a93�o 6-
Fax #:
Cupertino Business License #: Contractor License #:
6
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ ilt-Up roof
❑ tjesphalt Shingles W Asphalt Shingles
ood Shakes ❑ Wood Shakes
�ood Shingles ❑ Wood Shingles
❑ Other (Specify) ❑ Other (Specify)
Number of existing coverings �_ ❑ Provide I.C.B.O. Report #
be Removed ❑ Provide Mfgr. Installation Specs.
Job Description:
T< A r o F F X Seo' L Ry 1 t.1&� N -7//6 os r, Uv 14-t"
30 QJS 5-o y-tAv �rrs, c\��1� cJSl�rriKZ cbM�C�u1
Residential Commercial
Green Building: Please complete relevant portion,of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions:
applicable, include in plan set & the sheet index.
Valuation: 00
I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy:
•
Signature
CITY OF CUPERTINO
« � REROOF
OF
CUPERTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1RER00FC0M Re-roof Commercial B 1COMMLROOF
1BSEISMICO Seismic Commercial B
1RER00FRES Re-roof Residential B 1SFDWLROOF
D
1BSEISMICRE Seismic Residential B
1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF
1BSEISMICRE Seismic Residential B
1BUSLIC Business License B
Revised 6/16/08
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
• Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
• 6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be Raid before another inspection can be scheduled
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: �� ( f��
Job Site Address: \'-") L,Ot
Roofing Company Name:
Applicant's Signature: Date: G� p
• Greg Casteel
Building Official
Revised 11/2/04
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
• Building Points Categories that must be
shown and referenced on the Project
Plans See below
B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A3 1 Epont
P. Other 1. List Green Features on Plans A-1 1 MWOMMM TOTAL POINTS 40s
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered environmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your •
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project.
A.Site
1.Recycle Job Site Construction&Demolition Waste
65%=1 point;75%= 2 points;80%=4 points up to 4 Resource pts 0
2.Salvage Reusable Building Matedals 4 Resource pts y--yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stonnwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
S.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0 -
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes , 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1 1 1
B.Foundetion
1,Incorporate Recycled Flyash in Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10% •
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
1
mm
C.Structural Frame
1.Substitute Solid Sawn lumber with Engineered Lumber 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c.Roof 3 Energy pts Y--yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12.Use OSB
a.Subfloors 1 Resource pt y=yes 0
b.Sheathing 1 Resource pt y=yes 0 •
INPUT Resources Energy iAQ[Heafth
.Windows
1.Install Energy-Efficient Windows
• a.Double-Paned
b.Low-Emissivity(Low-E) 2 Energy pt y=yes 0
gyp y=yes 0
c.Low.Conductivity Frames 2 Energy pts y=yes 0
2.Install Low Heal Transmission Glazing 1 Energy pt y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All Duct Joints 2 Energy pts y--yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts Y_-Yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y--yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 7 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
8.Install Sealed Combustion Units
a.Furnaces 31A0/Health pts y--yes 0
b.Water Heaters 31AQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts Y--yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts Y--yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y--yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filler 4 IAQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 31AQ/Health pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0
7.Install Radiant Barrier 3 Energy pts y=yes p
1
L.Natural Heating and Cooling 1 1
1.Incorporate Passive Solar Heating 5 Energy pts y=yes p
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y--yes
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
1 1 1
Community Development
10300 Torre Avenue
.1 �'j. Cupertino CA 95014
Telephone(408) 777-3228
CITY OF Fax(408)777-3333
*�UPEkJINO
Building De artment
JOB ADDRE S: PERMIT #
1 6 e_ C� O SCS �C3( 7 9
OWNER'S NAME: PHONE # — 7
GENERAL CONTRACTOR: FAX #
I am not using any subcontractors:
67/ Signature Date
Please check applicable subcontractors and complete the followinginformation:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing E—R 3
Septic Tank
Sheet Metal
Sheet Rock
Tile
er/Contractor Signature Date