Loading...
08080078 CITY OF CUPERTINO *�''° r j •• ?" BUILDING DIVISIONPERMIT .��ONTRACTQR'INEQRMATION >y.+:7.1d. `�•?KF,..,,..�'•�'.,>�Y"FFz`,. o-.^f»,�,tAe BUILDING ADDRESS: PERMIT NO. 206'70 GREENLEAF CT LOT 3 NEXGEN BUILDERS, INC. 08080078 OWNER'S NAME: PERMIT ISSUE DATE CUPERTINO GREENLEAF LLC 225 DEMETER ST 08/12/2008 HIS: SANITARY NO. CONTROL NO. (650) 322-5800 ARCHr1ECTfENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH 0 0 0 0 �Oca LICENSED CONTRACOWS DECLARATION lob Description m' 1 hereby affirm that 1 am licenced under pmitiom vof Chapter 9(Commencing m'€ with Secdon70(l))ofDlvisan0ofmeBuainevandProfcuiumcode,andmYReemcis REV SLOPE ON SEWR, REVISE ROUTE OF WTR LINES is fall farce and effm Dg= License am Lie.1i ORIG#07020040 DOW_ARCHITECTS DECLARATION NOTE: ONLY 1 REV FEE FOR 3 REVIONS, LOTS 1-3 OK 1 uMmplans shad u vand my plans W weepublic records pa0 gW(n Licensed Pmfcsaional 5to IOWNER-BUILDER DECLARATION E 1 hcn:by sMs.that I am excerpt from to Contractors Us..Law for the HO O O following moon.(Section 101.5.But eels and Professions Coe:My City or County which requires a permit to construct,alter,improve,demolish.or repair any someone _I< prior to its insemes,site,requires lM applicant for such permit as file a signed statement iso must haulicensed Formal tothe psortsiomofthe Conarcwr'sLicense Law(Chapn9 Sq.Ft. Floor AreaValuation $ (commencing with Section 7000)of0tvison J of the Business and Per $fections Code)ar 1500 — that I.is eumpt shcmfrom and the basis for the alleged eaempilm.Any vlotatfnn of Section 7031.5 by any applicant for a pemah suhjeera the applicanfto a Civil penalty Of Number Occupancy not mamthsofivehundred dolluane dollars 32656029 P Y Type C 1,as owner of the property,m my employees with wages u their sale Compensation, will do the wont and the swveae b oat intended or offered for isle(Sec.7W.Business YW P(wfeatioN Code:The Contractors Limme law does ant apply in an wwtXr of Required Inspections property who Wilds Or improves thereon,and whodoessuclt work himrelf m though his awnemployer,provided Nusseliimp....asoenotinm iledanolremdferule IL however.the Wilding or improvement is sold within cam year of completion,aha cw ea- Wilder will have Use WNce of proving tat le did Out Wim Or improve for purpace of sale I.u mater of the property am exclusively contracting with licensed contractors in conamat the project(Sec.70aa,Business and Professions Cade:)lite Commeas',ti. . came Law does not apply to an owner of property who Wilds or improver thereon,and who contracts for such projects with a cormanoa(s)licensed pursuant m the amateurs Wceme Law. ❑l an ea�gf�'pl undo See B tit P C rte Nis mason Owner J I/f/t Data (2� WORKER'S COMPENSATION DECLARATION 40 1 hereby affirms wMer pcvalsy of pcajury me of the folbwing dalantions: I am and will mainWn aCceifhcate ofConstnl m ulf-Iuum for Workers Compcn- salon,as provided for by Saxon 3700 of the labour Code.for the perfarman¢of the wart fm which this permit is issued. 0 1 have and will mainam Workers Compensation Insurance,as acquired by Section 3700 ofta Labor Code,for de performance ofthe wart for which this permit is Wood ' My Workers Compensation Iwranet canner and Policy,number are; . Cartier. PaRcy No, CERTIFICATE OF EKEMMON FROM WORKERS COMPENSATION INSURANCE (Thu motion need not W completed due,Permit Is fmone hummed dollars(5100) or lot) 1 unify dam in the performaac of the wank for which this permit is booed,l shall am employ any person in any ma rsou fq hecomesubl'eetJm Warkers'Compenswmn Laws of California.Data / 116 Applicant /y- - NOTICE TO APPl3CANT:IL after making this Certificate of Exemption,you should become subjeu as dac Workers Compensation provisions of the labor Code.you must .J O forthwith ComP1Y with such provisions or this permit shall W dcormd revoked. ? ""' CONSTRUCTION LENDING AGENCY ti [—h IWrap,haRthi Net them it.ed(see nnlending agency for the performanu of Qi In the wok for which this permit u issued(Su.3097,Civ.C.) A Landers Nene � z lenders Adder.• C)Q 1 anifY that 1 have mad this applicoion and sum Nat 0.above hime adon is LL E comm 1 agree as Comply with all city and county antimatter and sate leas relating to O Wilding construction.and xrehymnivanne representatives ofthis city in coter upon the above-mentioned Property for inspection Purposes (We)agree to save,indemnify and keep haemma the City of Cupertino against in Iiabilitimpactmenm,Casa ma..peaacs which may i^any way accrue sgainstseid City V Z in cansequemt of the granting of this permit. ^h APPLICANT UNDERSTANDS AND WILL COMPLY WIT14 ALL NON-POINT Issued by: Date 50 REG4LA770NS (f �— -1 —Re-roofs Signature of Appli.UCmuO&cM, Data ' HAZARDOUS MATERIALS DISCLOSURE Type of Roof Will the applicant or future Wilding occupant some orandlc haardoes material as defined by the Culp nim Municipal Code.Chapter 9.13,and the Health and Safely Cole,Section 35532(a)T GYes All roofs shall be inspected prior to any roofing material being installed. Will the applicant or future Wilding amupanl use,equipment or devices which If a roof is installed without first obtaining an inspection,I agree to remove fah hmaNnas ter aontamimnta Diawie e as Oncd by tie Bay AM.Air Quality Management all new materials for inspection. 0Yes o IhavematthedvSmm mat . mquimmcotsun@r Chapter Q95ofthe Cali n& rias Out it is te=up=upset Jus rot cmmnJY have a temnL dao ilex my responsibility m notify the oceupsot of the m4immcnuwhkhmuaWmet pdor \ofaCeniBtamofaeupse, — ignatureofApplicant Date Owner or authomcd agent —) D,m All roof coverings to be Class'%W'or better ' CITY OF CUPERTINO • ITEM 1 OF 1 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 32656029 . 03 DATE ISSUED. . . . . . . : 08/12/2008 RECEIPT # . . . . . . . . . : BS000005757 REFERENCE ID # . . . : 08080078 SITE ADDRESS . . . . . : 20670 GREENLEAF CT LOT 3 SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . OWNER . . . . . . . . . . . . : CUPERTINO GREENLEAF LLC ADDRESS . . . . . . . . . . : 225 DEMETER ST CITY/STATE/ZIP . . . : E PALO ALTO, CA 94303 RECEIVED FROM . . . . : NEXGEN BUILDERS CONTRACTOR . . . . . . . : NOEL CHAMBERLAIN LIC # 29430 COMPANY . . . . . . . . . . : NEXGEN BUILDERS, INC. ADDRESS . . . . . . . . . . : 225 DEMETER ST CITY/STATE/ZIP . . . : E PALO ALTO, CA 94303 TELEPHONE . . . . . . . . : (650) 322-5800 • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- -- ----- ---------- ---------- ---------- ---------- ---------- 1REVSFDWL EACH 1 . 00 734 . 00 0 . 00 734 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 734 . 00 0 . 00 734 . 00 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CHECK 734 . 00 #37678 TOTAL RECEIPT 734 . 00 �-7R CITY OF CUPERTINO CITY OF • CUPERTINO REVISION/DEFERRED PERMIT APPLICATION FORM APN # 3.2-Go (,:�, 0 meq'( , tX3 Original Permit #: �-1 O `�O Building Address: ZC) Co-76 6-aEe1\)t,6JV CT- Lr--( 3 Mailing Address (if different from building address): 225 �cin���tiZ si. C/+ r' cu Owner's Name: Phone #: � U121Cn� LEl41- Ll-L , �` �22 ^ S�G6 Contractor: Phone: N��cC, 6/, 7301 LD��S�L• Fax: Contractor License #: -}37G��cti4S Cupertino Business License #: Contact: Phone: G J &,7- cl3 �S Fax: Building Permit Info: Bldg ❑ Elect ❑ Plumb Mech ❑ Residential H Commercial Job Description: kG- J is 10fv Is the project in the Wildland- Urban Interface Fire Area? Yes ❑ No ❑ Type of Construction (Usage Class): * Occupancy Type: 1-A, 1-B ❑ II/III/V-A ❑ II/I11 B, IV-HT, V-Bn] Valuation (cost of project): # Project Size: Express Standard Large Major Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it Points Achieved:• to the application or if applicable, include in plan set & the sheet index. For help, contact Build it Green at www.buildit2reen.org Revised 6/16/08 CITY OF CUPERTINO CITY OF RE VISION/DEFERRED CUPEkTINO PERMIT APPLICATION FORM • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft 1REVCOMNEW Revision Commercial New B 1* 1REVCOMTI Revision Tenant Improvement B 1* TI 1REVSFDWL Revision SFDWL B 1R3SFDW 1REVRESADD Revision Addition B 1R3SFDADD 1REVRESREM Revision Remodel B 1R3SFDREM 1DEFINSP Deferred Submittal not R-3 B 1* Inspection • 1DEFPLNCK Deferred Submittal not R-3 Plan B 1* OR Check 1* TI 1DEFR3PLNCK Deferred submittal R-3 Plan Chk B 1R3SFDW 1R3SFDADD 1R3SFDREM 2of3 Green Building Plan Check Index of Green Building Points/Categories Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 oints C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood Waist, (See Spec.) _ S-2 2P oints 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail 5-2 2 cints E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec.) A-4 2 cints F. Plumbing 1. Insulate all H.W.pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11.A 2500 Gal.Tank, (Note/Spec) L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 paint 3. Enerqy Star Refrigerator, (No ta/Spec. A-3 1 oint P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points • Plan Review Process Work Book Page-12-Revised 3/25/08 0 • LEED for Core and Shell v2.0 Registered Project Checklist Project Name: Project Address: . Ya 7 No Prereq 1 Construction Activity Pollution Prevention Required Credn 1 Site Selection 1 Credit 2 Development Density&Community Connectivity 1 Credit Brownfield Redevelopment 1 Credit 4.1 Alternative Transportation:Public Transportation Access 1 Credit 4.2 Alternative Transportation:Bicycle Storage&Changing Rooms 1 Credit 4.3 Alternative Transportation:Low-Emitting and Fuel-Efficient Vehicles 1 Credit 4.4 Alternative Transportation:Parking Capacity t Credit 5.1 Site Development:Protect of Restore Habitat 1 Credit 5.2 Site Development:Maximize Open Space 1 Credit 6.1 Stormwater Design:Quantity Control 1 Credit 6.2 Stormwater Design:Quality Control 1 Credit 7.1 Heat Island Effect,Non-Roof 1 Credit 7.2 Heat Island Effect,Roof 1 Credit a Light Pollution Reduction 1 Credit Tenant Design&Construction Guidelines 1 Credit 1.1 Water Efficient Landscaping:Reduce by 50% 1 Credit 1.2 Water Efficient Landscaping: No Potable Use or No Irrigation 1 • Credit Innovative Wastewater Technologies 1 Credit 3.1 Water Use Reduction:20%Reduction 1 Credit 3.2 Water Use Reduction: 30%Reduction 1 Ya 7 No r Prereq 1 Fundamental Commissioning of the Building Energy Systems Required Prereq 2 Minimum Energy Performance Required Prereq 3 Fundamental Refrigerant Management Required 'Nota for EAc1:NI LEED for Cora end Spell projects registered eMer June 2618 2007 ere required to achieve et least two(2)points under EAc1. ® Credit 1 Op timize Energy Performance 1 to 6 10.5%New Buildings or 3.5%Existing Building Renovations 1 14%New Buildings or 7%Existing Building Renovations 2 17.5%New Buildings or 10.5%Existing Building Renovations 3 21%New Buildings or 14%Existing Building Renovations 4 24.5%New Buildings or 17.5%Existing Building Renovations 5 28%New Buildings or 21%.Existing Building Renovations 6 31.5%New Buildings or 24.5% Existing Building Renovations 7 35%New Buildings or 28%Existing Building Renovations e Credit z Onsite Renewable Energy 1 Credit Enhanced Commissioning 1 Credit 4 Enhanced Refrigerant Management 1 Credit 5.1 Measurement&Verification-Base Building 1 Credit 5.2 Measurement 8 Verification-Tenant Sub-metering 1 Credit 6 Green Power 1 continued... • Yee 7 No Pmmq 1 Storage&Collection of Recyclables Required • Credit 1.1 Building Reuse: Maintain 25%of Existing Walls, Floors&Roof t Credit 1.2 Building Reuse: Maintain 50%of Existing Walls, Floors&Roof 1 Credit 1.3 Building Reuse: Maintain 75%of Interior Non-Structural Elements 1 Credit 2.1 Construction Waste Management: Divert 50%from Disposal t Credit 2.2 Construction Waste Management: Divert 75%from Disposal 1 Credit Materials Reuse: l% t Credit 4.1 Recycled Content: 10%(post-consumer+7/,pre-consumer) t Credit 4.2 Recycled Content:20%(post-consumer+X.pre-consumer) 1 Credit 5.1 Regional Materials: 10%Extracted,Processed&Manufactured Regionall 1 Credit 5.2 Regional Materials:20%Extracted,Processed&Manufactured Regionall 1 Credit Certified Wood 1 Y. 7 No a ;g Prereq 1 Minimum IAO Performance Required re Prereq 2 Environmental Tobacco Smoke(ETS)Control Required Credit 1 Outdoor Air Delivery Monitoring t Credit 2 Increased Ventilation t Credit 3 Construction IAO Management Plan: During Construction 1 Credit 4.1 Low-Emitting Materials:Adhesives&Sealants 1 Credit 4.2 Low-Emitting Materials: Paints&Coatings t Credit 4.3 Low-Emitting Materials: Carpet Systems t Credit 4.4 Low-Emitting Materials: Composite Wood&Agrifiber Products t Credit 5 Indoor Chemical&Pollutant Source Control 1 Credit 6 Controllability of Systems:Thermal Comfort 1 Credit 7 Thermal Comfort: Design t Credit e.1 Daylight&Views:Daylight 75%of Spaces t Credit e.2 Daylight&Views:Views for 90%of Spaces t Yee 7 No 11,01a iiii Credit 1.1 Innovation in Design:Provide Specific Title t credit 1.2 Innovation in Design: Provide Specific Title t Credit 1.3 Innovation in Design:Provide Specific Title t Credit 1.4 Innovation in Design:Provide Specific Title 1 Credit LEED°Accredited Professional t Y. 7 No Totals re-certification estimates) 61 Certified:e23 to 27 points, Silver: 26 to 33 points, Gold: 34 to 44 points, Platinum: 45 to 61 points • 0 . LEED for New Construction v2.2 Registered Project Checklist Project Name: .Project Address: Y.. 7 W Al Preraq 1 Construction Activity Pollution Prevention Required Credit 1 Site Selection 1 Credit 2 Development Density&Community Connectivity 1 Credit Brownfield Redevelopment 1 Credit 4.1 Alternative Transportation, Public Transportation Access 1 Credit 4.2 Alternative Transportation, Bicycle Storage&Changing Rooms 1 Credit 4.3 Alternative Transportation, Low-Emitting& Fuel-Efficient Vehicles 1 Credit 4.4 Alternative Transportation,Parking Capacity 1 Credit 5.1 Site Development,Protect or Restore Habitat 1 NCredit 5.2 Site Development, Maximize Open Space 1 Credit 6.1 Stormwater Design, Quantity Control 1 Credit 6.2 Stormwater Design, Quality Control 1 Credit 7.1 Heat Island Effect, Non-Roof 1 Credit 7.2 Heat Island Effect, Roof 1 Creditil Light Pollution Reduction 1 Yr 7 W Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1 • Credit 1.2 Water Efficient Landscaping,No Potable Use or No Irrigation 1 Credit 2 Innovative Wastewater Technologies 1 Credit 3.1 Water Use Reduction,20%Reduction 1 Credit 3.2 Water Use Reduction,30%Reduction 1 Prereq 1 Fundamental Commissioning of the Building Energy Systems Required Prereq 2 Minimum Energy Performance Required &' Prereq 3 Fundamental Refrigerant Management Required 'Note ad,EAc1:All LEED br New construction protects registered ager June 26^,2007 are required to achieve at least two(2)points under EAcl. ®Credit 1 O timize Energy Performance 1 to 10 10.5%New Buildings or 3.5% Existing Building Renovations 1 14%New Buildings or 7% Existing Building Renovations 2 17.5%New Buildings or 10.5%Existing Building Renovations 3 21%New Buildings or 14% Existing Building Renovations a 24.5% New Buildings or 17.5% Existing Building Renovations 5 28%New Buildings or 21% Existing Building Renovations 6 31.5% New Buildings or 24.5% Existing Building Renovations 7 35%New Buildings or 28%Existing Building Renovations 6 38.5% New Buildings or 31.5% Existing Building Renovations s 42%New Buildings or 35%Existing Building Renovations 10 ®Credit 2 Onsite Renewable Energy 1 to 3 - 2.5%Renewable Energy 1 7.5% Renewable Energy 2 12.5% Renewable Energy 3 Credit Enhanced Commissioning 1 Cradila Enhanced Refrigerant Management 1 Credit 5 Measurement&Verification 1 Credit Green Power 1 • continued... Y. 7 N. d Prereq 1 Storage&Collection of Recyclables Required credit 1.1 Building Reuse, Maintain 75%of Existing Walls, Floors&Roof t Credit 1.2 Building Reuse, Maintain 100%of Existing Walls, Floors&Roof 1 credit 1.3 Building Reuse, Maintain 50%of Interior Non-Structural Elements t Credit 2.1 Construction Waste Management, Divert 50%from Disposal 1 Credit 2.2 Construction Waste Management, Divert 75%from Disposal 1 Credit 3.1 Materials Reuse,5% 1 Credit 3.2 Materials Reuse,l0% t Credit 4.1 Recycled Content, 10%(post-consumer+y2 pre-consumer) 1 Credit 4.2 Recycled Content,20%(post-consumer+y,pre-consumer) t Credit 5.1 Regional Materials, 10% Extracted, Processed&Manufactured Regio t Credit 5.2 Regional Materials,20%Extracted,Processed&Manufactured Regio t Credit 6 Rapidly Renewable Materials 1 Credit? Certified Wood t Y. 7 W _ � a I'd Prereq 1 Minimum IAQ Performance Required i`d . Prereq 2 Environmental Tobacco Smoke(ETS)Control Required Credit 1 Outdoor Air Delivery Monitoring 1 Credit 2 Increased Ventilation 1 Credit 3.1 Construction IAQ Management Plan, During Construction t Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1 Credit 4.1 Low-Emitting Materials,Adhesives&Sealants 1 Credit 4.2 Low-Emitting Materials, Paints&Coatings t Credit 4.3 Low-Emitting Materials, Carpel Systems 1 Credit 4.4 Low-Emitting Materials, Composite Wood&Agrifber Products 1 Credit 5 Indoor Chemical&Pollutant Source Control 1 Credit 6.1 Controllability of Systems, Lighting t Credit 6.2 Controllability of Systems,Thermal Comfort 1 • Credit 7.1 Thermal Comfort,Design 1 Credit 7.2 Thermal Comfort,Verification 1 Credit 8.1 Daylight&Views,Daylight 75%of Spaces t Credit 8.2 Daylight&Views,Views for 90%of Spaces t Y. 7 No Credit 1.1 Innovation in Design:Provide Specific Title 1 credit 1.2 Innovation in Design: Provide Specific Title 1 PEPCredit 1.3 Innovation in Design:Provide Specific Title 1 Credit 1.4 Innovation in Design:Provide Specific Title t Credit LEED°Accredited Professional 1 Yr 7 No Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points •