08080161 CITY OF CUPERTINO es + �
BUILOINC DfV4SION PERMIT .?CONTACTQRtINFORMATION �
.
V
BUILINNG ADDRESS: PERMIT NO.
881 HYDE AVE ELEGANT KITCHEN AND BATH 08080161
OWNER'S NAME: i1VC. PERMIT ISSUE DATE
MAXWELL SLOMIEH 681 E BROKAW RD 08/21/2008
*NE: SANITARY NO. CONTROL NO.
(408) 441-0982
ARCHITECT/ENGINEER: BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
0 O C I=
12 O O LICENSED CONTRACTOR'S DECLARATION •
I hereby affirm that I am licensed under provisions of Chapter 9(commencing Job Description
ZZ 3,a with Smtion7WmofD' n3o1the Business and Professions Cede.and mylicense e RMDL EXTNG BTHRM& UPGRD ELECT PANEL FRM 100A TO
°=N in full force and eff �<7��/
o License
G( [V Lk.
Contractor (were f'zt1 2 0 0A
ARCHITECTS DECLARAYh1ON 1
1 U I understand my plans shall be used as public records �)r -
yG Licensed Professional
3 OWNER-BUILDER DECLARATION
9 te i I hereby alEfm that I am exempt from the Contractor's License Law for the
at 0 following reason.(Section 7031.5.Business and Profs ions Code:Any city or county
$g which requires a permit to constrict,alter.improve.demolish.m repair any structure •
-Z i prior to its issuance,also requires the applicant for such permit o file a signed statement
• < that he is licensed pursuant to the provisions of the Contractors License Law(Chapter 9 Sq.Ft.Floor Area Valuation
CommencingxF; (cmencing with Section 7000)of Division 3 of the Runnels end Professions Code)or $10000
tee — that he is exempt therefrom and the basis for the alleged exemption.Any violation of
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of A,pN Number OccupancyType
not more than five hundred dollars(S500). 37539010 .•CTV'
I.as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the guuclure is not intended or°Bexed for sale(See.7044.Business
and Professions Code:The Contractor's License Law does not apply to an ower of Required Inspections
property who builds or improves thereon,and who does such work himself or through his
own employees,provided that such improvements are not intended or offered for sale.If,
however,the building or improvement is sold within one year of completion,the owner-
builder will have the burden of proving that he did not build or improve for purpose of
sale.).
L as owner of the property-am exclusively contacting with licensed contractors to
construct the project(Sec.7044.Business and Professions Code:)The Coonacmrs Ii
cense Law does not apply to an owner of property who builds or improves thereon.and
who contracts for such projects with a contractor(s)licensed pursuant to the Contractors
License Law. ,
❑1 am exempt under Sec. .B&P C for this mason
Owner Date •
WORKER'S COMPENSATION DECLARATION
IIIIhereby aures under penalty of perjury one of the following declarations:
I have and will maintain aCmtfcaeof Consent to self-insure for Workers Comps-
ration,as provided for by Section 3700 of the Labor Code.for the performance of the
work for which this permit is issued.
I have and will maintain Workers Compensation Insurance.es required by Section '
3700 of the Labor Code.for the performance of to work for which this permit is issued. • '
My Works Compeensadoont®sunnce/paerier and Policy number am: •
Cartier. i rel PC (11Wv°'t Policy Na7/Z O 02773 -
CERTIFICATE OF EXEMPTION FROM WORKERS' •
COMPENSATION INSURANCE
(Thiscetioe need not he completed If the permit a(crone hundred dollars(5100) ,
or kat)
•
I certify that in the performance of the work for which this permit is issued.I shall not -
employ anyperson in any manner so as to become subject to the Workers'Compensation
Laws of California.Date
Applicant
NOTICE TO APPLICANT:IL after making this Certificate of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Code.you must
.J Z forthwith comply with such provisions or the Nunn shall be deemed revoked.
'�O CONSTRUCTION LENDING AGENCY
I~ I hereby affirm that them is a construction lending agency for the performance of
C' r. the work fur which this permit Is issued(Sec.3097,Civ.C.)
fz1 Q Landers Name
:Liz Lenders Address
L)O I certify that 1 have read this application and state than the above information is
IL.^ comm.I agree to comply with all city and county ordinances and sub laws relating to
0 SV" building construction.and hereby authorize representatives of this city to enter upon the
abuve.mentioned property for inspection purposes.
F, (We)agree to save,indemnify and keep harmless the City of Cupertino against
fA liabilities.judgments,costa and expenses which may in any way scene against said City �I J
L)z in consequence of Ne granting of this permit. J
^v APPLICANT UNDER • a5 - D WILL COMPLY WITH ALL NON-POINT Issued by: 1- 4014111,pi I Date C2-(
SOURCE REGULA s'S.
Re-roofs
Signature ofd -H °ntractor AZARDOUS MATERIALS DISCLOSURE fuse Type of Roof
Will the applicant or future building occupant store or handle hazardous material .
as defined by the Cupertino Municipal Code.Chapter 9.13.and the Health and Safety
Code,section 25532(a)t All roofs shall be inspected prior to any roofing material being installed.
❑TuNo
If a roof is installed without first obtainingan inspection,I agree to remove
Will the applicant or future building occupant taw:equipment or devices which P g
II hazardous air contaminants as defined by the Bay Area Air Quality Management all new materials for inspection.
District?
❑Yes tklu
I have read the hazardous materials requirements under Chapter 6.95 oft the Califor-
nia Health&Safety Code.Sccioru 25505.25533 and 25534.1 understand due lite building
does not camntly have tenant that it is my responsibility 10 notify the occupant of the
°gammmxwhknm °rbY f.4.,yw// Y° xyly Signature of Applicant Date
Owner or author reagent CY tDD e_ _ _ All roof coverings to be Class'1r or better
CITY OF CUPERTINO
5 ITEMS OF 5 PERMIT RECEIPT OPERATOR: patg
COPY # : 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN • 37539010 . 00
DATE ISSUED • 08/21/2008
RECEIPT # • BS00O005861
REFERENCE ID # . . . : 08080161
SITE ADDRESS • 884 HYDE AVE
SUBDIVISION
CITY • CUPERTINO
IMPACT AREA
OWNER • MAXWELL SLOMIEH
ADDRESS • 884 HYDE AVE
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-4639
RECEIVED FROM • ALI' S CONSTRUCTION
CONTRACTOR • KAMRAN ASLANPOUR LIC # 30333
COMPANY • ELEGANT KITCHEN AND BATH INC.
ADDRESS • 681 E BROKAW RD
CITY/STATE/ZIP . . . : SAN JOSE, CA 95112
TELEPHONE • (408) 441-0982
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
1BSEISMICR VALUATION 10, 000 . 00 1 : 00 0 . 00 1 . 00 0 . 00
1EPERMITFE FLAT RATE 1 . 00 40. 79 0 . 00 40 . 79 0 . 00
1REMRESBAT SQ FEET 45 . 00 429 . 00 0 . 00 429 . 00 0 . 00
1S'I'PLNCK HOURS 1 . 00 122 . 00 0 . 00 122 . 00 0 . 00
1TRAVDOC FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
TOTAL PERMIT : 633 . 58 0 . 00 633 . 58 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
CHECK 633 . 58 #720
TOTAL RECEIPT : 633 . 58
•
(4080/6 /
CITY OF CUPERTINO
• 'Ltt4.. ADDITION/REMODEL
• CUPER 1NO PERMIT APPLICATION FORM
APN # 3cy, / 0, o U Date: 2( od--
Building Address: I4y eV cA
C.-
Mailing
Mailing Address (if different from building address):
Owner's Name: Phone# :
GC7-4•Uc.1 (D INC\ e- 5'_,2_6,
Contractor: e T (` tLhch c �c Phone#: Gf Li) .— Ot
Fax #: Sf — �(ZZ
Contractor License#: J Q th
Cupertino Business License#:
Contact: / _ L` v o A _(0 � Phone#: '3G — 09??
C� ✓T_S Fax #:
Building Permit Info:
Bldg. . Elect. !w_ Plumb. Mech. ❑ Hillside ❑
.ob Description: n
Addition (adding sq footage): Oeyskoac_k • `'y. t Sc l nnhl (O c _Vn%A r 4'^- -
�ny 1 LI ext 1'm,nc1 Pro ., 100.4-- -2-00
What is being remodeled (not including addition)?
Remodel Includes Re-Roof: Yes ❑ No IJ If yes list number of squares
Remodel Includes Structural: Yes ❑ No '' _
Square Footage:
Addition: Porch: Deck: Garage: Detached Attached
Remodel: Kitchen Bath / Other
Type of Construction (Usage Class): Occupancy Type:
I-A, 1-B ❑ II/III/V-A E Il/III B, IV-HT, V-B V- -7
Valuation: 2_0, (Jaw, Please check this box if the project is a
second-story addition ❑
Project Size: Express co Standard ❑ Large ❑ Major ❑
Please complete relevant portion of the Green Building
"'checklist& attach it to the application or if applicable, Green Building Points Achieved:
include in plan set & the sheet index.
***For Office Use Only***
Over-the-Counter 0 Revised 7/01/08
CITY OF CUPERTINO
ADDITION/REMODEL
Y OF
CUFCITh? INO FEE SCHEDULE •
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
ADDITIONS 1R3SFDADD
PLLONGRNGR Long Range PL
Planning/Residential
1R3INSP Dwellings Inspections B
1R3PLNCK Dwellings plan check B
1R3REPINSP Dwellings Repeat B
Inspection
1R3REPPLNC Dwellings Repeat Plan B
Check
IR3HINSP Dwellings Hillside B
inspection
1R3HPLNCK Dwellings Hillside plan B
check
1R3HREINSP Dwellings Hillside B
Repeat Inspection •
1R3HREPLNC Dwellings Hillside B
Repeat Plan Check
I R3ALTINSP Dwellings Alternate B
Materials Inspection
1 R3ALTPLNC Dwellings Alternate B
Materials Plan Check
1PCESS Cesspool P
1PPRSEWG Ea. Private Sewage • P
Disposal System
1PRSEWER Sewers P
1BPSPRINK Lawn Sprinkler/Backflow P
1BPWSVCS Main Water Service •
P
IBSEISMICRE SeismicResidential B
DECKS 1R3SFDADD OR
1R3SFDREM
IDECKWOOD Deck (Wood)-Each B
(Each) •
1DECKRAIL Deck Railing-Each B
(Each)
•
CITY OF CUPERTINO
ADDITON/REMODEL
•
• FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
GARAGES 1R3SFDADD OR
DETACHED 1R3SFDREM
1GARDTW<=1K Wood Frame up to B
1,000 SF (each)
1 GARDTM<=1 K Masonry up to 1,000 SF B
(each)
BCONSTAXR Construction Tax Res
(new detached garage)
PATIO'S OPEN 1R3SFDADD OR
1R3SFDREM
1PATIOWOOD Wood Frame up to 300 B
SF
1PATIOMETAL Metal Frame up to 300 B
SF ,
1PATIOOTHER Other Frame up to 300 SF B
PATIO'S CLOSED 1R3SFDADD OR
• & SUN ROOMS
1R3SFDREM
1 PATIOENCLW Enclosed Wood up to 300 B
SF
1PATIOENCLM Enclosed Metal up to 300 B
SF
1PATIOENCLO Other Enclosed Patio up B
to 300 SF
I COVPORCH Porch Covered-Each B
(Each)
REMODELS 1R3SFDREM
1REMRESKIT Kitchen Remodel up to B (Deduct "$"for ea plan
300 SF check)
cis- 1 REMRESBAT Bath Remodel up to 300 B «
SF
I REMREOTH Other Remodel up to 300 B 46
SF
IREMRES2 Remodel Residential B
Greater than 1000 sq ft
• 1REMRES3 Remodel Residential B
Greater than 2500 sq ft.
3 of 3
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE • •
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
REMODEL PLNCK
1STPLNCK (1-3 for Standard Plan Check B NOT FOR OVER THE
remodel) COUNTER PLAN CKS.
1REROOFRES Residential Re-roof Each B
100 SF
WINDOW/SLIDING 1R3SFDREM
GLASS DOOR
1 WINREP Replacement windows B
• (ea 8 windows)
1 WINNEWNSTR New Window (non- B
structural)
1WINMEWSTR New Window (Structural B
Shear Wall/Masonry)
1 WINBAYSTR Bay Window (Structural) B
SKYLIGHTS • IR3SFDREM •
1 SKYL<10 SF Skylight less than 10 sf B
1 SKYL>10SF Skylight greater than 10 B
sf or structural
1STAIRS Stairs-first flight/ea addt'l B
1EPERMITFEE Electrical Permit Fee E
I MPERMITFEE Mechanical Permit Fee M
1 PPERMITFEE Plumbing Permit Fee P
1 ELCPLNCK Stand Alone Electric Pln E
Ck (hourly)
1 MECPLNCK Stand Alone Mechanical M
Pln Ck (hourly •
1PLMPLNCK Stand Alone Plumbing P
Pln Ck (hourly)
4 of 3
•
CITY OF CUPERTINO
ADDITON/REMODEL
• FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
1 BSEISMICRE Seismic Residential B
1 TRAVDOC Travel &Documentation B
1BUSLIC Business License B
•
•
5 of 3
•
Green Building Plan Check
•
Index of Green Building Points/Categories
• A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
• shown and referenced on the Project
Plans See below
b '9r ,.__--: i^ F hw'ihJ .;.:5:_c '`kt ,^o s...a-p:5i" i :...."'-.a..: a .t. aW�.,ii, ,R.4'. i v..r
B. Site 9. Install H.E. Irrigation, (details/spec)* L-1 2 points
11. Permeable Paving, (Note) L-1 2 points _
C. Foundation 1. Use 15% Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, (detail) S-2 2 points _
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec.) A-4 • 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 • 2 points
11.A 2500 Gal. Tank, (Note/Spec) L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec.) A-3 1 point
P. Other 1. List Green Features on Plans A-1 1 point
xi, ti r1 ,! `-'i TOTAL POINTS 40 points
•
•
• •
Nan Review Process Work Book Page-12-Revised 3/25/08
• Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a"total points"value to a project to be considered environmentally friendly is
• not feasible, However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project.
INPUT Resources Energy IAD/Health
.Site
1.Recycle Job Site Construction&Demolition Waste
65%=1 point;75%= 2 points;80%=4 points I up to 4 Resource pts • 0
2.Salvage Reusable Building Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0 •
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
8.Design Resource-Efficient Landscapes and Gardens` _j 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas ' 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
0 0 0
B.Foundation
1.Incorporate Recycled Flyash in Concrete •
• 25%Recycled Flyash=2 points;Add 1 point for every 10% '
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes- 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
0 0 0
C.Structural Frame
r1.Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
, 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
• 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12.Use OSB - - -_l
a.Subfloors ' 1 Resource pt y=yes 0
• b.Sheathing P 1 Resource t
Y=Yes 0
0 0 0
INPUT Resources Energy IAO/Health •
B.Exterior Finish
1.Use Sustainable Decking Materials
a.Recycled content 3 Resource pts y=yes- 0
b.FSC Certified Wood 3 Resource pts y=yes- 0 •
2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAQ/Health pt y=yes 0
3.Install House Wrap under Siding 1 IAQ/Health pt y=yes_ 0
14.Use Fiber-Cement Siding Materials _ 1 Resource pt y=yes 0
. 0 0 0
E.Plumbing
F.Install Water Heater Jacket - 1 1 Energy pt y=yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) i Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
4.Replace Toilest with Ultra-Low Flush Toilets •
(1 point each,up to 3 points) _ Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0
8.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
0 0 0
r.caectricai
1.Install Compact Fluorescent Light Bulbs(CFLs) •
(6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to •
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
0 0 0
G.Appliances
1.Install Energy Star Dishwasher { 1 Energy pt y=yes- 0
2.Install Washing Machine with Water and Energy I
Conservation Features 1 Energy pt y=yes- 0
3.Install Energy Star Refrigerator , 1 Energy pt y=yes- 0
4.Install Built-In Recycling Center 3 Resource pts y=yes_ 0
- -- -- 0 0 0
H.Insulation '
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings ' 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
f3.InstallRecycled-Content,Fiberglass Insulation with
No Added Formaldehyde 3 IAO/Health pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0
. b.Ceilings 4 Resource pts y=yes 0 •
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes 0
D.ceilings 4 Resource pts y=yes 0
0 0 0
•
' INPUT Resources Energy IAO/Health
I.Windows
' 1.InstalllEnergy-Efficient Windows
illa.Double-Paned , 1 Energy pt y=yes 0
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.Low.Conductivity Frames 2 Energypts
L_ y=yes 0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes • 0
0 0 0
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic in All Duct Joints
_ ------1 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
B.Install Sealed Combustion Units
a.Furnaces 3 IAQ/Health pts y=yes 0
b.Water Heaters 3 IAO/Health pts y=yes 0
9:Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stovesinserts 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 IAO/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
0 0 0
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4:Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
i6S._Selact Safe Durable and Roofing Materials —
— 7 1 Resource pt y=yes 0
7.Install Radiant Barrier - 3 Energy pts y=yes 0
0 0 0
L.Natural Heating and Cooling
1,Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
0 0 0
•
•
INPUT Resources Energy IAO/Health '
M. ndoor Air Qualify an. rnlshes •
L7.UseLow/No-VOC Paint - - _ , 1 IAQ/Health pts miss 0 •
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0
3.Use Low/No VOC Adhesives 3 IAQ/Health pts mes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6 IAQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
17.Seal all Exposed Particleboard or MDF _ J 4 IAQ/Health pts y=yes 0
8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes—� 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0
0 0 0
N.Flooring
1.Select FSC Certified Wood Flooring B Resource pts y=yes 0 •
2.Use Rapidly Renewable Flooring Materials —_J 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
0 0 0
•
Total Points Available: 1401 1301 57
Total Points Project Received: • 01 01 0 •
G:datarprogslgreenbuildingguidelineshemodelerstgreenpointsfinal2.12.04protected.xls
•
•
I- -----
1 - •
• � 33
BMP 'SHETU
. • 0 a BMP ,QHEET v.
, t) ___ ,
1.:__ __...4 ..._ . .. i ...) 11 "--
z � • c
.. ji,N \ ••.`i. N.. „:>NH. , . .\,,, ,,..i_ilL \H, -N.
` , l
oi
j ,c Vjj T
a a r IN J`''--,mc-m>•l.:L 1mY t 'SCD V
c ' \ ' •
r Gli?iER�iPtO l7/5�.1k ( 1' �\
• J WF,�( 6 2 ( t-G�
This rat of Diana •n„ _it:. .xt.ns MIS. CD
Tl
oe kept on the . ',at al tints-nd it is un
H i4, Ail to make .n; 7.;1 n-.es or alteration,
• or same with:u w.atrn permission iron /
�� th. building Dept., CAI) of Cupertino. l
`'S Tj a stamping of this�—i especdications.
f1ci SI IALL NUT be held htpe�iit or to be ar J �-'/�
A ;proval of the violaticJJI?L any p�tfr�_ c=
ally.City Ordinance S1te lAw 1�
e) f / '3 _> 6
1L
L_n i
l
W / r ,a
J r 'I , Lc,.
t I
i
Sd 1 i /
ca :...
cfi i \ /1
A ssw
--Y9 S+r7s vnl_jpVII \I
Community
atatio, munity Development
10300 Torre Avenue
Cupertino CA 95014
•CITY C!F •
Telephone(408)777-3228
*J Fax(408)777-3333
PEIQTINO
Building Department •
All Cupertino building permits must meet certain conditions related to maintaining
environmental quality and public peace and safety. The two most common
conditions are described below.
STORM WATER POLLUTION CONTROL
State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and
the Santa Clara Valley Water District control stormwater pollution. Educating local
residents and businesses and enforcing stormwater pollution control laws are key parts
of the City's compliance efforts. •
Stormwater pollution prevention: It's up to us
In northern Santa Clara Valley, storm drains flow directly to local creeks and San
Francisco Bay,, with no treatment. Stormwater pollution is a serious problem for wildlife
dependent on our waterways, for people living near streams and baylands, and for the
local water supply. Common sources of stormwater pollution include:
• Dripped oil, fuel, and antifreeze from vehicles and heavy equipment;
• Construction debris, including dirt, concrete and paint;
• • Landscaping runoff containing pesticides or weed killers; and
• Any material dumped or spilled into streets or storm drains
•
• The property owner and the contractor share ultimate responsibility for activities
occurring at a construction site and will be held responsible for any environmental
damage caused by subcontractors or employees.
For more information on construction-related stormwater requirements, see the
Stormwater Quality Regulations section of the City of Cupertino web site at: •
htto://www.cupertino.orq/city government/departments and offices/
environmental services
COMMUNITY NOISE CONTROL
The basic noise control requirements for construction sites are as follows:
• Typical construction work hours are:
- Weekdays - 7 a.m. to 8 p.m.
- Weekends - 9 a.m. to 6 p.m.
• Construction other than street construction is prohibited on holidays.
• Residential daytime noise levels from complaint site - 60 dBA
• Nonresidential daytime noise levels from complaint site - 65 dBA
For more information on noise control, please see Chapter 10.48 of the Cupertino
Municipal Code, which can be accessed at htto://www.amlegal.com/cupertino ca/
•
Greg Casteel
Building Official
c • (SIB ��W r �2CV`V%- -C-t • ••
• Ice Ira_ -- Rc:ti.F,�.•i €.21c, s�:n •P:.67-1-11/4.--...2_9 -F— N `f(o.cC i ic.vtic p 1czr_-�. . Po e.i..._, P f f e 'f'-sieLcs-��dclk_
1
— — 1-18I' , de
I —3 0 ---4 — /c 1
\c 4-5: J-S-(- 3 G° r
/-- i \ ejv or cif r.ca‘to ec.4r-
13O-rod-circiAtv v__
c... Lor 1 , j — Y .1 !SV'WHO 5tSft\c. b✓,at
tdtc-k- N `--, 7/ �fCi.-tvL
� /,
J
j
2 . re:II'
t` c
-c ` —
I, _.. Pk)uate-e-t f, '- J Ear u i I
C • V/K
-
D
r6 Cn
0 //:/-?%
Tr X7
\ -to. - • /7 / 7."
8
';/ -4 0 Door 1
-mac 440 2K14.494( 5fc :;,-,e ,k
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
SCUP[RJINO
Building Department
JOB ADDRESS: PERMIT #
8e SLCI6cPov0
OWNER'S NAME: /V(q,c I S /°rn, 17 PHONE # ycc(— C7 7a-2
GENERAL CONTRACTOR:C I�. T K,tck.a t*i9A FAX #
I am not using any subcontractors: 4 1Z r/O�-
Signature Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
• Linoleum/ Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date