Loading...
08090043 CITY OF CUPERTINO ,zr v BUILDrNb D3vlsioN PERMIT CCSNTRACTO MIiMt1TIO,N . PERMIT NO, BLBLp1hycg3gD,EFsJOHNSON AVE TBD — TO BE DETERMINED 08090043 OWNERS NAME: PERM11T LSSUEDATE JAMES C ATCHISON JR TRUSTEE 09/09/2008 NE: SANTrARY NO. CONTROL NO. ARCHr1ECT(ENGINEER:. BUILDING PERMIT INFO fil ELECT PLUMB MECH 0 0 0 0 0 0 LICENSED CONTRACTORS DECLARATION I demby affirm that I am licensed under provisions or Chapter 9(commencing Job Description _ wiNSeetion)00U)ofDivision3aftheButirkvandProfcssio om,andmylkcrmis RE—RF T/0 BLT—UP & REPLC W/MODFIED BITUMEN CLS A m N n full fame am cffat pp r j�iZ Licence ass Lam' fY.a O 20SQ n � D.m ARCHITECT'S D CIARATION a **PRO 'TECH ROOFING PD FOR NEW BSL 9/9/8 U 1 uMersund my plans shall be used as public research ., - gd L O Ix'mad PNfeSSlaml 3 OWNER-BUILDER DECLARATION ContrON E F 1 hmasu .Rite that 1 am eampt from the fes l..Cw License law for the E po following mason. erten t )0313,Buri•er. and w.de oli h.or MY city or county m�+ which require a permit re cores the slier,improv,demolish,or repair any structure _ REprior.its censed pursu require thovisio antsof for smhpermit nice.signed shap=9 < NuhcislleenseJpurmantathcpmrisionsafthe Cantncar'allcenseLaw(CTaPm9 Sq.F[. Floor Area Valuation xis (mmmencingwithSemon)1KIm)dt)ivWon3ofineBu:tne.� Pmre�ioeCade)or $8000 r3.- that he u b exempt therefrom and themu To,Ne alleged emmptioe Any violation of Section 703M by any applicant for a permit mbiccts de,epplkmt a a MAI penalty of Number Occupancy not mart than IT.hundred dollars ane s(M). 37530024 P Y Type ❑Las owner of the property.a my moployces with cages a their sok eampenution, wad Prtheloom,ane the heComusrotksendede awdo Tarek(Sit.RMS,wourev and ernkasinbu ease:The conuemon.came Law Sae not apply an an owner,of _ Required Inspections pro em lodeduildsulimprm'a dveon,andwho dossued lockhimrlfmthough his own employoouiprovlmd that such impm sold within not intendedoroRergd for sale If. builder me building or improwmrntumidwithinot yearormmovefortheowner- ask.). will haw terns burden of pvrina dui k did rot htild or Improve for puryoae of ask.). ❑1.as awmr of tic property.w emleinly contracting with Bccmed matracmrs to comtmct the pmject(sec.70,15.Business and Professions Code:)The Contractor's U. sense law dose cot apply in an oloner of property who builds or improv themon,and whocantricu for such projects with s lcmuneror(s)licensed Pleasure to the Convene/s Lkcex Law. ❑Iamexwptunder See ,B&PCfnrdusreasan Owner Date WORKERS COMPENSATION DECLARATION I barely affirm under penalty of perjury out of dm following declamtionc L ban and will maintain a Cnrtificataof Conan to self-usum fa WorgeYscompen- sedan,as provided for by Section 3700 of the fader Code,for the,perform.of the ...{, work,for which this Permit is imuea. 1 ban and will maintain Worhe/s Compenution Insurance,as required by section ]00 or the labor Coke.for tic Kdomtance of the wort for which this permit u issued My Wa s ompe rrtion lnmmrSR ami rend Polley nu D(me, lacy e-I ( ERTIFlGMOM - , Camkr. Q A FROO OF EXEMPTION M w'ORKEA5 COMPENSATION INSURANCE (Thu seetim reed not be cmnpkted if the permit u forme hundred dollen(SIM) or leu) 1 curtly that in the performance of the with for which this Permit is issued.I shall nw ernPloy any person in airy manoorm as b became subject in the Worgen'Compmuation Laws of California.Dam Applicant NOTICE TO APPLICANT:If,after malting this Cenifiam of Exemption,you abmk become subibet in the Workles Compensation provisions of the Labor Code.you muse .,O forthwith amply with such pm'amms w the permit shall he doomed unsold.za vy CONSTRUCTION LENDING AGENCY [-r Thereby affirm that then is a construction lending agency for the Performance of IY the loam for which the Permit is issued(sit.3097.Cir.C.) ip L<nmrh Name z L<ndersAaamss U O 1 certify mut 1 In.mad this application and some muss the elan information is W^ cmmct.I egrte in comply with all city and county unimar xs and sum laws mlmng in 0 lrJ' building construction,and hereby mo der n,mprraentadws of this city Is enter upon the alavmmenuoned pmpeny for ie pecum Porch may H y (We)agree to saw,indemnify and Imcp harmless the City of Cupertino against Uh lialllimu,Judgments.casu and expenses which may In any wyamueaaaimtadd Cap ane aegmn earmeam nog acro emit. Issued by: Date ► AP (CANT DERSTANDS AND WILL COMPLY WITH A L ON POINT SOXR TIONS. Signature of Appli=VCon DDam Re-roofs 11=10 ATERIAL9 DISCLOSURE Type of Roof Will the applicant or rte 'Iding occupant same or handle heard..mamrial asdeRmd by the Cupertino M cipal Cam.napmr 9.13.and the Heaith and Safety cam,Section es p,I Na zss32(.)) ❑Ye All roofs shall be inspected prior to any roofing material being installed. Will the applicant or lot=building oceupsnt use equipment m mesas which If a roof is installed without first obtaining an inspection,I agree to remove �hvaMe air cmtamium s as defined by the Bacs? y Arta Air Quality Management all new materials for inspection. �jk 'Lady haercmu materials mquimumms underChaper6.95ofthe Caiifor. am,Satires LS505.25533 and25534.T undersand thaifine holding n a tonna,that it u my rcrypmihilify be or,dear pant of mm artmmetprioranialanaof.Cerdecalof� p�T Signature of Applicant ate agent Olt coverings to be Class'%{."or better CITY OF CUPERTINO • 2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 37530024 . 00 DATE ISSUED. . . . . . . : 09/09/2008 RECEIPT # . . . . . . . . . : BS000006032 REFERENCE ID # . . . : 08090043 SITE ADDRESS . . . . . : 10840 JOHNSON AVE SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : JAMES 'C ATCHISON JR TRUSTEE ADDRESS . . . . . . . . . . : P 0 BOX 698 CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM . . . . : PRO TECH ROOFING CONTRACTOR . . . . . . . : TBD - TO BE DETERMINED LIC # 00096 COMPANY . . . . . . . . . . : TBD - TO BE DETERMINED ADDRESS . . . . . . . . . . : CITY/STATE/ZIP . . . . , TELEPHONE . . . . . . . . : • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BSEISMICR VALUATION 8, 000 . 00 0 . 80 0 . 00 0 . 80 0 . 00 1REROOFRES SQ FEET 20 . 00 260 . 00 0 . 00 260 . 00 0. 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 260 . 80 0 . 00 260 . 80 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CASH 260 . 80 --------------- TOTAL RECEIPT 260 . 80 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF • Okay � uy� Rix OF CUPERTINO Oddix REROOF .CUPEkTINO PERMIT APPLICATION APN # 3-75 3 o O,? ' / I 00 Date: Build' Address: `� lob Z-) cz\j Owner's Name• Rhone #: q �S _ ' t �3 C� `-t 7Oh� ift C_5 Contractor: c�, n Phone #: �.qu 910-39/ 7 g \k J 2C� 1 c��r vl — I `� Fax #: Cupertino Business License #: Contractor License #: Type of Roof Covering: Existing: Proposed: Al—Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles ❑ Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) K, Other(Specify)t U,j..i' _e� ­_�; N 0 Number of existing coverings ❑ Provide I.C.B.O. Report # ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Descri ti n: Residentia Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, include in plan set & the sheet index. Valuation: I Hav Read, Un erst d and Will Comply with Cupertino's Tear-Off Policy: Signature Revised 6/16/08 Sm CITY OF CUPERTINO REROOF OF CUPEfiTINO FEE SCHEDULE Number of Fee ID Fee Description Fee Permit Type Squares Group IREROOFCOM Re-roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 2 0 1RER00FRES Re-roof Residential B 1SFDWLR00F 1BSEISMICRE Seismic Residential B 1REROOFMRES Re-roof Multi-Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 • Community Development Department Building Division City of Cupertino 10300 Torre Avenue • Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. • a) Spark arrester installation. 5. If plywood is installed,a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/ "per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: �nh� Job Site Address: 109,40 Roofing Company Name: Qw Applicant's Signature: q Date: • Greg Casteel Building Official Revised 07/30/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G: Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 oint P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points • Plan Review Process Work Book Page-12-Revised 3/25/08 t Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a'total points"value to a project to be considered environmentally friendly is • not feasible.However,25 measures have been highlighted to signify,that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project. A.Srte 1.Recycle Job Site Construction&Demolition Waste i 65%=1 point;75%= 2 points;80%=4 points - up to 4 Resource pts p ,2.Salvage Reusable Building Materials _ 4 Resource pts y--yes p 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5. Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yas 0 S. Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7. Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 - --— - 18_Design Resource-Efficient Landscapes and Gardens _ 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 1 1 1 B.Foundation 1. Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts p 2.Use Recycled Content Aggregate 2 Resource pts y=yes p 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yesl;;F 0 I 1 1 C.Structural Frame (1.Substitute Solid Sawn Lumberw th Engineered Lumber J 3 Resource pts y=yes p 2.Use FSC Certified Wood for framing (For every 10%,of FSC lumber used=2 points,up to 10) up to 10 Resource pts. p 3.Use Wood(Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes p 5.Design Energy Heels on Trusses 6°or more 2 Energy pts y=yes p 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes p 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes p 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes p 9.Use Structural Insulated Panels(SIPS) a.Floors b.Wall 3 Energy pts y=yes p 3 Energy pts y=yes p c.Roof 3 Enercy pts y=yes p 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes p 12.use OSB — -- ' a.Subfloors , 1 Resource pt y=yes p • It.Sheathing 1 Resource of y=yes p ! 1 ! xtenor Ffmsh n 1.Use Sustainable Decking Materials a.Recycled content 3.Resource pts y=yes 0 . b.FSC Certified Wood 3 Resource pts y=yes 0 12.Use Treated Wood That Does Not Contain Chromiurn/Arsenic ? 1 IAO/Health pt y=yes 0 I3.Install House Wrap under Siding 1 IAO/Health pt y=yes 0 14.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 E.Plumbing L,Install Water Heater Jacket J 1 Energy pt Y_—Yes 0 2.Insulate of and Cold Water Pipes 2 Energy pts Y--yes 0 13.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0 J.Showerheads(1 point each,up to 2 points) f Up to 2 Resource pts. D ,4.Replace Toilest with Ultra-Low Flush Toilets ((1 point each,up to 3 points) Up to 3 Resource pts. 0 5.Install Chlorine Filler on Showerhead 1 IAO/Health pt y=yas 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes D 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 4 IAO Health pts. 0 B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0 1 1 1 r.trecmcar 11.Install Compact Fluorescent Light Bulbs(CFLs) 1(6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to • 5 points) Up to 5 Energy pts. D 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 1 1 1 G.Appliances 1.Install Energy Slar Dishwasher 1 Energy pt y=yes 0 12.Install Washing Machine with Water and Energy IConservation Features 1 Energy of Y--yes D 13.lnstall Energy Star Refrigerator 1 Energy pt y=yes 0 14.Install Built-in Recycling Center 3 Resource pts y--yes 0 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor Insulation over Cra\%d Space 4 Energy pts y=yes 0 �3.Install Racycled-Content,Fiberglass Insulation witli :No Added Formaldehyde 3 IAO/Health pts y=yes D •4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pis y=yes D • S.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes 0 o.t;emngs 4 Resource pis y=yes 0 1 1 indows 1.Install Energy-Efficient Wir dows • 1 a.Double-Paned 1 Energy pt y=yes D b.Low-Emissivity(Low•E) 2 Energy pts y yes 0 c.Low.Conductivity Frames 2 Energy pts y=yes 0 2.Insta l Low Heat Transmission Glai ng 1 Energy pt y=yes D 1 1 1 J.Heating Ventilation and Air Conditioning 1.Use Duct Mastic on ATI Duct Joints - 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y--yes 0 7.Install Whole House Fan 4 Energy pts y=yes D B.Install Sealed Combustion Units a.Furnaces 31AQ/Health pts y--yes 0 b.Water Heaters 3 IAQ/Health pts y--yes D 9.Replace Wall-Mounted Electric and Gas Heaters with - Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes D 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes D 12.Install 9D%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts Y--yes D 13.Retrofit Wood Burning Fireplaces • a.Install EPA certified wood stoves8nserts 1 IAQ/Health pt y--yes 0 b. InstalUReplace Dampers 1 Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydmnic Radiant Heating 3 Energy pts y=yes D 15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fai 3 IAQ/Health pts y=yes D 1 1 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts Y--yes D 2.Install Solar Water Heating System 10 Energy pts y=yes D 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes D 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points)_ Up to 18 Energy pts 0 6.Select Safe and Durable Roofing Materials 1 Resource of y=yes 0 7.Install Radiant Barrer 3 Energy pts y--yes. p 11 I 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes p 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p 1 1 1 • INPUT Resources Energy la()Mezilth ]M. n oor Air Qua ity and imshes . ;1.Use-LOW/ND-VOCPafnt - - 1 IAQ/Health pts y=yes 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes D . 3.Use CoWI146VOC Adhesives 3 IAQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y--yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 J.Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y--yes 0 6.Use FSC CertKed Materials for Intenor Finish 4 Resource pts y--yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQ/Health pts y--yes D 1 1 1 N.Flooring 1.Select FSC Certified Wood Flooring B Resource pts y=yes 0 (2.Use Rapidly Renewable Flooring male—nals _ _ 4 Resource pts y=yes 0 •3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAO/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 1 Total Points Availab e: a'�C 140 130 57 Total Points Project Received: —7�, ft �l �� L 0 0 0 • G:daarprogsigmenb�ildngguidelines/rvmodelersJgreenpointsf na1212.04prmecled.xls • Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone(408) 777-3228 CITY Of Fax(408)777-3333 46UPEkTINO Building De artment JOB ADDRESS: PERMIT # QJLro OS09onq OWNER'S NAME: --S--Oh PHONE # 10 GENERAL CONTRACTOR: FAX # I am not using any subcontractors: Si tune Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood • Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile a R � Owner/Contr tgnature Date