13085 (2) POST THIS,CARD NEAR FRONTPF BGALDING 7PERMIT
R
GITY OF CUPERTINO 85
i INSPECTION DIVISION
JOB INSPECTION RECORD,
TION
JOB ADDRESS 22081 'CINDY LANE UNIT# TRACT6L4f.}]# 4 .
- - PERMIT EXPIRES IF WORK
OWNER Te-f , fI R/)e-J CONTRACTOR IS NOT STARTED WITHIN
INSPECTI N DATE INSPE TOR INSPECTION RECORD 180 DAYS OF PERMIT ISSU.
FOUNDATION ` ANCE OR 180 DAYS FROM
L1."I'CRib2�Jf1- 'FDCZ `75'I2.2tIs_IVDIzL- 'LASTCALL'EDINSPECTION.
UFER - FI�'sr 4'TLx2 Ki'riD 61+n T ,O-y2'- .. -
PREGUNITE �PFA.'4w�F'R,R„LCRONy IN SYV[Ih Ws=l1. PERMIT VALIDATION
8 f�2lcC?IITIL�etuQ -C:Nt- 1-is-Gf
P URN CONCRETE UNTIL ABOVE HAS BEEN SIGNED '1 ] t{ ' CO►7p 1'rdNB}(.
UNDERGROUND /SLAB L, LLOUu
PLUMBING —�.-•®Q z - ,
ELECTRICAL .. p��� R �L ISSUANCE DATE
MECHANICAL , �iQA�({�1.1®O.IC ry ,S Wr t-L � ELECT, PLG. MECH,
00 NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING PERMIT
INFORMATION FORMA71 ON
WOOD FLOG R-v AL INFON $/FT.
PLUMBING - •( lkl, �"� .
MECHANICAL -
PERMIT TO
ELECTRICAL j
FRAMING
\ STORIES TYPE CONSTR.
INSULATION _I
OCC.GROUP RES UNITS
PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED
SO,FT,FLOOR AREA TOTAL ACREAGE
ROOF .1
°• DIAPHRAGM
BUILDING USE
RES, IND CON PB ONa
APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED ❑ ❑ ❑ 11 1:1
ASSESSON S PARCEL NO.
ROUGH -
PLUMBING -
TRACT NO. PARCEL NO.
GAS TEST •e i
MECHANICAL
ELECTRICAL - FINALS DATE INSP. ACC.DATE ACC.FILE NO,
FRAMING SAN IF dj63 -
ZONING ENG.SITE NO.
INSULATION - A5_ p, PLUMBING 21
W . GAS
' MECHANICAL . I FIRE SPRINK ENERGY T 24
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING Y ❑ N❑ Y ❑ "❑
aooD ZONE A.L.u,c.
" LATH—INTERIOR � -. ELECTRICAL '
LATH—EXTERIORE•„ 4:b FIRE DEPT. - Ym No Y ❑ N❑,
SHEETROCK GRADE ��� 'FEE SUMMARY
BUILDING ff 'BUI GI21, -
SHEAR INTERIOR - S- . 1
SHEAR EXTERIOR TEMPORARY APPROVALS:
+ 's FIREWALLS - ''� ELECTRIC ' _ PLAWCHECK
GAS ' _ -. ' FEE) /
G} NO TAPE ORP ASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE ' v'-
OCCUPANCYOFBUIILDING IS NOT PERMITTED UNTIL BUIL DING FINALIS SIGNED BY BUILDING INSPECTOR. ,MICROFILM
Lu i, ARRANGE FOR INSPECTION BY PHONING'252.4505, ' ELECTRIC
F
ONE-WORKING DAY BEFORE REQUIRED INSPECTION.:, PLUMBING
I O� PLEASE GIVE JOB ADDRESS WHEN, PHONING. '
✓ Z -MECHANICAL'.
—,SEE PERMIT FQR EXPIRATION DATE —
IMPORTANT! CONST.TAX dy
'PLEASE READ REVERSE,SIDE BEFORE 1IF, TOTAL
CAL LI NG,FOR-FINAL INSPECTION. +
qa OFF-ICECOPY > ' '
• The Gerard Group
Gerard Development Corporation —Gerard & Lambert, Inc.— Gerard Investments, Ltd.
July 12 , 1989
Mr . Joe Antonucci
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, CA 95014
RE: Arden Residence - 22081 Lindy Lane
Permit #13085
Dear Mr. Antonucci :
Gerard Development Corporation will have the following items
completed by August 01 , 1989, as per your request :
• Permanent handrail at upstairs deck off Master Bedroom
Permanent steps at rear of house
Porch and steps at Entry
Porch and steps at exterior of Study
Sincerely,
GERARD DEVELOPM T CO ORATION
Larry M. Johnson
Construction Manager
LMJ/cm
J D
JUL 1 1989
OLDG. INSPECTION DEPARTNMERL
CITY, 0-E CUPERTINQ -
141 first street • los altos, california 94022 • (415) 941-4141
IWO JUL 1 1%9
July 10 , 1989
Mr. Larry Johnson
Gerard Homes
1611 First Street
Los Altos, CA 94022
Dear Larry:
For purposes of closing and occupying our new residence, this
letter will serve as confirmation that my wife and I are willing
to accept our new residence without the sinks installed in the
utility room and the garage.
• It is understood that these fixtures will be installed as soon
as th per and re is obtained.
Si e ly,
Jerry A. Arden
21541 Regart Road
Cupertino, CA 95014
•
The Gerard Group
I —Gerard Development Corporation — Gerard & Lambert, Inc.— Gerard Investments, Ltd.
i
i
I
July 10, 1989
Mr. .Zoe Antonucci
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
Re: Arden Residence - 22081 Lindy Lane
Permit Number: 13085
Dear Mr. Antonucci;
It has come to our attention that the allowable furnace sizing calculations
for the afore-stated project are in error. The project data summary Form 1 (copy
attached) shows a maximum allowed bonnet capacity of (1.3 x 64,801) + (3711 x
10) = 121,351 btu/hr. The allowed bonnet capacity should be calculated as 1.3
x (64,801 + (3711 x 10)) = 132,484 btu/hr.
The furnaces installed are manufactured by Day & Night, model numbers and
• ratings as follows;
Upflow furnace: Model #395CAV036055. 53,000 BTUH output, 74.2% CSE
Horiz. furnace: Model #376CAVO48075, 75,000 BTUH output, 7.5.5% CSE
The combined output rating is 128,000 BTUH, which is below the correct
maximum allowed bonnet capacity of 132,484 BTUH. Both furnaces are certified
by the California Energy Commission although not listed in the Directory. I
spoke with Dan Kong of the California Energy Commission on their hotline number
of (916) 324 - 3376, should you wish to verify the same.
Thank you for your consideration in this matter and please do not hesitate
to contact me should you have any questions or comments.
Sincerely,
GERARD DEVELOPMENT CORPORATION
Lorin Nelson
•
141 first street • los altos, California 94022 • (415) 941-4141
PROJECT DATA SUMMARY W Form 1
owner
Tract Co40 I L,to w Ln
• project I checked by
+»tem-tree pate
.Iohn � Ierm�hns� .n A�, ( Sl
documentatlo author - data
SITE INFORMATION .
Heating Degree Day(from Appendix C)........................................................... HDD t 2-4:!>cc� OF-day
Outside Design Temperature(from Appendix.0 or Appendix G)...................... Tow _ 2 .�� of
PROPOSED BUILDING'ENVELOPE INFORMATION
Gran Floor Area if Low-Rim(from Calculations).............................................. At 3 3-711 h2
Grow Wall Arm if High-Rim (from Calculations) .......................................... Aw 4 h2
Designed Glazing Area (from Calculations)....................................................... Ag 5 h2
' Basic Glazing Area(16%of Line 3 if low-rise or 40%of Line if high Iisel........ Ag
6 h2
f Description of Assembly
GlazingI Ugl 7 .(o5 Btu/Ihr.ft2•09)
)��+ —,�� U92 B S9 Btu/(hr.ft2•OF)
Uq3 9 Btu,(heft--2F1
Well 2K4 Uwl 10Opt Btu/lhr.ill.dFl
Uw2 11 Btu/(hr-ft2.OFl
Uw3 )2 Btu/(hr•h2•OF) .
Uwe 13- Btu/(hr-ft2-OF)
CBilino/Root 1C, ?n Ucl 14 - ca!!2 C2 Owl(hr•ft2.OF)
• R—Z ) .n tJl Q� 9 H Uc2 15 . 050 I - 8tu/(hr.h2.OF)
Floor _Lnf�e fc- 19 !�H na ,1 Lift 16 X495 Btu/(hr.ft2.OFI
Uf2 17 Btu/(hr.ft 2.OFI
PROPOSED SPACE HEATING SYSTEM (Chapter 7) -
Gas Furnas - -
Building Design Hourly Heat Loss(from Form 2)......................................Q„... 19 Btu/hr
Maximum Allowed B nnet Capacity. ........ .. 19 .3 Btu/hr
Proposed Furnace �1.3 x G4 , 801 1
Make ^
Model De spoon A'Ke [L Q�oO S
Rated BonnetCapacity J )nCQ RTuh ino ,t 114 t CS 61-u1'1 Ou1('uPl 77.9 �nC.S,E,
r
Elaetrid Resistance Alone
Electric Resistance Life Cycle Con(from Form 5)................................:... BLCCe 20 5
Lowast Life Cycle Cost of the Other Systems(from Form 5)................... sLCCbwea 21 S
'Non•Depletable Energy w/Electric Resistance Back-Up
Percentage of Annual Hat Lou Met by Non-Depletable Energy
Sour"ffrom Calculations) ............................................................................... 22 %
Haat Pump with Electric Resistance Supplementary Han
Percentage of Annual Hat Lou Met by Electric Resistance
(from Calculations) .........................................................._................................ 23 %
PROPOSED WATER HEATING SYSTEM INFORMATION (Chapter 81
Electric Resistance Alone
Electric Resistance Life Cycle Cost (from Form 6) ................................. wLCC, 24 - S
Lowen Life Cycle Con of the Other Systems(from Form 61...................wLCCpsm 25 S
PROPOSED SWIMMING POOL HEATING SYSTEM INFORMATION (Chapter 91
.Solar Life Cycle Cost (from Form 7) ............................................................... pLCCs 26 S
Natural Gat Life Cycle Con(from Form 7)........................................_............ pLCCng 27 S
•