16600 POST THIS CARD NEAR FRONT OF BUILDING
PERMIT NUMBER
CITY OF CUPERTINO 16600
INSPECTION DIVISION
JOB INSPECTION RECORD
) PERMIT EXPIRATION
JOB ADDRESS o�OS S� -®--,/ UNIT# _LOT# -
PERMIT EXPIRES IF WORK
OwNEF/I 6 CONTRACTOR IS NOT STARTED WITHIN
INSPECTION DATE I INSPECTOR INSPECTION RECORD 180 DAYS OF PERMIT ISSU.
ANCE OR 1BO DAYS FROM
FOUNDATION NOTE:
LAST CALLED INSPECTION.
UFER
ALL GRADING AND DRAINAGE SHALL BE INSTALLED
TO COMPLY WITH THE APPROVED PLANS AND CIN OF PERMIT vni.lunrlory
PREGUNtTE CUPERTINO STANDARDS.
GARAGE SLABS
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED. . .
UNDERGROUND /SLAB ,
PLUMBING
ELECTRICAL ISSUANCE DATE
BLDGELECT. PLG. MEC.
MECHANICAL 0 o
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING PERMIT-
INFORMATION,
WOOD FLOOR - VALUATIOU - SIFT.
DID
PLUMBING . •� � U `3`(>'C�.�
MECHANICAL PERMIT TO
ELECTRICAL C1 Y UI t,u
FRAMING NEMA/)eL
STORIES TYPE CONSTR.
INSULATION
OCC,GROUP RES UNITS
PLACE NO SUBFLOOR UNTIL'ABOVE HAS BEEN SIGNED
SO Fi,FLOOR AV EA TOTAL AC_RE AGE
ROOF NOTE:NO FINAL INSP.SHALL BE MADE BEFORE
DIAPHRAGM THE CONSTRUCTION TAX IS PAID
y BUILDON usE
ROOF SHEATHING RES IND PB' El
APPLY NO ROOFING UNTIL ABOVE-HAS BEEN SIGNED. FINALS' - ,DATE INSP. Ej SE El EL
ASSESSORS PARCEL NO.
ROUGH SANA
PLUMBING ELECT.ENERGY
i.ACI NO. PARCEL NO
TUBS 8 SHOWER PAN PLUMBING ENERGY
MECHANICAL MECH.ENERGY
ACC.DATE ACC,FILE NO.
ELECTRICAL BUILDING ENERGY
FRAMING ELECT.FINAL TEST ZONING ENG.SITE NO.
INSULATION PLUMBING
GAS TEST GAS FIRE SPRINK ENERGY L]E
MECHANICAL Y E] NO NEl
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING
F LOOD ZONE A.LU.C.
EXTERIOR SHEAR ELECTRICAL RELEASE
INTERIOR SHEAR FIRE DEPT. Y[j NED Y ❑ N❑
SHEETROCK GRADE - . FEE SUMMARY
EXTERIOR LATH BUILDING - BUILDING /s'Gr+
INTERIOR LATH TEMPORARY APPROVALS
SCRATCH COAT ELECTRICFEEN CHECK 7S"
GAS
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE
OCCUPANCY OF BUILDING ISNOTPERMITTED UNTIL BUILDING FINAL ISSIGNED BY BUILDING INSPECTOR. MICROFILM
ARRANGE FOR INSPECTION BY PHONING 252-4505, ELECTRIC
LU ONE WORKING DAY BEFORE REQUIRED INSPECTION. PLUMBING
PLEASE GIVE JOB ADDRESS WHEN PHONING.
Z MECHANICAL
- SEE PERMIT FOR EXPIRATION DATE -
CONST.TAX
IMPORTANT!
PLEASE READ REVERSE SIDE BEFORE TOTAL
CALLING FOR FINAL INSPECTION.
OFFICE COPY