Loading...
080900520 O z0 P >_ ' � Q oz UO O Ej Uz CITY OF gPERTINO Buu.DrNG DIVISION PERMIT NFORNTATION,' aulLplpray,�pjC MC CLELLAN RD KITCHEN WORKS INC/DBA PERMIT NO. 08090052 , OWNEWSNAME: PERMIT MUE DATE JAHA TRISNADI 615 IRWIN ST 09/10/2008 NE: SANITARY NO. CONTROL NO. (415)456-4696 ARCHITECT/ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH 0 0 0 0 LICENSED CONTRACTOR'S DECLARATION Chapter Y Job Description ' 1 hereby affion that 1 am Ilcomce under provision of (commencing wlth section 700M (Divides.3afdteBusiness and PrufcadosCode. awmylicense is REPLC 2 BEDRM WNDWS LIKE4LIKE (MEETS EGRESS) in full forts and efrca License CIMS LW. N !7 4 Data Commit., ARCHITECrSDECLAIRATION 1 understand my plans shall he used M public records Licensed professional OWNER -BUILDER DECLARATION 1 hereby affirm that 1 un exempt from the Contactors License Law for the fallowing reason. (Schon 7W 1.5. Bulinus and Pmfcumuct Cods: Any city or county which requires a permit to consuucL altar, improve, demolish, or repair any abumme prior m its issuance. ilea requires the applicant foasuch Permit Or Isle, signed statement mat W is lksnmd pumunl in the Provisions of also Comsecturi Licome Law (Chapter 9 Sq. Ft. Floor Area Valuation (commencing with Section 70OD) of Division 3 of the Business and Ptefesvions Cade) or $4000 that W la attempt there0am and the iasis for the alleged so mp tum. My violit an of Salton 70313 by ury, applicant for a prsmlt subjects the applleant in a civil penalty of 35719062 Number Occupancy Type am, mom than Ove hundred doll.($Wn 0 1, u owner of rix po pony, ocmy croplo'nua wire wage M mob sok ompewdon. will do the work, and the,tructure Is ret amended or offered for who eice.7M4, Business and Pnfmslun Cade The Com.cmrs Limve Law does not apply W an Owner of _ Required Inspections pmpertY who builds ocimproves dtmean and who dies s Wm wart himself ser through his most employees. provided that sash improvements arc notimendcd oroffered forsale If, however, the building or improvement lasold within one year of completion, the owner. builder will have the Wren of proving that k did Out Wild or improve fa purpose of sale.). ❑ 1, u Maes of the property. am exclusively contracting with licensed mntramn to com tact the project (sec 1044. Business and Professions; Code:) The Coomcmrs U. . came Law dors not apply to an owner of property who builds or improm Merton, and who concocts far such projects with acmuactartU licensed purward to the Contractor' License law. El Iamexmnptundes5ee ,BhPCforthumason Owmr Dae WORKERS COMPENSATION DECLARATION 1 lumby salon under pemlty of perjury am of the fallowing deelan come: and will maintain a CertOue of Consent to self -insure for Workers Compere. cation, u provided for by Secdon 3100 of the labor Code. for the pesforam or of the work for which this permit is ivued ❑ I have and will maimain Worms. Compensation Insurance, as required by Settle. 37W of the labor Code, for the Performance of the weals farwhich mit Permit is issued My Workers Cmopensatim Neu curia end Pul;ry number are: �7 Tr" O7do Cartier. v rT d Policy NO.: — �a CERTIFlU OFEKEMPION FROM WORKERS' COMPENSATION INSURANCE (hila seNm need ret M completed if the Permit is fmom hundred dollars (SIM) mlesc) I unify, that in The performance of the works for which this Permit is issued, I ,hall not emplay army person in any mamma as as W beams subject to the Weol c e Cmmpensulm Laws of Califomia. Dae Applicant NOTICE TO APPLICANT: If, After making this Certificate of Exemption, you ahrrZ Warren subject m tha Workcls Compermdat instrument of the Labor Code, you mall roMwith comply veldt each pruvisinn or this Permit shall de uncured mmked. _-- CONSTRUCTION LENDING AGENCY — 1 hereby aRm that Nem is a conswcdm lending ¢gene, foo the parfurm,na or the wish fur which this Permit u issued (Sec 3091, Civ, C.) Landers Name Landers Address I certify that I have mad this application .rd use dear the jurve bdormadm is . canes - 1 agree W comply with all city and county, rmli es and use laws telexing W Wilding construction, and hereby anthorm representative¢ of this city W order upon the Nuve-mmtiumd far ,.K. m pugoea (Wa) indemnor agree to save. and kap harmless the City Of Cupertino .gaunt aO."cannyas expenseswhichmryIn any way ancmc against said City S incoitiusttence ftoemuand of to RSTA of this permit. A APPLICANT A UR REG N SAND WILL COMPLY WITH NON -POINT SOUR REG Issued by: * Date Y �/ r Re -roofs /Ys Sgnuun of ApplianuOanu.nor Data HAZARDOUS MATERIALS DISCLOSURE Type of Roof Will the applicant as future building aaupardnm a or handle summon mated j u defteed by the Caperton Municipal Code. Chapter 9.13, and the He tills and Safely code. Section 25532(.)7 Ely. RNm All roofs shall be inspected prior to any roofing material being installed. rIf Will sloe applicant or comm budding Occupant use equipment, or devisxs which a roof is installed without first obtainingan inspection, I agree to remove P g �suadnus iia curnead an s u dented by the Bay Area Air Qadily Management � all new materials for inspection. ❑Yu )6u I have mad the huados materials requimmems miler Cbpmr 6.95 of me Califer- nie Hcalthk5afcly Cade,Sction 25505.35533 and ]3534.1 andemand thariftM Wilding / p/ rima nal cumn Y have • mnanL mal It ur9yfespomibiliry W redly de ocupant of dr LL G mgdremcnu nmuRbe piortgKsuanccar,CutirseamarOccv Signature of Applicant Date All roof coverings to be Class'W' or better owmro,nthled.gem �D c • 2 ITEMS OF 2 • 0 CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: B1k: Lot: APN ........: 35719062.00 DATE ISSUED ....... : 09/10/2008 RECEIPT #.........: BS000006042 REFERENCE ID # ...: 08090052 SITE ADDRESS .....: 21757 MC CLELLAN RD SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 ' OWNER ............: JAHA TRISNADI ADDRESS ..........: 21757 MCCLELLAN RD CITY/STATE/ZIP'...: CUPERTINO CA, 95014-4053 RECEIVED FROM ....: KITCHEN WORKS, INC. CONTRACTOR .......: PRELL, LARRY LIC # 17457 COMPANY ..........: KITCHEN WORKS INC/DBA HOMEWORK ADDRESS ..........: 615 IRWIN ST CITY/STATE/ZIP ...: SAN RAFAEL, CA 94901 TELEPHONE ........: (415)456-4696 FEE ID UNIT QUANTITY ---------- ----------------------- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR VALUATION 4,000.00 -------------------- 0.50 ---------- 0.00 0.50 ---------- 0.00 1WINREP EACH 8 1.00 367.00 0.00 367.00 0.00 TOTAL PERMIT ---------- ---------- 367.50 ---------- 0.00 367.50 ---------- 0.00 METHOD OF PAYMENT ---------- CHECK TOTAL RECEIPT : AMOUNT --------------- 367.50 --------------- 367.50 REFERENCE NUMBER -------------------- #7107 09on/rjosI 'i�D., CITY OF CUPERTINO • CUPEkTINO GENERAL BUILDING U A PERMIT APPLICATION FORM APN # 57 ( O o O Date: l a 4�' Building Address: �! 75-.7 / G7 Ie / qzl Mailing Address (if different from building address): aMy� Owner's Name:jqqlh 4 � J jli r s� Phone #: 777, nZ / Contractor: Ki %G�� �„ol //f �a J �G✓�/�1 Phone: Ctf�� 4/ T- Fax: Contractor License #: sad �In Cupertino Business License #: Contact: ,,7 J� ir_ �� fc� � Phone:(,/,, -)Phone:(,/,,-) Fax: ommercial Residential Commercial-ET— Job Description: �eP/ �L���aG� 1✓�;, �Q of �%� G,`K� Tf Building Permit Info: Bldg Elect ❑ Plumb ❑ Mech ❑ Type of Construction (Usage Class): Occupancy Type: ^3 1-A, 1-B ❑ II/IIIN-A ❑ IVIII B, IV -HT, -B Valuation: �. Square Footage: oda, Project Size: Express kStandard ❑ Large ❑ Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Points Achieved: For help, contact Build it Green at www.buflditgreen.org Revised 7/01/08 Sm CITY OF CUPERTINO CITY OF CUPERTINO r GENERAL BUILDING PERMIT APPLICATION FORM Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or 1GENCOM 1BBOILERI For the installation or relocation of ea M boiler/compressor to & including 3 horsepower, or ea absorption sys to & incl 100,000 Btu/h (29.3kw) 1 BBOILER2 Installation /relocation of ea M boiler/compressor over 3 horsepower to & incl 15 horsepower, or ea absorption sys over 100,000 Btu/h 1 BBOILER3 Installation/relocation of ea M boiler/compressor over 15 horsepower to & incl 30 horsepower, or ea absorption sys over 500,000 Btu/h to & incl 1,000,000 Btu/h 1 BBOILER4 Installation/relocation of ea M boiler/compressor over 30 hosepower to & incl 50 horsepower, or for ea absorption sys over 1•,000,000 Btu/h to & incl 1,750,000 Btu/h 1BBOILER5 Installation/relocation of ea boiler or M refrigeration compressor over 50 horsepower, or ea absorption sys over 1,750,000 Btu/h 1 BAPPLOTH For ea appliance or piece of equip M regulated by this Code but not classed - in other appliance categories, or for which no other fee is listed in this code. 1 ELECINSP Other Electrical Inspections (per hour) E IMECHINSP Other Mechanical Inspections (per M hour) 1PLMBINSP Other Plumbing & Gas Inspections P (per hour) 1MEETINGIHR Application Meeting B P � .:Y CITY OF • CUPEkTINO I— L CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM ACOUSTICAL REVIEW IACOUSFDW SFDWL/Duplex New B IACOUSRESAD SFDWL/Duplex-Addition/Alteration B IACOUSCOM Multi-Family/Commercial B CHIMNEY'S 1CHIMNEY Chimney B 1CHDANEYR Chimney Repair B FENCES 1 FENCE>6FT Non -masonry, over 6 ft in height B 1 FENCEMAS>6 Masonry, over 6 ft in height B FIREPLACES 1FIREPLMAS Fireplace Masonry B 1FIREPLFAB Fireplace Pre-Fabricated/Metal B 1 FLAGPOL>20 Flag pole (over 20 ft in height) B I MODUSTRU Modular Structures B FOUNDATIONS 1FOUNDREP Foundation Repair B I PILECAST Pile Foundation Cast in place concrete B- -1 PILEDRIV Pile Foundation Driven (steel, pre- stressed concrete) B 3 of 5 Sam CITY OF CUPERTINO CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEESCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM RETAINING WALL(CONCRETE OR MASONRY 1 RETSTN Standard (up to 50 ft) B 1RETSP310 Special Design, 3-10' high (up to 50 `) B 1 RETSPI O Special Design, over 10' high (up to 50' B 1RETCRB< Gravity/Crib Wall, 0-10'high (up to 50 ft) B 1RETCRB> Gravity/Crib Wall over 10' high (up to 50 ft) B SHED -(EACH) Shed Over 120 sq ft B SIDING 1 SIDEST/BK Siding, Stone & Brick Veneer (interior/exterior) B 1 SIDEOTHER Siding all other B SKYLIGHTS 1 SKYL<l0 SF Skylight less than 10 sf B 1 SKYL>1 OSF Skylight greater than 10 sf or structural B 1STAIRS Stairs -first flight/ea addt'l B. STORAGE RACKS 1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B 1 SRACKS>8 Storage Racks over 8' high (up to 100 St B 445 • . t CITY OF • CUPEkTINO CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM 1STUCOAP Stucco Applications (up to 400 sf) additional stucco application B 1 WINREP Replacement windows/sliding glass door (ea 8 windows B 1WINMEWSTR New Window -structural shear wall/masonry (includes plan ck'fee B IEPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee . M 1 PPERMITFEE Plumbing Permit Fee P IELCPLNCK Stand Alone Electric Pln Ck (hourly) E 1MECPLNCK Stand Alone Mechanical Pln Ck (hrly) M 1 PLMBLNCK Stand Alone Plumbing Pln Ck (hrly) P 1 STPLNCK-(3 Hr Min when not over counter) Standard Plan Check (when no E/M)P) hourly -stand alone B f 1 BSEISMICR Seismic Residential B 113SEISMICO Seismic Commercial B 1TRAVDOC Travel & Documentation B 1BUSLIC Business License B 5 of 5 • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below I MUM= B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 oints C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood (Joist, (See Spec.) S-2 2 points 5: Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 oints F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Note/Spec.)A-3 1 oint P. Other 1. List Green Features on Plans A-1 1 point MEMMEM TOTAL POINTS 40 points • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects • Due to the diversity of remodeling project types, assigning a "total points" value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. INPUT Resources Energy [ADIHealth A. Site �1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 80%= 4 points up to 4 Resource pts 0 !2. Salvage Reusable Building Materials _ 4 Resource pts y=yes 0 3. Remodel for Mixed Use, Adaptive Reuse, and Histor c Preservation 4 Resource pts y=yes 0 4. Protect Native Soil 2 Resource pts y=yes 0 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 0 6. Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7. Protect Water Quality with Landscape Design _ _ 2 Resource pts y=yes 0 IB. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y=yes D 9. Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10. Install High -Efficiency Irrigation Systems 2 Resource pts y=yes 0 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes 0 B. Foundation 1. Incorporate Recycled Flyash in Concrete • 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource 2. Use Recycled Content Aggregate 2 Resource pts y_ 3. Insulate Foundation/Slab before backfill 3 Energy pts Y= C. Structural Frame 11 _ Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts. 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=yes 4. Use Web Floor Trusses 2 Resource pts y --yes 5. Design Energy Heels on Trusses 6" or more 2 Energy pts y=yes G. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 8. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Ener is 9Y P y --yes J. Wall 3 Energy pts Y_ -Yes c. Roof 3 Energy pts y=yes 10. Apply Advanced Framing Techniques 4 Resource pts y --yes 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 12. Use O8B — "- a. Subfloors • b. Sheathing 1 Resource pt y=yes 1 Resource pt y=yes 1. Use Sustainable Decking Materials a. Recycled content b. FSC Certified Wood 2. Use Treated Wood That Does Not Contain Chromium/Arsenic 13. Install House Wrap under Siding 14. Use Fiber -Cement Sidng Materials E. Plumbing �1. Install Water Heater Jacket 2. Insulate Hot and Cold Water Pipes I . Retrofit all Faucets and Showerheads with Flow Reducers a. Faucets (1 point each, up to 2 points) 1b. Showerheads (1 point each, up to 2 points) 4. Replace Toilest with Ultra -Low Rush Toilets 1(1 point each, up to 3 points) 5. Install Chlorine F Iter on Showerhead 6. Convert Gas to Tankless Water Heater 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) B. Install On -Demand Hot Water Circulation Pump V. uectncar 11. Install Compact Fluorescent Light Bulbs (CFLs) 1(6 bulbs—_2 points, 10 bulbs =3 points, 12 bulbs = 4 points) 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) 3 Resource pts y --yes 3 Resource pts y=yes 1 IAO/Health pt y --yes 1 IAO/Health pt y --yes 1 Resource of y=yes 1 Energy pt y=yes 2 Energy pts y=yes Up to 2 Resource pts. Up to 2 Resource pts. Up to 3 Resource pts. 1 IAO/Health pt y=yes 4 Energy pts y=yes Up to 4 IAO/Health pts. 4 Resource pts y=yes Up to 4 Energy Up to 5 Energy pts. Up to 4 Energy pts. Up to 4 Energy pts. G. Appliances 1. Tnstell Energy Star Dishwasher 1 Energy pt y=yes i2. Install Washing Machine with Water and Energy 2 Energy pts y --yes Conservation Features 1 Energy pt y=yes 3.Install Energy Star Refrigerator 1 Energy pt y=yes 4. Install Built -In Recycling Center - 3 Resource pts y=yes H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls 2 Energy pts y --yes b. Ceilings 2 Energy pts y=yes 2. Install Floor Insulation over Crawl Space 4 Energy pts y=yes !3. Install Recycled -Content, Fiberglass Insulation with INo Added Formaldehyde 31A0/Health pts y=yes 4. Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 5. Use Cellulose Insulation a. Walls 4 Resource pts y --yes b. Ceilings 4 Resource pts y=yes 6. Altemative Insulation Products (Cotton, spray -foam) a. Walls 4 Resource pts y=yes n. tapings 4 Resource pts y=yes • • N I. Windows 2 Energy pts 1. Install Energy -Efficient Windows 3 Energy pts • a. Double -Paned 1 Energy pt b. Low -Emissivity (Low -E) 2 Energy pts c. Low. Conductivity Frames 2 Energy pts 2. Install Low Heat Transmission Glazing 1 Energy pt J. Heating Ventilation and Air Conditioning 1. Use Duct Mastic on All Duct Joints _ _ _ 2 Energy pts _ _ Z. Install Ductwo k within Conditioned Space 3 Energy pts 3. Vent Range Hood to the Outside 1 IAQ/Health pt 4. Clean all Ducts Before Occupancy 2 IAQ/Health pts 5. Install Solar Attic Fan 2 Energy pts S. Install Attic Ventilation Systems . 1 Energy pt 7. Install Whole House Fan 4 Energy pts B. Install Sealed Combustion Units 14. Install Zoned, Hydronic Radiant Heating a. Furnaces 31AQ/Health pts b. Water Heaters 3 IAQ/Health pts 9. Replace Wall -Mounted Electric and Gas Heaters with 16. Install Heat Recovery Ventilation Unit (HRV) Through -the -Wall Heat Pumps 3 Energy pts 10. Install 13 SEERM 1 EER or higher AC with a TXV 3 Energy pts 11. Install AC with Non -HCFC Refrigerants 2 Resource pts Y=Yes 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pis y=yes • 13. Retrofit Wood Burning Fireplaces a. Install EPA certified wood stoves/inserts 10 Energy pts y= 3. Pre -Wire for Future Photovoltaic (PV) Installation 1 IAQ/Health pt y=yes b. Install/Replace Dampers 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y=yes 15. Install High Efficiency Filter 4 IAQ/Health pts y=yes 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts y=yes 17. Install Separate Garage Exhaust Fan 3 IAQ/Health ots v=ves K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 4 Energy pts y= 2. Install Solar Water Heating System 10 Energy pts y= 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y= 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =1 B points) Up to 18 Energy 6. Select Safe and Durable Roofing Materials - 1 Resource pt y- _ __ _ 7. Install Radiant Barrier 3 Energy pts y= L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 1 5 Energy pts 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts 3. Plant Deciduous Trees on the West and South Sides 3 Energy pts LJ 1. Use Low/No-VQC Paint 2. Use Low VOC, Water -Based Wood Finishes '3. Use Cowi%VOC Adhesives 4. Use Salvaged Materials for Interior Finishes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 6. Use Exterior Grade Plywood for Interior Uses '7. Seal all Exposed Particleboara or MDF - 6. Use FSC Certified Materials for Interior Finish 9. Use Finger -Jointed or Recycled -Content Trim 10. Install Whole House Vacuum System N. Flooring 1. Select FSC Certified Wood Flooring 2. Use Rapidly Renewable Flooring Materials 3. Use Recycled Content Ceramic Tiles 4. Install Natural Linoleum in Place of Vinyl . 5. Use Exposed Concrete as Finished Floor 6, Install Recycled Content Carpet with Low VOCs 1 IAQ/Health pts y=yesi 1 0 21AQ/Health pts y=yes 0 _ 31AQ/Health pts y=yesA 0 3 Resource pts y yes 0 61AQ/Health pts 1 IAQ/Health pts 4IAQ/Health pts 4 Resource pts 1 Resource pts 3 IAQ/Health pts S Resource pts y --yes; 4 Resource pts y=yes 4 Resource pts y=yes 5 IAQ/Health pts y=yes 4 Resource pts y --yes 4 Resource pts y=yes Total Points Available: 1 1401 130 57 Total Points Pro'ect Received: 69 01 010 • G:datalpings/greenbuildingguidellnes4emodelerslgmenpointsfimal2.12.04prmeMad.xls 0 R&,p/ 4 6,eG �e,,l G �e, 1-i 1LIf, . G fq,/),cr� a-39. 9 Z/`xs �4Y° X. K k x W v C� • A ACCORDANCE WITH THE CITY U' WPERTINO CODES ANO ORDINANCES aA � ecificadws Ml1S� phis set of ,ans and sp og kept on the j'.b at ati times and Itis un ZOgg 11:1 to make any changes or alteraf SEP 1 0 -o Same without w'itten permissi0e hOn' he huildinR D60.,.city of Cupertino* n of this pian ,nd sPecrfrws T HAdwLL p � led to permit or to be or wom of the violation of any p►OMM "V t:it, OMmance or'ate Lav - adw CITY OF �UPEkTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 Building Department All Cupertino building permits must meet certain conditions related to maintaining environmental quality and public peace and safety. The two most common conditions are described below. STORMWATER POLLUTION CONTROL State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and the Santa Clara Valley Water District control stormwater pollution. Educating local residents and businesses and enforcing stormwater pollutioncontrol laws are key parts • of the City's compliance efforts. Stormwater pollution prevention: It's up to us In northern Santa Clara Valley, storm drains flow directly to local creeks and San Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife dependent on our waterways, for people living near streams and baylands, and for the local water supply. Common sources of stormwater pollution include: • Dripped oil, fuel, and antifreeze from vehicles and heavy equipment; • Construction debris, including dirt, concrete and paint; • Landscaping runoff containing pesticides or weed killers; and • Any material dumped or spilled into streets or storm drains The property owner and the contractor share ultimate responsibility for activities occurring at a construction site and will be held responsible for any environmental damage caused by subcontractors or employees. For more information on construction -related stormwater requirements, see the Stormwater Quality Regulations section of the City of Cupertino web site at: http://www.cui)ertino.org/city government/departments and offices/ environmental services COMMUNITY NOISE CONTROL The basic noise control requirements for construction sites are as follows: Typical construction work hours are: • - Weekdays - 7 a.m. to 8 p.m. - Weekends - 9 a.m. to 6 p.m. • Construction other than street construction is prohibited on holidays. Residential daytime noise levels from complaint site - 60 dBA • Nonresidential daytime noise levels from complaint site - 65 dBA For more information on noise control, please see Chapter 10.48 of the Cupertino Municipal Code, which can be accessed at http://www amlegal com/cupertino ca/ Greg Casteel Building Official l?ePl0,6G tp�t- rd i�Y�.1-G/'rS'an rj%v-,•� �2/! G �✓!4%si/''S • C -P -I -_ 1'2G 4• ;(a�ly CITY OF �UPEkTINO E • Owner/C tractor tgna e Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department JOB ADDRESS: 7✓5— 7 (( /ylG � 9e / /fL� G / Com/ ll !�d PERMIT # a��vvs Z OWNER'S NAME: q, w Cabinets & Millwork PHONE # GENERAL CONTRACTOR: a FAX # I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the followinginformation: Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Date