19583l •
6A
POST THIS CARD NEAR FRONT OF BUILDING
CITY OF CUPERTINO
INSPECTION DIVISION - JOB INSSPE( IN&CORD
JOB ADDRESS G �7 U 'K e-Rc>mk) 1 L ��UNIT # �3. LOT #1 c
OWNER '}{C�d..t4-- l rJO� CONTRACTOR tI4t✓ 1 1`G `\ `^
PERMITN
q.
19583
A
GATGORY
CoNTROL a
BUILDING PERMIT INFO
INSPECTION DATE INSPECTOR
INSPECTION RECORD
NOTE: ALL GRADING AND DRAINAGE
SI TALL RE INSTALLED TO COMPLY WITH
THE APPROVED PLANS AND CITY OF
CUPERTINO STANDARDS.
FOUNDATION/PIERS
UFERGROUND
JOB DCSCRIPIION
.- .'v
.. yf •.. 4 Cr •,, •.7 ,�'Er
PAD/SETBACK-CERT
GARAGE SLABS PREGUNITE
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED
INSPECTION
DATE
INSPECTOR
UNDERGROUND/SLAB
PLUMBING
ELECTRICAL
MECHANICAL
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
WOOD FLOOR
PLUMBING
MECHANICAL
ELECTRICAL
FRAMING/VENTS/CLEAR
INSULATION
PLACE NO SIIBFLOOR UNTIL ABOVE HAS BEEN SIGNED
ROUGH
PLUMBING
TU135 & SHOWER PAN
MECHANICAL
ELECTRICAL ACUZZI 13OND
FRAMING STAIRS
INSULATION/ VENTILATION
EMERG.EGRESS
SEWER/WA ER
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED
EXTERIOR SHEAR HOLD DOWN
INTERIOR SHEAR/HOLD DOWN
SHEETROCK/SHEETROCKSHEAR
EXTERIOR LATH/ W -SCREEN
SHOWER LATH
SCRATCH COAT
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED
NOTE: NO FINAL INSPECTION SHALL BE MADE BEFORE
THE CONSTRUCTION TAX /S PAID
FINALS DATE IINSPECTOR
SAN.#
ELECT. ENERGY
PLUMBING ENERGY
MECH. ENERGY
BUILDING ENERGY
ELECT. FINAL TEST
PLUMBING
GAS TEST
MECHANICAL
HEATING
ELECTRICAL RELEASE -
FIRE DEPT.
GRADE
OCCUPANCY
TEMPORARY APPROVALS
ELECTRIC
GAS
BUILDING ISSUANC DATE
OCCUPANCY OF BUILDING IS NOT PERMITTED UNTIL V
BUILDING FINAL IS SIGNED BY BUILDING INSPECTOR
ARRANGE FOR INSPECTION By PHONING 252-4505 BETWEEN
12:3o PM AND 4:30 PM MONDAY THROUGH FRIDAY, 24 HOURSBEFORE !Q� N 1g90
DRESS AND
NING
PERMIT # ARERED EDEDPWHEN PHONING.
IMPORTANT!
PLEASE READ REVERSE SIDE BEFORE CALLING FOR FINAL INSPECTION
OFFICE COPY