08090197 CITY OF CUPERTINO r °coy M.
C,
BUILDING DIVISION PERMIT CONTR�CTQRkINF6F -f .TM.
�yi. ;vel -^ ..w
BUI 1 G D ESS: PERMITNO.
���g� MERRITT DR RICKMAN CONSTRUCTION 08090197
OWNER'S NAME: PERMIT ISSUE DATE
JOHN' & KRISTINE FERGASON 10200 EMPIRE AVE 09/29/2008
NE SANfTARY NO. CONTROL NO.
(408) 691-9454
ARCHITECTIENGINEER: BUILDING PERMIT INFO
BLOC ELECT PLUMB MECHO
38p LICENSED CONTRACTOR'S DECLARATION Job Description
I hereby Warm dw 1 am licensed udder Provisions Of Dopler 9(commucind P
4 � withSection]000)ofDivision 3offtBusiness and-ProlcuionsCods�mylicense u SERVC PANEL UPGRADE 100 TO 200AMP
^ or in full into and effce r)
j b Z IJcenu Li.k
e t;, Dear
Con lrssmr
;q As drail us en DECLARATION
'd IuMcwnJ my plans YWlbe ur-0upublic rsorda
n
C in
Licensed Professional
OWNER-BUILDER DECLARATION
<I I hereby affirm that 1 am ewmpl from the Contractors License Law for the
i
no following mason.(section 70 1.5.Business and Professions Cods:Any city or county
which lequifes•Permit m emotions.eller.improv.demolish.or.pair any a1metune
I< point to its issuance,also requires Ne applicant for such permit to file a signed statement
pp Sq.Ft. Floor Area Valuation
that too is liceased puramnl to the provisions of the Contractor's License Law(Chapter9
y�$ (commencing wits Section 7000)of Division 3 of the Business and Prefemiom Code)Or $3000
e`c— that he is exempt shmerrom and the basis for the alleged coempuon.Any violation of
Section 7031.5 by am,applicant for a permit wbjcces the applicant l0 a civil penalty ofNumber Occas ane Type
not mom than Bee hundred dollars(sem). 31630026 . P Y YP
0 I,u owner of the property,or my employees with wage an Neir=to compenudon,
will ds the work,and the swnune us not intended or dithered for sale(Sec.1044,ammoom
and Professor.coda:The Convectors Live Law does lel apply to an owner of Required Inspections
property who builds or improves Yeroon,and whodoeaauch work himseforthrouah his -
dwmemployees,pwW duiwebimprovementsarenotinseddntoRaodforests If.
however,the Wilding or improvmnent tswld within ons year of compeuon.the owner.
builder will have tic buodem of proving that M did not Wild or improve for purpose of
uls.),
❑1.as owner of de property,am exclusively conuaning with licensed contractors an
Wast do the project(Sec.7044.Business and Professions Code:)TW Cmmtracmrs L4
come Law does not apply m an matter of Portnoy who Wilds or improves thencon,and,
wind contracts for such projects with a conacmgs)licensed pursuant to Use Convacmrs
Lice.law.
❑lamesemplunder See ,BRPCforthhosomm
owner Dale
WORKERS COMPENSATION DECLARATION
1 hereby sit.under penalty of perjury,rote of the following declaration!:
1 ham and will amodam a Cmfifi®emf Consent an self-Wont for WmllmrsCompen-
urian,u provided ror by Section 37m of the Labor Code,for she pefponmatee of We
work rwhich this permit us nodded.
haw and will maintain Workers Compemtion Imurwce.as Weidner!by Section
3 mMthe labor Code.for the perform o[the work fn whits dais permit u heated
My Workers G emmaamion Imp a 'c rod Policy number art:
Cartier. Ti /LV Polity No.:
CERTIFICATE OF EXEMPTION FROM WORKERS
COMPENSATION INSURANCE
(nds rection need wt W cunpkled H the permit Is Rvore hundred dollars(Sim)
orlca)
1 Comfy the[in Use Performamc mf the wort for which this pmmil u wood.I shall net
employ an,,.in wy ozone,w u to Wcomm rob*,so the W,,kms'Compewuon
Laws of Califomin.Date
Applicant
NOTICE TO APPLICANT:If.apart making thus Certifinlc of Esemption.you should
become subject to the Worker's Compeeuuon provisions of the lobo,Cone.you mud
.J O forthwith comply with such provisions or this permit dull he deeoed mvmked
Z r✓y CONSTRUCTION LENDING AGENCY
(•+> the wort,for Ther use construction lending agency for the performwce of
fZ permit is ivutl(Sec.3097.Civ.C.)
�W Q lenders Namc
."T. z Lenders AM.
V 0 1 comfy Nat I have read this application and We that the.Ww infotntauun is
pL COMCL 1 agree ter Comply with all City and Coldly ordlmWlRa and see 1.R1a6n1 an
.O Wilding CmISWCUrn.and hereby wulson.reproamust Of this city Or color upon the
W ahove-memuoted progeny for i cap.pur,dwhich ms
6 (We)agree to saw.indemnify and aecp harmleu de City of Caputo,against
y incoiuca npuntamenu.Snuwd expos es which may in wywyacrnc aaainstsaid City
O z A PLICAPtenofthepoplinsor this permit.
APPLIC DERSTANDS A M'=LY Wnli A NON- INT Issued by: Date
SOUR REGU 0
V; Re-roofs
bamsurn Of
APph YContracbr Do.
HAZARDOUS MATERIALS DISCLOSURE Type of Roof
Will she applicant or fugue Wilding ampwttem of hwdic horrendous material
u
defined by time Cup"on Martin Cods.Chaplet 9.13,and the Health Ltd Saety
Conn.Section 25532(a)?1ec Yes All roofs shall be inspected prior to any roofing material being installed.
wn thn a licwl or future building Occupant use a If a roof is installed without first obtainingan inspection,I agree to remove
OP 8 p a Air Qnl or ds dna meant P
II M1aaalloas air conuminsnu u der d by the gay Area Air Quality Management all new materials for inspection.
❑Yes JPe
1 haw marl the hassNousmaurials Icquimlly"m.oder ovpim .95ofthe Caiifow
nixes ["SdelyCods,Scctiom255!15.25533rod]5534.1undsumndthvifthc Wilding
does til�t�
pmasiNlilY b notify Nor mf the
dons rawSignature of ApplicantrOqui
Date
owe`' � Z� All roof coverin s to be Class"/Q"ae- g or better
CITY OF CUPERTINO
3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: pdtg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 31630026 . 00
DATE ISSUED. . . . . . . : 09/29/2008
RECEIPT # . . . . . . . . . : BS000006231
REFERENCE ID # . . . : 08090197
SITE ADDRESS . . . . . : 19866 MERRITT DR
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . . '
OWNER . . . . . . . . . . . . : JOHN & KRISTINE FERGASON
ADDRESS . . . . . . . . . . : 19866 MERRITT
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : ROBERT ALAN RICKMAN
' CONTRACTOR . . . . . . . : ROBERT RICKMAN LIC # 30371
COMPANY . . . . . . . . . . : RICKMAN CONSTRUCTION
ADDRESS . . . . . . . . . . : 10200 EMPIRE AVE
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
TELEPHONE . . . . . . . . : (408) 691-9454
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 3 , 000 . 00 0 . 50 0 . 00 0. 50 0 . 00
lEPERMITFE FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
1TRAVDOC FLAT RATE 1 . 00 40 .79 0 . 00 40 . 79 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 82 . 08 0 . 00 82 . 08 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 82 . 08 MC
---------------
TOTAL RECEIPT 82 , 08
•
' oho q o/97
Sam CITY OF CUPERTINO
CITY OF
CUPERTINO GENERAL BUILDING
PERMIT APPLICATION FORM
APN # 2 j D/1 / D U Date: 9
Building Address:
Mailing Address (if different from building address):
Owner's N e: Phone#:
( Z ry 7
Contra or: J Phone: (-,16,F, 4.1 C7 �s
t) G�1 P I" Fax: &/
Contractor License#: y 1' -?O S
Cupertino Business License #:
Contact: (�'/ r 7 l I ✓���� Phone: c/08 &�/ eys-1Te_1
• Fax: `/`/�
Residential Commercial
Job Descriptiioon:: //
V1. Lel /� NG l v�l� pI t-
loo .a„y Zoo n p^p
Building Permit Info:
Bldg ❑ Elect el-/ Plumb ❑ Mech ❑
Type of Construction (Usage Class): Occupancy Type:
1-A, 1-B ❑ II/III/V-A ❑ II/III B, IV-HT, V-13 E] S1 ` A
Valuation: v Square Footage:
o o ._-,
Project Size: Express ❑ Standard ❑ Large ❑ Major ❑
Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it
Points Achieved: to the application or if applicable, include in plan set& the sheet index.
•
For help, contact Build it Green at www.buildit reen.or
Revised 7/01/08
J CITY OF CUPERTINO
CUPERTINO GENERAL BUILDING
PERMIT APPLICATION FORM
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group IGENRES or
1GENCOM
1BBOILERI For the installation or relocation of ea M
boiler/compressor to & including 3
horsepower, or ea absorption sys to &
incl 100,000 Btu/h (29.3kw)
IBBOILER2 Installation /relocation of ea M
boiler/compressor over 3 horsepower
to & incl 15 horsepower, or ea
absorption sys over 100,000 Btu/h
1 BBOILER3 Install ation/relocation of ea M
boiler/compressor over 15 horsepower
to & incl 30 horsepower, or ea
absorption sys over 500,000 Btu/h to
&incl 1,000,000 Btu/h
1 BBOILER4 Installation/relocation of ea M
boiler/compressor over 30 hosepower •
to & incl 50 horsepower, or for ea
absorption sys over 1•,000,000 Btu/h to
& incl 1,750,000 Btu/h
1 BBOILER5 Installation/relocation of ea boiler or M
refrigeration compressor over 50
horsepower, or ea absorption sys over
1,750,000 Btu/h
1 BAPPLOTH For ea appliance or piece of equip M
regulated by this Code but not classed
in other appliance categories, or for
which no other fee is listed in this
code.
1 ELECINSP Other Electrical Inspections (per hour) E
1MECHINSP Other Mechanical Inspections (per M
hour)
1PLMBINSP Other Plumbing & Gas Inspections P
(per hour
IMEETINGIHR Application Meeting B •
•
R"I"
OF CUPERTINO
CITY OF GENERAL BUILDING APPLICATION
CUPEkTINO
FEESCHEDULE
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
1GENCOM
ACOUSTICAL
REVIEW
1ACOUSFDW SFDWL/Duplex New B
IACOUSRESAD SFDWL/Duplex-Addition/Alteration B
1ACOUSCOM Multi-Family/Commercial B
CHIMNEY'S
1 CHIMNEY Chimney B
I CHIMNEYR Chimney Repair B
FENCES
1 FENCE>6FT Non-masonry, over 6 ft in height B
1 FENCEMAS>6 Masonry, over 6 ft in height B
FIREPLACES
1FIREPLMAS Fireplace Masonry B
IFIREPLFAB Fireplace Pre-Fabricated/Metal B
1 FLAGPOL>20 Flag pole (over 20 ft in height) B
1MODUSTRU Modular Structures B
FOUNDATIONS
IFOUNDREP Foundation Repair B
1 PILECAST Pile Foundation Cast in place concrete B
1PILEDRIV Pile Foundation Driven (steel, pre- B
stressed concrete)
3 of 5
CITY OF CUPERTINO
CITY OF GENERAL BUILDING APPLICATION
CUPERTINO
FEE SCHEDULE
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
1GENCOM
RETAINING
WALL(CONCRETE
OR MASONRY
1 RETSTN Standard (up to 50 ft) B
1 RETSP310 Special Design, 3-10' high (up to 50 `) B
1RETSP10 Special Design, over 10' high (up to B
50')
1RETCRB< Gravity/Crib Wall, 0-10'high (up to B
50 ft)
1RETCRB> Gravity/Crib Wall over 10' high (up to B
50 ft
SHED-(EACH) Shed Over 120 sq ft B •
SIDING
1SIDEST/BK Siding, Stone & Brick Veneer B
interior/exterior)
1 SIDEOTHER Siding all other B
SKYLIGHTS
1 SKYL<10 SF Skylight less than 10 sf B
1 SKYL>10SF Skylight greater than 10 sf or B
structural
1STAIRS Stairs-first flight/ea addt'l B
STORAGE RACKS
1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B
1 SRACKS>8 Storage Racks over 8' high (up to 100 B
st)
•
4of5
GCS. CITY OF CUPERTINO
CUP TYOf NO GENERAL BUILDING APPLICATION
FEE SCHEDULE
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
1GENCOM
1STUCOAP Stucco Applications (up to 400 sf) B
additional stucco application
1 WINREP Replacement windows/sliding glass B
door (ea 8 windows)
1WINMEWSTR New Window-structural shear B
wall/masonry includes plan ck fee)
/ 1 EPERMITFEE Electrical Permit Fee E
IMPERMITFEE Mechanical Permit Fee M
IPPERMITFEE Plumbing Permit Fee p
IELCPLNCK Stand Alone Electric Pln Ck (hourly) E
1 MECPLNCK Stand Alone Mechanical Pln Ck (hrly) M
IPLMBLNCK Stand Alone Plumbing Pln Ck (hrly) P
1 STPLNCK-(3 Hr Min Standard Plan Check (when no E/M/P) B
when not over counter) hourly-stand alone
1BSEISMICR Seismic Residential B
1BSEISMICO Seismic Commercial B
ITRAVDOC Travel & Documentation B
IBUSLIC Business License B
5 of 5
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
gong
B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 Points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G: Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 oint
P. Other 1. List Green Features on Plans A•1 1 point
TOTAL POINTS1 40 points
•
Plan Review Process Work Book Page A2-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a"total points"value to a project to be considered environmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for'greening"your project.
A.Site INPUT Resources Energy 1A01health
11.Recycle Job Site Construction&Demolition Waste
65%,=1 point;75%= 2 points;80%=4 points up to 4 Resource pts 0
12.Salvage Reusable Building Materials 4 Resource pts y--yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design _ 2 Resource pts Y--yes 0
A Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes p
1 1 I
B.Foundation
1.Incorporate Recycled Flyash in Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yesF; F p
1 1 !
C.Structural Frame
t.Substitute Solid Sawn Lumber with Engineered-L—urn'bar 3 Resource pts y=yes p
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y--yes 0
5.Design Energy Heels on Trusses 6"or more . 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pis y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pis y=yes 0
b.Wall
3 Energy pts y=yes p
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes p
Q.Use OSB
a.Subfloors 1 Resource pt y=yes 0
O b.Sheathing
1 Resource pt y=yes p
xterior mis .
1.Use Sustainable Decking Materials
a.Recycled content 3 Resource pts y=yes 0
b.FSC Certified Wood 3 Resource pts y=yes 0
'2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAQ/Health pt y=yes 0
(3.Install House Wrap under Siding 1 IAQ/Health pt y=yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
E.Plumbing
11.Install Water Heater Jacket 1 Energy pt y=yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0
3.Retrofit ail Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
14.Replace Toilest with Ultra-Low Flush Toilets
I(1 point each,up to 3 points) Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAQIHealth pts. 0
S.Install On-Demand Hot Water Circulation Pump 4 Resource pts y--yes 0
1 1 1
r,ciec ncai
11.Install Compact Fluorescent Light Bulbs(CFLs)
I(6 bulbs=2 points,10 bulbs=3 points,.12 bulbs=4 points) _ Up to 4 Energy pts. LL •
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to
5 points) Up to 5 Energy pts.
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts.
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4Energy pts.
1
G.Appliances
i1.Install Energy Star Dishwasher - 1 Energy pt y=yes 0
i2.Install Washing Machine with Water and Energy
Conservation Features 1 Energy pt y=yes 0
I3.Install Energy Star Refrigerator 1 Energy pt y=yes 0
4.Install Built-In Recycling Center 3 Resource pts y=yes 0
_ 1 1 1
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
i3:Install Recycled-Content,Fiberglass Insulation with
IND Added Formaldehyde 31AQ/Health pts y=yes 4
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0
b.Ceilings 4 Resource pts y=yes 0 •
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes D
o.Ceilings 4 Resource pts y=yes 0
1 1 1
INPUT Resources EnErgy 1ADIHealth
I.Win ows
1.Install Energy-Efficient Windows
a.Double-Paned 1 Energy pt y=yes 0
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
G.Low.Conductivity Frames 2 Energy pts y=yes 0
12.Install Low Heat Transmsio
isn Glazing - _ 1 Energy pt y=yes D
1 1 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All duct Joints 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes p
4.Clean all Ducts Before Occupancy 21AO/Health pts y=yes 7
0
5.Install Solar Attic Fan -2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7,Install Whole House Fan 4 Energy pts Y--yes 0
8.Install Sealed Combustion Units
a.Furnaces 31AQ/Health pts y=yes 0
b.Water Heaters 3 IAD/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heal Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts Y=Yes D
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
a.Install EPA certified wood stoveslnserts 1 IAO/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15,Install High Efficiency Filter 41AQ/Health pts y=yes D
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y==yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3,Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=1 B points) Up to 18 Energy pts 0
�6.Select Safe and Durable Roofing Materials _ _ 1 Resource pt y=yes p
7.Install Radiant Barrier 3 Energy pts y=yes 0
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes p
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pisD
y=yes
r�
1 1 i
•
_ff
.In oor it uality and Finishes
�1.Use LowMo-VOC Paint 1 IAQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0
113 Use Low/No VOsives C Adhe3 IAOMealth pts y=yes D
-
4.
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y--yes 0
[7.Seal all Exposed Particleboard or MDF 4 IAQ/Health pis y=yes 0
8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAO/Health pts y=yes 0
1 1 !
N.Flooring
1.Select FSC Certified Wood Flooring 6 Resource pts y=yes 0
[2.Use Rapiddy Renewable Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4,Install Natural Linoleum in Place of Vinyl 51AQ/Health pts y=yes D
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpel with Low VOCs 4 Resource pts y=yesp. 0
1 1 1
Total Points Available: 1 1401 130 57
Total Points Project Received: 0 0 0
G:data/progsrgmenbuildmgguidelineshemodelersrgreenpointsfna12.12.04pmlectedxls