Loading...
08050107CITY OF CUPERTINO T�e,�T -axzze �`@ry�+'-1_„�'��' .g(`�"1'�T' HCO3\1�L�CibQR'l�011Vl\.`:, BUILDING DIVISION PERMIT BDILD1N6ATr%TLLER AVE TBD - TO BE DETERMINED PERMIT NO. 08050107 'ER'S NAME: - PERMIT ISSUE DATE ELIZABETH M BIALOGSKI 05/13/2008 PHONE: SANITARY NO. CONTROL NO. ARCHITECr/ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH LICENSED CONrRACTOWS DECLARATION - Job Description al 1 acounder pre ons of Chapter 9 (commencing 1 hereby dam Nm acsted i with section 7")OfDhision 3 of the Bush. and Prokesm. Code, and my liars: u BTHRM RMDL NON-STRUCTRL INCLDNG ELECTRCL&PLMBNG NII forts and Z., Iicena Clm - Ci . Lle. 11721 CALIFORNIA ENERGY SERVICES PD BUS LIC 5/13/8 De¢ Conlfenor I i 6 y4 �— ARCHTEC'rSDECLARATION $rap �, �iG 1 understand my plans Nall he used u puhlk records Licwed Professional OWNER-BUILDER DECLARATION I hcmby M. Nat I am exempt from the Conuano's License law for dm following mason. (Section 7031.5. Business and Professions Code: My city or county which rtq.t. a permit to constitutes. .hes. i nprow. dcmol"sh, or .Pair any suaum prior at its issue=. also rep uirn led applicant for such permit to file a signed sukmcnl mad is licensed to of be Contranurk license law(Chaptn9 Sq. FL Floor Area . Valuation pussuanl the provisions $13000 1 (commencing with Session 7000) of Division 3 of the Business and Professions, Code) or this he is exempt thsmfrom and Use bus for the alleged exemption My violad'm Of 37505037A?bT Number Occupancy Type SeNon 7031.5 by arty applicant fora permit abjOM the applicant in a 6,11 psWty of ml m.m thn fw hundred dollar(s5=. 0I,uownerofdiepmpmy.mmywploymwi0wgnuNekmkcorn dim, Required Inspections the wart, and Ne sttructureunut mended arort red toOwner and Professions Cndn Th r. Liana law den cot apply b N owner of am Pr apply q p m dere his enywho Wilds thneonand wha oruffeorNmueb pounidmpmvv Owoe me V, we oycea oro@R4 forsalbthe Nuacner,is umanuin not ear ofd ow , ft wmmt la said within one Year of cnmpncfor the owner- however, the building or den buil(er will haw tic Nvden of povine Nat k did cot build or Improv (a purpoa of O ale.). C 1, u Owner ofdu property me exclusively canuacting wish liaised antradaa On convect the pmjen (Sec. 7Uo4, Business; and profctians Code:) The Contractors U. . eena Law does not apply to an Owner of property, who builds or improves thereon. and. who conuuu for such pmlcns with a comuanor(s) licensed purls., In the Comraeroh License Law. ❑ l am nernp under See ,B d PC For this manse Dau WORKERS COMPENSATION DECLARATION 1 hereby obiter under penalty Of perjury one of the following declan dans: 0 1 ham and will trumum a CerdBcau of Covent to selr-ivum for Woolens Compeer aadan, so provided for by Section 3700 of he labor Code. fu she pedamanco of the wart for which this permit Is issued. 0 1 haw and will maintain Worker. Compcvadoa Insuranc. u "sued by Section 37W of Ne laborfoonrr ft pYear�froure avec of the work forwhich this Permit is Wood. //Code, �peread Calder �,Jr�ilHCR M K �ey, No,: nuC- aa: . CERTIFICATE OF EXEMPTION FROM WORKERS COMPENSATION INSURANCE Tru motor aced not W emnpkad if the peomil'u for one hundred dolWs (SIM) or less) 1 certiry WI in thc perfomance of the work for which this permit is Leaned, I Nall not employ any person in my sumer so as th become object he f Workcn' Compensation Laws of Gallfomi6 Due Applicant NOTICE TO APPLICANT: IL afar making this Certificate of Eaempdon. you NouW become .ubjm On he Worker's Compewtion provisions Of the labor Code. you must forthwith comply with such provisions or this permit shall W deemed revoked j CONSTRUCTION LENDING AGENCY I hereby affirm tha dem u a cammumim lending agency for the nerforma en of dm wort for whiten this permit in issued (See 309'1. Civ, C.) - Landers Name Lenders Address 1 mdfy that I haw sad Nis application W .tau that the above iMornation is cornn, I agree In comply with all city aid county Ordinances and surd laws missing to Wilding construction, and hereby mshoure rtpresenuuvn or Nis city a tour upon da show-es.jWg d c for . ponm indemnify (We) agree m ave, and keep harmless the City of C.pmim against Iiacoidalu nu. costs expcNos which m and cxpcs.ea which cony In my way amoc aguvt aid City , tee of the Aconsequence of Ne granting or this D WILL UNDERSTANDS AND WILL COMPLY WRH^ALL SOU Issued Issued by: Date . /NON-POINT Re-roofs Type of Roof silmadimafAppiicandCOm Dau HAZARDOUS MATERSAuS DISCLOSURE WIII the applicant no future Wilding ott.pant atom or handle hesardou material dUmd the nO Mmsici 1 Cade. Chapter 9.12, and sire Fica1N and Safny Scrim . io 33s1z(a)± 32(.)? CY All roofs shall be inspected prior to any roofing material being installed. Will the applicant or future building ocoupant use equipment or devicea which If a roof is installed without first obtaining an inspection, I agree to remove it hNous sir contaminates defined by the Bay Ma Al, Quality Mamagcmenl OD1ara all new materials for inspection. /a C Y. I have read the haudmsmskriab requiremcw under Chapter6.95 ofthe Califon m HcaiNh Safely Cade, Smiorsts 35505.25533 and35534. lunderaand thaifthe building deco mol it haw a unapt, not it is my remensiibbiilmity On notify Us:occupant of the req. poor hlk o ca¢or Oo,o/p�avy. Signature of Applicant Date r'G C S ^( ,Dam All roof coverings to be Class'W' or better Owmet aNo auri>rd ages 0 4 ITEMS OF 4 • 0 CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk:, Lot: APN ........: 37505037.00 DATE ISSUED.......: 05/13/2008 RECEIPT #.........: BS000004753 REFERENCE ID # ...: 08050107 SITE ADDRESS .....: 10466 MILLER AVE SUBDIVISION ....... . CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT : AMOUNT --------------- 662.30 --------------- 662.30 .• REFERENCE NUMBER -------------------- #5614 OWNER ............: ELIZABETH M BIALOGSKI ADDRESS ..........: 10466 MILLER AVE CITY/STATE/ZIP ...: CUPERTINO, CA 95014 - RECEIVED FROM.....: CALIFORNIA ENERGY CONTRACTOR .......: TBD - TO BE DETERMINED LIC # 00096 COMPANY ..........: TBD - TO BE DETERMINED ADDRESS ..........: CITY/STATE/ZIP .... TELEPHONE ........: FEE ID ---------- UNIT QUANTITY ----------------------- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR VALUATION 13,000.00 ---------- 1.30 ---------- 0.00 ---------- 1.30 ---------- 0.00 1BUSLIC FLAT RATE 1.00 110.00 0.00 110.00 0.00 1REMRESBAT SQ FEET 48.00 429.00 0.00 429.00 0.00 1STPLNCK HOURS 1.00 122.00 ---------- 0.00 122.00 0.00 TOTAL PERMIT 662.30 ---------- 0.00 ---------- 662.30 ---------- 0.00 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT : AMOUNT --------------- 662.30 --------------- 662.30 .• REFERENCE NUMBER -------------------- #5614 ti-/� - CITY OF CUPEkTINO CITY OF CUPERTINO ADDITION/REMODEL PERMIT APPLICATION FORM Oj'05 0/07, ♦ 47`` APN # / o S 0 37, U 0Date: S^= Building Address: Mailing Address (if different from building address): Owner's Name: ni8� �J o Phone # �97y Contractor:�1I F i rb�„a Evt e1Jy Sew�FCaS , Phone #: 5 wN a 1 (3 N Fax #: a Contractor License #: % / I I O Cupertino Business License #: Contact: Phone #: Fax #: Building Permit Info: Bld . ❑ Elect. 0 Plumb. 21 Mech. ED' Hillside ❑ Job Description: /� r SOA6,00/, " �e.s�—t.D,�h ( 4-4,t4J S�i� 7e,., f Addition (adding sq footage): �Z1 )-Ace144ef \ What is being remodeled? Remodel Includes Re -Roof: Yes ❑ No T If yes list number of squares Remodel Includes Structural: Yes ❑ No gl Square Footage: Addition: Porch: Deck: Garage: Detached Attached Remodel: Kitchen at t-' p Other Type of Construction (Usage Class): Oc��cppupancy Type: IA, 11, 111, V -A ❑ 11, 111, 1VV-B to 3 Valuation: 3 Please check this box if the project is a el second -story addition ❑ Please complete relevant portion of the Green Building Checklist & attach it to the application or if applicable, Green Building Points Achieved; include in plan set & the sheet index. ** v *For Office Use Only*** Over -the -Counter ❑ CITY OF CUPERTINO S-eu.- ADDITION/REMODEL • CUPEkTiNO FEE SCHEDULE Quantity Sq Ft Fee ID Fee Description Fee Group Permit Type ADDITIONS 1R3SFDADD PLLONGRNGR Long Range Planning/Residential PL IR3INSP Dwellings Inspections B 1 R3PLNCK Dwellings plan check B 1R3REPINSP. Dwellings Repeat Inspection B I R3REPPLNC Dwellings Repeat Plan Check B 1R3HINSP Dwellings Hillside inspection B 1R3HPLNCK Dwellings Hillside plan check B 1R3HREINSP Dwellings Hillside Repeat Inspection B 1R3HREPLNC Dwellings Hillside Repeat Plan Check B. IR3ALTINSP. Dwellings Alternate- Materials Ins ection B 1R3ALTPLNC Dwellings Alternate Materials Plan Check B 1PCESS Cesspool P 1PPRSEWG Ea. Private Sewage Disposal System P 1PRSEWER Sewers P 1BPSPRINK Lawn Sprinkler/Backflow P 1BPWSVCS Main Water Service P 1BSEISMICRE SeismicResidential B DECKS 1R3SFDADD OR 1R3SFDREM 1DECKWOOD (Each) Deck (Wood) -Each B 1DECKRAIL (Each) Deck Railing -Each B e 0 CITY OF CUPERTINO ADDITON/REMODEL FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft GARAGES 1R3SFDADD OR 1R3SFDREM 1GARDTW<=1K Wood Frame up to B 1,000 SF - .- 1GARDTM<=1K Masonry up to 1,000 SF B BCONSTAXR Construction Tax Res (new detached garage) PATIO'S OPEN 1R3SFDADD OR 1R3SFDREM 1PATIOWOOD Wood Frame up to 300 B SF 1PATIOMETAL Metal Frame up to 300 B SF 1PATIOOTHER Other Frame up to 300 SF B PATIO'S CLOSED 1R3SFDADD OR IR3SFDREM 1PATIOENCLW Enclosed Wood up to 300 B . SF 1PATIOENCLM Enclosed Metal up to 300 B SF IPATIOENCLO Other Enclosed Patio up B to 300 SF 1COVPORCH Porch Covered -Each B Each) IREROOFRES Residential Re -roof Each B 100 SF REMODELS 1R3SFDREM 1REMRESKIT Kitchen Remodel up to B (Deduct "$"for ea plan 300 SF check U� 1REMRESBAT Bath Remodel up to 300 B « SF 1 REMREOTH Other Remodel up to 300 B « SF REMODEL PL 1 STPLNCK (1-3 for Standard Plan Check B NOT FOR OVER THE remodel) COUNTER PLAN CKS. 3 of 3 CITY OF CUPERTINO ADDITON/REMODEL FEESCHEDULE E Quantity Sq Ft Fee ID Fee Description Fee Group Permit Type WINDOW/SLIDING 1R3SFDREM GLASS DOOR 1 WINREP Replacement windows (ea 8 windows) B 1 WINNEWNSTR New Window (non- structural) B 1 WINMEWSTR New Window (Structural Shear Wall/Masonry) B 1 WINBAYSTR Bay Window (Structural) B SKYLIGHTS 1R3SFDREM 1 SKYL<l0 SF Skylight less than 10 sf B 1 SKYL>10SF Skylight greater than 10 sf or structural B 1STAIRS Stairs -first flight/ea addt'l B IEPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1PPERMITFEE Plumbing Permit Fee P IELCPLNCK Stand Alone Electric Pln Ck ourl E 1 MECPLNCK Stand Alone Mechanical Pln Ck (hourly M 1PLMPLNCK Stand Alone Plumbing Pln Ck (hourly) P 1BSEISMICRE Seismic Residential B 1TRAVDOC Travel & Documentation B 1BUSLIC Business License B 4of3 • • Assessor's Parcel Number: `T7 S—oS O3 —2 Name of owner. Project address. Contact person. Cd " iyt eEws G-vr, ne. �z S ^ f 2.fr - 2 3 7l Fax. z�— zc' Net square footage of lot. Existing Proposed Square footage: First floor: Second floor: Garage: TOTAL: ee there at least two 10 foot by 20 foot clear spaces inside the garage? Y 1 Is privacy protection planting required for the project? )� N On what floor(s) is work being done? /Is.: j Brief description of work. Code editions: 2008 CBC 2008 CPC Effective 1/1/08 • l J N)2008 CFC N)2008 NEC (Y - N)2008 CMC Plan Review Process Work Book Page -8 -Revised 1/1/08 SUBMITTAL #1 E -- C,Fr RVEYED I uY : 3 2008 SUBMITTAL #1 oUT .,�—LuiNc� CP - i oUT .,�—LuiNc� CP - r - � t a 1 -:PRG: Assessor's Parcel Number: S-oS–01 % Name of owner. Project address. Contactperson.` .�rtx �br�G1J �ryvt one. qzs^ 82S 237/ Fax. 9ZS– r- KZ A Net square footage of lot. Existing Square footage: First floor: Second floor: Garage: TOTAL: Proposed Oe there at least two 10 foot by 20 foot clear spaces inside the garage? 1 Is privacy protection planting required for the project? Y> N On what floor(s) is work being done? l s— Brief description of work. Code editions: 2008 CBC Y N)2008 CFC 2008 CPC N)2008 NEC Effective 1/1/08 f(Y - N)2008 CMC a- N) ( N) 31099 SUBMITTAL #1 OFMCE COPY Plan Review Process Work Book Page -8-Revised 1/1/08 + L1 l0 5 �t1 GFS _ 110 # mamens - AS,. j BOOI E �� MAO Acl qU, ___ ! -Community Development • it 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 CITY OF Fax (408) 777-3333 CUPEkTINO Building Department All Cupertino building permits must meet certain conditions related to maintaining environmental quality And public peace and safety. The two most common conditions are described below. STORMWATER POLLUTION CONTROL State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and the Santa Clara Valley Water District control stormwater pollution. Educating local residents and businesses and enforcing stormwater pollution control laws are key parts of the City's compliance efforts. Stormwater pollution prevention: It's up to us In northern Santa Clara Valley, storm drains flow directly to local creeks and San Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife dependent on our waterways, for people living near streams and baylands, and for the local water supply. Common sources of stormwater pollution include: • Dripped oil, fuel, and antifreeze from vehicles and heavy equipment; • Construction debris, including dirt, concrete and paint; • Landscaping runoff containing pesticides or weed killers; and • Any material dumped or spilled into streets or storm drains The property owner and the contractor share ultimate responsibility for activities' occurring at a construction site and will be held responsible for any environmental damage caused by subcontractors or employees. . For more information on construction -related stormwater requirements, see the Stormwater Quality Regulations section of the City of Cupertino web site at: htti)://www.cupertino.org/city government/departments and offices/ environmental services COMMUNITY NOISE CONTROL The basic noise control requirements for construction sites are as follows: • Typical construction work hours are: - Weekdays - 7 a.m. to 8 p.m. - Weekends - 9 a.m. to 6 p.m. • Construction other than street construction is prohibited on holidays. • Residential daytime noise levels from complaint site - 60 dBA • Nonresidential daytime noise levels from complaint site - 65 dBA For more information on noise control, please see Chapter 10.48 of the Cupertino • Municipal Code, which can be accessed at http:ZZwww.amlegal.com/cui)ertino ca/ Greg Casteel Building Official • Plan Review Process Work Book Page A2 -Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator. (Note/Spec. A-3 1oint P. Other 1. List Green Features on Plans A-1 1 paint MMEMM TOTAL POINTS 40 points • Plan Review Process Work Book Page A2 -Revised 3/25/08 Green Points Rating System for Remodeling Projects 46 Due to the diversity of remodeling project types, assigning a "total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for "greening" your project. . 1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 80%= 4 points up to 4 Resource pts '2. Salvage Reusable Building Materials _ 4 Resource pts y --yes 3. Remodel for Mixed Use, Adaptive Reuse, and 2. Use FSC Certified Wood for framing Historic Preservation 4 Resource pts y --yes 4. Protect Native Soil 2 Resource pts y=yes 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 6. Implement Construction Site Stomwater Practices 2 Resource pts y=yes 7. Protect Water Quality with Landscape Design 2 Resource pts y=yes a besign Resource -Efficient Landscapes and Gardens _ 4 Resource pts y=yes 9. Reuse Materials/Use Recycled Content Materials 2 Resource pts y=yes for Landscape Areas 2 Resource pts y=yes 10. Install High -Efficiency Irrigation Systems 2 Resource pts Y --yes 11. Provide for On -Site Water Catchment / Retention 2 Resource ots v=ves B. Foundation • 1. Incorporate Recycled Flyash in Concrete 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource pts 2. Use Recycled Content Aggregate 2 Resource pts y=yes 3. Insulate Foundation/Slab before backfill 3 Energy pts y=yes C. structural Frame 1. Substitute Solid Sawn Lumber with Engineered Lumber's 3 Resource pts 2. Use FSC Certified Wood for framing y=ye: (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts. 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=yes 4. Use Web Floor Trusses 2 Resource pts y=yas 5. Design Energy Heels on Trusses 6" or more 2 Energy pts y=yes 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes B. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=yes b. Wall 3 Energy pts y=yes c. Roof 3 Energy pts y=yes 10. Apply Advanced Framing Techniques 4 Resource pts y=yes 11. Use Reclaimed Lumber for Non Structural Applications -- 3 Resource pts y=yes 12.UseOSB - -- • a. subfloors 1 Resource pt y=ye s b. Sheathing - 1 Resource pt y=yes 1. Use Sustainable Decking Materials a. Recycled content b. FSC Certified Wood 2. Use Treated Wood That Does Not Contain Chromium/Arsenic :3. Install House Wrap under Siding 4. Use Fiber -Cement Siding Materials r E. Plumbing +1.Install'Water Heater Jacket 2. Insulate Hot and Cold Water Pipes F3. Retroft all Faucets and Showarheadswilli Flow Reducers a. Faucets (1 point each, up to 2 points) i b. Showerheads (1 point each, up to 2 points) 4. Replace Toilest with Ultra -Low Flush Toilets (1 point each, up to 3 points) 5. Install Chlonne Filter on Showerhead 6. Convert Gas to Tankless Water Heater 7. Install (Nater Filtration Units at Faucets (2 points each, up to 4 points) S. Install On -Demand Hot Water Circulation Pump r. tieccncei ,1. InstallCompact Fluorescent Light Bulbs (CFLs) L( bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) 2. Install IC -AT Recessed Fixtures with CFCs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) . G. Appliances 11: Install, Energy Star Dishwasher 2. Install Washing Machine with Water and Energy Conservation Features 3.Install Energy Star Refrigerator 4. Install Built -In Recycling Center H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls b. Ceilings 2. Install Floor Insulation over Crawl Space '.3. Install Recycled -Content, Fiberglass Insulation with No Added Formaldehyde 4. Use Advanced Infiltration Reduction Practices 5. Use Cellulose Insulation a. Walls b. Ceilings 6. Alternative Insulation Products (Cotton, spray -foam) a. Walls a Ueuings 3 Resource pts y=yE 3 Resource pts y=yi 1 IAQ/Health of y=yE 1 IAQ/Health pt y=yE 1 Resource pt y=yes 1 Energy pt y=yes 2 Energy pts , y=yes Up to 2 Resource pts Up to 2 Resource pts Up to 3 Resource pts 1 IAQ/Healih pt yges 4 Energy pts y=yes Up to 4 IAQ/Health pis 4 Resource pts y=yes Up to 4 Energy pts. Up to 5 Energy pts. Up to 4 Energy pts. Up to 4 Energy pts, 1 Energy of , 1 Energy pt 1 Energy of 3 Resource pts 2 Energy pts y=yes 2 Energy pts y=yes 4 Energy pts y=yes 3IAQ/Health pts y=ym 2 Energy pts y=ye 4 Resource pts . y=yas 4 Resource pts y=yeE 4 Resource pts ygae 4 Resource pts y=ye: 0 0 0 Mill 2 Energy pts y=yes 2 Energy pts y=yes 4 Energy pts y=yes 3IAQ/Health pts y=ym 2 Energy pts y=ye 4 Resource pts . y=yas 4 Resource pts y=yeE 4 Resource pts ygae 4 Resource pts y=ye: Ci 0 0 1 0 Mill Ci 0' 0 0 - Ci 1. Install Energy -Efficient Windows a. Double -Paned 1 Energy pt y=yes b. Low -Emissivity, (Low -E) 2 Energy pts y=yes c. Low. Conductivity Frames 2 Energy pts y=yes 2. Install Low Heat Transmission Glazing 1 Energy pt y=yes J. Heating Ventilation and Air Condltioning 1. Use Duct Mastic on All Duct Joints - 2 Energy pts y=yes 2. Install Ductwork within Conditioned Space 3 Energy pts y=yes 3. Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 4. Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 5. Install Solar Attic Fan 2 Energy pts y=yeS 6. Install Attic Ventilation Systems 1 Eneroy pt y=yes 7. Install Whole House Fan 4 Energy pts y=yes B. Install Sealed Combustion Units a. Furnaces 3IAO/Healthis p y=yes y y b. Water Heaters 31AO/Health pts y=yes 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 3 Energy pts y=yes 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 11. Install AC with Non -HCFC Refrigerants 2 Resource pts y=yes • 12. Install 11% Annual Fuel Utilization Efficiency (AFUE) Furnace 13. Retrofit Wood Burning Fireplaces 2 Energy pts y=yes a. Install EPA certified wood stovesfinserts 1 IAQ/Health pt y=yes b. Install/Replace Dampers 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y=yes 15. Install High Efficiency Filter 4 IAQ/Health pts y=yes 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts y=yes 17. Install Separate Garage Exhaust Fan 3 IAQ/Haalth pts v=ves K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 4 Energy pts y=yas 2. Install Solar Water Heating System 10 Energy pts y=yes 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points) Up to 16 Energy pts :6. Select Safe and Durable Roofing Materials 1 Resource pt y=yes _ 7. Install Rant Barrier adi 3 Energy pts y=yes L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts 3. Plant Deciduous Trees on the (Nest and South Sides 3 Energy pts 1. Use Low/No-VOC Paint 2. Use Low VOC, Water -Based Wood Finishes 13. Use Low/No VOC Adhesives 4. Use Salvaged Materials for Interior Finishes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 6. Use Exterior Grade Plywood for Interior Uses J7. Seal all Exposed.Particleboard or MDF 6. Certified Use FSC Matanals for Interior Finish 9. Use Finger -Jointed or Recycled -Content Trim 10. Install Whole House Vacuum System N. Fiooring 1. Select FSC Certified Wood Flooring '2. Use Rapidly Renewable Floor"ing Materials 3. Use Recycled Content Ceramic Tiles 4. Install Natural Linoleum in Place of Vinyl 5. Use Exposed Concrete as Finished Floor 6. Install Recycled Content Carpet with Low VOC 1 IAQ/Health pts y=yes 21AQ/Health pts y=yes 31AQ/Health pts y=yes 3 Resource pts y=yes 6IAQ/Health pts y=yes 1 IAQ/Health pts y=yas 41AQ/Health pts y=yes 4 Resource pts y=yes 1 Resource pts Y--yes 3 IAQfHaalth pts y=yes 8 Resource pts s y=yes 4 Resource, pts y==yes 4 Resource pts y=yes 5 IAQ/Health pts y=yes ' 4 Resource pts y=yes 4 Resource pis y=yes Total Points Available: Total Points Project Received: IAQlHealth G:dwalpro,srgreenbuildngguidelineslremodelersrgreenpoinsfina1212A4pmtected.zls 0 IlkCil T -Of UPERTINO • Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 Building Department JOB ADDRESS: PERMIT # r C A "lie I- W v• 1 0 ko-rot'O� OWNER'S NAME: L PHONE # P=zf_- 82f- 7 GENERAL CONTRACT l' AX # �S I am not using any subcontractors: Signature Date Please check apulicable subcontractors and rmmn1,-fP FhP Owner/ Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/ Contractor Signature Date