Loading...
07-023, Environmental Consulting Services 67-0;'3 AGREEMENT CITY OF CUPERTINO 10300 Torre Avenue Cupertino, CA 95014 408-777 -3200 NOt!RP-tJ" 4-9 J> BY THIS AGREEMENT, made and entered into this 27'h day of Februarv, 2007. by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (1) Environmental Consultina Services (2) Address: 18488 Prospect Road. Suite 1 City: Saratoaa Zip: 95070 Phone: (408) 257-1045 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR shall provide or furnish the following specified services and/or materials: Noise Study Proposal for the Las Palmas Residential Development, North Stelling Road, Cupertino EXHIBITS: The following attached exhibits hereby are made part of this Agreement: Environmental Consulting Services scope of work proposal (Attached) TERMS: The services and/or materials furnished under this Agreement shall commence on Februarv 27,2007 and shall be completed before When complete - no later than April 27. 2007 COMPENSATION: For the full performance of this Agreement, CITY shall pay CONTRACTOR: Shall not exceed Shall not exceed $3,400.00 GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and all damage and liability due to negligence, errors and omissions, including all costs of defending any claim, caused by or arising out of the performance of this Agreement. City shall not be liable for acts of Contractor in performing services described herein. Insurance. Should the City require evidence of insurability, Contractor shall file with City a Certificate of Insurance before commencing any services under this Agreement. Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination. No discrimination shall be made in the employment of persons under this Agreement because of the race, color, national origin, ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this Agreement is not a contract of employment in the sense that the relationship of master and servant exists between City and undersigned. At all times, Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement. Contractor certifies that no one who has or will have any financial interest under this Agreement is an officer or employee of City. Changes. This Agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. '1J ENTERED CONTRACT CO-ORDINATOR and representative for CITY shall be: NAME Garv Chao DEPARTMENT Plannina Department This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties have executed this Agreement the day and year first written above. CITY OF CUPERTINO: By: Garv Chao Title: Associate Planner EXPENDITURE DISTRIBUTION $3,400.00 Environmental Consulting Services 18488 Prospect Road - Suite 1, Saratoga, CA 95070 Phone: (408) 257-1045 stansheIl99(a~toast.net FAX: (408) 257-7235 November 24, 2006 Mr. Gary Chao Assoc. Planner 10300 Torre Avenue Cupertino, CA 95014-3202 Re: Noise Study Proposal for the Las Palmas Residential Development, North Stelling Road, Cupertino; Dahlin Group Project No. 305.001 Dear Mr. Chao, I appreciate the opportunity to respond to your request for a noise study proposal on the subject residential development in Cupertino. The scope of the noise study would comply with State multifamily residential noise standards and City of Cupertino residential development guidelines, including on-site noise monitoring. The primary noise source at this location would appear to be traffic on Highway 280, and to some extent that on North Stelling Avenue. Long-term design noise levels for the project residential units with the highest anticipated noise exposures would be determined, based on field noise monitoring and projections of future vehicular noise in the area. A noise report would be prepared describing field noise measurements, analysis procedures, and noise design guidelines. General noise mitigation measures would be developed, to the extent they are required. The estimated portion of work involved in each phase of each noise study would be as follows: Data gathering and field work Analysis and modeling Mitigation measure development Report preparation 25% 25 15 35 The fee for the noise study would be based upon the actual time and materials required to complete the work as described above, at a rate of $175 per hour plus expenses, not to exceed $3400. A report generally could be completed within two weeks after go-head and receipt of all relevant project and traffic information, weather permitting convenient field measurements. I have a set of site and design drawings dated October 24, 2006, which I believe are the latest version. I understand there are no special noise-related conditions of City approval, such as exterior protected areas with specific noise limits, but that a noise wall along the freeway property line will be constructed. Finally, I would need authorized and ready access to the site for making noise measurements (that is, without the need to scale fences or worry about existing conflicting on-site activities). I would hope that a partial completion payment of $1000, in lieu of a retainer, would be available soon after work is under way. I would handle all phases of the study as project manager. Las Palmas Residential Development Noise Study Proposal- Cupertino Page 2 of 3 As you are aware, I have over 25 years of experience in the noise analysis and mitigation field relating to community noise and development projects, including many projects similar to this in northern California, as well as others in the San Francisco Bay area, and in Monterey and Santa Cruz Counties, and many in Cupertino. I have attached a Statement of Qualifications. A representative list ofECS noise studies completed can be provided on request. If you need more details on this proposal, or ifthe scope or estimated costs of the project are not satisfactory, please let me know immediately, so that we can make a mutually acceptable modification. If the scope of the study proposal is acceptable, an authorized signature at the end of this document will allow this to serve as a Letter of Agreement and an authorization to enter the project site for noise measurements, and work can proceed at your convenience. Or a City P.O. or contract can also be prepared with this proposal as an attachment. 1 look forward to working with you and your team on this project. Respectfully submitted, ~~ H. Stanton Shelly Acoustical Consultant Board Certified Member (1982) Institute of Noise Control Engineering Att: Statement of Qualifications Proposed Las Palmas Residential Development Noise Study approved. BY.~ e-( p~' ~A I;) b (" ) Z),/.]- Date Printed Name 0tJ.. f<"{ c{~ Title As-:;o c",t$ IJh111V Y . ) Environmental Consulting Services * * * Saratoga Las Palmas Residential Development Noise Study Proposal- Cupertino Page 3 of3 Statement of Qualifications H. Stanton Shelly - Acoustical Consultant Professional Interests and Capabilities Architectural noise control, exterior and interior, including California Title 24 Noise Insulation Standards; machinery noise measurement, analysis, and control; traffic noise measurement and modeling; municipal noise ordinance development and enforcement; land use planning for noise compatibility, including environmental impact analysis and mitigation. Relevant Experience Developed and managed the municipal noise control program for the City of Palo Alto, including preparing a unique Noise Ordinance and a Noise Element for the Comprehensive Plan; as an independent consultant, prepared over one hundred fifty noise impact assessment and mitigation studies for residential, commercial, industrial, and public facility projects. List of representative ECS noise studies available on request. Education and Traininq B.S.E. (Electrical Engineering) - University of Michigan M.S. Civil Engineering (Environmental) - Stanford University Institute of Noise Control Engineering (lNCE): Associate Member since INCE founding in 1972. Board Certified Member since 1982. Professional Emplovment Principal Consultant, Environmental Consulting Services - 1977 to present Environmental Specialist, City of Palo Alto - 1971-1976 Systems Test Engineer, Eastman Kodak, Rochester, NY - 1967-1969 Electronic and Acoustical Test Engineer, General Dynamics/Astronautics, San Diego - 1963-1967 Environmental Consulting Services * * * Saratoga