Loading...
8461 • FIRE DAMAGE CERTIFICATION STATEMENT BEFORE FINAL ELECTRICAL . PERMIT No. BUILDING ADDRESS: mp'y7 x� DATE:-". / I certify that before final. electrical approval, that a written signed statement by the electrical contractor who is in compliance with the state licensing law or the owner/occupant, that all electrical cir- cuits have been tested for the following: 1. Grounding conductor continuity. 2. Correct wiring polarity. 3. Overcurrent devices. • 4. Appliances and special equipment. S. G.F.I. ci.rcuits. 6. Integrity of wire insulation. The tests required above shall be recorded and shall be made avail- able before final to Building Department. The recorded tests shall be signed and dated by the testor. Additional testing may be necessary on special installations. A determination will be made at time of final inspection. Owners signature Contractors signa re Owners a rens ontractors icens% um er Contractors Address, ity, Zip •