08010075 CITY
.�+OF CUPERTINO
BUILDINGbIVISION PLI'RMIyV15„C> TO � Q,�� y
BUILDING DDRESS: PERMrr NO.
1045 NORTHVIEW SQ CALIFORNIA BATHROOM & 08010075
OWNER'S NAME: kiLN PERMIT ISSUE DATE
SUSAN HUBBART 1261 LINCOLN AVE STE 204 01/14/2008
ONE: SANITARY NO. CONTROL NO.
ARCHITEC(ENGINEER: BUILDING PERMITINFO
REMODEL KITCHEN BO ELECT PLUMB O
�oo LICENSED CONTRACTOR'S DECLARATION
I h.eby affirm that 1 am licensed uad.,provisions of Chains,9(cemmendell Job Description
.� with Section 7000)of Division 3 of the Business and Professions Code.and my[too=is
ray mull fo=eandefibet.
Z Llcsnm s LM.M
Dam Co.,BLbf
e ARCHITECCS DECLARATION
e7
Y I understand my plans shall be used as public=cards
yasd5 Licensed Professional
7a OWNER-BUILDER DECLARATION
1 hereby se a1Bnn that 11. exempts an Ne Coment Cad License Law for the,
p o following moon.(Sado)cmeare5.Business and Prere,demolish.
h.or Any city or county
which requires•permit m cnns,Lw.alma improsu demnnit t or epnig any Nodum
prior bits issuaae,also requires Ne applicant for wchpctoi's NcssiaadsWcment
< than heulicensedpursuantmtheprovialoneofNsCantracmr'sLiven=fAw(Chapmr9 Sq.Ft. Floor Area Valuation
E $ (commencing with Section 7000)M Division 3 or Ne Businaasnd Professions Cod,)or
S.. That he is aumpt dmemfrom and the basis for Ne alleged exemption.Any violadan of
Section 7031.5 by any applicant for a permit subjects Ne applicant no a civil Penalty of APN Number Occupancy Type
not now Nan live hundred dollars(5500),
❑1,u owner of de Property,ar mY emplaYcex with wags u then seletampenseoon, ,
will d thewark,and dessuudu=isnumumultlm,afferd formic(Sec.70th,Bustneu Required Inspections
and Professional Code:The ConaacWf's LIcMC Law does set apply m an awnW e of q P
property who builds or im prove thereon,and who does such work himself or through hit
own emplayeaa,provided thatsuch improvements are not imanded oronerM funds.if,
however.she building or improvement is mid within au,year of impletion.the awoer-
molder will hale the burden of proving that he did not build or Improve for purpose of
ale.).
❑1,as owner of the Property am exclusively contracting with licensed convectors to
construct the project(Sec.7041.Business and Professions Code:)The Citrau7or,Li-
...taw does not apply man own.of property who builds or improve=devices,and.
who convects for men pmjeets with a conaacnor(s)licensed pursuant to Ne Contractor's
Lkeue Law.
❑I am exempt and.See .B&P C far this moan
Owner Date
WORKER'S COMPENSATION DECLARATION
1 hereby affirm under penalty of perjury oro a(the fallowing declauu mes:
I ham sd will ronin Wn a Cenificate of C...t m self-im um fe,WahefsCompen-
man,as provided for by Section 3700 of the tabor Cade,for to performance of me
work for which this permit is issued.
1 have and will maintain Worker's Comparisons Insurance,as required by Section
3700 of me Labor Code,for me performance of the work for which this Permit is Issued
My Waukee,Compensad..Inauraran carrier and Policy number are:
cemk,:Lintwl.n Leff" PolicyN..: US/ S C
CERT1 P170N FROM WORKERS'
COMPENSATION INSURANCE
(Goes wooden need mulm completed Iran,permit Is f.one hundred dollars($100)
or kis)
1 certify that in to performance of the work for which this Permit is issued,l shall not
employ any person In try mannerse as m became abject to the Woken'CompcuWon
Laws of California.Dam
Applicant
NOTICE TO APPLICANT:If,after making this Certificate of Exemption.you should
become subject he lie Worker's Compensation provisions of the later Coda,you moat
O Z fanhwith comply with such Provisions to this Permit shall be deemed revoked.
Z O CONSTRUCTION LENDING AGENCY
(..i oI hereby aline that Nem is a constmcdnn lending agency far the perfurmmne,of
ai Ne work fm which this permit is Wood(Sec.3097,Civ.C.)
ts7 0 Lassoes Name
O z Lender's Address
U O 1 notify that I have rad this application and main mat the ad=Infomatiun u
ly H correct.I agree m comply with all city and county oNinances and sera laws missing In
.OU building construction,and herebyauNadn repaccoadves of this city in now,open de
Q.l shave-mentioned property for inspection purpuo.
(We)agree to save,indemnify and keep hannkss the City of Cupertino against
,A Ilabilides.jdgmena,mmuand eapeues which may in any way acerae against said City
U in consequence of the gnnang of this ar=il
APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL ON-POINT Issued by: Date l �I
SOURCER ATIo�S.
signata //'�vL–� T/�IL_ Re-roofs
HAZARDOUS MATERIALS DISCLOSURE Type of Roof
WIII the applicant or furore building occupant stare orhandle harudou m ccrial
as defined by the Cupertino Municipal Cade.Chapter 9.17,and the Mason fid Safety
Cod,,Sectia.75537(s)7 All roofs shall be inspected prior to any roofing material being installed.
[3 year IJ}Nu
WIII the apPlican r fu=ns building occupant use equipment u device whist If a roof is installed without first obtaining an inspection,I agree to remove
I huardnus air conumi..nu as defrncd by the Bay Area Air Quality Managemcna all new materials for inspection.
ulet7
❑Ycs No
Ihave read the hva ssumamriaismquimmcnts under Chep¢r6.95oflhe Calille,
nisHralN&SafctyCde.Sectio=75505,25533md25534.1ndermand NuifNc building
does not currently ha=a e nasal Nat It is my vpomihiliny to redly the oaupann of the
mquimmcnuw 'hm�sst gymet prior m issuance of a Cenifmam of O�p .D� Signature of Applicant Date
//� �� j,F— All roof coverings to be Class"B"or better
Ownc towderisadeg t Dam
CITY OF CUPERTINO
® 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: SylviaM
COPY # 1
Sec: Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 31636010. 00
DATE ISSUED. . . . . . . : 01/14/2008
RECEIPT # . . . . . . . . . : BS000003679
REFERENCE ID # . . . : 08010075
SITE ADDRESS . . . . . : 10845 NORTHVIEW SQ
SUBDIVISION . . . . . . .
CITY CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : SUSAN HUBBART
ADDRESS . . . . . . . . . . : 10845 NORTHVIEW SQ
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-0541
RECEIVED FROM . . . . : ALLYEN JOHNSON
CONTRACTOR . . . . . . . : JOHNSON, ALLYN K LIC # 21160
COMPANY . . . . . . . . . . : CALIFORNIA BATHROOM & KITCHEN
ADDRESS . . . . . . . . . . : 1261 LINCOLN AVE STE 204
CITY/STATE/ZIP . . . : SAN JOSE, CA 95125
TELEPHONE . . . . . . . . : (408) 360-9700
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 40, 000. 00 4 . 00 0. 00 4 . 00 0 .00
1REMRESKIT SQ FEET 90. 00 429 . 00 0 . 00 429 . 00 0 . 00
1STPLNCK HOURS 1. 00 122 . 00 0 . 00 122 . 00 0. 00
---------- ---------- ---------- ----------
TOTAL PERMIT 555. 00 0 . 00 555 . 00 0. 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 555 . 00 MASTER CARD
---------------
TOTAL RECEIPT 555 . 00
r
CITY OF CUPERTINO
ADDITION/REMODEL
CITYCUPEI�TINO PERMIT APPLICATION FORM
APN# e:
Date:
Building Address:
D Q /0 0T E v✓ Sc GuPg/LTi vc�
Mailing Address (if different from building address):
Owner's Name: Phone# : ,
vS V `/lof -7ZS�—g7
Contractor: (j A--7-twwal,4 d-L i rC i a.✓ Phone#: y n r�_ 3 �'Q q 7 go
2��onri;�ra�f l�C.
Fax #: Z
Contractor License#: q 7 /
Cu ertino Business License#: 11t0
Contact: A"VI/ To /JAI'SPhone#: 17 pg,
Fax#:
Building Permit Info: ;.� j�,,� l-o..y AAA may` --!Truce�Y �
Bldg. Q' Elect. Plumb. [`� Mech. E3— Hillside ❑
Job Description:
Addition(adding sq footage):
What is being remodeled? IG 1 T( H tfN ;
Remodel Includes Re-Roof: Yes ❑ No ® If yes list number of squares
Remodel Includes Structural: Yes ❑ No [R
Square Footage:
Addition: Porch: Deck: Garage: Detached Attached
Remodel: Kitchen Bath Other
Type of Construction (Usage Class): Occupancy Type:
1 FR, IlFR ❑ 11, 111, V-IHR ❑ 11, 111, 1V V-N 2-
Valuation: S Please check this box if the project is a
oOOq second-story addition ❑
Green Building Check list must be completed and
attached to the plans. Green Building Points Achieved:
**For Office Use Only***
Over-the-Counter ❑
i
CITY OF CUPERTINO
lao ADDITION/REMODEL
CUPEI,TINO FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
ADDITIONS 1R3SFDADD
PLLONGRNGR Long Range PL
Planning/Residential
17R3INSP . Dwellings Inspections B
5dPLNCK Dwellings plan check B
1R3REPINSP Dwellings Repeat. B
Inspection
1R3REPPLNC Dwellings Repeat Plan B
Check
1R3HINSP Dwellings Hillside B
inspection
1R3HPLNCK Dwellings Hillside B
Dl an check
1R3HREINSP Dwellings Hillside B
Repeat Inspection
1R3HREPLNC Dwellings Hillside B
Repeat Plan Check
1R3ALTINSP Dwellings Alternate B
Materials Inspection
1R3ALTPLNC Dwellings Alternate B
Materials Plan Check
1PCESS Cesspool P
Ea. Private Sewage P
1PPRSEWG g
Disposal System
1PRSEWER Sewers P
1BPSPRD,K Lawn P
Sprinkler/Backflow
1BPWSVCS Main Water Service P
1BSEISMICRE SeismicResidential B
DECKS 1R3SFDADD OR
1R3SFDREM
1DECKWOOD Deck(Wood)-Each B
Each
1DECKRAIL Deck Railing-Each B
Each
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
GARAGES 1R3SFDADD OR
1R3SFDREM
1GARDTW<=1K Wood Frame up to B
1,000 SF
1GARDTM<=1K Masonry up to 1,000 B
SF
BCONSTAXR Construction Tax Res
new detached garage)
PATIO'S OPEN 1R3SFDADD OR
1R3SFDREM
1PATIOWOOD Wood Frame up to.300 B
SF
1PATIOMETAL Metal Frame up to 300 B
SF
1PATIOOTHER Other Frame up to 300 B
SF
PATIO'S CLOSED 1R3SFDADD OR
1R3SFDREM
1PATIOENCLW Enclosed Wood up to B
300 SF
1PATIOENCLM Enclosed Metal up to B
300 SF 1.
1PATIOENCLO Other Enclosed Patio B
-up to 300 SF
1COVPORCH Porch Covered-Each B
Each
1REROOFRES Residential Re-roof B
Each 100 SF
REMODELS 1R3SFDREM
1REMRESKIT Kitchen Remodel up to B (Deduct "$"for ea plan
300 SF check
1REMRESBAT Bath Remodel up to B
300 SF
1REMREOTH Other Remodel up to B
300 SF
REMODEL PLNCK
ISTPLNCK(1-3 for Standard Plan Check B NOT FOR OVER THE
remodel) COUNTER PLAN CKS.
3 of 3
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
WINDOW/SLIDING 1R3SFDREM
GLASS DOOR
1 WINREP Replacement windows B
ea 8 windows
1WINNEWNSTR New Window (non- B
structural
1WINMEWSTR New Window B
(Structural Shear
WalVMas0
1WINBAYSTR Bay Window B
Structural
SKYLIGHTS 1R3SFDREM
1SKYL<10 SF Skylight less than 10 sf B.
1SKYL>lOSF Skylight greater than B,
10 sf or structural
1STAIRS Stairs-first flight/ea B
addt'1
1BUSLIC Business License . B
4 of 3
❑0❑
❑❑❑ From Planning&Design to Detailed&Quality Craftsmanship
000 License No. 698718
♦ BATH RGDM 0001313
1261 Lincoln Ave. - Fa • San Jose, 95125
&KITCHEN 0130❑
REMODELERS ❑❑❑E9 408-360-9700 rax: 408-360-9797 97
271 V11LW sib — — — -- XIf7j.Al - 1V0.✓r4L'K7-QA1
TJ
�-
6Fr- goo
AP �/ I88d $ T NV
M ACCORDANCE IIH THE CITY i .
(� I CUPERTINO CODES AND ORDINACES GI,'a' J e KISTi ✓(i
/ )ATE �il-t[,4
LL % 3IONEU — --+ — —
v this set of plans an specifications\
\
Or kept on the i, b at all tirand it j �c
Iaeul to make a ry changes or alterp ion,
j on same without written permission I ron,
he building Dept,.City of Cupertino.
rhe stamping of t fls plan and specificytn• —
/ WILL NOT be held to permit or o e a
6F )pproval of the violation of an sl X, s
anv Citv Oramance or )tate ..
It
L I (> N
1� _I
_ XL -i- 3 . _� _ ITJ+ -O( P
--I- �- -- -;--;- ( �—� -------I v p O A,TK, �G f TC 11-C,11 A LT:.
�O v—ML _ O�rL 1 ._ONLY _-- —�
� __ � �- -�-- . 1-.._-- �O✓TLFTI_ .d �12c.ti;f77 To top
ir
%Al,6n _C2/�[ .I;N(! �!j kFP( LkGj- s vQ.-pi�L,
—r _�/v To�lNT`� t ►I /,d�0� - -- ._ ` i'��I✓.GafTfNVTI cov,✓fplLS,
I =
tb
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered erlvironmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These Rams have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening'your project.
' ite
t Recycle Job Site Construction&Demolition Waste }
65%=t point;75%_'2 points;BO%=4 points up to 4 Resource pts 0
2.Sebaga Reusable Suilding Materials 4 Resource pts y yes D
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y--yes; 0
4.Protect Native Soil 2 Resource pts y--yes D
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt Y_—Yes D
6.Implement Construction Site Stormwater Practices 2 Resource pts y--yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y--yes 0
B.Design.Resourde•Effcientlandscapes and Gardens.: ,. .14 Resource pts y=yes D
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y--yes D
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes D
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes D
1 1
B.FoundaHon
1.Incorporate Recycled Flyash in Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10%
® increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y-yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes p
{ 1 1
C.Structural Frame
N'.Substltute_Solld SawnLumb rr w th Englnaered)Lumber. 3 Resource pts y--yes D
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes D
5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes D
6.Use Recycled Content Steel Studs for Intedor Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(S)PS)
a.Floors 3 Energy Wall Pis Y--yes 0
3 Energy pts y--yes 0
c.Roof 3 Ener is
9Y P Y_—Yes D
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
1Z Use.O_SBS
#a Subfioor`s
iff I r ". 1 Resource pt y=yes 0
b:Sheathing 1 ResourceY
P t =Y es 0
• 1 1 1
eror ns
1.Use Sustainable Decking Materials
a.Recycled content 3 Resource pts y--yes 0
b.FSC Garbed Wood 3 Resource pts y=yas 0
2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAO/Health pt y--yes D
3.Install House Wrap under Siding 1 IAO/Health pi j--yes D
4.Use Fiber-Cemant Siding Materials 1 Resource pt Y--yes 0
1 1 1
E.Plumbing
1.Install Water Heater Jacket 1 Energy pt yryes 0
2.insulate Hot and Cold Water Pipes 2 Energy pts Y_—Yes 0
3,Retrofit all Faucets and Showarheads with Flow Reducers
a,Faucets(1 point each,up to 2 points) Up to 2 Resource pts. D
to.Showarheads(1 point each,up to 2 points) Up to 2 Resource pis. 0
4.Replace Toil with Ultra-Low Flush Toilets
(1 point each,up to points) Up to 3 Resource pts, 0
5.Install Chlorine Filter on Showerhead 1 IAO/Health pt y=yes 0
6.Convert Gas to Tanklsss Water Heater 4 Energy pts yryes D
7.Install Water.Filtration Units at Faucets
(2 points each,up to 4 points) Up to 41A0/Health pts. 0
B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y--yes 0
{ 1
V.tleCIfIC81
1.Install Compact Fluorescent Light Bulbs(CFLs)
(B bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0
2. Install IGAT Recessed Fixtures with CFLs(1 point each,up to
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
1 1 1
G.Appliances
a.Install Energy Star Dishwasher i Energy pty yes 0
2.Install Washing Machine with Water and Energy
Conservation Features 1 Energy pt Y--yes 0
3.Install Energy Star Refrigerator 1 Energy pt yryes 0
4.Install Built-In Recycling Center 3 Resource pts y--yes 0
f
H.Insulation
1.Upgrade Insulation to Exceed Tltle 24 Requirements
a.Walls 2 Energy pts Y--yes 0
b.Ceilings 2 Energy pts yryes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y--yes 0
3.Install Recycled-Content, Fiberglass Insulation with
:No Added Formaldehyde 3 IAO/Health pts. y--yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pis Y_—Yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts . y--yes 0
b.Ceilings 4 Resource pts y--yes 0 •
6.Alternative Insulation Products(Cotton,spray-loam)
a.Walls 4 Resource pis Y_—Yes D
D.U8111ngs 4 Resource pts y--yes 0
1 1 f
I. n ows INPUT Reswtces Energy IAWHealth
1•.-install Energy-Efficient Windows
a.Double-Panad 1 Energy pt y_y+es 0
It,Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.Low."Conductivity Frames 2 Energy pts Y--yes .0
2.Install Low Heat Transmission Glazing - 1 Energy pt Y--yes 0
i ! i
J.Heating Ventilation and Air Conditioning
1.Use Duet Masfic on All Duct Joints gyp yy
,. , _ 2 Ener is es 0
2,Install Ductwork within Conditioned Space 3 Energy pts yryes 0
3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes 0
4.Clean all Ducts Before Occupancy 21AQMealth pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts yryes 0
6.Install Attic Ventilation Systems 1 Energy pt Y--yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
6,Install Sealed Combustion Units
a.Furnaces 3IAO/Health pts y=yes 0
b.Water Heaters 31AQ/Health pts y--yes p
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes D
10.Install 13 SEER/11 EER or higher AC with a 1XV 3 Energy pts Y--yes D
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes D
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts Y--yes 0
13.Retrofit Wood Buming Fireplaces
a.Install EPA certified wood stovesrnserts 1 IAQ/Health pt y--yes p
® b. Install/Replace Dampers 1 Energy pt yryes p
c.Install Airtight Doors 1 Energy pt y=yes D
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes p
15.Install High Efficiency Filter 41AQ/Health pts y--yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
i 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y_yes 0
2.Install Solar Water Heating System 10 Energy pts Y--yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes p
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=16 points) Up to 16 Energy pts 0
6r Seleot'Safe'an_ fing
d Durable.Roo ,Materials 1 Resource pt Y--yes 0
LL""..�.-.....T _
f.Install Radia_Y :.�nt Barrier 3 Energy pts y=yes D
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes p
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes p
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p
1 1 1
. n oor r us ty en n s es
1.Use Low/No-VOC Paint 1 IAO/Health pts y--yes; 0
2.Use Low VOID,Water-Based Wood Finishes 2 IAQ/Heaith pts y--yes 0
3.Use -DW/ND VOC Adhesives 31AQ/Hsalth pts y--yes 0 •
4.Use Salvaged Materials for interior Finishes 3 Resource pts y--yes; 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6IAO/Health pts y=yas 0
S.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y--yes 0
7.Seal all Exposed Particleboard or MDF 4 IAOMealth pts y--yes 0
B.Use FSC Certified Materials for Interior Finish 4 Resource pts yryes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y--yes D
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 6 Resource pts y=yes 0
.:2.Use Rapidly Renewable,Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 51AQ/Health pts y--yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y--yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts Y--yes 0
1 I 1
Total Points A 1 1401 130 57
Total Points Project Received: 1 01 07-016
G:data/progsrgmenbulldingguidalines/remodelarslgmmpointsfinal212e4pmfectedxls
t
!' Community Development
10300 Torre Avenue
Teleph
Cupertino CA 95014
kCITY OF Fax(408)777-3333
IJUPEkTINO
Building Department
All Cupertino building permits must meet certain conditions related to maintaining
environmental quality and public peace and safety. The two most common
conditions are described below.
STORMWATER POLLUTION CONTROL
State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and
the Santa Clara Valley Water District control stormwater pollution. Educating local
residents and businesses and enforcing stormwater pollution control laws are key parts
of the City's compliance efforts.
Stormwater pollution prevention: It's up to us
In northern Santa Clara Valley, storm drains flow directly to local creeks and San
Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife
dependent on our waterways, for people living near streams and baylands, and for the
local water supply. Common sources of stormwater pollution include:
• Dripped oil, fuel, and antifreeze from vehicles and heavy equipment;
• Construction debris, including dirt, concrete and paint;
• Landscaping runoff containing pesticides or weed killers; and
® Any material dumped or spilled into streets or storm drains
The property owner and the contractor share ultimate responsibility for activities
occurring at a construction site and will be held responsible for any environmental
damage caused by subcontractors or employees.
For more information on construction-related stormwater requirements, see the
Stormwater Quality Regulations sectionof the City of Cupertino web site at:
htti)://www.cupertino.org/city government/departments and offices/
environmental services
COMMUNITY NOISE CONTROL
The basic noise control requirements.for construction sites are as follows:
• Typical construction work hours are-
- Weekdays - 7 a.m. to 8 p.m.
' - Weekends - 9 a.m. to 6 p.m.
Construction other than street construction is prohibited on holidays.
• Residential daytime noise levels from complaint site - 60 dBA
a Nonresidential daytime noise levels from complaint site - 65 dBA
For more information on noise control, please see Chapter 10.48 of the Cupertino
Municipal Code, which can be accessed at httr)://www.amlegal.com/cuoertino ca/
® Greg Casteel
Building Official
°a°
OO° From Planning&Design to Detailed H Quality Craftsmanship
BATH R(3DM OO° cense No. 698718
°a°° 1261 Lincoln Ave. #204 • San Jose, CA 95125
&KiTCHEN0000
°°°o°° 408-360-9700 • Fax: 408-360-9797
REMODELERS
_Svsl3.i✓-. F1!V-� Qin fir;--- '- - -- � - T -�- -,. ._�
--.0-9-1/-S A/
._ , - 7111 v'v - --e
-X sT/.v G N q•✓SiQ xnlL&C
r-y4L9X CIOLI16 To Mf
F- L- dlf v✓
GFS 000
�EX• CEFt�.✓G
1 o/w I
e Ksn �G
t I
�. .001I I 1
i I
i ASS SSo
F�ovR4IcL.✓F �QCdISnD COPY
.
y�i4 f
i I
_-- Fo K �.o
Z 'P
— 1---I O v,✓rP2_ OJrtrl .O/ [Y ✓P DPrT1C �c I Tc (y�.✓ TCT
I
D✓TLc77 d- 1-i2C+-v;I'tl To CUprZ
-�—y� - - r
_�l_IG=.�—FX_,- -57/-N_G C.Q..��[r.l.t✓_(i 1 _._.__ _- , _R�.P: 1E_S t.Q_-(�fLv'fCL
_
Iwo-v-. � -ST(L✓CTrr� � L_. .' - R�dz wl �w lig tI�g
livti . . :To�Fi✓S�N- �/ o a' rW_ CA671f �
� 'co .-Iret4
Community Development
10300 Torre Avenue
J Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
CUPERTINO
Building De artment
JOB ADDRESS: PERMIT #
1 09'E A,o9T*VI )T J SQ. <f-0bo7—
OWNEWSNAME: 5(i5jan/ PHONE # 't'08 6fl_ 97oa
GENERAL CONTRACTOR: C,, : „�:w B (� A r FAX# 9,0 - d o - Y 7
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the following information
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical TAIL EtEcTtuic
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
• Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing C Z .
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
•
Owner/Contractor Signature Date