Loading...
08050199Y�e 0z z C a> D. A az UO_ �E Fa uz - BUILDIN$ DIVISIODI PERMIT C®I�ITRAC OR IIVF,U'RMATIQIY BUIL ING,A DRESS: PERMIT NO. �ON� NOVEMBER DR A PLUS CONTRACTING 08050199 NEW NAME: PERMIT ISSUE DATE KRISH & GLORIA KUMAR 383 HANS WAY 05/27/2008 ONE: SANITARY NO. CONTROL NO. (877)929-5524 ARCHITECT/ENGINEER: BUILDING PERMIT INFO BLDGELECT PLUMB MECH 0 0 0 0 LICENSED CONTRACTOR'S DECLARATION Chapter Job Description P I hmcby affirm this 1 am licemad under provisions of 9 (commencing wiN Suction 70(10) of Division J of the Rudnes; and Profcssimu Code, and my lam= is REPLC GALVNZD WTR PIPE W/COPPER in full fame mhW effec N Littnso �I - Lac. $ Dale CSDECL LO AR DECLARATI N � - Ithe.ma 1 undersand my plans Thant W used u public rucnNs Licensed Professional OWNER -BUILDER DECLARATION 1 Wrehy oMo. Ihot I am =xampt from me Conuxtors Liccnx Law far me following moon. (Sudan 70313, Busia , and Pmfeasiom Cale: My city or county which mquims a pm of to construct. alcor. improve, dcmokuh. or miss any structure ! prior to its issuance. also mquiru tM.pplium farmch permauo file. at,mAmamem than W u licammd ro the me Contractor's uttmm law(Chapmr 9 Sq. Ft. Floor Area Valuation palmaal provisiml.f $5000 (commencing with Salon 7000) of Division J of Ne Businessand Profusions Cado) or that ho is mem n themfmm and tW hums for the siloged exemption An, violation of Salon 7031.5 by say applium far. pemhit "bjcca the applicant o .,Ml pcnslly ofNumber 36216030.E1fpe Occupancy mal mom mfi anahunhaddollars(ML 0 I, u owner of IW pmleny, a my moployces with wags u them role eompenuuon, will da tW work. and me macwm is nolinsnded or offered tarsale (Sae. 7066, Buimss Required Inspections and Pmfeuians Cade Ths Comrwmis Lkcnse Law las not apply o an was of property who builds m (op ob. theran, and wha does such wart h W xlf or though his own employes. povisad that such improvements am rot inmnGd oreQemul fur sale If, hwew, the building or improvement is sold within arc yew of completion, me away. builder will have the hurdan of moving that In, did not build or improve for pugose of sal'.). 0 1, as wrier of an, property, so exclusively contacting with licensed conuanan to wnstrocl to pole" (Sac. 7046. Business ahM Prufa..Wns Code:) The contractors U. . cape law does not appy as an owner of property who Wilds or improves thereon. and who contract, for such projects with a eomracon(.) licensed pursuant to IW Canuasures Liceme law. 0 lam"empt Yndm Sat. ,BBPCfathisouon mer Date WORKER'S COMPENSATION DECLARATION 1 bcmby affirm under penally of perjury mm of to following dalaralonc 0 1 h.w end will maimam a Cemficam ofConsem o xlf-Wuca far Wman'sCompen- salon, as provided for by Section YM) of tiro labor Cade. far me poforman o of me work for which No Punnfl IS boon. 0 I have and will murrain Workor'. Coalmauadan Insurance, as ma u rad by Sermon 3700 of the Lamm Coo, fm are performance of the work for which this ptoth is tssuM. My Worlme, Compensation Insurance tamer and Policy number am: Carries Policy No.: CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (Thu xcti. band col W compleo:d if me p=mhit is faro. hundmd dollen (51007 or leis) I certify that in the perfo.mec of the work for, which this permit is Wood. l shall not employ any person in myth sea n at to theW d sCampcnsal. lawsof Cali(p0ya. am Applicant Ir4 qqts NOTICE TO : II, a er a ong s Cem hcam�f Exempuan, you should beeomn ..him to the Worker's Campcwtion provisions of to Lamm Coda. you rotes forthwith comply with such provisions or this permit shall W dttmW rewkcd. CONMUC71ON LENDING AGENCY 1 kmbY air m than mem H a consuucmm landing agency fm the perfarmamc of the wort for which this permit Is usuad (Sec. 709?, Cir. C.) Lender's Namc l<ndars Andres. 1 cenify, that I have mad Itis application and sem than ma aWve mparm h n is .ren. I .gra to cmoPly wim.11 city and court, amlnwnms and atm laws Rladng o Wilding concoction, and hereby "maraca mpmsenmtins of this city to color upon the abuve-ojudgm properly far pmpwhich sx,m.om (We) agme o caw, indemnify and keep hanaleu t, City of Capenlno against ms o coma and expense. which may In any way acerae against said City in comms.nanc f m, ofinegranting of thisD WIL A APPLICANT APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT Issued by: Date SOURCERE LATIONS. r- / Re -roofs Signanum o(ApplicanUCo pram RDOU HAlARDOUS MATERIALS DISCLOSURE Type of Roof Will me.pplicturt or (Muni Wilding oc.panlan912 handle haraNausd u dc0ned by tan Cupertino Municipal Chapmr 9.13. and the Health and Safety War, role, Sermon 25572(.)? ❑Yns All roofs shall be inspected prior to any roofing material being installed. Will ma applicant or fuwm Wilding ..spam caw cquipmem or dcviaa which If a roof is installed without first obtaining an inspection, ection, I agree to remove emit hazardous oar contaminants as dc0ned by the Bay Ama Air Quality Manag=m.t all new materials for inspection. District? DY., I haw mal the hacamtus muarials mcmimmcma or &, Chapor 6.95 of tW Califor- nia Halm d: Safcty Cadc. Sations 25505, 25577 and MN.I undcamad than ifte building door not cuhmnty haw a imunl ma its my mspa ait,luy m ally the oawant of me begotnaw hmustWmet r ins ccaf rm,mafa. Signature of Applicant Date All roof coverings to be Class'jq." or better own=rmatmaricad as=m p,m • 4 ITEMS OF 4 • CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN ...I....: 36216030.00 DATE ISSUED ........ : 05/27/2008 RECEIPT #.........: BS000004891 REFERENCE ID # ...: 08050199 SITE ADDRESS .....: 1092 NOVEMBER DR SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 METHOD OF PAYMENT ---------- CREDIT CARD TOTAL RECEIPT . AMOUNT --------------- 143.28 --------------- 143.28 REFERENCE NUMBER -------------- VISA VOICE ID DESCRIPTION VOICE ID DESCRIPTION ------------------ ------ ---------------------------- 301 ROUGH PLUMBING 507 FINAL PLUMBING OWNER ............: KRISH & GLORIA KUMAR ADDRESS ..........: 1092 NOVEMBER DR CITY/STATE/ZIP ...: CUPERTINO CA, 95014-4130 RECEIVED FROM ....: EDWARD L MULLINS CONTRACTOR .......: EDWARD L MULLINS LIC # 25457 COMPANY ..........: A PLUS CONTRACTING ADDRESS ..........: 383 HANS WAY CITY/STATE/ZIP ...: SAN JOSE, CA 95133 TELEPHONE ........: (877)929-5524 FEE ID ---------- UNIT QUANTITY ----------------------- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR VALUATION 5,000.00 -------------------- 0.50 0.00 ---------- 0.50 ---------- 0.00 1PPERMITFE FLAT RATE 1.00 40.79 0.00 40.79 0.00 1PRREPIPE NO OF FIXTURE 6.00 61.20 0.00 61.20 0.00 1TRAVDOC FLAT RATE 1.00 40.79 0.00 ---------- 40.79 0.00 TOTAL PERMIT ---------- 143.28 0.00 ---------- 143.28 ---------- 0.00 METHOD OF PAYMENT ---------- CREDIT CARD TOTAL RECEIPT . AMOUNT --------------- 143.28 --------------- 143.28 REFERENCE NUMBER -------------- VISA VOICE ID DESCRIPTION VOICE ID DESCRIPTION ------------------ ------ ---------------------------- 301 ROUGH PLUMBING 507 FINAL PLUMBING -5-( CITY OF • CUPEkTINO r L og°S7(D19 � CITY OF CUPERTINO REPIPE/SEWER/MAIN SERVICE PERMIT APPLICATION FORM APN # 2 r a J /^ J 0? O 63 �N Fee ID Date: Building Address: Permit Type 1D9 a moymber �- r Owner's Name: P Phone #: V,r'i h i- 6.100'67 ICu07a/1-- I BPREPIPE ??Z - Contractor: 1CPRP Phone #: �jo2�j Ss�y �7o i 1q.5- Coli A-GZG� 0 Commercial Gas Piping System 1-4 Outlets Fax #: Contact: I A �d ��(Cr!��//Jv Phone #: 029 spa y Seismic Commercial P `?37 z1f IBSEISMICR Fax#: Contractor License #: 767 7� Cupertino Business License #: ✓� y� IPRSEWER Job Description: Re /QG� Iqq t VcP ��ed �Ge— Residential Commercial 0 Valuation: Green Build' g: Please complete relevant portion of the Green Building Checklist & attach it to the. application or if applicable, include in plan set & the sheet index. Quantity Fee ID Fee Description Fee Group Permit Type 1PCSEWER Commercial building sewer/sanitary sewer P 1CPSS I BPREPIPE Commercial re -pipe per fixture P 1CPRP 1PGASCOM Commercial Gas Piping System 1-4 Outlets P 1BSEISMICOM Seismic Commercial P IBSEISMICR Seismic Residential P IPRSEWER Residential building sewer/sanitary sewer P 1R -PSS CITY OF CUPERTINO CITY OF CUPERTINO REPIPE/SEWER/MAIN SERVICE FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type 1 PRREPIPE Residential re -pipe per fixture P IR -PRP 1BPWSVCS Water Service P 1CPWS or 1RPWS IPPRSEWG Private Sewage Disposal System P 1PCESS Cesspool P 1BPWATER Install/alter Water Pipe P 1BPFIXTURE Plumbing Fixture P 1PGASRES Residential Gas Piping System 1-4 Outlets P. 1BPGAS Gas Piping System 5+ Outlets P J 1 PPERMITFEE Plumbing Permit Fee Issuance P 1PLMBLNCK Plumbing Plan Check P 1PLMBINSP Other Plumbing/gas Insp. P J1TRAVDOC Travel & Documentation Fee B 1BUSLIC Business License B 40 • 1J 4 u • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' ~ L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points u • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects • Due to the diversity of remodeling project types, assigning a "total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. INPUT Resources Energy IAQIHeafth A. Site 1. Recycle Job Site Const uction 8 Demolition Waste i 65%-1 point; 75%= 2 points; 80%= 4 points up to 4 Resource 2. Salvage Reusable Building Materials 4 Resource pts y=; 3. Remodel for Mixed Use, Adaptive Reuse, and Historic Preservation 4 Resource pts y= 4. Protect Native Soil 2 Resource pts y= 5. Minimize Disruption of Existing Plants 8 Trees 1 Resource pt y= 6. Implement Construction Site Stormwater Practices 2 Resource pts y= 7. Protect Water Quality with Landscape Design 2 Resource pts y= 8. Design Resource-Effcient Landscapes and Gardens 4 Resource pts y= 9. Reuse Materials/Use Recycled Content Materials 2 Resource pts for Landscape Areas 2 Resource pts y 10. Install High -Efficiency Irrigation Systems 2 Resource pts y== 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y= B. Foundation • 1. Incorporate Recycled Flyash in Concrete 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource pts 2. Use Recycled Content Aggregate 2 Resource pts y=yes 3. Insulate Foundation/Slab before backfill 3 Energy pts y=yes C. Structural Frame 1, Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts. 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=yes 4. Use Web Floor Trusses 2 Resource pts y=yes 5. Design Energy Heels on Trusses 6' or more 2 Energy pts y=yes 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes B. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPs) a. Floors 3 Ener 9Y pts y=yes b. Wall 3 Energy pts y=yes c. Roof 3 Ener is Energy y=yes 10. Apply Advanced Framing Techniques 4 Resource pts y=yes 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 12. Use OSB • a. Subfloors b. Sheathing 1 Resource pt y=yes 1 Resource of v=ves 1. Use Sustainable Decking Mateeals a. Recycled content 3 Resource pts y=yi b. FSC Certified Wood i 3 Resource pts y=yl 2. Use Treated Wood That Does Not Contain ChromiurrVArsenic 1 IAO/Health pt y=yi 3. Install House Wrap under Siding 1 IAQ/Health pt y=p 4. Use Fiber -Cement Siding Materials 1 Resource pt y=yes E. Plumbing 1. Install Water Heater Jacket _j 1 Energy pt 2. Insulate Hot and Cold Water Pipes 2 Energy pis a. Faucets (1 point each, up to 2 points) b. Showerheads (1 point each, up to 2 points) 4. Replace Toilest with Ultra -Low Flush Toilets (1 point each, up to 3 points) 5 Install Chlnrine Filter on Showerhead 6. Convert Gas to Tankless Water Heater 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) 8. Install On -Demand Hot Water Circulation Pump r. ctecrncat 1. Install Compacl Fluorescent Light Bulbs (CFLs) (6 bulbs=2 points, l0 bulbs =3 points, 12 bulbs = 4 points) ) 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) G. Appliances Install Washing Machine with Water and Energy roservation Features nstall Energy Star Refrigerator Install Built -In Recycling Center H. Insulation 1, Upgrade Insulation to Exceed Title 24 Requirements a. Walls b. Ceilings 2. Install Floor Insulation over Crawl Space S. Install Recycled -Content, Fiberglass Insulation with No Added Formaldehyde 4. Use Advanced Infiltration Reduction Practices 5, Use Cellulose Insulation a. Walls b. Ceilings 6. Alternative Insulation Products (Cotton, spray -foam) a. Walls D.cemngs Up to 2 Resource pts. Up to 2 Resource pts. Up to 3 Resource pts. 1 IAQ/Health pt y=yes 4 Energy pts y=yes Up to 4 IAQ/Health pts. 4 Resource pts y=yes Up to 4 Energy pts. Up to 5 Energy pts. Up to 4 Energy pts, Up to 4 Energy pts 1 Energy pt y=ye: 1 Energy pt y=yep 1 Energy pt y=ye 3 Resource pts y=ye: 2 Energy pts 2 Energy pts 4 Energy pts 31AQ/Health pts y=yes 2 Energy pts y=yes 4 Resource pts 4 Resource pts 4 Resource pts y=yes 4 Resource pts y=yes E • • 11. Install Energy -Efficient Windows l 3 Energy pts a. Double -Paned 1 Energy pt y=yes 4. Clean all Ducts Before Occupancy J. Low -Emissivity (Low -E) 2 Energy pts y=yes 2 Energy pts c. Low. Conductivity Frames 2 Energy pts y=yes 2. Install Low Heat Transmission Glazing 1 Energy of y=yes J. Heating Ventilation and Air Conditioning I1. Use Duct Mastic on All Duct Joints 2 Energy pts 2. Install Ductwork within Conditioned Space 3 Energy pts 3. Vent Range Hood to the Outside 1 IAQ/Health pt 4. Clean all Ducts Before Occupancy 2 IAO/Health pts 5. Install Solar Attic Fan 2 Energy pts 6. Install Attic Ventilation Systems 1 Energy pt 7. Install Whole House Fan 4 Energy pts 8. Install Sealed Combustion Units 5 IAQ/Health pts a. Furnaces 3 IAQ/Health pts b. Water Heaters 3 IAQ/Health pts 9. Replace Wall -Mounted Electric and Gas Heaters with 7. Install Radiant Barner Through -the -Wall Heat Pumps 3 Energy pts 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts 11. Install AC with Non -HCFC Refrigerants 2 Resource pts 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts 13. Retrofit Wood Burning Fireplaces 1. Pre -Plumb for Solar Water Heating a. Install EPA certified wood stoveslnseds 1 IAQ/Health pt b. Install/Replace Dampers 1 Energy pt c. Install Airtight Doors 1 Energy pt 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts 15. Install High Efficiency Filter 4 IAQ/Health pts 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts 17. Install Separate Garage Exhaust Fan 31AO/Health pts K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 4 Energy pts y=yes 2. Install Solar Water Heating System 10 Energy pts y=yes 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2A kw =12 points, 3.6 kw =18 points) Up to 18 Energy pts (6 Select Safe and Durable Roofing Matenals ! J 1 Resource of y=yes 7. Install Radiant Barner 3 Energy pts y=yes L. Natural Heating and Cooling 1, Incorporate Passive Solar Heating 5 Energy pts 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts 3. Plant Deciduous Trees on the West and South Sides 3 Energy pts 0 1. Use Low%No-VOC Paint — ' 1 IAQfHealth pts y=yes 2. Use Low VOC, Water -Based Wood Finishes 2 IAQ/Health pts y=yes F. Use Low/No VOC Adhesives, 3 IAQ/Health pts y=yes 4. Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 6. Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes r7. Seal all Exposed Particleboard or MDF _ _ 4 IAQ/Health pts y=yes 8. Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 9. Use Finger -Jointed or Recycled -Content Trim 1 Resource pts y=yes 10. Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 0 0 1. Select FSC Certified Wood Flooring 0 0 0 0 0 0 • 2. Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 3. Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 4. Install Natural Linoleum in Place of Vinyl 51A0/Health pts y=yes 5. Use Exposed Concrete as Finished Floor 4 Resource pts 0 N. Flooring 1. Select FSC Certified Wood Flooring 8 Resource pts y=yes 2. Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 3. Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 4. Install Natural Linoleum in Place of Vinyl 51A0/Health pts y=yes 5. Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 6. Install Recycled Content Carpet with Low VOCs 4 Resource pts y=ye=. Total Points AE!able: 1401 1301 57 . Total Points Project Received: 0 01 0 G:daWprogs/greenbuildngguidelines4emodelerslgreenpoimsf na1212.e4prolecied.xls 0