08090132BUILDING DIVISION PERMIT
1--timf—PLACER SPRING CT I CASTILLO'S ROOFING 108090132
IFNER'S NAME: PERMIT ISSUE DATE
DESAI NAUSHIK AND MEENA 1703 CATHAY DR 09/19/2008
PHONE: (408)251-3565 SANITARY NO. CONTROL NO.
nmr1�T
with Secdon TOM) of Division 3 of the Business and Professimu C
I full force and ertem. /�
License Clg9yy e' Lie. Is 3 0
Dam `J COmratnf.
I understood my plans shall ba used A public records
Job Description
TEAR OFF EXISTING WOOD SHAKES, INSTALL # 30 IB
FELT, GAF COMP SHINGLES.
Licemed professional
OWNER -BUILDER DECLARATION
1 bemby alarm Nat I am exempt from dm Contractors License Law for the
following reason. (Section II01.5. Business and Professions Cade: Any city or county
which r e)uiru a Permit in consutcL alley, improve, demWLah, or repair my statute
Prior to its issuer c. atw requires the applicant for such permit to file asigned sidemen,
Nat W is licensed pursuant to the provisions of the Contractor's liccnm law (Chapter 9 Sq
(commencing with Section 1000) of Division 3 of too Business and profession. Codc) or
Oat he u exempt Nemm froand the basis fm the alleged exemption. Any vialidun of
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of
rot acme than It. hundred "Ins, ($500). 3 6 6 5 5 0 01
❑ 1, as owner of On Property, or my employees with wages as Nab sok co rapevadon,
will do the work and the structure It not intended or offered for We (Sec. 1014, Business
and Professional Coda: The Cor mmoh License Law does not apply H in owner of
property who builds or improv thereon, and who does such work himself or through his
ova amployeca. provided mat Inch iacprovemmU art not intended "offered fm axle If.
however. Ne building or.impornment uald within one year of completion. tic owner -
Wilder will have the hurtlan of proving Hat he did nm build as improve for purpose of
1, a Owner of Nc Property, sac esclmively COntracling with Ilemum J ammoacmm in
..It the project (See. 1004. Business and Profession Cade:) The Cmtracum's Lt.
se taw does not apply to an Owner of property who Wilds or improv Hereon. and
o contracts fm such projects with a contracmr(s) licensed purswnt as de Contranors
m a
I law.
am exempt mdse Bee ,B&PCfar His mason
no Data
WORKER'S COMPENSATION DECLARATION
1 hereby aQom under penalty of perjury oro of the following decunuartn
1 ham and will maintain a Certificate of Covent in self-insum fm Workers Compen.
on, A provided for by Section 3100 of the labor Cade, for the Performance of He
h for which Hu permit is issued.
I have and will maintain Wareces Compevation latrans, u required by Sermon
poi the Labe Cade. for On Nrf.. of the wank for which His permit u issued.
COMPENSATION INSURANCE
(Thu aeerlm need Out he mmVlemd if the pewit u forom bundmdde0ass (SIM)
or leu)
I certify Het in He performance of the work fm which this perch u issued, l shall not
employ any person in any mannerm sa in become subject re the Worked Composition
laws of California Da¢
Applicant
NOTICE TO APPLICANT: If, after making this Certificate of Exemption, you should
become Inbieca in the Worker's Cincinnatian provisions of the tabor Code, you acus
.J O forthwith comply with such provision or His permit shall k m
deccd mated.
Z � CONSTRUCTION LENDING AGENCY
I hereby allm that dem is a construction lending agency for the perfmmarc of
E
i He work for which His Permit is island (Sec. 3091, Cho, C.)
Q Leaders Name
z Lenders Address
U Q 1 certify Hat I have mW this application and state that the above information is
In F coned I .gra in cansply with all dry and county oNivncerand state laws ¢hung H
Wilding construction, and hereby Intborixe representatives ofths city in mter upon the
C17 above-mentioned pmpcny fOc inspection purposes.
gk. (We) agree to An. indemnify and kap harmless the City of Cupertino against
IA Iimilibrajudgmenu coats and expanses which may in any way aria against aid City
V Z in cortsrguenee of the granting of this permit.
^ APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT
IDOUS MATERIALS DISCLOSURE
future Wilding Occupant nom or handle havrtlous material
Municipal Cade. Chapter 9.13, and me, Health and Safety
Will me applicant or forum building occupant use equipment at devices which
emit hovadous air contaminants at usfomi by me Bay Area Air Quality Management
Dinned
❑Yes O
I have mad me hvardom acamrialsroquin mems undef Chapmr6.95 of the Cdifor-
nRHealth &SafctyCode, Secures 25505, 25533 amt 25534.1 utdersund thuifthe Wilding
den^^99t cuncnlly have a meant, mat it u my ac"Ohihiliry In tmuty do occupant of the
mquyhmcnuyrbkhpmf keret privur isaaaoa of. Conif marlYcunancv.
Issued by:
Re -roofs
Type of Roof
:111
Required Inspections
Date .aVAZ
All roofs shall be inspected prior to any roofing material being installed.
If a roof is installed without first obtaining an inspection, I agree to remove
all new materials for inspection.
Signature of Applicant Date
All roof coverings to be Class 'W' or better
CITY OF
*UPEkTINO
E
•
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax(408)777-3333
Building De artment
JOB ADDRESS:
Placer
PERMIT #
D Zb4 3'z—
OWNER'S NAME: G' u ch t k-
G')
PHONE #
UcY 2 - cSLa
GENERAL CONTRACTOR: o
,yjc,
FAX #
_
I am not using any subcontraeter
Signature Date
Please check applicable subcontractors an omplete the following information
ba
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Date
• 2 ITEMS OF 4
•
•
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot:
APN ........: 36655001.00
DATE ISSUED.......: 09/19/2008
.RECEIPT #.........: BS000006138
REFERENCE ID # ...: 08090132
SITE ADDRESS .....: 11832 PLACER SPRING CT
SUBDIVISION .......
CITY .............: CUPERTINO
IMPACT AREA .......
OPERATOR: SylviaM
COPY # : 1
OWNER ............: DESAI NAUSHIK AND MEENA
ADDRESS ..........: 11832 PLACER SPRING CT
CITY/STATE/ZIP ...: CUPERTINO, CA 95014-5102
METHOD OF PAYMENT
-----------------
CHECK
TOTAL RECEIPT :
AMOUNT
---------------
469.60
---------------
469.60
VOICE ID DESCRIPTION
-------- ----------------------------
601 ROOF TEAR OFF
604 ROOF IN -PROGRESS
REFERENCE NUMBER
--------------------
15351
VOICE ID DESCRIPTION
-------- ----------------------------
602 ROOF PLYWOOD NAIL
605 FINAL REROOF
RECEIVED FROM ....:
CASTILLO ROOFING
CONTRACTOR .......:
JOSE CASTILLO LIC #
25850
COMPANY ..........:
CASTILLO'S ROOFING
ADDRESS ..........:
1703 CATHAY DR
CITY/STATE/ZIP ...:
SAN JOSE, CA 95122
TELEPHONE ........:
(408)251-3565
FEE ID
-----------------------
UNIT QUANTITY
----------
AMOUNT PD -TO -DT
THIS REC
NEW BAL
1BSEISMICR VALUATION 8,000.00
---------- ----------
0.80 0.00
----------
0.80
----------
0.00
1REROOFRES SQ
FEET 18.00
234.00 0.00
234.00
0.00
TOTAL PERMIT
---------- ----------
234.80 0.00
----------
234.80
----------
1 0.00
METHOD OF PAYMENT
-----------------
CHECK
TOTAL RECEIPT :
AMOUNT
---------------
469.60
---------------
469.60
VOICE ID DESCRIPTION
-------- ----------------------------
601 ROOF TEAR OFF
604 ROOF IN -PROGRESS
REFERENCE NUMBER
--------------------
15351
VOICE ID DESCRIPTION
-------- ----------------------------
602 ROOF PLYWOOD NAIL
605 FINAL REROOF
CITY OF CUPERTINO
d' REROOF
•CUPEkTINO PERMIT APPLICATION
02040/32.
APN #
c3leecv' - 61.0b
Date:
- (g 0I
Building Address:
I 1 '93',- P�
r`
n_q6 CA,
Owner's Name:
Phone #:
P
Contractor:
Phone #:
35'40S
Fax #:
Cupertino Business License #:
Contract Licens #:
Type of Roof Covering:
Existing: Proposed:
❑ Built -Up Roof
sphalt Shingles
❑ 90 -Up roof
Shingles
Wood Shakes
M/Asphalt
❑ Wood Shakes
❑ Wood Shingles
❑ Wood Shingles
❑ Other (Specify)
❑ Other (Specify)
Number of existing coverings j
❑ Provide I.C.B.O: Report #
aY o be Removed
❑ Provide Mfgr. Installation Specs.
Job Description: T E"C)FF ejG Sq -i li j
S a�s/ Tj 4-36
(a M.O. shy
6fa,
Residential
Commercial
Green Building: Please complete relevant portion of
the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
-applicable, include in plan set & the sheet index.
Valuation:
D oz
0 Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy:
Revised 6/16/08
CUPERTINO
CITY OF CUPERTINO
REROOF
FEESCHEDULE
Number of
Squares
Fee ID
'Fee Description
Fee
Group
Permit Type -
1RER00FC0M
Re -roof Commercial
B
1COMMLROOF
IBSEISMICO
Seismic Commercial
B
1REROOFRES
Re -roof Residential
B
1SFDWLROOF
1BSEISMICRE
Seismic Residential
B
1RER00FMRES
Re -roof Multi -Family
B
1MFDWLROOF
1BSEISMICRE
Seismic Residential
B
IBUSLIC
Business License
B
Revised 6/16/08
0
•
1]
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
Subject: Re -roofing policy for the City of Cupertino
Prior to permit issuance, you must agree to comply with 2007 IBC Standards
and manufacturers specifications on re -roofing. All roofs are Class "A" per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re -roofing
is completed.
3.All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre -inspection and/or tear off approval.
2) In -progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re -inspection fee of $176.18. The re -inspection fee must
be Raid before another inspection can be scheduled
IMPORTANT:
1. Flat roofs must have a minimum of/a " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re -roofing.
ttoA ll � p
Homeowner's Name: Vy Q a / �5 I1 lIU Ct i
Job Site Address: I I 0 3 �- q (� / ot-e Coir
Roofing Company Name: tri42
Applicant's Si afore: ' Date: ' I� O
Greg Casteel
Building Official
Revised 07/30/08
C4
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
REROOF TEAR OFF POLICY
1. You must schedule an inspection for the tear off the day before
you wish the inspection to be made. The procedure is to call the
Building Division (408) 777-3228 between the hours of 7:30 a.m. and
3:30 p.m. to request a. next -day inspection.
• 2. When the roof is torn off, the nails have been removed or driven in,
and all of the dry -rotted wood has been replaced, you must call the
City Building Division. An inspector will be there within one hour.
There are special hours for this service: from 7.30 a.m. to 10:30 a.m.
and 1:00p.m. to 3:30 p.m., Monday through Thursday and from
7:30 a.m. to 10:30 a.m. and 1:00 p.m. to 2:30 p.m. on Friday. (Note:
Building inspectors are on lunch break from 11:30 a.m. to 12:30 p.m.
and will not be called during that time. City Hall is closed between
12:00 and 1:00 p.m. daily.)
0
3. If you call for a tear -off inspection and the job is not ready, you will
be charged a re -inspection fee of $176.18. The re -inspection fee must
be paid before another inspection can be scheduled
Greg Casteel
Building Official
Revised 8/13/04
a
•
•
Plan Review Process Work Book Page -12-Revised 3/25/08
Green Building Plan Check
Index of Green Building
Points/Categories
A.
Category
Example of an Index or Table of Green
Plan Sheet or Page
Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B.
Site
9.
Install H.E. Irrigation, (details/spec)'
L-1
2 points
11.
Permeable Paving, Note
L-1
2 points
C.
Foundation
1.
Use 15 % Flyash Concrete, (note)
S-1
5 points
D.
Structural
3.
Uses Wood I -Joist, (See Spec.)
S-2
2 points
5.
Use Truss with heels, (detail)
S-2
2 points
6.
B. OSB Sheathing, detail
S-2
2 points
E.
Ext. Finish
1.
Composite Decking, (Note/Spec.)
A-3
2 points
4.
B. Fiber Cement Siding, (Note/Spec.
A-4
2 points
F.
Plumbing
1.
Insulate all H.W. pipes, (Note/Spec.)
P-1
2 points
5.
Tankless W.H., (Note/Spec.)
A-2
2 points
11.
A 2500 Gal. Tank, (Note/Spec
L-1
10 points
G.
Electrical
4.
E. Ceiling Fans, (Note/Spec.)
A-3
4 points
H.
Appliances
1.
Energy Star Dishwasher, (Note/Spec.)
A-3
1 point
3.
Energy Star Refrigerator,(No te/Spec.)
A-3
1 point
P.
Other
1.
List Green Features on Plans
A-1
1 point
IRMAIMEM
TOTAL POINTS1
40 points
•
•
Plan Review Process Work Book Page -12-Revised 3/25/08
1'
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project.
A. Site
1. Recycle Job Site Construction & Demolition Waste
65%=1 point; 75%= 2 points; 60%= 4 points up to 4 Resource pts 0
12. Salvage Reusable Building Materials 4 Resource pts y --yes 0
3. Remodel for Mixed Use, Adaptive Reuse, and
Historic Preservation 4 Resource pts y=yes 0
4. Protect Native Soil 2 Resource pts y=yes D
5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 0
6. Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7. Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
�B. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9. Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10. Install High -Efficiency Inigation Systems 2 Resource pts y=yes D
11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes D
B. Foundation
• 1. Incorporate Recycled Flyash in Concrete
25% Recycled Flyash = 2 points; Add 1 point for every 10%
increase of flyash, up to 5 points
2. Use Recycled Content Aggregate
3, Insulate FoundatioNSlab before backfill
C. Structural Frame
r_Substitute Solid Sawn Lumber with Engineered Lumber
2. Use FSC Certified Wood for framing
(For every 10% of FSC lumber used = 2 points, up to 10)
3. Use Wood I -Joists for Floors and Ceilings
4. Use Web Floor Trusses
up to 5 Resource pts
2 Resource pts y=yes
3 Energy pts y=yes
3 Resource pts y=ye
up to 10 Resource pt:
2 Resource pts y=ye
2 Resource pts y=ye
5. Design Energy Heels on Trusses 6" or more
2 Energy pts
y=ye
6. Use Finger -Jointed Studs for Vertical Applications
2 Resource pts
y=ye
7. Use Engineered Studs for Vertical Applications
2 Resource pts
y=ye
8. Use Recycled Content Steel Studs for Interior Framing
2 Resource pts
y=ye.
9. Use Structural Insulated Panels (SIPS)
a. Floors
3 Energy pts
y=ye
b. Wall
3 Energy pts
y=ye:
c. Roof
3 Energy pts
y=ye;
10. Apply Advanced Framing Techniques
4 Resource pts
y=ye;
11. Use Reclaimed Lumber for Non Structural Applications
-
3 Resource pts
yqe;
12. Use OSB
• a. Subfloors
1 Resourcep t
y -ye '
b. Sheathing
-
1Resource pt
y=yes
l_
r
r
r
r
r
r
r
r
r
- -O.
r
r
r
r
--. 0,.....
�
0
l_
l_
l_
_
-1. Use Sustainable backing Materials
a. Recycled content
J. FSC Certified Wood
12. Use Treated Wood That Does Not Contain Chmmium/Arsenic
13. Install House Wrap under Siding
14. Use Fiber -Cement Siding Materials
L
E. Plumbing
1. Install Water Heater Jacket
2. Insulate Hot and Cold Water Pipes
i3. Retrofit all Faucets and Showerheads with Flow Reducers
a. Faucets (1 point each, up to 2 points)
b. Showerheads (1 point each, up to 2 points)
l
(4. Replace Toilest with Ultra -Low Flush Toilets
(1 point each, up to 3 points)
5. Install Chlorine Filter on Showerhead
6. Convert Gas to Tankless Water Heater
7. Install Water Filtration Units at Faucets
(2 points each, up to 4 points)
8. Install On -Demand Hol Water Circulation Pump
r. uectncar
I1. Install Compact Fluorescent Light Bulbs (CFLs)
(6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points)
2. Instal IC -AT Recessed Fixtures with CFLs (1 point each, up to
5 points)
3. Install Lighting Controls (1 point per fixture, up to 4 points)
4. Install High Efficiency Ceiling Fans with CFLs
(1 point each, up to 4 points)
G. Appliances
1. Install Energy Star Dishwasher
I2. Install Washing Machine with Water and Energy
!Conservation Features
!3.Install Energy Star Refrigerator
'4. Install Built -In Recycling Center
H. Insulation
1. Upgrade Insulation to Exceed Title 24 Requirements
a. Walls
b. Ceilings
2. Install Floor Insulation over Crawl Space
3. Install Recycled -Content, Fiberglass Insulation with
jNo Added Formaldehyde
4. Use Advanced Infiltration Reduction Practices
5. Use Cellulose Insulation
a. Walls
b. Ceilings
6, Alternative Insulation Products (Cotton, spray -foam)
a. Walls
a. Uetlings
3 Resource pts
y=yes
3 Resource pts
y=yes
1 IAQ/Health at
y=yes
1 IAQ/Health pt
y --yes
1 Resource of
v=ves
1 Energy pt y=yes
2 Energy pts y=yes
Up to 2 Resource pts.
Up to 2 Resource pts.
Up to 3 Resource pts.
1 IAQ/Health at y=yes
4 Energy pts y=yes
Up to 4 IAQ/Health pts,
4
Resource pts y=yes
Up to 4 Energy
Up to 5 Energy pts.
Up to 4 Energy pts.
Up to 4 Energy pts.
1 Energy at
1 Energy pt
1 Energy at
3 Resource pts
2 Energy pts
2 Energy pts
4 Energy pts
31AQ/Health pts y=yes
2 Energy pts y=yes
4 Resource pts y=yes
4 Resource pts y=yes
4 Resource pts
4 Resource pts
•
•
•
r
r
r
r
0,
r
IJ
r
31AQ/Health pts y=yes
2 Energy pts y=yes
4 Resource pts y=yes
4 Resource pts y=yes
4 Resource pts
4 Resource pts
•
•
•
1. Install Energy -Efficient Windows
a. Double -Paned
b. Low -Emissivity (Law -E)
c. Low. Conductivity Frames
2. Install Low Heat Transmission Glazing
J. Heating Ventilation and Air Conditioning
1. Use Duct Mastic on All Duct Joints -
1 Energy pt y --yes
y=yes
2 Energy pts y=yes
3 Energy pts
2 Energy pts y --yes
_
1 Energy pt y=yes
1. Use Duct Mastic on All Duct Joints -
2 Energy pts
y=yes
._-
Z. Install Ductwork within Conditioned Space
3 Energy pts
yryes
3. Vent Range Hood to the Outside
1 IAO/Health pt
y=yes
.4. Clean all Ducts Before Occupancy
2 IAQ/Health pts
y=yes
5. Install Solar Attic Fan
2 Energy pts
y=yes
6. Install Attic Ventilation Systems
1 Energy pt
y=yes
7. Install Whole House Fan
4 Energy pts
Y --yes
S. Install Sealed Combustion Units
a. Furnaces
3 IAQ/Health pts
y --yes
b. Water Heaters
31AQ/Health pts
y=yes
9. Replace Wall -Mounted Electric and Gas Heaters with
Through -the -Wall Heat Pumps
3 Energy pts
y=yes
10. Install 13 SEER/11 EER or higher AC with a TXV
3 Energy pts
y=yes
11. Install AC with Non -HCFC Refrigerants
2 Resource pts
y=yes
12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace
2 Energy pts
• 13. Retrofit Wood Burning Fireplaces
2. Install Solar Water Heating System
a. Install EPA certified wood stoveshnserts
1 IAQMealth pt
b. Install/Replace Dampers
1 Energy pt
c. Install Airtight Doors
1 Energy pt
14. Install Zoned, Hydronic Radiant Heating
3 Energy pts
15. Install High Efficiency Filter
41AQ/Health pts
16. Install Heat Recovery Ventilation Unit (HRV)
51AQ/Health pts
17. Install Separate Garage Exhaust Fan
3 IAQMealth pts
K. Renewable Energy and Roofing
1. Pre -Plumb for Solar Water Heating
4 Energy pts
y=yeE
2. Install Solar Water Heating System
10 Energy pts
y=ye=.
3. Pre -Wire for Future Photovoltaic (PV) Installation
4 Energy pts
y=yes
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points)
Up to 18 Energy
pts
�6. Select Safe andburable Roofing Malerials_
1 Resource pt
yryes
_ _ _
7. Install Radiant Barrier
3 Energy pts
y=yes
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating 5 Energy pts
2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts
3. Plant Deciduous Trees on the West and South Sides 3 Enerav ots
0
-1. Use Low/No-VDC Paint
2. Use Low VOC, Water -Based Wood Finishes
15. Use Low/14o VOC Adhesives
4. Use Salvaged Materials for Interior Finishes
5. Use Engineered Sheet Goods with no added Urea
Formaldehyde
6. Use Exterior Grade Plywood for Interior Uses
7. Seal all Exposed Particleboard or MDF
------- —
6. Use FSC Certified Materials for Interior Finish
9. Use Finger -Jointed or Recycled -Content Trim
10. Install Whole House Vacuum System
N. Flooring
1. Select FSC Certified Wood Flooring
fL2. Use Rapidly Renewable Flooring Materials
3. Use Recycled Content Ceramic Tiles
4. Install Natural Linoleum in Place of Vinyl
5. Use Exposed Concrete as Finished Floor
6. Install Recycled Content Carpet with Low VOCs
1 IAQ/Health pts
21AQ/Health pts
31AQ/Health pts
3 Resource pts
61AQ/Health pts
1 IAQ/Health pts
41AQ/Health. pts
4 Resource pts
1 Resource pts
3 IAQ/Health ots
6 Resource pts
y=yes
4 Resource pts
y=yes
4 Resource pts
y=yes
5 IAQ/Health pts
y=yes
4 Resource pts
y=yes
4 Resource pts
y=yes
Total Points Available:
Total Points Project Received:
•
1401 1301 57 •
01 0 0
Gaatalprogs/greenbm ingguidelineslramodelersrgreenpointsinal2.12.04pmladad.zis