Loading...
08090132BUILDING DIVISION PERMIT 1--timf—PLACER SPRING CT I CASTILLO'S ROOFING 108090132 IFNER'S NAME: PERMIT ISSUE DATE DESAI NAUSHIK AND MEENA 1703 CATHAY DR 09/19/2008 PHONE: (408)251-3565 SANITARY NO. CONTROL NO. nmr1�T with Secdon TOM) of Division 3 of the Business and Professimu C I full force and ertem. /� License Clg9yy e' Lie. Is 3 0 Dam `J COmratnf. I understood my plans shall ba used A public records Job Description TEAR OFF EXISTING WOOD SHAKES, INSTALL # 30 IB FELT, GAF COMP SHINGLES. Licemed professional OWNER -BUILDER DECLARATION 1 bemby alarm Nat I am exempt from dm Contractors License Law for the following reason. (Section II01.5. Business and Professions Cade: Any city or county which r e)uiru a Permit in consutcL alley, improve, demWLah, or repair my statute Prior to its issuer c. atw requires the applicant for such permit to file asigned sidemen, Nat W is licensed pursuant to the provisions of the Contractor's liccnm law (Chapter 9 Sq (commencing with Section 1000) of Division 3 of too Business and profession. Codc) or Oat he u exempt Nemm froand the basis fm the alleged exemption. Any vialidun of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of rot acme than It. hundred "Ins, ($500). 3 6 6 5 5 0 01 ❑ 1, as owner of On Property, or my employees with wages as Nab sok co rapevadon, will do the work and the structure It not intended or offered for We (Sec. 1014, Business and Professional Coda: The Cor mmoh License Law does not apply H in owner of property who builds or improv thereon, and who does such work himself or through his ova amployeca. provided mat Inch iacprovemmU art not intended "offered fm axle If. however. Ne building or.impornment uald within one year of completion. tic owner - Wilder will have the hurtlan of proving Hat he did nm build as improve for purpose of 1, a Owner of Nc Property, sac esclmively COntracling with Ilemum J ammoacmm in ..It the project (See. 1004. Business and Profession Cade:) The Cmtracum's Lt. se taw does not apply to an Owner of property who Wilds or improv Hereon. and o contracts fm such projects with a contracmr(s) licensed purswnt as de Contranors m a I law. am exempt mdse Bee ,B&PCfar His mason no Data WORKER'S COMPENSATION DECLARATION 1 hereby aQom under penalty of perjury oro of the following decunuartn 1 ham and will maintain a Certificate of Covent in self-insum fm Workers Compen. on, A provided for by Section 3100 of the labor Cade, for the Performance of He h for which Hu permit is issued. I have and will maintain Wareces Compevation latrans, u required by Sermon poi the Labe Cade. for On Nrf.. of the wank for which His permit u issued. COMPENSATION INSURANCE (Thu aeerlm need Out he mmVlemd if the pewit u forom bundmdde0ass (SIM) or leu) I certify Het in He performance of the work fm which this perch u issued, l shall not employ any person in any mannerm sa in become subject re the Worked Composition laws of California Da¢ Applicant NOTICE TO APPLICANT: If, after making this Certificate of Exemption, you should become Inbieca in the Worker's Cincinnatian provisions of the tabor Code, you acus .J O forthwith comply with such provision or His permit shall k m deccd mated. Z � CONSTRUCTION LENDING AGENCY I hereby allm that dem is a construction lending agency for the perfmmarc of E i He work for which His Permit is island (Sec. 3091, Cho, C.) Q Leaders Name z Lenders Address U Q 1 certify Hat I have mW this application and state that the above information is In F coned I .gra in cansply with all dry and county oNivncerand state laws ¢hung H Wilding construction, and hereby Intborixe representatives ofths city in mter upon the C17 above-mentioned pmpcny fOc inspection purposes. gk. (We) agree to An. indemnify and kap harmless the City of Cupertino against IA Iimilibrajudgmenu coats and expanses which may in any way aria against aid City V Z in cortsrguenee of the granting of this permit. ^ APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT IDOUS MATERIALS DISCLOSURE future Wilding Occupant nom or handle havrtlous material Municipal Cade. Chapter 9.13, and me, Health and Safety Will me applicant or forum building occupant use equipment at devices which emit hovadous air contaminants at usfomi by me Bay Area Air Quality Management Dinned ❑Yes O I have mad me hvardom acamrialsroquin mems undef Chapmr6.95 of the Cdifor- nRHealth &SafctyCode, Secures 25505, 25533 amt 25534.1 utdersund thuifthe Wilding den^^99t cuncnlly have a meant, mat it u my ac"Ohihiliry In tmuty do occupant of the mquyhmcnuyrbkhpmf keret privur isaaaoa of. Conif marlYcunancv. Issued by: Re -roofs Type of Roof :111 Required Inspections Date .aVAZ All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant Date All roof coverings to be Class 'W' or better CITY OF *UPEkTINO E • Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 Building De artment JOB ADDRESS: Placer PERMIT # D Zb4 3'z— OWNER'S NAME: G' u ch t k- G') PHONE # UcY 2 - cSLa GENERAL CONTRACTOR: o ,yjc, FAX # _ I am not using any subcontraeter Signature Date Please check applicable subcontractors an omplete the following information ba SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Date • 2 ITEMS OF 4 • • CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN ........: 36655001.00 DATE ISSUED.......: 09/19/2008 .RECEIPT #.........: BS000006138 REFERENCE ID # ...: 08090132 SITE ADDRESS .....: 11832 PLACER SPRING CT SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: SylviaM COPY # : 1 OWNER ............: DESAI NAUSHIK AND MEENA ADDRESS ..........: 11832 PLACER SPRING CT CITY/STATE/ZIP ...: CUPERTINO, CA 95014-5102 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT : AMOUNT --------------- 469.60 --------------- 469.60 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS REFERENCE NUMBER -------------------- 15351 VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 605 FINAL REROOF RECEIVED FROM ....: CASTILLO ROOFING CONTRACTOR .......: JOSE CASTILLO LIC # 25850 COMPANY ..........: CASTILLO'S ROOFING ADDRESS ..........: 1703 CATHAY DR CITY/STATE/ZIP ...: SAN JOSE, CA 95122 TELEPHONE ........: (408)251-3565 FEE ID ----------------------- UNIT QUANTITY ---------- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR VALUATION 8,000.00 ---------- ---------- 0.80 0.00 ---------- 0.80 ---------- 0.00 1REROOFRES SQ FEET 18.00 234.00 0.00 234.00 0.00 TOTAL PERMIT ---------- ---------- 234.80 0.00 ---------- 234.80 ---------- 1 0.00 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT : AMOUNT --------------- 469.60 --------------- 469.60 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS REFERENCE NUMBER -------------------- 15351 VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 605 FINAL REROOF CITY OF CUPERTINO d' REROOF •CUPEkTINO PERMIT APPLICATION 02040/32. APN # c3leecv' - 61.0b Date: - (g 0I Building Address: I 1 '93',- P� r` n_q6 CA, Owner's Name: Phone #: P Contractor: Phone #: 35'40S Fax #: Cupertino Business License #: Contract Licens #: Type of Roof Covering: Existing: Proposed: ❑ Built -Up Roof sphalt Shingles ❑ 90 -Up roof Shingles Wood Shakes M/Asphalt ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings j ❑ Provide I.C.B.O: Report # aY o be Removed ❑ Provide Mfgr. Installation Specs. Job Description: T E"C)FF ejG Sq -i li j S a�s/ Tj 4-36 (a M.O. shy 6fa, Residential Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ -applicable, include in plan set & the sheet index. Valuation: D oz 0 Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy: Revised 6/16/08 CUPERTINO CITY OF CUPERTINO REROOF FEESCHEDULE Number of Squares Fee ID 'Fee Description Fee Group Permit Type - 1RER00FC0M Re -roof Commercial B 1COMMLROOF IBSEISMICO Seismic Commercial B 1REROOFRES Re -roof Residential B 1SFDWLROOF 1BSEISMICRE Seismic Residential B 1RER00FMRES Re -roof Multi -Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B IBUSLIC Business License B Revised 6/16/08 0 • 1] Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department Subject: Re -roofing policy for the City of Cupertino Prior to permit issuance, you must agree to comply with 2007 IBC Standards and manufacturers specifications on re -roofing. All roofs are Class "A" per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. 3.All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre -inspection and/or tear off approval. 2) In -progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be Raid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of/a " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re -roofing. ttoA ll � p Homeowner's Name: Vy Q a / �5 I1 lIU Ct i Job Site Address: I I 0 3 �- q (� / ot-e Coir Roofing Company Name: tri42 Applicant's Si afore: ' Date: ' I� O Greg Casteel Building Official Revised 07/30/08 C4 Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department REROOF TEAR OFF POLICY 1. You must schedule an inspection for the tear off the day before you wish the inspection to be made. The procedure is to call the Building Division (408) 777-3228 between the hours of 7:30 a.m. and 3:30 p.m. to request a. next -day inspection. • 2. When the roof is torn off, the nails have been removed or driven in, and all of the dry -rotted wood has been replaced, you must call the City Building Division. An inspector will be there within one hour. There are special hours for this service: from 7.30 a.m. to 10:30 a.m. and 1:00p.m. to 3:30 p.m., Monday through Thursday and from 7:30 a.m. to 10:30 a.m. and 1:00 p.m. to 2:30 p.m. on Friday. (Note: Building inspectors are on lunch break from 11:30 a.m. to 12:30 p.m. and will not be called during that time. City Hall is closed between 12:00 and 1:00 p.m. daily.) 0 3. If you call for a tear -off inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be paid before another inspection can be scheduled Greg Casteel Building Official Revised 8/13/04 a • • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator,(No te/Spec.) A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point IRMAIMEM TOTAL POINTS1 40 points • • Plan Review Process Work Book Page -12-Revised 3/25/08 1' Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. A. Site 1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 60%= 4 points up to 4 Resource pts 0 12. Salvage Reusable Building Materials 4 Resource pts y --yes 0 3. Remodel for Mixed Use, Adaptive Reuse, and Historic Preservation 4 Resource pts y=yes 0 4. Protect Native Soil 2 Resource pts y=yes D 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 0 6. Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7. Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 �B. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y=yes 0 9. Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10. Install High -Efficiency Inigation Systems 2 Resource pts y=yes D 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes D B. Foundation • 1. Incorporate Recycled Flyash in Concrete 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points 2. Use Recycled Content Aggregate 3, Insulate FoundatioNSlab before backfill C. Structural Frame r_Substitute Solid Sawn Lumber with Engineered Lumber 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber used = 2 points, up to 10) 3. Use Wood I -Joists for Floors and Ceilings 4. Use Web Floor Trusses up to 5 Resource pts 2 Resource pts y=yes 3 Energy pts y=yes 3 Resource pts y=ye up to 10 Resource pt: 2 Resource pts y=ye 2 Resource pts y=ye 5. Design Energy Heels on Trusses 6" or more 2 Energy pts y=ye 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=ye 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=ye 8. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=ye. 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=ye b. Wall 3 Energy pts y=ye: c. Roof 3 Energy pts y=ye; 10. Apply Advanced Framing Techniques 4 Resource pts y=ye; 11. Use Reclaimed Lumber for Non Structural Applications - 3 Resource pts yqe; 12. Use OSB • a. Subfloors 1 Resourcep t y -ye ' b. Sheathing - 1Resource pt y=yes l_ r r r r r r r r r - -O. r r r r --. 0,..... � 0 l_ l_ l_ _ -1. Use Sustainable backing Materials a. Recycled content J. FSC Certified Wood 12. Use Treated Wood That Does Not Contain Chmmium/Arsenic 13. Install House Wrap under Siding 14. Use Fiber -Cement Siding Materials L E. Plumbing 1. Install Water Heater Jacket 2. Insulate Hot and Cold Water Pipes i3. Retrofit all Faucets and Showerheads with Flow Reducers a. Faucets (1 point each, up to 2 points) b. Showerheads (1 point each, up to 2 points) l (4. Replace Toilest with Ultra -Low Flush Toilets (1 point each, up to 3 points) 5. Install Chlorine Filter on Showerhead 6. Convert Gas to Tankless Water Heater 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) 8. Install On -Demand Hol Water Circulation Pump r. uectncar I1. Install Compact Fluorescent Light Bulbs (CFLs) (6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) 2. Instal IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) G. Appliances 1. Install Energy Star Dishwasher I2. Install Washing Machine with Water and Energy !Conservation Features !3.Install Energy Star Refrigerator '4. Install Built -In Recycling Center H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls b. Ceilings 2. Install Floor Insulation over Crawl Space 3. Install Recycled -Content, Fiberglass Insulation with jNo Added Formaldehyde 4. Use Advanced Infiltration Reduction Practices 5. Use Cellulose Insulation a. Walls b. Ceilings 6, Alternative Insulation Products (Cotton, spray -foam) a. Walls a. Uetlings 3 Resource pts y=yes 3 Resource pts y=yes 1 IAQ/Health at y=yes 1 IAQ/Health pt y --yes 1 Resource of v=ves 1 Energy pt y=yes 2 Energy pts y=yes Up to 2 Resource pts. Up to 2 Resource pts. Up to 3 Resource pts. 1 IAQ/Health at y=yes 4 Energy pts y=yes Up to 4 IAQ/Health pts, 4 Resource pts y=yes Up to 4 Energy Up to 5 Energy pts. Up to 4 Energy pts. Up to 4 Energy pts. 1 Energy at 1 Energy pt 1 Energy at 3 Resource pts 2 Energy pts 2 Energy pts 4 Energy pts 31AQ/Health pts y=yes 2 Energy pts y=yes 4 Resource pts y=yes 4 Resource pts y=yes 4 Resource pts 4 Resource pts • • • r r r r 0, r IJ r 31AQ/Health pts y=yes 2 Energy pts y=yes 4 Resource pts y=yes 4 Resource pts y=yes 4 Resource pts 4 Resource pts • • • 1. Install Energy -Efficient Windows a. Double -Paned b. Low -Emissivity (Law -E) c. Low. Conductivity Frames 2. Install Low Heat Transmission Glazing J. Heating Ventilation and Air Conditioning 1. Use Duct Mastic on All Duct Joints - 1 Energy pt y --yes y=yes 2 Energy pts y=yes 3 Energy pts 2 Energy pts y --yes _ 1 Energy pt y=yes 1. Use Duct Mastic on All Duct Joints - 2 Energy pts y=yes ._- Z. Install Ductwork within Conditioned Space 3 Energy pts yryes 3. Vent Range Hood to the Outside 1 IAO/Health pt y=yes .4. Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 5. Install Solar Attic Fan 2 Energy pts y=yes 6. Install Attic Ventilation Systems 1 Energy pt y=yes 7. Install Whole House Fan 4 Energy pts Y --yes S. Install Sealed Combustion Units a. Furnaces 3 IAQ/Health pts y --yes b. Water Heaters 31AQ/Health pts y=yes 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 3 Energy pts y=yes 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 11. Install AC with Non -HCFC Refrigerants 2 Resource pts y=yes 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts • 13. Retrofit Wood Burning Fireplaces 2. Install Solar Water Heating System a. Install EPA certified wood stoveshnserts 1 IAQMealth pt b. Install/Replace Dampers 1 Energy pt c. Install Airtight Doors 1 Energy pt 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts 15. Install High Efficiency Filter 41AQ/Health pts 16. Install Heat Recovery Ventilation Unit (HRV) 51AQ/Health pts 17. Install Separate Garage Exhaust Fan 3 IAQMealth pts K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 4 Energy pts y=yeE 2. Install Solar Water Heating System 10 Energy pts y=ye=. 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points) Up to 18 Energy pts �6. Select Safe andburable Roofing Malerials_ 1 Resource pt yryes _ _ _ 7. Install Radiant Barrier 3 Energy pts y=yes L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts 3. Plant Deciduous Trees on the West and South Sides 3 Enerav ots 0 -1. Use Low/No-VDC Paint 2. Use Low VOC, Water -Based Wood Finishes 15. Use Low/14o VOC Adhesives 4. Use Salvaged Materials for Interior Finishes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 6. Use Exterior Grade Plywood for Interior Uses 7. Seal all Exposed Particleboard or MDF ------- — 6. Use FSC Certified Materials for Interior Finish 9. Use Finger -Jointed or Recycled -Content Trim 10. Install Whole House Vacuum System N. Flooring 1. Select FSC Certified Wood Flooring fL2. Use Rapidly Renewable Flooring Materials 3. Use Recycled Content Ceramic Tiles 4. Install Natural Linoleum in Place of Vinyl 5. Use Exposed Concrete as Finished Floor 6. Install Recycled Content Carpet with Low VOCs 1 IAQ/Health pts 21AQ/Health pts 31AQ/Health pts 3 Resource pts 61AQ/Health pts 1 IAQ/Health pts 41AQ/Health. pts 4 Resource pts 1 Resource pts 3 IAQ/Health ots 6 Resource pts y=yes 4 Resource pts y=yes 4 Resource pts y=yes 5 IAQ/Health pts y=yes 4 Resource pts y=yes 4 Resource pts y=yes Total Points Available: Total Points Project Received: • 1401 1301 57 • 01 0 0 Gaatalprogs/greenbm ingguidelineslramodelersrgreenpointsinal2.12.04pmladad.zis