08090133i
CITY OF CUPERTINO
R P'N We4art': f"�€`u cvewr"'�3-
TR:ACT6*1N.FQRMAT10N,
BUILDING DIVISIONpERMIT
BUI I�.�G ESS:
PERMRNO.
.�� PLACER SPRING CT
CASTILLO'S ROOFING
08090133
NER'S NAME:
PERMIT ISSUE DATE
LAHIRI ASHOK AND RANGANA
1703 CATHAY DR
09/19/2008
PHONE
SANITARY NO. CONTROL NO.
(408)251-3565
ARCH=fENGINEER:
BUILDING PERMIT INFO,
BLDG ELECT PLUMB MECH
LICENSEDCOMRACnDECLARATION
9
Job Description
P tion
rt I ansed under mkr Pmm visioo(CnoPmr (mmmcncing
1 hereby afford Wm lice
wlthsatim 7ogB orDivlsion3otdm Budnea aM afadom de,aM mylieemvsets
TEAR .OFF EXISTING WOOD SHAKE, INSTALL 30 IB FELT
in full torte and erten.
License Cl3SF `— -! !Y. g
& .
Dau "J ��CI
GAF COMP SHINGLE
ARcxnEcrsDN
I understood my plans shall M used u public reElcoms
Licensed Preelection onol
OWNER -BUILDER DECLARATION
1 hereby aRm Nal 1 am ca empl from W Contranors License Law for the
following mason. (Section 7031.3, Business and Professions Code: Any city of County
which ¢quires • permit m construct, other. improve. demolish, or repair any ammuro
prior N its Women. also, requires the ipplieaml for such permil to file asigncd Comment
he is licensed told ofW Commodes Liceue Law (Chapter 9
Sq. Ft. Floor Area
- Valuation
that punuem provisions
(commencing with section 7") of Division 3 of Ne 9udoea and Prof ions Cade) or
$8000
1 that he is exempt therefrom and then boom for W allegcd wmpdmv Any violation of
Number
Occupancy P Y Type
Section 7031.5 by arty applicant for a permit subjects W applicant to a civil penalty of
not euro than five hundred doll. (3501).
36655002.
I, u owner of W property, a my wploycea wIN wags u Ne'v sole mmpewtion,
will de use wart. and the swnure is notimended or offered forsam (Sec. 706/. Budnw
and Professions Code: The Commutes License law dues and apply to an owner of
Required Inspections
prespony who builds or impmms dtmmn, and wins decs ooh work nimv5 r m through hu
own employees, Provided that such improvements are not intended oroRered forsale If.
however, the building or improvement is sold within can year acompletim, W owner.
builds will have an, burden of moving that he did rot build or improve for purpose of
Cole.).
O 1, u owner M W property not caelusivcly conbaming with licensed eoretracrms is
rnmuen the pmjen (Sec. 7064. Business aM Pmfessiom Code:) The Commemes U.
come law doa not apply m an owner of property who builds or improves blown. and
who contracts for such project with a contracmr(s) licensed punum to the Contractors
Licxme law.
I am exempt under Inc. . B & P C for this mason
ter Date
WORKER'S COMPENSATION OECLARATION
1 hereby affirm under pedally of Perjury mm often fallowing declarations
❑thaw and will of consentto for Wortmar Comf
scion, oo provided fm by Section 7700 of W labor Code, far W perfarmari¢ of the
rorbyn•tion370 Crude.the
wort for wn 'CO ONu permit is inued.
ave and will maintain Workers Compenudon Insurarum, u required by Section
mi=atm9
aCboam
wo-rk fnnuumwher hirsn:
WIm�upnc_dnocmle ncacarrcarrierd
'
WoofrkNeerslpCedmdtea.dfoonr
My and
Carrier. AB
IiryyN.:-57-3,7B1;9
CERTIFl(DATE OF FRO WORKERS'
ISATIO INN
COMPENSATION INSURANCE
Close rim acrd not be com plead if the perch is for. hundred dollars (SIM)
or leu)
I comfy WI u W pot mmarce of W work for which this permit u named. I mail nm
employ any person in any mmmrse on, m lornme subye, m that Warke s' Compemadon
Laws of Csiifomia. Dau
Applicant
NOTICE TO APPLICANT: If, after making this Ccnificate of Exemption. yon shr.ld
become mbim as the Worl Compensation provision of Ne labor Codc, you most
forthwith comply with such provisions or this Permit shall be darned revoked.
CONsmvcnON LENDING AGENCY
I Mreby arum Wt ft. ts a condensed.. lending agency for W perfmmammre or
W wart for which this Permit ts named soot. 3097. Clv. GJ
Landers Name
Lenders Address
I cmffy Nal l have orad this application and sum Nu the above Wfmmadun in
correct. 1 agree m CMPIY with all city and county odimnces and sum laws reading to
Wilding construction, and hereby suburban mpmsrnutiws of this city to cour upon the
above-mcndonedproperty fon suL
eseryon
(We) agree m ave, indemnify and keep homeless the City of Cupenido against
ii which may
rime coonand mdensawhich mey In my way accrue against said City
comm ennoO
m cansequ of the Aof Nis permit.
NT
APPLICAUNDERSTRSTANNDS AND WILL COMPLY WITH ALL NON -POINT
Issued by: /
SOUR REGU TIO
Date
Re -roofs
s' nu of ApplicandCo Dem
RDOU
xAt rfor= MATE RIALS DrsLm oSURE
Type Of Roof
1 Nc applicant m fMuni building nom or handle hicallous maurisi
de. ed by the e, Chapter
Cupertino Municipal Cade. Chapuo 9.13. and dem Health and Safety
de. Croom zss3z(q?
32(a)
❑Yon
All roofs shall be inspected prior to any roofing material being installed.
Will thea Rant or future Wilding occupant us m
applicant gea pmeutor which
If a roof is installed without first obtainingan inspection, I agree to remove
P
north hvadmus sirconumimnmdbyW Bay Area Air Quality Management
Moana
all new materials for inspection.
District?
Ym
1 have room Ne haaadcumamrlalsmquirements under Gupta Q95of W Califar-
doHralN&Sa1clYCode, 5nvw2550.25533am125534. 1 understand NairNc building
does eon currently haw a mount. thu it u mY responsibility to notify do oaepant of W
ocyuimmcnm ich m mol prior m imu nce of a Ccrtificaml Orcupapcy�q
�99 UUyY
Signature of Applicant Date
All roof coverings to be Class "%}a' or better
LQ4mcr rauthorindagent Date
CITY OF
WUPEkTINO
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax(408)777-3333
Building Department
JOB ADDRESS:. PERMIT #
1 , P V
OWNER'S NAME: k (� i - U PHONE #
GENERAL CONTRACTOR: A<rH 1 ( dS fQa6r,-jYk FAX # P_
I am not using any subco -I C7 - O t
Signature Date
Please check at)olicable subcontractors and r mnlete the fnllnwina infnrmatinn-
60
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
I
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
` er/Contractor Signature
CD
Date
INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE
CITY OF CUPERTINO
PERMIT INVOICE OPERATOR: SylviaM
Sec: Twp: Rng: Sub: Blk: Lot:
APN ........: 36655002.00
INVOICE DATE......: 09/19/2008
REFERENCE ID # ...: 08090133
SITE ADDRESS .....:
11842 PLACER SPRING CT
SUBDIVISION .......
CITY .............:
CUPERTINO
IMPACT AREA .......
OWNER ............:
LAHIRI ASHOK AND RANG ANA
ADDRESS ..........:
11842 PLACER SPRING CT
CITY/STATE/ZIP ...:
CUPERTINO, CA 95014-5102
CONTRACTOR .......:
JOSE CASTILLO LIC # 25850
COMPANY ..........:
CASTILLO'S ROOFING
ADDRESS ..........:
1703 CATHAY DR
CITY/STATE/ZIP ...:
SAN JOSE, CA 95122
TELEPHONE ........:
(408)251-3565
•FEE DESCRIPTION- ----- DUE
--- -----------
FOR AMOUNT DUE PAID
BALANCE
SEISMIC
--- --
------ --- ----------
RESIDENTIAL PRINTING PERMIT 0.80 0.80
0.00
RE -ROOF:
RESIDENTIAL PRINTING PERMIT 234.00 234.00
----------
0.00
---------- ----------
234.80 234.80
0.00
VOICE ID
--------
DESCRIPTION
----------------------------
VOICE ID DESCRIPTION
601
ROOF TEAR OFF _
-------- ----------------------------
602 ROOF PLYWOOD NAIL
604
ROOF IN -PROGRESS
605 FINAL REROOF
���
�CIN OF
CUPERTINO
t
CITY OF CUPERTINO
REROOF
PERMIT APPLICATION
n�Dq 0133
APN #
Date:
a
BuildinAddress:
120 2 Fce,<Sins
C-4
Owner's Name:
Phone #:
JAS ho L,ox h r
C'�SS- 115(
Contractor:
9VD�-�
Phone #:
Fax #:
Cupertino Business License #:
Contractor License #:
Type of Roof
Covering:
Existing: Proposed:
❑ Built -Up Roof
Shingles
❑ By'It -Up roof
❑ Asphalt
r_1/Asphalt Shingles
Wobd Shakes
❑ Wood Shakes
❑ Wood Shingles
❑ Wood Shingles
❑ Other (Specify)
❑ Other (Specify)
N3Rlber of existing coverings �_
❑ Provide I.C.B.O. Report #
d' To be Removed
❑ Provide Mfgr. Installation Specs.
Job Description: !✓ pr P_ v FAX i S h'
V�D acA,
301 b. F -e 14 I � �� � Corn p .
Residential
Commercial El
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions:
applicable, include in plan set & the sheet index.
Valuation: 6U
•I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy:
Revised 6/16/08
�rr g
cm o
CUPEI,TINO
CITY OF CUPERTINO
REROOF
FEE SCHEDULE
Number of
Squares
Fee ID
Fee Description
Fee
Group
Permit Type
1REROOFCOM
Re -roof Commercial
B
1COMMLROOF
1BSEISMICO
Seismic Commercial
B
(/
1RER00FRES
Re -roof Residential
B
1SFDWLR00F
1BSEISMICRE
Seismic Residential
B
IREROOFMRES
Re -roof Multi -Family
B
1MFDWLROOF
IBSEISMICRE
Seismic Residential
B
1BUSLIC
Business License
B
Revised 6/16/08
0
Community Development Department
Building Division
• City of Cupertino
10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
Subject: Re -roofing policy for the City of Cupertino
1. Prior to permit issuance, you must agree to comply with 2007 IBC Standards
and manufacturers specifications on re -roofing. All roofs are Class "A" per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re -roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre -inspection and/or tear off approval.
2) In -progress inspection approval.
• 3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re -inspection fee of $176.18. The re -inspection fee must
be Raid before another inspection can be scheduled
IMPORTANT:
1. Flat roofs must have a minimum of 1/ " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re -roofing.
Homeowner's Name: S h C j= LZA Y I 1 r l
Job Site Adc
Roofing Coi
• Applicant's
Greg Castee
Building Official
Revised 07/30/08
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
REROOF TEAR OFF POLICY
1. You must schedule an inspection for the tear off the day before
you wish the inspection to be made. The procedure is to call the
Building Division (408) 777-3228 between the hours of 7:30 a.m. and
3:30 p.m. to request a next -day inspection.
• 2. When the roof is torn off, the nails have been removed or driven in,
and all of the dry -rotted wood has been replaced, you must call the
City Building Division. An inspector will be there within one hour.
There are special hours for this service: from 7:30 a.m. to 10:30 a.m.
and 1:00p.m. to 3:30 p.m., Monday through Thursday and from
7.30 a.m. to 10:30 a.m. and 1:00 p.m. to 2:30 p.m. on Friday. (Note:
Building inspectors are on lunch break from 11:30 a.m. to 12:30 p.m.
and will not be called during that time. City Hall is closed between
12:00 and 1:00 p.m. daily.) .
9
3. If you call for a tear -off inspection and the jobis not ready, you will
be charged a re -inspection fee of $176.18. The re -inspection fee must
be paid before another inspection can be scheduled
Greg Casteel
Building Official
Revised 8/13/04
a
•
•
Plan Review Process Work Book Page -12-Revised 3/25/08
Green Building Plan Check
Index of Green Building
Points/Categories
A.
Category
Example of an Index or Table of Green
Plan Sheet or Page
Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B.
Site
9.
Install H.E. Irrigation, (details/spec)'
L-1
2 points
11. Permeable Paving, Note
L-1
2 points
C.
Foundation
1.
Use 15 % Flyash Concrete, (note)
S-1
5 points
D.
Structural
3.
Uses Wood I -Joist, (See Spec.)
S-2
2 points
5.
Use Truss with heels, (detail)
S-2
2 points
6.
B. OSB Sheathing, detail
S-2
2 points
E.
Ext. Finish
1.
Composite Decking, (Note/Spec.)
A-3
2 points
4.
B. Fiber Cement Siding, (Note/Spec.
A-4
2 points
F.
Plumbing
1.
Insulate all H.W. pipes, (Note/Spec.)
P-1
2 points
5.
Tankless W.H., (Note/Spec.)
A-2
2 points
11. A 2500 Gal. Tank, (Note/Spec
L-1
10 points
G.
Electrical
4.
E. Ceiling Fans, (Note/Spec.)
A-3
4 points
H.
Appliances
1.
Energy Star Dishwasher, (Note/Spec.)
A-3
1 point
3.
Energy Star Refrigerator, (Note/Spec.
A-3
1 point
P.
Other
1.
List Green Features on Plans
A-1
1 point
TOTAL POINTS
40 points
•
•
Plan Review Process Work Book Page -12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
16 Due to the diversity of remodeling project types, assigning a "total points' value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project.
A. site INPUT Resources Energy 'IAQ[Hmhh
t Recycle Job Site Construction & Demolition Waste
65%=1 point; 75%= 2 points; 60%= 4 points up to 4 Resource pts p
12. Salvage Reusable Building Materials 4 Resource pts y --yes p
3. Remodel for Mixed Use, Adaptive Reuse, and
Historic Preservation
4 Resource pts y=yes p
4. Protect Native Soil 2 Resource pts y=yes 0
5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes p
5. Implement Construction Site Stormwater Practices 2 Resource pts y=yes p
7. Protect Water Quality with Landscape Design 2 Resource pts Y --yes p
B. Design Resource-NOent Landscapes and Gardens _ 4 Resource pts y=yes p
9. Reuse Matehals/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes p
10. Install High -Efficiency Irrigation Systems 2 Resource pts yryes p
11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes p
B. Foundation
• 1. Incorporate Recycled Flyash in Concrete
25% Recycled Flyash = 2 points; Add 1 point for every I D%
increase of flyash, up to 5 points up to 5 Resource pts
2. Use Recycled Content Aggregate 2 Resource pts y=yes
3. Insulate Foundation/Slab before backfill 3 Enerav ots ewes
C. Structural Frame
Substitute Solid Sawn Lumber with Engineered Lumber
3 Resource pts
2. Use FSC Certified Wood for framing
J
y=yes
(For every 10% of FSC lumber used = 2 points, up to 10)
3. Use Wood I -Joists for Floors and Ceilings
up to 10 Resource
2 Resource pts
pts.
4. Use Web Floor Trusses
2 Resourceis
P
yryes
Y=Y es
5. Design Energy Heels on Trusses 6' or more
2 Energy pts
6. Use Finger -Jointed Studs for Vertical Applications
2 Resource pts
y=yes
7. Use Engineered Studs for Vertical Applications
2 Resource
y=yes
6. Use Recycled Content Steel Studs for Interior Framing
pts
2 Resource pts
y=yes
9. Use Structural Insulated Panels (SIPS)
y=yes
a. Floors
3 Energy pts
y=yes
b. Wall
c. Roof
3 Energy pts .
y=yes
10. Apply Advanced Framing Techniques
3 Energy pts
y=yes
11. Use Reclaimed Lumber for Non Structural Applications
4 Resource pts
y=yes
72. Use OSB - -
3 Resource pts
y=yes
a. Subfloors
• b. Sheathing
1 Resource of
y=yes
_
1 Resource pt
yryes
I . Use Sustainable Decking Materials
r. Install Water Haater Jacket
t. -- --- — — —
a. Recycled content
3 Resource pts
y=yf
b. FSC Certified Wood
3 Resource pts
y=ys
T. Use Treated Wood That Does Not Contain Chmmium/Arsenic
1 IAQ/Health pt
y=yr
I3. Install House Wrap under Sidling
1 IAQ/Health pt
y=ye
4. Use Fiber -Cement Siding Materials
— —.
1 Resource pt
y=yes
E. Plumbing
r. Install Water Haater Jacket
t. -- --- — — —
1 Energy pt Y=Y es
2. Insulate Hol and Cold Water Pipes
2 Energy pts y=yes
13. Retrofit all Faucets and Showerheads with Flow Reducers ,
Up to 4 Energy pts.
a. Faucets (1 point each, up to 2 points)
Up to 2 Resource pts.
b. Showerheads (1 point each, up to 2 points)
Up to 2 Resource pts.
14. Replace Toilest with Ultra -Low Flush Toilets
3. Install Lighting Controls (1 point per fixture, up to 4 points)
(1 point each, up to 3 points) _ _
Up to 3 Resource pts.
5. Instali Chlorine Filter on Showerhead
1 IAQ/Health pt y --yes
6. Convert Gas to Tankless Water Heater
4 Energy pts y=yes
7. Install Water Filtration Units at Faucets
(2 points each, up to 4 points)
Up to 4 IAQ/Health pts,
6. Install On -Demand Hot Water Circulation Pump
4 Resource pts y=yes
r. rrectncai
.i. Install Compact Fluorescent Light Bulbs (CFLs)
;(6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) _
Up to 4 Energy pts.
2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to
5 points)
Up to 5 Energy pts.
3. Install Lighting Controls (1 point per fixture, up to 4 points)
Up to 4 Energy pts.
4. Install High Efficiency Ceiling Fans with CFLs
(1 point each, up to 4 points)
Up to 4 Energy pts.
G. Appliances
it. Install Energy Star Dishwasher
1 Energy pt
y=yes
i2. Install Washing Machine with Water and Energy
'Conservation Features
1 Energy pt
y=yes
3.Install Energy Star Refrigerator
1 Energy pt
y=yes
:4. Install Built -In Recycling Center
3 Resource pts
y=yes
H. Insulation
1. Upgrade insulation to Exceed Title 24 Requirements
a. Walls
2 Energy pts
y=yes
J. Ceilings
2 Energy pts
y=yes
2. Install Floor Insulation over Crawl Space
4 Energy pts
y=yes
1P. Install Recycled -Content, Fiberglass Insulation with
INo Added Formaldehyde
3 IAQ/Hsalth pts
y=yes
4. Use Advanced Infiltration Reduction Practices
2 Energy pts
y=yes
5. Use Cellulose Insulation
a. Walls
4 Resource pts
y=yes
b. Ceilings
4 Resource pts
y=yes
6. Alternative Insulation Products (Cotton, spray -foam)
a. Walls
4 Resource pts
y=yes
it. cewngs
4 Resource pts
y=yes
0
E
I. Windows
1. Install Energy -Efficient Windows
a. Double -Paned
b. Low -Emissivity (Low -E)
c. Low. Conductivity Frames
2. Install Low Heat Transmission Glazing
J. Heating Ventilation and Air Conditioning
91. Use Duct Mastic on All Duct Joints - -.
2. Install Ductwork within Conditioned Space
3. Vent Range Hood to the Outside
4. Clean all Ducts Before Occupancy
5. Install Solar Attic Fan
6, Install Attic Ventilation Systems
7. Install Whole House Fan
B. Install Sealed Combustion Units
a. Furnaces
b. Water Heaters
9. Replace Wall -Mounted Electric and Gas Heaters with
Through -the -Wall Heat Pumps
10. Install 13 SEER/11 EER or higher AC with a TXV
11. Install AC with Non -HCFC Refrigerants
• 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace
13. Retrofit Wood Burning Fireplaces
a. Install EPA certified wood stoveslnserts
b. Install/Replace Dampers
c. Install Airtight Doors
14. Install Zoned, Hydronic Radiant Heating
15. Install High Efficiency Filter
16. Install Heat Recovery Ventilation Unit (HRV)
17. Install Separate Garage Exhaust Fan
K. Renewable Energy and Roofing
1. Pre -Plumb for Solar Water Heating
2. Install Solar Water Heating System
3. Pre -Wire for Future Photovoltaic (PV) Installation
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points)
16. Select Safe and -Durable Roofng Materials
'7."Install Radiant Barrier
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating
2. Install Overhangs orAwnings over South Facing Windows
3. Plant Deciduous Trees on the West and South Sides
0
1 Energy pt
2 Energy pts
2 Energy pts
1 Energy pt
2 Energy pts
3 Energy pts
1 IAO/Health pt
21AQ/Health pts
2 Energy pis
1 Energy pt
4 Energy pis
31AQ/Health pts
31AQ/Health pts
3 Energy pts
3 Energy pts
2 Resource pts
2 Energy pts
1 IAQ/Health pt
y=yes
1 Energy pt
y=yes
1 Energy pt
y=yes
3 Energy pts
y=yes
41AQ/Health pts
y --yes
5 IAQ/Health pts
y --yes
31AQ/Health pts
v=ves
4 Energy pts
10 Energy pts
4 Energy pts
Up to 18 Energy pts
1 Resource pt y=yes
3 Energy pts y=yes
5 Energy pts
3 Energy pts
3 Energy pts
1.1. Use Low/No-VOC Paint
2. Use Low VOC, Water -Based Wood Finishes
13. Use LowNo VOC Adhesives
4. Use Salvaged Materials for Interior Finishes
5. Use Engineered Sheet Goods with no added Urea
Formaldehyde
6. Use Exterior Grade Plywood for Interior Uses
.7. Seal all Exposed Particleboard or MDP
6. U
-- s—
e FSC Certified Materials for Interior Finish
9. Use Finger -Jointed or Recycled -Content Trim
10. Install Whole House Vacuum System
N. Flooring
1. Select FSC Certified Wood Flooring
2. Use Rapidly Renewable Flooring Materials
3. Use Recycled Content Ceramic Tiles
4. Install Natural Linoleum in Place of Vinyl
5. Use Exposed Concrete as Finished Floor
6. Install Recycled Content Carpet with Low VOCs
1 IAQIHealth pts y=yes D
21AQ/Health pts y=yes 1 1 0
31AQ/Health pts y=yes 0
3 Resource pts y=yes 0
61AQ/Health pts
y=yes
1 IAQ/Health pts
y=yes
41AQ/Health. pts
y=yes
4 Resource pts
y=yes
1 Resource pts
y=yes
3 IAQ/Heaith pts
y=yes
6 Resource pts
4 Resource pts
4 Resource pts
5 IAQ/Health pts
4 Resource pts
4 Resource ots
' P
Total Points Available: 1 1401 130 57 •
Total Points Project Received: 0 0 0
G:datalprogs/greenbulldingguidelines/remodelers)greenpdntsfinel21204pvecled.ds
0