Loading...
08090133i CITY OF CUPERTINO R P'N We4art': f"�€`u cvewr"'�3- TR:ACT6*1N.FQRMAT10N, BUILDING DIVISIONpERMIT BUI I�.�G ESS: PERMRNO. .�� PLACER SPRING CT CASTILLO'S ROOFING 08090133 NER'S NAME: PERMIT ISSUE DATE LAHIRI ASHOK AND RANGANA 1703 CATHAY DR 09/19/2008 PHONE SANITARY NO. CONTROL NO. (408)251-3565 ARCH=fENGINEER: BUILDING PERMIT INFO, BLDG ELECT PLUMB MECH LICENSEDCOMRACnDECLARATION 9 Job Description P tion rt I ansed under mkr Pmm visioo(CnoPmr (mmmcncing 1 hereby afford Wm lice wlthsatim 7ogB orDivlsion3otdm Budnea aM afadom de,aM mylieemvsets TEAR .OFF EXISTING WOOD SHAKE, INSTALL 30 IB FELT in full torte and erten. License Cl3SF `— -! !Y. g & . Dau "J ��CI GAF COMP SHINGLE ARcxnEcrsDN I understood my plans shall M used u public reElcoms Licensed Preelection onol OWNER -BUILDER DECLARATION 1 hereby aRm Nal 1 am ca empl from W Contranors License Law for the following mason. (Section 7031.3, Business and Professions Code: Any city of County which ¢quires • permit m construct, other. improve. demolish, or repair any ammuro prior N its Women. also, requires the ipplieaml for such permil to file asigncd Comment he is licensed told ofW Commodes Liceue Law (Chapter 9 Sq. Ft. Floor Area - Valuation that punuem provisions (commencing with section 7") of Division 3 of Ne 9udoea and Prof ions Cade) or $8000 1 that he is exempt therefrom and then boom for W allegcd wmpdmv Any violation of Number Occupancy P Y Type Section 7031.5 by arty applicant for a permit subjects W applicant to a civil penalty of not euro than five hundred doll. (3501). 36655002. I, u owner of W property, a my wploycea wIN wags u Ne'v sole mmpewtion, will de use wart. and the swnure is notimended or offered forsam (Sec. 706/. Budnw and Professions Code: The Commutes License law dues and apply to an owner of Required Inspections prespony who builds or impmms dtmmn, and wins decs ooh work nimv5 r m through hu own employees, Provided that such improvements are not intended oroRered forsale If. however, the building or improvement is sold within can year acompletim, W owner. builds will have an, burden of moving that he did rot build or improve for purpose of Cole.). O 1, u owner M W property not caelusivcly conbaming with licensed eoretracrms is rnmuen the pmjen (Sec. 7064. Business aM Pmfessiom Code:) The Commemes U. come law doa not apply m an owner of property who builds or improves blown. and who contracts for such project with a contracmr(s) licensed punum to the Contractors Licxme law. I am exempt under Inc. . B & P C for this mason ter Date WORKER'S COMPENSATION OECLARATION 1 hereby affirm under pedally of Perjury mm often fallowing declarations ❑thaw and will of consentto for Wortmar Comf scion, oo provided fm by Section 7700 of W labor Code, far W perfarmari¢ of the rorbyn•tion370 Crude.the wort for wn 'CO ONu permit is inued. ave and will maintain Workers Compenudon Insurarum, u required by Section mi=atm9 aCboam wo-rk fnnuumwher hirsn: WIm�upnc_dnocmle ncacarrcarrierd ' WoofrkNeerslpCedmdtea.dfoonr My and Carrier. AB IiryyN.:-57-3,7B1;9 CERTIFl(DATE OF FRO WORKERS' ISATIO INN COMPENSATION INSURANCE Close rim acrd not be com plead if the perch is for. hundred dollars (SIM) or leu) I comfy WI u W pot mmarce of W work for which this permit u named. I mail nm employ any person in any mmmrse on, m lornme subye, m that Warke s' Compemadon Laws of Csiifomia. Dau Applicant NOTICE TO APPLICANT: If, after making this Ccnificate of Exemption. yon shr.ld become mbim as the Worl Compensation provision of Ne labor Codc, you most forthwith comply with such provisions or this Permit shall be darned revoked. CONsmvcnON LENDING AGENCY I Mreby arum Wt ft. ts a condensed.. lending agency for W perfmmammre or W wart for which this Permit ts named soot. 3097. Clv. GJ Landers Name Lenders Address I cmffy Nal l have orad this application and sum Nu the above Wfmmadun in correct. 1 agree m CMPIY with all city and county odimnces and sum laws reading to Wilding construction, and hereby suburban mpmsrnutiws of this city to cour upon the above-mcndonedproperty fon suL eseryon (We) agree m ave, indemnify and keep homeless the City of Cupenido against ii which may rime coonand mdensawhich mey In my way accrue against said City comm ennoO m cansequ of the Aof Nis permit. NT APPLICAUNDERSTRSTANNDS AND WILL COMPLY WITH ALL NON -POINT Issued by: / SOUR REGU TIO Date Re -roofs s' nu of ApplicandCo Dem RDOU xAt rfor= MATE RIALS DrsLm oSURE Type Of Roof 1 Nc applicant m fMuni building nom or handle hicallous maurisi de. ed by the e, Chapter Cupertino Municipal Cade. Chapuo 9.13. and dem Health and Safety de. Croom zss3z(q? 32(a) ❑Yon All roofs shall be inspected prior to any roofing material being installed. Will thea Rant or future Wilding occupant us m applicant gea pmeutor which If a roof is installed without first obtainingan inspection, I agree to remove P north hvadmus sirconumimnmdbyW Bay Area Air Quality Management Moana all new materials for inspection. District? Ym 1 have room Ne haaadcumamrlalsmquirements under Gupta Q95of W Califar- doHralN&Sa1clYCode, 5nvw2550.25533am125534. 1 understand NairNc building does eon currently haw a mount. thu it u mY responsibility to notify do oaepant of W ocyuimmcnm ich m mol prior m imu nce of a Ccrtificaml Orcupapcy�q �99 UUyY Signature of Applicant Date All roof coverings to be Class "%}a' or better LQ4mcr rauthorindagent Date CITY OF WUPEkTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 Building Department JOB ADDRESS:. PERMIT # 1 , P V OWNER'S NAME: k (� i - U PHONE # GENERAL CONTRACTOR: A<rH 1 ( dS fQa6r,-jYk FAX # P_ I am not using any subco -I C7 - O t Signature Date Please check at)olicable subcontractors and r mnlete the fnllnwina infnrmatinn- 60 SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting I Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile ` er/Contractor Signature CD Date INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE CITY OF CUPERTINO PERMIT INVOICE OPERATOR: SylviaM Sec: Twp: Rng: Sub: Blk: Lot: APN ........: 36655002.00 INVOICE DATE......: 09/19/2008 REFERENCE ID # ...: 08090133 SITE ADDRESS .....: 11842 PLACER SPRING CT SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OWNER ............: LAHIRI ASHOK AND RANG ANA ADDRESS ..........: 11842 PLACER SPRING CT CITY/STATE/ZIP ...: CUPERTINO, CA 95014-5102 CONTRACTOR .......: JOSE CASTILLO LIC # 25850 COMPANY ..........: CASTILLO'S ROOFING ADDRESS ..........: 1703 CATHAY DR CITY/STATE/ZIP ...: SAN JOSE, CA 95122 TELEPHONE ........: (408)251-3565 •FEE DESCRIPTION- ----- DUE --- ----------- FOR AMOUNT DUE PAID BALANCE SEISMIC --- -- ------ --- ---------- RESIDENTIAL PRINTING PERMIT 0.80 0.80 0.00 RE -ROOF: RESIDENTIAL PRINTING PERMIT 234.00 234.00 ---------- 0.00 ---------- ---------- 234.80 234.80 0.00 VOICE ID -------- DESCRIPTION ---------------------------- VOICE ID DESCRIPTION 601 ROOF TEAR OFF _ -------- ---------------------------- 602 ROOF PLYWOOD NAIL 604 ROOF IN -PROGRESS 605 FINAL REROOF ��� �CIN OF CUPERTINO t CITY OF CUPERTINO REROOF PERMIT APPLICATION n�Dq 0133 APN # Date: a BuildinAddress: 120 2 Fce,<Sins C-4 Owner's Name: Phone #: JAS ho L,ox h r C'�SS- 115( Contractor: 9VD�-� Phone #: Fax #: Cupertino Business License #: Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built -Up Roof Shingles ❑ By'It -Up roof ❑ Asphalt r_1/Asphalt Shingles Wobd Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) N3Rlber of existing coverings �_ ❑ Provide I.C.B.O. Report # d' To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: !✓ pr P_ v FAX i S h' V�D acA, 301 b. F -e 14 I � �� � Corn p . Residential Commercial El Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: applicable, include in plan set & the sheet index. Valuation: 6U •I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy: Revised 6/16/08 �rr g cm o CUPEI,TINO CITY OF CUPERTINO REROOF FEE SCHEDULE Number of Squares Fee ID Fee Description Fee Group Permit Type 1REROOFCOM Re -roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B (/ 1RER00FRES Re -roof Residential B 1SFDWLR00F 1BSEISMICRE Seismic Residential B IREROOFMRES Re -roof Multi -Family B 1MFDWLROOF IBSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 0 Community Development Department Building Division • City of Cupertino 10300 Torre Avenue Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department Subject: Re -roofing policy for the City of Cupertino 1. Prior to permit issuance, you must agree to comply with 2007 IBC Standards and manufacturers specifications on re -roofing. All roofs are Class "A" per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre -inspection and/or tear off approval. 2) In -progress inspection approval. • 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be Raid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/ " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re -roofing. Homeowner's Name: S h C j= LZA Y I 1 r l Job Site Adc Roofing Coi • Applicant's Greg Castee Building Official Revised 07/30/08 Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department REROOF TEAR OFF POLICY 1. You must schedule an inspection for the tear off the day before you wish the inspection to be made. The procedure is to call the Building Division (408) 777-3228 between the hours of 7:30 a.m. and 3:30 p.m. to request a next -day inspection. • 2. When the roof is torn off, the nails have been removed or driven in, and all of the dry -rotted wood has been replaced, you must call the City Building Division. An inspector will be there within one hour. There are special hours for this service: from 7:30 a.m. to 10:30 a.m. and 1:00p.m. to 3:30 p.m., Monday through Thursday and from 7.30 a.m. to 10:30 a.m. and 1:00 p.m. to 2:30 p.m. on Friday. (Note: Building inspectors are on lunch break from 11:30 a.m. to 12:30 p.m. and will not be called during that time. City Hall is closed between 12:00 and 1:00 p.m. daily.) . 9 3. If you call for a tear -off inspection and the jobis not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be paid before another inspection can be scheduled Greg Casteel Building Official Revised 8/13/04 a • • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points • • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects 16 Due to the diversity of remodeling project types, assigning a "total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. A. site INPUT Resources Energy 'IAQ[Hmhh t Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 60%= 4 points up to 4 Resource pts p 12. Salvage Reusable Building Materials 4 Resource pts y --yes p 3. Remodel for Mixed Use, Adaptive Reuse, and Historic Preservation 4 Resource pts y=yes p 4. Protect Native Soil 2 Resource pts y=yes 0 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes p 5. Implement Construction Site Stormwater Practices 2 Resource pts y=yes p 7. Protect Water Quality with Landscape Design 2 Resource pts Y --yes p B. Design Resource-NOent Landscapes and Gardens _ 4 Resource pts y=yes p 9. Reuse Matehals/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes p 10. Install High -Efficiency Irrigation Systems 2 Resource pts yryes p 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes p B. Foundation • 1. Incorporate Recycled Flyash in Concrete 25% Recycled Flyash = 2 points; Add 1 point for every I D% increase of flyash, up to 5 points up to 5 Resource pts 2. Use Recycled Content Aggregate 2 Resource pts y=yes 3. Insulate Foundation/Slab before backfill 3 Enerav ots ewes C. Structural Frame Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts 2. Use FSC Certified Wood for framing J y=yes (For every 10% of FSC lumber used = 2 points, up to 10) 3. Use Wood I -Joists for Floors and Ceilings up to 10 Resource 2 Resource pts pts. 4. Use Web Floor Trusses 2 Resourceis P yryes Y=Y es 5. Design Energy Heels on Trusses 6' or more 2 Energy pts 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource y=yes 6. Use Recycled Content Steel Studs for Interior Framing pts 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPS) y=yes a. Floors 3 Energy pts y=yes b. Wall c. Roof 3 Energy pts . y=yes 10. Apply Advanced Framing Techniques 3 Energy pts y=yes 11. Use Reclaimed Lumber for Non Structural Applications 4 Resource pts y=yes 72. Use OSB - - 3 Resource pts y=yes a. Subfloors • b. Sheathing 1 Resource of y=yes _ 1 Resource pt yryes I . Use Sustainable Decking Materials r. Install Water Haater Jacket t. -- --- — — — a. Recycled content 3 Resource pts y=yf b. FSC Certified Wood 3 Resource pts y=ys T. Use Treated Wood That Does Not Contain Chmmium/Arsenic 1 IAQ/Health pt y=yr I3. Install House Wrap under Sidling 1 IAQ/Health pt y=ye 4. Use Fiber -Cement Siding Materials — —. 1 Resource pt y=yes E. Plumbing r. Install Water Haater Jacket t. -- --- — — — 1 Energy pt Y=Y es 2. Insulate Hol and Cold Water Pipes 2 Energy pts y=yes 13. Retrofit all Faucets and Showerheads with Flow Reducers , Up to 4 Energy pts. a. Faucets (1 point each, up to 2 points) Up to 2 Resource pts. b. Showerheads (1 point each, up to 2 points) Up to 2 Resource pts. 14. Replace Toilest with Ultra -Low Flush Toilets 3. Install Lighting Controls (1 point per fixture, up to 4 points) (1 point each, up to 3 points) _ _ Up to 3 Resource pts. 5. Instali Chlorine Filter on Showerhead 1 IAQ/Health pt y --yes 6. Convert Gas to Tankless Water Heater 4 Energy pts y=yes 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) Up to 4 IAQ/Health pts, 6. Install On -Demand Hot Water Circulation Pump 4 Resource pts y=yes r. rrectncai .i. Install Compact Fluorescent Light Bulbs (CFLs) ;(6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) _ Up to 4 Energy pts. 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) Up to 5 Energy pts. 3. Install Lighting Controls (1 point per fixture, up to 4 points) Up to 4 Energy pts. 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) Up to 4 Energy pts. G. Appliances it. Install Energy Star Dishwasher 1 Energy pt y=yes i2. Install Washing Machine with Water and Energy 'Conservation Features 1 Energy pt y=yes 3.Install Energy Star Refrigerator 1 Energy pt y=yes :4. Install Built -In Recycling Center 3 Resource pts y=yes H. Insulation 1. Upgrade insulation to Exceed Title 24 Requirements a. Walls 2 Energy pts y=yes J. Ceilings 2 Energy pts y=yes 2. Install Floor Insulation over Crawl Space 4 Energy pts y=yes 1P. Install Recycled -Content, Fiberglass Insulation with INo Added Formaldehyde 3 IAQ/Hsalth pts y=yes 4. Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 5. Use Cellulose Insulation a. Walls 4 Resource pts y=yes b. Ceilings 4 Resource pts y=yes 6. Alternative Insulation Products (Cotton, spray -foam) a. Walls 4 Resource pts y=yes it. cewngs 4 Resource pts y=yes 0 E I. Windows 1. Install Energy -Efficient Windows a. Double -Paned b. Low -Emissivity (Low -E) c. Low. Conductivity Frames 2. Install Low Heat Transmission Glazing J. Heating Ventilation and Air Conditioning 91. Use Duct Mastic on All Duct Joints - -. 2. Install Ductwork within Conditioned Space 3. Vent Range Hood to the Outside 4. Clean all Ducts Before Occupancy 5. Install Solar Attic Fan 6, Install Attic Ventilation Systems 7. Install Whole House Fan B. Install Sealed Combustion Units a. Furnaces b. Water Heaters 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 10. Install 13 SEER/11 EER or higher AC with a TXV 11. Install AC with Non -HCFC Refrigerants • 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 13. Retrofit Wood Burning Fireplaces a. Install EPA certified wood stoveslnserts b. Install/Replace Dampers c. Install Airtight Doors 14. Install Zoned, Hydronic Radiant Heating 15. Install High Efficiency Filter 16. Install Heat Recovery Ventilation Unit (HRV) 17. Install Separate Garage Exhaust Fan K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 2. Install Solar Water Heating System 3. Pre -Wire for Future Photovoltaic (PV) Installation 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points) 16. Select Safe and -Durable Roofng Materials '7."Install Radiant Barrier L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 2. Install Overhangs orAwnings over South Facing Windows 3. Plant Deciduous Trees on the West and South Sides 0 1 Energy pt 2 Energy pts 2 Energy pts 1 Energy pt 2 Energy pts 3 Energy pts 1 IAO/Health pt 21AQ/Health pts 2 Energy pis 1 Energy pt 4 Energy pis 31AQ/Health pts 31AQ/Health pts 3 Energy pts 3 Energy pts 2 Resource pts 2 Energy pts 1 IAQ/Health pt y=yes 1 Energy pt y=yes 1 Energy pt y=yes 3 Energy pts y=yes 41AQ/Health pts y --yes 5 IAQ/Health pts y --yes 31AQ/Health pts v=ves 4 Energy pts 10 Energy pts 4 Energy pts Up to 18 Energy pts 1 Resource pt y=yes 3 Energy pts y=yes 5 Energy pts 3 Energy pts 3 Energy pts 1.1. Use Low/No-VOC Paint 2. Use Low VOC, Water -Based Wood Finishes 13. Use LowNo VOC Adhesives 4. Use Salvaged Materials for Interior Finishes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 6. Use Exterior Grade Plywood for Interior Uses .7. Seal all Exposed Particleboard or MDP 6. U -- s— e FSC Certified Materials for Interior Finish 9. Use Finger -Jointed or Recycled -Content Trim 10. Install Whole House Vacuum System N. Flooring 1. Select FSC Certified Wood Flooring 2. Use Rapidly Renewable Flooring Materials 3. Use Recycled Content Ceramic Tiles 4. Install Natural Linoleum in Place of Vinyl 5. Use Exposed Concrete as Finished Floor 6. Install Recycled Content Carpet with Low VOCs 1 IAQIHealth pts y=yes D 21AQ/Health pts y=yes 1 1 0 31AQ/Health pts y=yes 0 3 Resource pts y=yes 0 61AQ/Health pts y=yes 1 IAQ/Health pts y=yes 41AQ/Health. pts y=yes 4 Resource pts y=yes 1 Resource pts y=yes 3 IAQ/Heaith pts y=yes 6 Resource pts 4 Resource pts 4 Resource pts 5 IAQ/Health pts 4 Resource pts 4 Resource ots ' P Total Points Available: 1 1401 130 57 • Total Points Project Received: 0 0 0 G:datalprogs/greenbulldingguidelines/remodelers)greenpdntsfinel21204pvecled.ds 0