Loading...
08090191u° Z' 00 cfC oQZQoZu �yC C �ot jCc Mme –2> Su�= 0 C z W> n, G D U 0t Fa �z CITY OF CUPERTINO+s.:t., DIVISION PERM CONTRACTOR INFORMATION ��. BUILDING er ^:�*�.°n.Si `�4?"PERMIT "RI V�WR sEINBOW DR ALLSTAR PLUMBING NO.. 08090191 OWNER'S NAME: PERNIMISUEDAE - GAYLA ALTHOFF 326 PHELAN AVE 09/29/2008 WN E (408) 230-5569 SANITARY NO. CONTROL NO. ARCHIECDENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH LICENSED CONTRACTOR'S DECLARATION 9 Job Description 1 hereby shim Nat 1 are focused under provisions of chapter (commencing with Section 70M) of Division Softie Business and Professmos Code.and my license is GAS PRESSURE TEST in full fora and cmm L' License Class Lk. R � Dab rA�' LMS / r X. Gamamw ARFHITECI'S DECLARATION 1 undersuu my plans shall he used as public meet& Licensed Professional OWNER -BUILDER DECLARATION I hereby aflim that 1 am exempt from the Consacmrs License Law for the rollowing mason. (Section ]031.5. Business and Pmfessiom Cmc: Any city or aunty ! which requires a permit in moonstruck slim. improve, dental W, or repair any structure ! prior to is Wuana,alw requites the applicant for such permit in rile a signed statement Wt he is limmcd purwanuo the provisions of due Comam«S License Law (Chapter 9 Sq. Ft. Floor Area Valuation ing ] or the Budnusand Code) Or 1200 busidson3 muswiNSemim on. Any 1 that he k exempt therefrom and the bus for sire alleged exemption. Any than a is and the Pladan of 36230020: Number Occupancy Type P Y YP to it Schon ]051.5m airy, applicant f« • permit subjects the appOcwt b a ciWl penally of not mart than five hundred dollars 015001 I, u owner arthe property. «my eroployees wash "gnu the'v sek compewdon, will do Ne work and the structure Ice not intended or offered for sale (Sm. 7044. Business Required Inspections au Prefestiuv Cede: The Commmors License Law don Out apply an an owner of _ ptapeny who Wilds«improvnthuwn,cede whodonurhwerkhimulr«Wongh his awn employees, provided Nat such improvements are not intended oroffured f«u1e If. _ hmmvur, the building «Improveme« Iswld within arc Year of completion. the owner, holder will now the burden of proving that M did not Wild or improve for purpose of ask.). O 1. as owner of the property am eaciutively contracting with flamed anoanon in com mtct the project (Sec. 7044, Business and Protections Cade:) The Comuacbrs U- . sue law does not apply in an owns of property who builds or impmm Merton. and. who contracts for such Projects, with a consaaartU licensed pursuant to the Contractors License Law. ❑ I am exempt under See , B h P C for this muan Owner Das WORKER'S COMPENSATION DECLARATION 1 hereby alum under pematty of perjury, One of the following declvuiom, 1 have and will maintain •Ce dficae of Covent in self-imum f«Workers Corniest. sation.0 pmvidu f« by Section 3]00 of de LAbnr Code. far me perform. of the which this permit is ins«d. `work�iar V I have and will maintain WnAces compenutiao Insurma. as required by Section 3-/110 of the labor Code, for the performance of the work f«which this pi mti(is issued MY Workers Compevamet marmanee carrier and Policy number am: l� Carrico 7l�iIb PolicyNo.nlnk� V l CERTIFICATE OF EKEMPION FROM W RKERS' COMPENSATION INSURANCE . Inti+section need Out be completed if the permit isform chuMmd dollars (SIM) or less.) I cent that in the performance of de work for which this permit is issued. I shall me employ any person in any manner an u In Myoma subject to the Workers' Compeuadon Lam of California Dae Applicant NOTICE TO APPLICANT. If. after making this Cenifle a of Eamption, you should became iubica in the Wa can's L'ompmear ion previLOm of dm Labor Cade you mon forthwith comply with such Moslem or this permit shall M dcemcd revoked. CONSI'RUCION LENDING AGENCY 1 herebY aRrm thal there i a.ouhucmm lending apency fnr the performance of the work for whim the permit Or Ls«d (Sec. 309], Civ, C.) Lenders Nam: Iendara Adders 1 certify that I have tend this appfiwion andmace then the above information is comcL 1 aIIa m comply with all city aid county ordinances and scale lava relating in Wilding construction. and hereby wthorm reprnattatires of then city to mt«upon 0e (Wr) Ric b ave, indemnify and kap hornless the City of Cupertino against Tum upcvnwhkhmryin any way accrue agaivlsaid City in of Lh.'S.dnd in conn race of the'ironun[a(this permit. APPLI NT UNDERSTANDS AND WILL COMPLY WITH ALL NO-taOBff SOURC REGUL - Sy ey �`[Jr\/�t/((/w['/////Jnr. Issued by: Date Re -roofs Signature o(A licarruContraclor Dale HAZARDOUS MATERIALS LOSURE Type of Roof Will apCupertor Cge. P-1 amhandleh noMuni Municipal Chaptuortom u defined the Cupertino Municipal Cade. Chapter 9.13. and the HcaiN and Safety mildousmeteety Code. p ns zs53xfa)+ p,� All roofs shall be inspected prior to any roofing material being installed. Will applicant in future con equipment oo devices If a roof is installed without first obtainingan inspection, I agree to remove P g us dclined by me D Qu Management Districtl Nexus air contaminants u defined by the Bay Am Air Quality Manepcment all new materials for inspection. ❑Yes- Ih u rChaplcr6.95oftenCallor - naHul e / ubndne^rtiufYndththe uaaifvthpewbtu idnegy55 5mus'lmiryI oilfd don mcu.Fghave a l'my require hishmmhueno'W'u wf Ccnifcab of Occepamy. Signature of Applicant Date All roof coverings to be Class 'W or better owns fauthommdagent .Dam • 3 ITEMS OF 3 CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN ......... 36230020.00 DATE ISSUED.......: 09/29/2008 RECEIPT #.........: BS000006225 REFERENCE ID # 08090191 SITE ADDRESS .....: 7553 RAINBOW DR SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 METHOD OF PAYMENT ----------- CREDIT CARD TOTAL RECEIPT : AMOUNT ----------- 82.08 --------------- 82.08 VOICE ID DESCRIPTION -------- ---------------------------- 301 ROUGH PLUMBING • REFERENCE NUMBER ----------- VISA VOICE ID DESCRIPTION -------- ---------------------------- 507 FINAL PLUMBING OWNER ............: GAYLA ALTHOFF ADDRESS ..........: 7553 RAINBOW DR CITY/STATE/ZIP ...: CUPERTINO, CA 95014 RECEIVED FROM ....: JOHN GERLETTI CONTRACTOR .......: DUARTE TADEV LIC # 22189 COMPANY ..........: ALLSTAR PLUMBING ADDRESS ..........: 326 PHELAN AVE CITY/STATE/ZIP ...: SAN JOSE, CA 95122 TELEPHONE ........: (408) 230-5569 • FEE ID ---------- UNIT QUANTITY ------------- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR ---------- VALUATION 1,200.00 ------------------------------ 0.50 0.00 0.50 ---------- 0.00 1PPERMITFE FLAT RATE 1.00 40.79 0.00 40.79 0.00 1TRAVDOC FLAT RATE 1.00 40.79 0.00 ---------- 40.79 0.00 TOTAL PERMIT ---------- ---------- 82.08 1 0.00 82.08 ---------- 0.00 METHOD OF PAYMENT ----------- CREDIT CARD TOTAL RECEIPT : AMOUNT ----------- 82.08 --------------- 82.08 VOICE ID DESCRIPTION -------- ---------------------------- 301 ROUGH PLUMBING • REFERENCE NUMBER ----------- VISA VOICE ID DESCRIPTION -------- ---------------------------- 507 FINAL PLUMBING lm r..-. Cm" . CUPEkTINO CITY OF CUPERTINO REPIPE/SEWER/MAIN SERVICE PERMIT APPLICATION FORM o �cv D/ 9� APN # � DD Fee ID Date: 9 z q -meg Building Address: -- 15S3, ,N � Permit Type Owner's Name,.,,,,( 1PCSEWER Phone #: sg�?- - 3112 - Contractor: 1CPSS Phone #: qD& a--&-(.0oL1v �F1L�ST:a (� �tvh-�3SNC� Commercial re -pipe per fixture P 1CPRP Fax #: Contact: P Phone #: ' q D8 - - 7 1 sr, �► c-1 GK ETT - IBSEI3MICOM Seismic Commercial p Fax #: Contractor License #: 015 3CP Seismic Residential Cupertino Business License #: Job Description: 1PRSEWER GqS-�feSs�s�e✓ -�-C3i P esidential Commercial ❑ Valuation: 00 — Project Size: Express Standard B Large LJ Major ❑ . Green Building: Please complete relevant portion of the Green Building Checklist & attach Tt to the application or if applicable, include in plan set & the sheet index. Green Building Points: Quantity Fee ID Fee Description Fee Group Permit Type 1PCSEWER Commercial building sewer/sanitary sewer P 1CPSS 1BPREPIPE Commercial re -pipe per fixture P 1CPRP 1PGASCOM . Commercial Gas Piping System 1-4 Outlets P IBSEI3MICOM Seismic Commercial p 1BSEISMICR Seismic Residential P 1PRSEWER Residential building sewer/sanitary sewer P 1RPSS CITY OF CUPERTINO fa` REPIPE/SEWER/MAIN SERVICE CUPEkTINO FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type IPRREPIPE Residential re -pipe per fixture P 1RPRP 1BPWSVCS Water Service P 1CPWS or 1RPWS 1PPRSEWG Private Sewage Disposal System P 1PCESS Cesspool P 1BPWATER Install/alter Water Pipe P 1BPFIXTURE Plumbing Fixture P 1PGASRES Residential Gas Piping System 1-4 Outlets P 1BPGAS Gas Piping System 5+ Outlets P / 1PPERMITFEE Plumbing Permit Fee Issuance P IPLMBLNCK Plumbing Plan Check P 1PLMBINSP Other Plumbing/gas Insp. P ITRAVDOC Travel & Documentation Fee B 1BUSLIC Business License B Revised 6-16-08 .• • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. _ Install H.E. Irrigation, (details/spec)' y L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TIVAMIMMM TOTAL POINTS 40 points • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is • not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for "greening' your project. A. Site INPUT Res=ces Energy IAQ/Health 1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; BO%= 4 points up to 4 Resource pts 0 2. Salvage Reusable Building Materials _ J 4 Resource pts y=yes 0 3. Remodel for Mixed Use, Adaptive Reuse, and Historic Preservation 4 Resource pts y --yes 0 4. Protect Native Soil 2 Resource pts y=yes 0 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 0 6. Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7. Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 Design ResgurCe-Ef c em Landscapes and Ga dens __ _ I 4 Resource pts y=yes 0 9. Reuse Matedals/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10. Install High -Efficiency Irrigation Systems 2 Resource pts y=yes 0 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes p B. Foundation 1. Incorporate Recycled Flyash in Concrete • 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource 2. Use Recycled Content Aggregate 2 Resource pts y= 3. Insulate Foundation/Slab before backfill 3 Energy pts y_ C. Structural Frame -- r r r rr r r r r 0 r r r or 1. Substitute Solid Sawn Lumber with Engineered number 3 Resource pts _ 2. Use FSC Certified Wood for framing y=ye (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pt: 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=ye 4. Use Web Floor Trusses 2 Resource pts y=ye 5. Design Energy Heels on Trusses 6' or more 2 Energy pts y=ye 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=ye 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=ye 8. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=ye 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y -ye. b. Wall 3 Energy pts y=ye: c. Roof 3 Energy pts y=ye: 10. Apply Advanced Framing Techniques 4 Resource pts y=ye: 11. Use Reclaimed Lumber for Non Structural Applications r--12. -- - -- - —. - - 3 Resource pts y=ye: Use OSB" - -' -1 a. Subfloors 1 Resource of y=ye: • It. Sheathing 1 Resource pt y=yes - — r r r rr r r r r 0 r r r or 0 .1. Use Sustainable Deeking Mateaals a. Recycled content b. FSC Certified Wood 2. Use Treated Wood That Does Not Contain Chromiurn/Arseno 13. Install House Wrap under Siding 14. Use Fiber -Cement Siding Materials E. Plumbing 1. Install Water Heater Jacket 2. Insulate Hot and Cold Water Pipes 1. Install Energy S1arDishwasher 3. Retrofit all Faucets and Showerheads wth Flow Reducers a. Faucets (1 point each, up to 2 points) b. Showerheads (1 point each, up to 2 points) 2. Install Washing Machine with Water and Energy 4. Replace Toilest with Ultra -Low Flush Toilets (1 point each, up to 3 points) 5. Install Chlorine Filter on Showerhead 6. Convert Gas to Tankless Water Heater 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) 6. Install On -Demand Hol Water Circulation Pump r. ciectncai 1. Install Compaq Fluorescent Light Bulbs (CFLs) (6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) 3 Resource pts Y--yes0 • 3 Resource pts y=yes D 1 IAQ/Health pt y=yes D 1 IAQ/Health pt y=yes 0 1 Resource pt y yes 0 1 Energy pt y=yes 2 Energy pts y=yes Up to 2 Resource pts. Up to 2 Resource pts. Up to 3 Resource pts. 1 IAQ/Health pt y --yes 4 Energy pts y=ye=. Up to 4 IAQ/Health 4 Resource pts y: Up to 4 Energy pts. D • 0 Up to 5 Energy pts. Up to 4 Energy pts. 0 Up to 4 Energy G. Appliances 1. Install Energy S1arDishwasher -1 1 Energy pt Y --yes 0 2. Install Washing Machine with Water and Energy 7 Conservation Features 1 Energy pt y=yes 0 3.lnstall Energy Star Refrigerator 1 Energy pt y=yes 0 4. Install Built -In Recycling Center 3 Resource pis y=yes C 1 1 1 H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls 2 Energy pts y=yes 0 b. Ceilings 2 Energy pts y=yes 0 2. Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 3. Install RecycledLontenl, Fiberglass Insulation with ', NoAdded Formaldehyde 31AQ/Health pts y=yes 0 4. Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5. Use Cellulose Insulation a. Walls 4 Resource pts y=yes 0 b. Ceilings 4 Resource pts y=yes 0 • 6. Alternative Insulation Products (Cotton, spray -foam) a. Walls 4 Resource pts y=yes c b. Cenings 4 Resource pts y=yes 0 R: Install Encrgy-Efficient Windows- - • a. Double -Paned 1 Energy pt y=yes b. Low -Emissivity (Low -E) 2 Energy pts y=yes c. Low. Cit L ___ Conductivity Frames __ _ _ 2 Energy pts y=yes 2. Install Low Heat Transmission Glazing — 1 Energy of y=yes J. Heating Ventilation and Air Conditioning 2 Energy pts '1 r. Use Duct Mastic on All Duct Joints _ �j R: Install Encrgy-Efficient Windows- - • a. Double -Paned 1 Energy pt y=yes b. Low -Emissivity (Low -E) 2 Energy pts y=yes c. Low. Cit L ___ Conductivity Frames __ _ _ 2 Energy pts y=yes 2. Install Low Heat Transmission Glazing — 1 Energy of y=yes J. Heating Ventilation and Air Conditioning 2 Energy pts y=yes r. Use Duct Mastic on All Duct Joints _ �j 2 Energy pts y=yes 2. Install Ductwork within Conditioned Space 3 Energy pts y=yes 3. Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 4. Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 5. Install Solar Attic Fan 2 Energy pts y=yes 6. Install Attic Ventilation Systems 1 Energy pt y=yes 7. Install Whole House Fan 4 Energy pts y=yes 8. Install Sealed Combustion Units 3 IAQ/Health cis v=ves a. Furnaces 3 IAQIHealth pts y --yes b. Water Heaters 3 IAQ/Health pts y=yes 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 3 Energy pts y=yes 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 11. Install AC with Non -HCFC Refrigerants 2 Resource pts y=yes 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts y=yes 13. Retrofit Wood Burning Fireplaces 4 Energy pts y=yes . a. Install EPA certified wood stoveslnserts 1 IAQ/Health pt y=yes b. Install/ReplaceDampers 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y=yes 15. Install High Efficiency Filter 4 IAQ/Health pts y=yes 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts y=yes 17. Install Separate Garage Exhaust Fan 3 IAQ/Health cis v=ves K. Renewable Energy and Roofing ' 1. Pre -Plumb for Solar Water Heating 4 Energy pts y=yes 2. Install Solar Water Heating System 10 Energy pts y=yes 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes 4, Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw = 18 points) Up to 18 Energy pts r----- - -. ..- 6. Select Safe and Durable Roofing Materials_ L. 1 Resource __ _ _ _ _ _ 7, Install Radiant Barrier _—' pt - y=yes 3 Enerov Dts v=ves L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts 3. Plant Deciduous Trees on the West and South Sides 3 Energy pts 0 L. Use Low/No--VOC Paint 1 IAO/Health pts y --yes 2. Use Low VOC, Water -Based Wood Finishes 2 IAO/Health pts y=yes 3. Use LowMo VVOC Adhesives _ _ 3 IAQ/Health pts y=yes 4. Use Salvaged Materials for Interior Finishes 3 Resource pts y --yes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 6. Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 17 Seal all Exposed Particleboard or MDF J _ 4 IAQMealth pts y --yes B. Use FSC Certified Materials for Intedor Finish 4 Resource pts y=yes 9. Use Finger -Jointed or Recycled -Content Trim 1 Resource pts y=yes 10. Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 0 0 1. Select FSC Certified Wood Flooring 0 0 0 0 0 0 y=yes 2. Use Rapidly Renewable FlooringMaledalo _ _ J 4 Resource pts y=yes 3. Use Recycled Content Ceramic Tiles 4 Resource pts y --yes 4. Install Natural Linoleum in Place of Vinyl 5 IAQMealth pts y=yes 5. Use Exposed Concrete as Finished Floor 4 Resource pts 0 N. Flooring 1. Select FSC Certified Wood Flooring B Resource pts y=yes 2. Use Rapidly Renewable FlooringMaledalo _ _ J 4 Resource pts y=yes 3. Use Recycled Content Ceramic Tiles 4 Resource pts y --yes 4. Install Natural Linoleum in Place of Vinyl 5 IAQMealth pts y=yes 5. Use Exposed Concrete as Finished Floor 4 Resource pts y --yes 6. Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes Total Points A 1 140 130 57 Total Points Project Received: 1 01 01 0 G:da W progsrgreenbuildngguidelines4emodelersJgmenpantsfmal21 ZNprotected.[Is �Y 0