C 9425 POST THIS CARD NEAR FRONT OF BUILDING
CITY OF CUPERTINO PlRMiT NUMBER
INSPECTION DIVISION' 9425
JOB INSPECTION RECORD
r
PERMIT EXPIRATION
JOB ADDRESS `� I V 'UNIT' LOT#
PERMIT EXPIRES IF WORK
OWNER CONTRACTOR IS NOT STARTED WITHIN
INSPECTION DATE INSPECTOR . INSPE ION RECORD 180 DAYS OF PERMIT ISSU-
FOUNDATION XANCE OR 180 DAYS FROM
LIFER - LASTCALLED INSPECTION.
PREG UNITE PERMIT VALIDATION
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED _
UNDERGROUND /SLAB
PLUMBING
ELECTRICAL ' -
ISSUANCE.DATE
MECHANICAL - - RCD ELECT. PLG, MECH.
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING PERMIT
WOOD-FLOOR INFORMATION
PLUMBING ,
VALUATION $/FT.
MECHANICAL
ELECTRICAL ERMITyq
FRAMING
INSULATION STORIES vP orysTR.
- - OCC,GROUP RES.UNITS
PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED -
�. ROOF SO,FT,FLOOR AREA TOTAL ACREAGE
DIAPHRAGM
BUILDING USE
- NES IND CON PR OP."
. . APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED - ❑ ❑ ❑ ❑
ROUGH ASSESSORSPARCELNO. "
PLUMBING ! -
GAS TEST - + TRACT NO PARCEL NO,
MECHANICAL -
ELECTRICAL FINALS DATE INSP. ACC DATE ACC.FILE NO.,
FRAMING SAN #
INSULATION - PLUMBING ZONING ENG.SITE NO.
- GAS
MECHANICAL FIRE SPRINK ENERGY T Y<
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING Y ❑ N'❑ Y ❑ N❑
LATH—INTERIOR ELECTRICAL FLOOD ZONE - A.Cu.c.
LATH—EXTERIOR FIRE DEPT. Y❑ N❑ v❑ N❑
SHEETROCK - GRADE
FEE SUMMARY
SHEAR INTERIOR BUILDING -
SHEAR EXTERIOR TEMPORARY APPROVALS BUILDING 'r
FIREWALLS . JELECTRIC - 'PLAN CHECK
GAS i FEE
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED JOCCUPANCY SEISMIC FEE
OCCUPANCYOF BUILDING IS NOT PERMITTED UNTIL BUILDING FINAL IS SIGNED By BUILDING INSPECTOR. MICROFILM
ARRANGE FOR INSPECTION BY PHONING 252-4505, ELECTRIC,
a� ONE WORKING DAY BEFORE REQUIRED'INSPECTION. . PLUMBING
Z "
PLEASE GIVE JOB ADDRESS WHEN PHONING.
- SEE PERMIT FOR EXPIRATION DATE - MECHANICAL
IMPORTANT! CONST.TAX
PLEASE READ REVERSE SIDE BEFORE TOTAL
CALLING FOR FINAL INSPECTION. .
OFFICE COPY