.05 U-2007-03 Clifford Chang
CITY OF CUPERTINO
10300 Torre Avenue, Cupertino, California 95014
DEPARTMENT OF COMMUNITY DEVELOPMENT REPORT FORM
Application: U-2007-03, ASA-2007-05, Agenda Date: June 12, 2007
EXC-2007-08, TM-2007-08 & TR-2007-03
Applicant (s): Clifford Chang
Property Location: 10100 N. Tantau Avenue
Northeast corner of Stevens Creek Blvd. and N. Tantau Ave.
Application Summary:
1. USE PERMIT and ARCHITECTURAL AND SITE APPROVAL to construct a
10,582 square foot retail building and one-level parking garage on an existing
office site.
2. EXCEPTION to the Heart of the City Specific Plan for a front yard setback.
3. TENTATIVE MAP to subdivide a 9.4 acre site into two parcels, approximately 1
acre and 8.4 acres respectively.
4. TREE REMOV AL PERMIT for tree removal and replanting in conjunction with a
proposed 10,582 square foot retail building and one-level parking garage on an
existing office site.
RECOMMENDATION
Staff recommends that the Planning Commission recommend approval to the City
Council of:
1. Use Permit (U-2007-03) and Architectural and Site Approval (ASA-2007-05) to .
construct a new retail building and one-level parking garage in accordance with
the model resolution.
2. Exception to the Heart of the City (EXC-2007-08) for a front yard setback.
3. Tentative Map (TM-2007-08) to subdivide a 9.4 acre site into two parcels in
accordance with the model resolution.
4. Tree Removal Permit (TR-2007-03) to remove 63 trees to accommodate the
development of a new retail commercial building and one-level parking garage
in accordance with the model resolution.
Project Data:
General Plan Designation:
Zoning Designation:
Specific Plan:
Acreage (Net):
Proposed Parcell (Retail):
Proposed Parcel 2 (Existing Office):
Commercialj Office / Residential
P (CG, 0, ML, Hotel)
Heart of the City (Commercial & Office)
9.4 acres
1 acre
8.4 acres
5,/
Applications: U-2007-03, ASA-2007-05, EXC-2007-08 & TR-2007-03
10100 N. Tantau Avenue
Page 2
Building SF:
Parcell (Proposed Retail Building):
Parcel 2 (Proposed Parking Garage):
Parcel 2 (Existing Building):
10,582 square feet
26,500 square feet (Approx.)
151,321 square feet (two-story office
building)
28 feet (fin wall at 31 feet)
14 feet
594 spaces
573 spaces
Proposed Retail Building Height:
Proposed Garage Height:
Total Parking Proposed:
Total Parking Required:
Proj ect Consistency with:
General Plan:
Zoning:
Heart of the City
Specific Plan:
Yes
Yes
No, due to request for front yard setback exception
Environmental Assessment:
Categorically Exempt per Section 15332, Class 32 of
CEQA
BACKGROUND:
The project site is currently developed with a 151,321 square foot, two-story office
complex that is occupied by Verigy, which designs and develops testing systems for the
semiconductor industry. The site is located on the northeast corner of Stevens Creek
Boulevard and N. Tantau Avenue and is surrounded by Interstate 280 to the north;
retail commercial, residential and office uses to the south across Stevens Creek
Boulevard; a 4-story office complex to the east; and vacant land to the west across N.
Tantau Boulevard.
The site was originally constructed as a two-story office complex in the early 1990' sand
shares a reciprocal ingress/ egress driveway with the adjacent property to the east that
is located in the City of Santa Clara and is developed with a 4-story office building.
DISCUSSION:
Project Description
The applicant is proposing to construct a new one-story, 10,582 square foot retail
commercial building on the northeast corner of Stevens Creek Boulevard and N. Tantau
A venue in front of the existing two-story office complex, and a new one-level, 94 space
parking garage at the rear of the site. Development of this project will not affect the
existing building on the subject property, but will require the reconfiguration of the
existing parking lot to fit the new retail building and parking garage.
Site Layout
The applicant is requesting approval of the use permit and architectural and site
approval to allow the proposed site layout and architectural design of the new
structures on the property. The new retail commercial building will be located within
existing parking and landscaping areas at the corner of the property and will be
developed with a plaza area in the front of the building facing both Stevens Creek
5"~
Applications: U-2007-03, ASA-2007-05, EXC-2007-08 & TR-2007-03
10100 N. Tantau Avenue
Page 3
Boulevard and N. Tantau Avenue to accommodate an outdoor seating area for future
prospective retail tenants of the building. The new parking garage will be located
within existing parking and landscaping areas at the rear of the office complex site,
adjacent to Interstate 280.
The site is accessed by two driveways along N. Tantau Avenue and two driveways
along Stevens Creek Boulevard, one of which is located on the adjacent property to the
east. There is a reciprocal ingress/egress driveway that is shared between the subject
property and the adjacent, existing 4-story office building to the east. No changes are
proposed to these shared driveway accesses. The reciprocal ingress/egress accesses
between these properties will be maintained.
Architectural Design
The new retail commercial building is proposed to be a one-story, 28-foot high building
with a modern design, including extensive spandrel (non-visible) and clear glass
around all elevations to enhance the retail commercial function of the building, recessed
stucco walls with various reveal lines to create interesting visual articulation on the
building, metal canopies, and a 31 foot-high stucco accent fin wall.
The proposed one-level parking garage will be constructed of concrete block that will
be painted to match the color of the existing office complex building. A concrete block
crash wall or cable railing is proposed along the upper level perimeter of the parking
garage.
The City's Architectural Advisor has reviewed the plans and supports the design of the
new structures, but provided the following recommendations on the retail commercial
building:
· Consider using clear vision glass rather than spandrel glass along the top
portion of the glass storefront areas.
· Consider using a solid base along the bottom portion of the glass storefront
areas rather the spandrel glass.
· Add landscaping and quality paving along the rear of the retail building to
soften the harsh edge and interface with the existing two-story office building.
· Use of this much glazing may not be viable for a significant retail use if
merchandise display area is needed along the glass storefront areas.
· There will be a substantial loss of mature trees along the corner.
The applicant reviewed the Architectural Advisor's comments and modified the
landscape plan to include half-diamond landscape planters in the surface parking
spaces behind the retail commercial building to soften the edge of the building.
However, the applicant still intends to remove the trees along the corner to provide
sufficient space to construct the building and for visibility of the retail building. The
applicant also intends to retain the use of the spandrel glass, since the applicant's
architect believes it is an integral part of the design of the building.
5"3
Applications: U-2007-03, ASA-2007-05, EXC-2007-08 & TR-2007-03
10100 N. Tantau Avenue
Page 4
Additionally, the applicant's architect clarified that use of extensive storefront glazing is
needed to accommodate each of the retail tenants in the building, since it is the
applicant's objective to maximize the storefront visibility of each of its tenants facing
Stevens Creek Boulevard. Staff is in agreement with the applicant's objective to
maximize the storefront glazing along Stevens Creek Boulevard, but does not believe
that use of spandrel glass will achieve this objective since it does not provide clear
visibility through the glass. For this reason, staff supports the City Architect's
recommendation to provide clear vision glass above the proposed clear glass storefront
areas and to provide a solid base at the bottom of the building, unless clear vision glass
can also be accommodated at the base of the building.
Heart of the City Specific Plan Setback Exception
The proposed project complies with all of the Heart of the City Specific Plan
requirements, except for the proposed front yard setback along Stevens Creek
Boulevard and N. Tantau Avenue. The following table indicates the project's
compliance with the applicable development requirements of the Heart of the City,
except for the front yard setback.
Item...
Re urre . :Allowed
Commercial & Office
Develo ment
Max. 45 feet; 60 feet if there is a
retail com anent
Conforms?
Use
Height
Yes
Setbacks:
Corner parcel
(along both
street frontages)
9 feet (from Stevens Creek
Parkway Landscape Easement)
and 35 feet building-from-curb
setback
Retail: 32 feet 2 inches along
Stevens Creek Boulevard and
N. Tantau Avenue.
No, for minor portions of the
building to articulate
building walls. The majority
of the setbacks are 35 feet or
greater.
Yes.
Sides
Half the height of the building
or 10 feet, whichever is greater
Retail: Approx. 310 feet (east)
Garage: 10 feet
Rear
None, if not adjacent to Retail: Approx. 380 feet
residential. Garage: 10 feet
Yes
The Heart of the City Specific Plan requires a minimum 35-foot front yard setback along
Stevens Creek Boulevard and N. Tantau Avenue. The applicant proposes an average
setback of approximately 46 feet, but a minimum setback of 32 feet 2 inches to create
wall articulations and visual interest in the design of the building, while also
maximizing the necessary retail square footage for prospective tenants.
The proposed retail commercial use will also require an allocation from the retail
commercial development allocation pool from the Heart of the City area. The
commercial build out of the area allows for 1,476,115 square feet of commercial use in
the area. The existing commercial square footage is 1,182,456 square feet, allowing for
an additional 293,659 square feet of commercial development potential in the area. The
proposed project will require an allocation of 10,582 square feet from the Heart of the
5,tf
Applications: U-2007-03, ASA-2007-05, EXC-2007-08 & TR-2007-03
10100 N. Tantau Avenue
Page 5
City allocation pool that will leave 282,807 square feet of commercial square footage
available.
Tentative Map
The applicant requests approval of a tentative map to subdivide the existing property
into two parcels, separating the new retail commercial building from the office complex
portion of the site. The two properties will still function as one combined office/ retail
commercial complex and will retain the existing reciprocal ingress/ egress driveways
and shared parking within the office complex. However, the retail commercial parking
proposed within Parcel 1 can accommodate the parking needs for the retail building
alone.
The tentative map proposes an approximately 1 acre site (Parcell) for the retail
commercial building and the remaining 8.4 acres (Parcel 2) for the existing office
complex and new parking garage.
Tree RemovalfLandscaping Plan
The applicant's arborist, Walter Levison, submitted a revised tree survey (See Exhibit B)
on June 4, 2007 that recommends removing a total of 63 trees, including 53 trees to
accommodate the retail building and parking garage, and an additional 10 trees due to
their poor ratings and condition. These trees primarily include the existing evergreen
ash trees along the Stevens Creek Boulevard and N. Tantau Avenue corner behind the
back of sidewalk, some of the London Plane trees within the interior parking lot areas to
accommodate the new retail building, and some of the Coast Redwood trees along the
north (rear) and northwest perimeters of the property to accommodate the new parking
garage and that are in poor health.
The revised tree survey was submitted in response to the City Arborist's review of the
trees that was prepared on May 24, 2007. The City Arborist had identified additional
trees that were not included in the initial tree survey and asked that these trees be
reviewed by the applicant's arborist and included in the survey. These additional trees
have been reviewed by the applicant's arborist and are now included in the revised tree
survey.
The preliminary landscape plan indicates that the project will accommodate new accent
shrubs along the new plaza areas in front of the new retail building facing Stevens
Creek Boulevard and N. Tantau Avenue, and new trees within the surface parking
spaces behind the building within half-diamond planter areas. All other trees and
landscaping on site are to remain, including the London Plane trees in the interior
parking lot of the site that are not affected by the development and many of the Coast
Redwoods along the northern and northwest perimeter of the site that can be retained
even with the new parking garage.
Staff recommends that additional trees and shrubs be planted on site to visual enhance
the retail commercial building and adjacent plaza area, and to soften the appearance of
5..-5
Applications: U-2007-03, ASA-2007-05, EXC-2007-08 & TR-2007-03
10100 N. Tantau Avenue
Page 6
the new parking garage. Staff also recommends that the plaza area in front of the retail
building be enhanced. To accomplish these goals, staff recommends the following:
· Plant field grown size 'Praxinus Americana' Ash trees, or largest size trees that
can be accommodated within the "sawtooth" corners of the retail commercial
building facing Stevens Creek Boulevard. These trees will replace the existing
ash trees that will need to be removed behind the back of sidewalk along
Stevens Creek Blvd. and N. Tantau Ave.
· Provide a "green screen" around the perimeter of the parking garage that
includes planting of trees and shrubs that will screen the garage. Existing
redwood trees may suffice as the "green screen" along the rear elevation of the
parking garage facing Interstate 280, unless the redwood trees are significantly
pruned. If the redwood trees along the rear elevation of the parking garage are
significantly pruned and do not provide adequate screening from Interstate 280,
additional screening shall be provided.
· Widen the plaza area to allow portions of the plaza to extend out to the public
right-of-way along N. Tantau Ave. and Stevens Creek Boulevard. The plaza area
shall incorporate decorative interlocking pavers as the hardscape area to
promote permeability, rather than the proposed broom and salt-finished
concrete.
Tree Replacements
Although a total of 63 trees are identified for removal, the applicant intends to replant
21 trees as replacement trees, including eight flowering accent trees in the half-diamond
planters along the rear of the retail commercial building and 13 redwood trees along the
front of the new parking garage. The applicant is not able to plant any additional trees
on site due to the limitation of available area to accommodate new trees.
Given the City's current review and imminent adoption of the protected trees
ordinance, staff recommends that the applicant be required to provide an in-lieu fee for
the removed trees that cannot be replaced on site. There are 42 trees proposed to be
removed that cannot be replaced on site; therefore, staff recommends that an in-lieu fee
of $9,240 be required by the applicant based upon the total purchase and installation
cost of 42 trees at $220 per tree, unless additional replacement trees can be planted on
site, thereby reducing the in-lieu fee accordingly. Staff used a modest purchase and
installation cost for replacement trees, due to the large number of trees involved.
Sidewalks
The project site is surrounded by a 5-foot wide monolithic sidewalk to the west along N.
Tantau Avenue and a 35-foot wide landscape parkway to the south along Stevens Creek
Blvd. that includes a 5-foot wide sidewalk between the parkway. The landscape
parkways on each side of the sidewalk along Stevens Creek Blvd. are improved mature
ash trees.
5..."
Applications: U-2007-03, ASA-2007-05, EXC-2007-08 & TR-2007-03
10100 N. Tantau Avenue
Page 7
Staff has noticed that some of the sidewalks are uplifting on both streets due to the
mature growth of the adjacent trees. Staff recommends that the sidewalks along N.
Tantau Ave. be repaired or replaced where necessary. However, staff recommends that
the sidewalks along Stevens Creek Blvd. be replaced to incorporate the minimum 6-foot
wide sidewalk requirement of the Heart of the City Specific Plan. Because the frontage
of this corner will be significantly modified due to the location of the retail commercial
building, staff recommends that the sidewalks be replaced to comply with the frontage
renovation requirements of the Heart of the City Specific Plan.
Parking
The proposed project will provide a total of 594 parking spaces on site for the parking
needs of the existing two-story office complex and the new retail commercial building.
The required number of parking spaces for this site is 572 parking spaces, based upon
151,321 square feet of office space and 10,582 square feet of retail commercial space.
Therefore, the proposed project will exceed the required number of parking spaces for
the site. The applicant intends to use the surplus parking spaces to accommodate future
retail uses that may entail eateries with outdoor seating areas.
ENCLOSURES
Model Resolutions
Exhibit A: Comments from Larry Cannon, Architectural Advisor
Exhibit B: Arborist report (revised) prepared by Walter Levison, dated June 4, 2007
Exhibit C: City Arborist report dated May 24, 2007
Plan Set
Submitted by: Aki Honda Snelling, Senior Planner ~
Approved by: Steve Piasecki, Director of Community Development ~ ~ /
G:\ Planning \ PDREPORT\pcllsereports\ lL2007_3.doc ~
5-1
U-2007-03
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
MODEL RESOLUTION
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
APPROVING A USE PERMIT TO CONSTRUCT A 10,582 SQUARE FOOT RETAIL
BUILDING AND ONE-LEVEL PARKING GARAGE ON AN EXISTING OFFICE SITE
SECTION I: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application
for a Use Permit, as described in Section II of this Resolution; and
WHEREAS, the necessary public notices have been given in accordance with the
Procedural Ordinance of the City of Cupertino, and the Planning Commission has held
one or more public hearings on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and has satisfied the following requirements:
1) The proposed use, at the proposed location, will not be detrimental or injurious
to property or improvements in the vicinity, and will not be detrimental to the
public health, safety, general welfare, or convenience; and
2) The proposed use will be located and conducted in a manner in accord with the
Cupertino Comprehensive General Plan and the purpose of the Conditional Use
Permits Chapter of the Cupertino Municipal Code.
3) The proposed development is essentially consistent with the Heart of the City
Specific Plan, except for the exception from front yard setbacks along Stevens
Creek Boulevard and N. Tantau Avenue.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, the application for a Use Permit is hereby approved, subject to
the conditions which are enumerated in this Resolution beginning on Page 2 thereof; and
That the subconclusions upon which the findings and conditions specified in this
resolution are based and contained in the public hearing record concerning Application
No. U-2007-03 as set forth in the Minutes of the Planning Commission Meeting of June
12,2007, and are. incorporated by reference as though fully set forth herein.
SECTION II: PROTECT DESCRIPTION
Application No.: U-2007-03
Applicant: Clifford Chang
Location: 10100 N. Tantau
5-8
Model Resolution
Page 2
U-2007-03
June 12, 2007
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
The approval is based on Exhibits submitted by Chang Architecture titled:
"Tantau Retail and Parking Garage" consisting of 14 pages labeled pages C, A1-
A4.1, PL-1, PL-2, C1-C4 and a colored rendering of the project, except as may be
amended by the Conditions contained in this Resolution.
2. "DEVELOPMENT APPROVAL
Approval is granted to construct a 10,852 square foot retail commercial building
on Parcel 1 of the project site (northeast corner of Stevens Creek Blvd. and N.
Tantau Ave.) and a 94-space, one-level parking structure on Parcel 2 of the
project site.
3. DEVELOPMENT ALLOCATION
The applicant shall receive an allocation of 10,582 square feet of retail commercial
allocation from the Heart of the City Specific Plan Area allocation.
4. HEART OF THE CITY SETBACK EXCEPTION
Approval is granted for a front yard setback exception from the Heart of the City
Specific Plan requirements to allow the retail commercial building on Parcel 1 to
have a minimum 32 feet 2 inch setback from Stevens Creek Boulevard and N.
Tantau A venue.
5. PARKING
The applicant shall provide a nunImum of 594 parking spaces on site In
accordance with the approved site plan.
6. BICYCLE PARKING
The applicant shall provide bicycle parking and bike racks for the proposed retail
commercial building in accordance with the City's Parking Regulations under
Chapter 19.100 of the Cupertino Municipal Code.
7. LANDSCAPE PLAN
The applicant shall submit detailed landscape and irrigation plans to be
reviewed and approved by the Director of Community Development prior to
issuance of building permits. The landscape plan shall provide the following:
a. The landscape plan shall include water conservation and pesticide reduction
measures in conformance with Chapter 14.15, Xeriscape Landscaping, and the
pesticide control measures referenced in Chapter 9.18, Stormwater Pollution
Prevention and Watershed Protection, of the Cupertino Municipal Code.
5-q
Model Resolution
Page 3
U - 2007-03
June 12, 2007
b. Plant field grown size 'Praxinus Americana' ash trees, or the largest size trees
that can be accommodated within the 11 sawtooth" corners of the retail
commercial building facing Stevens Creek Blvd.
c. Provide a 11 green screen" around the perimeter of the parking garage that
includes planting of trees and shrubs that will screen the garage. Existing
redwood trees may suffice as the 11 green screen" along the rear elevation of
the parking garage facing Interstate 280, unless the redwood trees are
significantly pruned. If the redwood trees along the rear elevation are
significantly pruned and do not provide adequate screening from Interstate
280, additional screening shall be required.
8. PLAZA AREAS
The applicant shall provide decorative pavement treatment in the plaza areas
around the retail commercial building. The plaza area shall be widened in front
of the retail commercial building to allow portions of the plaza to extend out to
the public right-of-way along N. Tantau Avenue and Stevens Creek Boulevard.
The plaza area shall incorporate use of decorative interlocking pavers as the
hardscape area, rather than the broom and salt-finished concrete.
9. SIDEWALKS
a. Prior to final occupancy, the applicant shall repair or replace any portions of
the sidewalk along N. Tantau Ave. in front of the project site that are in
disrepair, as determined by the Director of Public Works.
b. Prior to final occupancy, the applicant shall replace the entire sidewalk along
Stevens Creek Blvd. with a minimum 6-foot wide sidewalk, in compliance
with the Heart of the City Specific Plan requirements.
10. SIGN PROGRAM
A sign program shall be required for the new retail commercial building
proposed on Parcell.
11. BUILDING COLORS AND MATERIALS
The building colors and materials shall be consistent with the materials board
submitted by the applicant.
12. INGRESS/EGRESS EASEMENT
The applicant shall record a deed restriction and covenant running with the land,
subject to approval of the City Attorney, for all parcels that share common
driveways. The deed restriction shall provide for necessary reciprocal ingress
and egress easement to and from the affected parcels. The easements shall be
recorded prior to issuance of building permits.
rs - JD
Model Resolution
Page 4
U - 2007-03
June 12, 2007
13. MAINTENANCE AGREEMENT
The applicant shall record a maintenance agreement subject to the approval of
the City Attorney for the maintenance of the shared driveways by the property
owners of each of the lots.
14. RECIPROCAL PARKING
The applicant shall record a reciprocal parking easement for the shared parking
between Parcell (new retail commercial building site) and Parcel 2 (existing two-
story office complex with new parking structure), subject to the approval of the
City Attorney prior to issuance of building permits.
15. TREE REMOVAL
The applicant is approved to remove a total of 63 trees on site in accordance with
the arborist report submitted by Walter Levinson Consulting Arborist, dated
January 21, 2007, that include 53 trees that will require removal due to the
location of the new structures on site and 10 trees that are in poor or failing
health. For any trees to be retained, the applicant shall follow protection
measures for the retainment of these trees.
16. TREE PROTECTION
As part of the building permit drawings, a tree protection plan shall be prepared
by a certified arborist for the trees to be retained. In addition, the following
measures shall be added to the protection plan:
a. For trees to be retained, chain link fencing and other root protection shall be
installed around the dripline of the tree prior to any project site work.
b. No parking or vehicle parking shall be allowed under root zones, unless
using buffers approved by the project arborist.
c. No trenching within the critical root zone area is allowed. If trenching is
needed in the vicinity of trees to be retained, the City Arborist shall be
consulted before any trenching or root cutting beneath the dripline of the
tree.
d. Tree protection conditions shall be posted on the tree protection barriers.
e. Retained trees shall be watered to maintain thern in good health.
17. TREE PROTECTION BOND
The applicant shall provide a tree protection bond in the amount of $100,000 to
ensure protection of trees slated for preservation prior to issuance of grading,
demolition or building permits. The bond shall be returned after completion of
construction, subject to a letter from the City Arborist indicating that the trees are
in good condition.
5"-1/
Model Resolution
Page 5
U-2007-03
June 12, 2007
18. TREE REPLACEMENT IN-LIEU FEE
The applicant shall pay an in-lieu fee of $9,240 prior to issuance of building
permits and upon effective adoption of the protected trees ordinance for the
removal of 42 trees on site that cannot be replaced on site, unless additional
replacement trees are planted on site in which case the in-lieu fee may be
reduced accordingly. The in-lieu fee for each tree removal that cannot be
replaced on site shall be $220, based upon the purchase and installation cost of a
replacement tree.
19. SCREENING
All mechanical and other equipment on the retail building or on the site shall be
screened so they are not visible from public street areas or adjoining
developments. Screening materials/colors shall match building features and
materials. The height of the screening shall be taller than the height of the
mechanical equipment that it is designed to screen. The location of equipment
and necessary screening shall be reviewed and approved by the Director of
Community Development prior to issuance of building permits.
20. RESTAURANT ODOR ABATEMENT
All new restaurants shall install odor abatement systems to reduce odor impacts
from the restaurants to the adjacent community. The odor abatement systems
shall be installed prior to final occupancy of the associated restaurant(s).
Detailed plans shall be reviewed and approved by the Director of Community
Development prior to issuance of building permits.
21. TRASH AND DELIVERY ACTIVITIES
A detailed refuge and truck delivery plan must be prepared by the applicant.
The plan shall specify locations of trash facilities, refuge pick up schedules and
truck delivery schedules and routes. All trash facilities must be screened and
enclosed to the satisfaction of the Public Works Department. The final plan shall
be submitted to the City for review and approval prior to issuance of building
permits.
22. CONSTRUCTION MANAGEMENT PLAN
A construction management plan. shall be prepared by the applicant and
approved by staff prior to issuance of building permits. Staging of construction
and equipment shall not occur within 250 feet of any residential property.
23. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum
extent feasible subject to the Building Official. The applicant shall provide
evidence that materials will be recycled prior to issuance of final demolition
permits.
5"/~
Model Resolution
Page 6
U - 2007-03
June 12, 2007
24. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER
EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
Pursuant to Government Code Section 66020(d) (1), these Conditions constitute
written notice of a statement of the amount of such fees, and a description of the
dedications, reservations, and other exactions. You are hereby further notified
that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section
66020(a), has begun. If you fail to file a protest within this 90-day period
complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT.
25. STREET WIDENING
Street widening and dedications shall be provided in accordance with City
Standards and specifications and as required by the City Engineer.
26. CURB AND GUTTER IMPROVEMENTS
Curbs and gutters, sidewalks and related structures shall be installed In
accordance with grades and standards as specified by the City Engineer.
27.STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the City Engineer.
Lighting fixtures shall be positioned so as to preclude glare and other forms of
visual interference to adjoining properties, and shall be no higher than the
maximum height permitted by the zone in which the site is located.
28.FIRE HYDRANT
Fire hydrants shall be located as required by the City and Santa Clara County
Fire Department as needed.
29.GRADING
Grading shall be as approved and required by the City Engineer in accordance
with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404
permits maybe required. Please contact Army Corp of Engineers and/ or
Regional Water Quality Control Board as appropriate.
30.DRAINAGE
Drainage shall be provided to the satisfaction of the City Engineer. Pre- and
post-development calculations must be provided to indicate whether additional
storm water control measures are to be installed.
~"/3
Model Resolution
Page 7
U-2007-03.
June 12, 2007
31.FIRE PROTECTION
Fire sprinklers shall be installed in any new construction to the approval of the
City as needed.
32.UNDERGROUND UTILITIES
The developer shall comply with the requirements of the Underground Utilities
Ordinance No. 331 and other related Ordinances and regulations of the City of
Cupertino, and shall coordinate with affected utility providers for installation of
underground utility devices. The developer shall submit detailed plans showing
utility underground provisions. Said plans shall be subject to prior approval of
the affected Utility provider and the City Engineer.
33.IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of
Cupertino providing for payment of fees, including but not limited to checking
and inspection fees, storm drain fees, park dedication fees and fees for under
grounding of utilities. Said agreement shall be executed prior to issuance of
construction permits.
Fees:
a. Checking & Inspection Fees:
$ 6% of Off-Site Improvement Cost or
$3,540.00 minimum
$ 6% of. Site Improvement Cost or
$2,060.00 minimum
$ 2,000.00
$ 12,430.31
b. Grading Permit:
c. Development Maintenance Deposit:
. d. Storm Drainage Fee:
e. Power Cost:
f. Map Checking Fees:
g. Park Fees:
h. Street Tree
**
NjA
NjA
By Developer
**
Based on the latest effective PG&E rate schedule approved by the PUC
Bonds:
a. Faithful Performance Bond: 100%. of Off-site and On-site
Improvements
b. Labor & Material Bond: 100% of Off-site and On-site Improvement
c. On-site Grading Bond: 100% of site improvements.
-The fees described above are imposed based upon the current fee schedule
adopted by the City Council. However, the fees imposed herein may be modified
at the time of recordation of a final map or issuance of a building permit in the
5'''1 if
Model Resolution
Page 8
U - 2007 -03
June 12, 2007
event of said change or changes, the fees changed at that time will reflect the then
current fee schedule.
34.TRANSFORMERS
Electrical transformers, telephone vaults and similar above ground equipment
enclosures shall be screened with fencing and landscaping or located
underground such that said equipment is not visible from public street areas. The
transformer shall not be located in the front or side building setback area.
35.BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water
Resources Control Board, for construction activity, which disturbs soil. BMP plans
shall be included in grading and street improvement plans. Erosion and or
sediment control plan shall be provided.
36.STORMWATER QUALITY GUIDELINES FOR DEVELOPMENT PROTECTS
For a project creating or replacing 10,000 square feet or more of impervious
surface, the applicant must fulfill the City's storm water quality requirements,
which includes but is not limited to a Storm Water Management Plan/Notice of
Intent (NOI), design and implementation of permanent storm water treatment
BMPs, BMP operation and maintenance responsibilities, and BMP inspection and
reporting.
37.EROSION CONTROL PLAN
The developer must provide an approved erosion control plan by a Registered
Civil Engineer. This plan should include all erosion control measures used to
retain materials on site. Erosion control notes shall be stated on the plans.
38.TRAFFIC SIGNAL IMPROVEMENTS
The developer shall install traffic signal improvements at the Stevens Creek
Blvd/Tantau and ValIeo Parkway /Tantau intersections. The improvements
include a new traffic signal controller cabinet, battery backup, and emergency
vehicle pre-emption at ValIeo Parkway /Tantau, and emergency vehicle pre-
emption at Stevens Creek Blvd/Tantau.
39.TRAFFIC CONTROL PLAN
The developer must submit a traffic control plan by a Registered Traffic Engineer
to be approved by the City. The plan shall include a temporary traffic control plan
for work in the right of way as well as a routing plan for all vehicles used during
construction. All traffic control signs must be reviewed and approved by the City
prior to commencement of work. The City has adopted Manual on Uniform
Traffic Control Devices (MUTCD) standards for all signage and striping work
throughout the City.
5,./5
Model Resolution
Page 9
U - 2007 -03
June 12, 2007
40.TRASH ENCLOSURES
The trash enclosure plan must be designedto the satisfaction of the
Environmental Programs Manager.
41.REFUSE TRUCK ACCESS
The developer must obtain clearance from the Environmental Programs Manager
in regards to refuse truck access for the proposed development.
PASSED AND ADOPTED this 12th day of June 2007, at a Regular Meeting of the
Planning Commission of the City of Cupertino, State of California, by the following roll
call vote:
AYES:
NOES:
ABST AIN:
ABSENT:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS: .
ATTEST:
APPROVED:
Steve Piasecki
Director of Community Development
Lisa Giefer, Chair
Planning Commission
5' '11,
ASA-2007-05
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
MODEL RESOLUTION
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
APPROVING AN ARCHITECTURAL AND SITE APPROVAL TO CONSTRUCT A
10,582 SQUARE FOOT RETAIL BUILDING AND ONE-LEVEL PARKING GARAGE
ON AN EXISTING OFFICE SITE
SECTION I: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application
for an Architectural and Site Approval, as described in Section II of this Resolution; and
WHEREAS, the necessary public notices have been given in accordance with the
Procedural Ordinance of the City of Cupertino, and the Planning Commission has held
one or more public hearings on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and has satisfied the following requirements:
1) The proposed use, at the proposed location, will not be detrimental or injurious
to property or improvements in the vicinity, and will not be detrimental to the
public health, safety, general welfare, or convenience; and
2) The proposed use will be located and conducted in a manner in accord with the
Cupertino Comprehensive General Plan and the purpose of the Architectural
and Site Review Chapter of the Cupertino Municipal Code; and
3) The proposed development is essentially consistent with the Heart of the City
Specific Plan, except for the exception from front yard setbacks along Stevens
Creek Boulevard and N. Tantau Avenue.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, the application for Architectural and Site Approval is hereby
approved, subject to the conditions which are enumerated in this Resolution beginning
on Page 2 thereof; and
That the subconclusions upon which the findings and conditions specified in this
resolution are based and contained in the public hearing record concerning Application
No. ASA-2007-05 as set forth in the Minutes of the Planning Commission Meeting of
June 12, 2007, and are incorporated by reference as though fully set forth herein.
5,./ 7
Model Resolution
Page 2
ASA-2007-05
June 12, 2007
SECTION II: PROTECT DESCRIPTION
Application No.: ASA-2007-05
Applicant: Clifford Chang
Location: 10100 N. Tantau
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
The approval is based on Exhibits submitted by Chang Architecture titled:
"Tantau Retail and Parking Garage" consisting of 14 pages labeled pages C, Al-
A4.1, PL-1, PL-2, C1-C4 and a colored rendering of the project, except as may be
amended by the Conditions contained in this Resolution.
2. DEVELOPMENT APPROVAL
Approval is granted to construct a 10,852 square foot retail commercial building
on Parcell of the project site (northeast corner of Stevens Creek Blvd. and N.
Tantau Ave.) and a 94-space, one-level parking structure on Parcel 2 of the
project site.
3. DEVELOPMENT ALLOCATION
The applicant shall receive an allocation of 10,582 square feet of retail commercial
allocation from the Heart of the City Specific Plan Area allocation.
4. HEART OF THE CITY SETBACK EXCEPTION
Approval is granted for a front yard setback exception from the Heart of the City
Specific Plan requirements to allow the retail commercial building on Parcel 1 to
have a minimum 32 feet 2 inch setback from Stevens Creek Boulevard and N.
Tantau Avenue.
5. PARKING
The applicant shall provide a nummum of 594 parking spaces on site In
accordance with the approved site plan.
6. BICYCLE PARKING
The applicant shall provide bicycle parking and bike racks for the proposed retail
commercial building in accordance with the City's Parking Regulations under
Chapter 19.100 of the Cupertino Municipal Code.
7. LANDSCAPE PLAN
The applicant shall submit detailed landscape and irrigation plans to be
reviewed and approved by the Director of Community Development prior to
issuance of building permits. The landscape plan shall provide the following:
5'IB
Model Resolution
Page 3
ASA-2007-05
June 12, 2007
a. The landscape plan shall include water conservation and pesticide reduction
measures in conformance with Chapter 14.15, Xeriscape Landscaping, and the
pesticide control measures referenced in Chapter 9.18, Stormwater Pollution
Prevention and Watershed Protection, of the Cupertino Municipal Code.
b. Plant field grown size 'Praxinus Americana' ash trees, or the largest size trees
that can be accommodated within the "sawtooth" corners of the retail
commercial building facing Stevens Creek Blvd.
c. Provide a "green screen" around the perimeter of the parking garage that
includes planting of trees and shrubs that will screen the garage. Existing
redwood trees may suffice as the" green screen" along the rear elevation of
the parking garage facing Interstate 280, unless the redwood trees are
significantly pruned. If the redwood trees along the rear elevation are
significantly pruned and do not provide adequate screening from Interstate
280, additional screening shall be required.
8. PLAZA AREAS
The applicant shall provide decorative pavement treatment in the plaza areas
around the retail commercial building. The plaza area shall be widened in front
of the retail commercial building to allow portions of the plaza to extend out to
the public right-of-way along N. Tantau Avenue and Stevens Creek Boulevard.
The plaza area shall incorporate use of decorative interlocking pavers as the
hardscape area, rather than the broom and salt-finished concrete.
9. SIDEWALKS
1. Prior to final occupancy, the applicant shall repair or replace any portions of
the sidewalk along N. Tantau Ave. in front of the project site that are in
disrepair, as determined by the Director of Public Works.
2. Prior to final occupancy, the applicant shall replace the entire sidewalk along
Stevens Creek Blvd. with a minimum 6-foot wide sidewalk, in compliance
with the Heart of the City Specific Plan requirements.
10. SIGN PROGRAM
A sign program shall be required for the new retail commercial building
proposed on Parcell.
11. BUILDING COLORS AND MATERIALS
The building colors and materials shall be consistent with the materials board
submitted by the applicant.
12. INGRESS/EGRESS EASEMENT
The applicant shall record a deed restriction and covenant running with the land,
subject to approval of the City Attorney, for all parcels that share common
driveways. The deed restriction shall provide for necessary reciprocal ingress
and egress easement to and from the affected parcels. The easements shall be
recorded prior to issuance of building permits.
5'11
Model Resolution
Page 4
ASA-2007-05
June 12, 2007
13. MAINTENANCE AGREEMENT
The applicant shall record a maintenance agreement subject to the approval of
the City Attorney for the maintenance of the shared driveways by the property
owners of each of the lots.
14. RECIPROCAL PARKING
The applicant shall record a reciprocal parking easement for the shared parking
between Parcell (new retail commercial building site) and Parcel 2 (existing two-
story office complex with new parking structure), subject to the approval of the
City Attorney prior to issuance of building permits.
15. TREE REMOVAL
The applicant is approved to remove a total of 63 trees on site in accordance with
the arborist report submitted by Walter Levinson Consulting Arborist, dated
January 21, 2007, that include 53 trees that will require removal due to the
location of the new structures on site and 10 trees that are in poor or failing
health. For any trees to be retained, the applicant shall follow protection
measures for the retainment of these trees.
16. TREE PROTECTION
As part of the building permit drawings, a tree protection plan shall be prepared
by a certified arborist for the trees to be retained. In addition, the following
measures shall be added to the protection plan:
1. For trees to be retained, chain link fencing and other root protection shall be
installed around the drip line of the tree prior to any project site work.
2. No parking or vehicle parking shall be allowed under root zones, unless
using buffers approved by the project arborist.
3. No trenching within the critical root zone area is allowed. If trenching is
needed in the vicinity of trees to be retained, the City Arborist shall be
consulted before any trenching or root cutting beneath the dripline of the
tree.
4. Tree protection conditions shall be posted on the tree protection barriers.
5. Retained trees shall be watered to maintain them in good health.
17. TREE PROTECTION BOND
The applicant shall provide a tree protection bond in the amount of $100,000 to
ensure protection of trees slated for preservation prior to issuance of grading,
demolition or building permits. The bond shall be returned after completion of
construction, subject to a letter from the City Arborist indicating that the trees are
in good condition.
6~o
Model Resolution
Page 5
ASA-2007-05
June 12, 2007
18. TREE REPLACEMENT IN-LIEU FEE
The applicant shall pay an in-lieu fee of $9,240 prior to issuance of building
permits and upon effective adoption of the protected trees ordinance for the
removal of 42 trees on site that cannot be replaced on site, unless additional
replacement trees are planted on site in which case the in~lieu fee may be
reduced accordingly. The in-lieu fee for each tree removal that cannot be
replaced on site shall be $220, based upon the purchase and installation cost of a
replacement tree.
19. SCREENING
All mechanical and other equipment on the retail building or on the site shall be
screened so they are not visible from public street areas or adjoining
developments. Screening materials/colors shall match building features and
materials. The height of the screening shall be taller than the height of the
mechanical equipment that it is designed to screen. The location of equipment
and necessary screening shall be reviewed and approved by the Director of
Community Development prior to issuance of building permits.
20. RESTAURANT ODOR ABATEMENT
All new restaurants shall install odor abatement systems to reduce odor impacts
from the restaurants to the adjacent community. The odor abatement systems
shall be installed prior to final occupancy of the associated restaurant(s).
Detailed plans shall be reviewed and approved by the Director of Community
Development prior to issuance of building permits.
21. TRASH AND DELIVERY ACTIVITIES
A detailed refuge and truck delivery plan must be prepared by the applicant.
The plan shall specify locations of trash facilities, refuge pick up schedules and
truck delivery schedules and routes. All trash facilities must be screened and
enclosed to the satisfaction of the Public Works Department. The final plan shall
be submitted to the City for review and approval prior to issuance of building
permits.
22. CONSTRUCTION MANAGEMENT PLAN
A construction management plan shall be prepared by the applicant and
approved by staff prior to issuance of building permits. Staging of construction
and equipment shall not occur within 250 feet of any residential property.
23. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum
extent feasible subject to the Building Official. The applicant shall provide
evidence that materials will be recycled prior to issuance of final demolition
permits.
5-:11
Model Resolution
Page 6
ASA-2007-05
June 12, 2007
24. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER
EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
Pursuant to Government Code Section 66020(d) (1), these Conditions constitute
written notice of a statement of the amount of such fees, and a description of the
dedications, reservations, and other ,exactions. You are hereby further notified
that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section
66020(a), has begun. If you fail to file a protest within this 90-day period
complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT.
25. STREET WIDENING
Street widening and dedications shall be provided in accordance with City
Standards and specifications and as required by the City Engineer.
26. CURB AND GUTTER IMPROVEMENTS
Curbs and gutters, sidewalks and related structures shall be installed In
accordance with grades and standards as specified by the City Engineer.
27.STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the City Engineer.
Lighting fixtures shall be positioned so as to preclude glare and other forms of
visual interference to adjoining properties, and shall be no higher than the
maximum height permitted by the zone in which the site is located.
28.FIRE HYDRANT
Fire hydrants shall be located as required by the City and Santa Clara County
Fire Department as needed.
29.GRADING
Grading shall be as approved and required by the City Engineer in accordance
with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404
permits maybe required. Please contact Army Corp of Engineers and! or
Regional Water Quality Control Board as appropriate.
3D. DRAINAGE
Drainage shall be provided to the satisfaction of the City Engineer. Pre- and
post-development calculations must be provided to indicate whether additional
storm water control measures are to be installed.
5-~d
Model Resolution
Page 7
ASA-2007-05
June 12, 2007
31.FIRE PROTECTION
Fire sprinklers shall be installed in any new construction to the approval of the
City as needed.
32.UNDERGROUND UTILITIES
The developer shall comply with the requirements of the Underground Utilities
Ordinance No. 331 and other related Ordinances and regulations of the City of
Cupertino, and shall coordinate with affected utility providers for installation of
underground utility devices. The developer shall submit detailed plans showing
utility underground provisions. Said plans shall be subject to prior approval of
the affected Utility provider and the City Engineer.
33.IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of
Cupertino providing for payment of fees, including but not limited to checking
and inspection fees, storm drain fees, park dedication fees and fees for under
grounding of utilities. Said agreement shall be executed prior to issuance of
construction permits.
Fees:
a. Checking & Inspection Fees:
$ 6% of Off-Site Improvement Cost or
$3,540.00 minimum
$ 6% of Site Improvement Cost or
$2,060.00 minimum
$ 2,000.00
$ 12,430.31
b. Grading Permit:
c. Development Maintenance Deposit:
d. Storm Drainage Fee:
e. Power Cost:
f. Map Checking Fees:
g. Park Fees:
h. Street Tree
**
NjA
NjA
By Developer
**
Based on the latest effective PG&E rate schedule approved by the PUC
Bonds:
a. Faithful Performance Bond: 100% of Off-site and On-site
Improvements
b. Labor & Material Bond: 100% of Off-site and On-site Improvement
c. On-site Grading Bond: 100% of site improvements.
-The fees described above are imposed based upon the current fee schedule
adopted by the City Council. However, the fees imposed herein may be modified
at the time of recordation of a final map or issuance of a building permit in the
event of said change or changes, the fees changed at that time will reflect the then
current fee schedule.
5-28
Model Resolution
Page 8
ASA-2007-05
June 12, 2007
34.TRANSFORMERS
Electrical transformers, telephone vaults and similar above ground equipment
enclosures shall be screened with fencing and landscaping or located
underground such that said equipment is not visible from public street areas. The
transformer shall not be located in the front or side building setback area.
35.BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water
Resources Control Board, for construction activity, which disturbs soil. BMP plans
shall be included in grading and street improvement plans. Erosion and or
sediment control plan shall be provided.
36.STORMWATER QUALITY GUIDELINES FOR DEVELOPMENT PROTECTS
For a project creating or replacing 10,000 square feet or more of impervious
surface, the applicant must fulfill the City's storm water quality requirements,
which includes but is not limited to a Storm Water Management Plan/Notice of
Intent (NOI), design and implementation of permanent storm water treatment
BMPs, BMP operation and maintenance responsibilities, and BMP inspection and
reporting.
37.EROSION CONTROL PLAN
The developer must provide an approved erosion control plan by a Registered
Civil Engineer. This plan should include all erosion control measures used to
retain materials on site. Erosion control notes shall be stated on the plans.
38.TRAFFIC SIGNAL IMPROVEMENTS
The developer shall install traffic signal improvements at the Stevens Creek
Blvd/Tantau and Valko Parkway /Tantau intersections. The improvements
include a new traffic signal controller cabinet, battery backup, and emergency
vehicle pre-emption at Valko Parkway /Tantau, and emergency vehicle pre-
emption at Stevens Creek Blvd/Tantau.
39.TRAFFIC CONTROL PLAN
The developer must submit a traffic control plan by a Registered Traffic Engineer
to be approved by the City. The plan shall include a temporary traffic control plan
for work in the right of way as well as a routing plan for all vehicles used during
construction. All traffic control signs must be reviewed and approved by the City
prior to commencement of work. The City has adopted Manual on Uniform
Traffic Control Devices (MUTCD) standards for all signage and striping work
throughout the City.
40.TRASH ENCLOSURES
The trash enclosure plan must be designed to the satisfaction of the
Environmental Programs Manager.
5 .,~tf
TM - 2007 -08
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
MODEL RESOLUTION
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A
TENTATIVE MAP TO SUBDIVIDE AN EXISTING 9.4 ACRE SITE INTO TWO
PARCELS, APPROXIMATELY 1 ACRE AND 8.4 ACRES RESPECTIVELY
SECTION I: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application
for a Tentative Parcel Map, as described in Section II of this R~solution; and
WHEREAS, the necessary public notices have been given in accordance with the
Procedural Ordinance of the City of Cupertino, and the Planning Commission has held
one or more public hearings on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and has satisfied the following requirements:
1) That the proposed subdivision map is consistent with the City of Cupertino
General Plan.
2) That the design and improvements of the proposed subdivision are consistent
with the General Plan.
3) That the site is physically suitable for the type and intensity of development
contemplated under the approved subdivision.
4) That the design of the subdivision or the proposed improvements is not likely
to cause substantial environmental damage nor substantially and
unavoidably injure fish and wildlife or their habitat.
5) That the design of the subdivision or the type of improvements associated
there is not likely to cause serious public health problems.
6) That the design of the subdivision and its associated improvements will not
conflict with easements acquired by the public at large for access through or
use of property within the proposed subdivision.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, the application for Tentative Parcel Map is hereby approved,
subject to the conditions which are enumerated in this Resolution beginning on Page 2
thereof; and
That the subconclusions upon which the findings and conditions specified in this
resolution are based and contained in the public hearing record concerning Application
No. TM-2007-08 as set forth in the Minutes of the Planning Commission Meeting of June
12,2007, and are incorporated by reference as though fully set forth herein.
5"'Rb
Model Resolution
Page 2
TM-2007 -08
June 12, 2007
SECTION II: PROTECT DESCRIPTION
Application No.: TM-2007-08
Applicant/ Owner: Clifford Chang
Location: 10100 N. Tantau
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
The recommendation of approval is based on the Tentative Parcel Map titled:
"Tentative Map, Retail and Parking Development, 10100 N. Tantau Avenue,
Cuerptino California" consisting of one sheet labeled C-01, prepared by AP
Consulting Engineers dated March 10,2007.
2. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent
feasible subject to the Building Official. The applicant shall provide evidence that
materials will be recycled prior to issuance of final demolition permits.
3. NOTICE OF FEES, DEDICATIONS,RESERV ATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant
to Government Code Section 66020( d) (1), these Conditions constitute written notice
of a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
4. TREE PROTECTION
As part of the building permit drawings, a tree protection plan shall be prepared by
a certified arborist for the trees to be retained. In addition, the following measures
shall be added to the protection plan:
a. For trees to be retained, chain link fencing and other root protection shall be
installed around the dripline of the tree prior to any project site work.
b. No parking or vehicle parking shall be allowed under root zones, unless using
buffers approved by the project arborist.
c. No trenching within the critical root zone area is allowed. If trenching is needed
in the vicinity of trees to be retained, the City Arborist shall be consulted before
any trenching or root cutting beneath the dripline of the tree.
d. Tree protection conditions shall be posted on the tree protection barriers.
e. Retained trees shall be watered to maintain them in good health.
5 ".z7
Model Resolution
Page 3
TM - 2007 -08
June 12, 2007
5. TREE PROTECTION BOND
The applicant shall provide a tree protection bond in the amount of $100,000 to
ensure protection of trees slated for preservation prior to issuance of grading,
demolition or building permits. The bond shall be returned after completion of
construction, subject to a letter from the City Arborist indicating that the trees are in
good condition.
SECTION. IV:
DEP ARTMENT
CONDITIONS ADMINISTERED BY THE PUBLIC WORKS
6. STREET WIDENING
Street widening and dedications shall be provided in accordance with City
Standards and specifications and as required by the City Engineer.
7. CURB AND GUTTER IMPROVEMENTS
Curbs and gutters, sidewalks and related structures shall be installed in accordance
with grades and standards as specified by the City Engineer.
8. STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the City Engineer.
Lighting fixtures shall be positioned so as to preclude glare and other forms of
visual interference to adjoining properties, and shall be no higher than the
maximum height permitted by the zone in which the site is located.
9. FIRE HYDRANT
Fire hydrants shall be located as required by the City and Santa Clara County Fire
Department as needed.
10. GRADING
Grading shall be as approved and required by the City Engineer in accordance with
Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits
maybe required. Please contact Army Corp of Engineers and/ or Regional Water
Quality Control Board as appropriate.
11.DRAINAGE
Drainage shall be provided to the satisfaction of the City Engineer. Pre- and post-
development calculations must be provided to indicate whether additional storm
water control measures are to be installed.
12. FIRE PROTECTION
Fire sprinklers shall be installed in any new construction to the approval of the City
as needed.
6';J~
Model Resolution
Page 4
TM-2007 -08
June 12, 2007
13. UNDERGROUND UTILITIES
The developer shall comply with the requirements of the Underground Utilities
Ordinance No. 331 and other related Ordinances and regulations of the City of
Cupertino, and shall coordinate with affected utility providers for installation of
underground utility devices. The developer shall submit detailed plans showing
utility underground provisions. Said plans shall be subject to prior approval of the
affected Utility provider and the City Engineer.
14. IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of
Cupertino providing for payment of fees, including but not limited to checking and
inspection fees, storm drain fees, park dedication fees and fees for under grounding
of utilities. Said agreement shall be executed prior to issuance of construction
. permits.
Fees:
a. Checking & Inspection Fees:
c. Development Maintenance Deposit:
d. Storm Drainage Fee:
e. Power Cost:
f. Map Checking Fees:
g. Park Fees:
h. Street Tree
$ 6% of Off-Site Improvement Cost or
$3,540.00 minimum
$ 6% of Site Improvement Cost or
$2,060.00 minimum
$ 2,000.00
$ 12,430.31
b. Grading Permit:
**
NjA
NjA
By Developer
**
Based on the latest effective PG&E rate schedule approved by the PUC
Bonds:
a. Faithful Performance Bond: 100% of Off-site and On-site
Improvements
b. Labor & Material Bond: 100% of Off-site and On-site Improvement
c. On-site Grading Bond: 100% of site improvements.
-The fees described above are imposed based upon the current fee schedule
adopted by the City Council. However, the fees imposed herein may be modified
at the time of recordation of a final map or issuance of a building permit in the
event of said change or changes, the fees changed at that time will reflect the then
current fee schedule.
5 ';JCJ
Model Resolution
Page 5
TM-2007-08
June 12,2007
15. TRANSFORMERS
Electrical transformers, telephone vaults and similar above ground equipment
enclosures shall be screened with fencing and landscaping or located underground
. such that said equipment is not visible from public street areas. The transformer
shall not be located in the front or side building setback area.
16. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water
Resources Control Board, for construction activity, which disturbs soil. BMP plans
shall be included in grading and street improvement plans. Erosion and or
sediment control plan shall be provided.
17. STORMWATER QUALITY GUIDELINES FOR DEVELOPMENT PROTECTS
For a project creating or replacing 10,000 square feet or more of impervious surface,
the applicant must fulfill the City's storm water quality requirements, which
includes but is not limited to a Storm Water Management Plan/Notice of Intent
(NOI), design and implementation of permanent storm water treatment BMPs,
BMP operation and maintenance responsibilities, and BMP inspection and
reporting.
18. EROSION CONTROL PLAN
The developer must provide an approved erosion control plan by a Registered Civil
Engineer. This plan should include all erosion control measures used to retain
materials on site. Erosion control notes shall be stated on the plans.
19. TRAFFIC SIGNAL IMPROVEMENTS
The developer shall install traffic signal improvements at the Stevens Creek
Blvd/Tantau and Valko Parkway /Tantau intersections. The improvements
include a new traffic signal controller cabinet, battery backup, and emergency
vehicle pre-emption at Valko Parkway /Tantau, and emergency vehicle pre-
emption at Stevens Creek Blvd/Tantau.
20. TRAFFIC CONTROL PLAN
The developer must submit a traffic control plan by a Registered Traffic Engineer to
be approved by the City. The plan shall include a temporary traffic control plan for
work in the right of way as well as a routing plan for all vehicles used during
construction. All traffic control signs must be reviewed and approved by the City
prior to commencement of work. The City has adopted Manual on Uniform Traffic
Control Devices (MUTCD) standards for all signage and striping work throughout
the City.
21. TRASH ENCLOSURES
The trash enclosure plan must be designed to the satisfaction of the Environmental
Programs Manager.
5'?f)
Model Resolution
Page 6
TM-2007 -08
June 12, 2007
22. REFUSE TRUCK ACCESS
The developer must obtaIn clearance from the Environmental Programs Manager in
regards to refuse truck access for the proposed development.
PASSED AND ADOPTED this 12th day of June 2007, at a Regular Meeting of the
Planning Commission of the City of Cupertino, State of California, by the following roll
call vote:
AYES:
NOES:
ABST AIN:
ABSENT:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
ATTEST:
APPROVED:
Steve Piasecki, Director
Community Development Department
Lisa Giefer, Chair
Planning Commission
G: IPlanningIPDReport\Res\2007\TM-200 7 -08.doc
5'31
EXC-2007-08
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
MODEL RESOLUTION
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
APPROVING AN EXCEPTION TO THE HEART OF THE CITY
SPECIFIC PLAN FOR A FRONT YARD SETBACK ON A RETAIL
COMMERCIAL BUILDING ON THE NORTHEAST CORNER OF STEVENS
CREEK BOULEVARD AND N. T ANT A U AVENUE
SECTION I: PROTECT DESCRIPTION
Application No.:
Applicant:
Location:
EXC-2007-08
Cliff Chang
10100 N. Tantau
SECTION II: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application for an
exception to the Parking Regulations (Chapter 19.100 of the Cupertino Municipal Code), as
described in this Resolution; and
WHEREAS, the Planning Commission finds the following with regards to this application:
a) That the literal enforcement of the provisions of this chapter will result in restrictions
inconsistent with the spirit and intent of this title;
b) That the granting of the exception will not be injurious to property or improvements in the
area nor be detrimental to the pubic safety, health and welfare; and
c) That the exception to be granted is one that will require the least modification and the
minimum variance to accomplish this purpose; and
d) That the proposed exception will not result in significant impacts to neighboring properties.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted
in this matter, the exception to the Heart of the City Specific Plan regulations is hereby
approved subject to the conditions which are enumerated in this Resolution; and
That the subconclusions upon which the findings and conditions specified in this Resolution are
based and contained in the Public Hearing record concerning Application EXC-2007-08, as set
forth in the Minutes of the Planning Commission Meeting of June 12, 2007 and are incorporated
by reference herein.
5"- 3 ~
Model Resolution
Page 2
EXC-2007-08
June 12, 2007
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPT.
1. APPROVED EXHIBITS
The approval is based on Exhibits submitted by Chang Architecture titled:
"Tantau Retail and Parking Garage" consisting of 14 pages labeled pages C, A1-
A4.1, PL-1, PL-2, C1-C4 and a colored rendering of the project, except as may be
amended by the Conditions contained in this Resolution.
2. HEART OF THE CITY SETBACK EXCEPTION
Approval is granted for a front yard setback exception from the Heart of the City
Specific Plan requirements to allow the retail commercial building on Parcel 1 to
have a minimum 32 feet 2 inch setback from Stevens Creek Boulevard and N.
Tantau Avenue.
PASSED AND ADOPTED this 12th day of June 2007,. at a Regular Meeting of the Planning
Commission of the City of Cupertino by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
ATTEST:
APPROVED:
Steve Piasecki
Director of Community Development
Lisa Giefer, Chair
Planning Commission
5'~3
TR-2007-03
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
MODEL RESOLUTION
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING
TREE REMOVALS IN CONJUNCTION WITH A
PROPOSED 10,582 SQUARE FOOT RETAIL BUILDING AND A ONE-
LEVEL PARKING GARAGE ON AN EXISTING OFFICE SITE
SECTION 1: PROTECT DESCRIPTION
Application No.:
Applicant:
Location:
TR-2007-03
Clifford Chang
10100 N. Tantau
SECTION II: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application
for the removal of 63 trees in conjunction with the development of a retail commercial
building and parking garage; and
WHEREAS, the 63 trees are part of an approved landscape plan, subject to Chapter
14.18 of the Municipal Code, pertaining to Heritage and Specimen Trees; and
WHEREAS, the necessary public notices have been given in accordance with the
Procedural Ordinance of the City of Cupertino, and the Planning Commission has held
one or more public hearings on this matter; and
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, application for a tree removal is hereby approved; and
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the Public Hearing record concerning
Application TR-2007-03, as set forth in the Minutes of the Planning Commission
Meeting of June 12, 2007 are incorporated by reference herein.
5"3'-1
Model Resolution
Page 2
TR-2007-03
June 12, 2007
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROV AL ACTION
The applicant is approved to remove a total of 63 trees on site in accordance with the
arborist report submitted by Walter Levinson Consulting Arborist, dated January 21,
2007, that include 53 trees that will require removal due to the location of the new
structures on site and 10 trees that are in poor or failing health. For any trees to be
retained, the applicant shall follow protection measures for the retainment of these
trees.
2. TREE PROTECTION
As part of the building permit drawings, a tree protection plan shall be prepared by
a certified arborist for the trees to be retained. In addition, the following measures
shall be added to the protection plan:
a. For trees to be retained, chain link fencing and other root protection shall be
installed around the drip line of the tree prior to any project site work.
b. No parking or vehicle parking shall be allowed under root zones, unless using
buffers approved by the project arborist.
c. No trenching within the critical root zone area is allowed. If trenching is needed
in the vicinity of trees to be retained, the City Arborist shall.be consulted before
any trenching or root cutting beneath the dripline of the tree.
d. Tree protection conditions shall be posted on the tree protection barriers.
e. Retained trees shall be watered to maintain them in good health.
3. TREE PROTECTION BOND
The applicant shall provide a tree protection bond in the amount of $100,000 to
ensure protection of trees slated for preservation prior to issuance of grading,
demolition or building permits. The bond shall be returned after completion of
construction, subject to a letter from the City Arborist indicating that the trees are in
good condition.
4. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
6--35
Model Resolution
Page 3
TR-2007 -03
June 12, 2007
5. TREE REPLACEMENT IN-LIEU FEE
The applicant shall pay an in-lieu fee of $9,240 prior to issuance of building permits
and upon effective adoption of the protected trees ordinance for the removal of 42
trees on site that cannot be replaced on site, unless additional replacement trees are
planted on site that would reduce the in-lieu fee. The in-lieu fee is based upon the
purchase and installation cost of $220 per tree removal for each tree that cannot be
replaced on site.
PASSED AND ADOPTED this 12th day of June 2007, at a Regular Meeting of the
Planning Commission of the City of Cupertino by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
ATTEST:
APPROVED:
Steve Piasecki
Director of Community Development
Lisa Giefer, Chair
Cupertino Planning Commission
G: \ Planning \ PDREPORT\RES \2007\ TR-2007-03res.doc
5.. 310
Exhibit A
Why spandrel glass when
any dropped ceiling is likely
to be above this level?
I RECESSED - ACCENT un.. RECESSED -
I ~fCO W~! PANEl.. (P4}_ _.-.SJ1JCCO~ _
.I~~..-_~!!!- ~ . __'._
-~ r... a P.'!II .... :-; P3 n P,lt ~ p.!I ;:-:;
~ D ; ; . i ~ ; U. ~
~ ~ ~
-- f" .....,. , .- .-'-.-- - --
~. .-...
This much glazing may not be
viable for a significant retail use
~p
:t
I <
NOTE: REFER TO SfiEET L-I FOR PRELIMINARY LANDSCAPE
PLAN FOR PROPOSED PARKING STRUCTURE ~ NORTH-EAST
PROPERTY LINE.
""1
,-jn5
I
JI..IlLD!NC: re. I
e'JIL~ll~~ ~
357,9 .
,__ ~_~~)r,~_
~~~~~.~~TO
SCALL: I 20'
STEVENS CREEK BLVD
Substantial loss of
mature trees at street edges
Site Plan and Elevation Comments
10100 NORTH TANTAU
Cupertino
CANNON DESIGN GROUP
May 10,2007
5"'37
I' ~'."4'hf"':lt"'{.:'"~~'1 ""
:..':~~, 'Yr,. '-~l '" _ ~,~<...:~ ....
'.- I '.';IP
r
I
';. /0
,. . r--- :---
Example of a retail building of similar
scale and massing
San Rafael
Note: This is the only significant
area available for tenant signage
~~Ie~s n~me is ~~r1 or sign small '1
_"~p _ _ _ .. ... _ UI _ _~
~.- ~---I --1-
L~. - - - - - '. - - - - ·
.. ...
.. '.. i;
.,
..J- . '::-
- !
Scale of the structure is relatively large,
but probably OK if it is devoted to a
single, significant tenant
The photo above is a structure of similar scale
Scale and Massing' Comments
10100 NORTH TANTAU
Cupertino
CANNON DESIGN GROUP
May 10, 2007
5" 3f>
Consider vision glass
rather than spandrel glass
't
Provide alternate approach to facade
treatment in the event that tenant will
not be able to tolerate this much glazing
Not needed if this is being designed for a
known and committed tenant
t
Consider solid base bulkheads
rather than spandrel glass
"'1/\$1
~~
~o
~,(',
'b
~~
Add landscaping, quality paving
and pedestrian amenities
~
--..--
. ,... . . ~~
\''''-_ '....._Al._~~:);..,'-__/A,,,_ _ '^~1.._;,/^,___/;
EXlSJ1oIQ~A&H"sYCA.UORElRWT05lER~~(REFEJtTO wmNQ~ '\EXStN)~
"-=fV(m~.y~@, ~""'2D' lD~ ~~NYVEN~
Site Plan and Elevation Suggestions
10100 NORTH TANTAU
Cupertino
Landscaping and pedestrian amenities
example from Staples retail store
in San Rafael
CANNON DE$IGN GROUP
May 10, 2007
5'31
~)~ ~~!t~f,NH~i~~Pr
Exhibit B
,\\
~~~
"'_ "~"" 'r>'''' ,. --,
'.'.,,,.-.,,...............,..
ASCA ReQistered Consultina Arborist #401
ISA Certified Arborist #WC-3172
Assessment of 125 trees at
10100-10200 North Tantau Avenue
Cupertino, California
Prepared at the Request of:
Sand Hill Property Company
489 South EI Camino Real
San Mateo, CA 94402
Site Visits:
Walter Levison
11/8/06
6/4/07
Report:
Walter Levison
11/10/06
REV 11/27/06, 1/21/07,6/5/07
1 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5,L/O
~)}J ~~lt~f, N~~;;,i~~R
ASCA Registered ConsultinCl Arborist #401
,\\
^!tl~;.
ISA Certified Arborist #WC-3172
1. Summary 3
2. Assignment 4
3. Observations and Discussion 5
4. Recommendations 7
5. Tree Location Maps - Partial Scans (Site Plan Version 01/07) 11
6. Photographs 13
7. Consultant's Qualifications 16
8. Bay Area Vendors 17
9. Assumptions and Limiting Conditions 18
10. Certification 19
Attached: Tree Data Charts
2 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5"''''
~)p ~~!~~;'N~~~i~~2
ASCA Reqistered Consultinq Arborist #401
i~
~~'\.
A ~~;,',~,',':':.. ~:.:';:.>.~. ':':..~>,
ISA Certified Arborist #WC-3172
1. Summary
a) Tree Survey:
A total of one-hundred twenty-five (125) trees were tagged, located on a tree plot sheet,
and asses,sed in the attached tree data charts. Only those specimens that were in close
proximity to or directly conflicting with the proposed site plan parameters were originally
assessed.
The City Arborist David Babby requested in a letter dated 5/24/07 that an additional
twenty-six (26) trees be assessed. These trees were added into the tree data charts and
the report on 6/5/07 as trees #98 through #123. Except for four specimens #98, 99, 100,'
and #115, twenty-two (22) of these trees appear to be unaffected or only slightly affected
by the revised site plan proposal, assuming grading modifications at the west side of the
retail development can be achieved in the final construction set of plans.
Trees #1 through #123 and trees A (124) and B (125) were tagged with numbered
aluminum race track shaped tree tags at approximately eye level on the main trunk of
each tree.
b) Removals Dueto Project Conflicts:
Of the 125 "subject trees", at least fifty-three (53) specimens will be removed due to site
plan conflicts (~rees #1-29,48,81-84,85-87,88-100, 115, and trees A(124) and B(125))
as per the January 2007 site plan revision (see two tree location map scans below in this
report).
c) Removals Due to Low Condition Ratings & Hazard:
I have proposed ten (10) trees for removal based on very poor overall condition ratings
(25% or below) or high risk factors forfailure (tree #91). These are trees #50, 51, 52, 55,
60, 71, 80, 91, 103, and 105. Tree #91 will be removed outright due to conflicts with the
January 2007 version of the site plan. The City Arborist recommends removing tree #60
and tree #105. The City Arborist also suggests in his letter dated 5/24/07 that we could
improve the prognosis of specimens rated in very poor overall condition, assumably via
improved irrigation, etc.
d) Site Plan Impacts to Coast Redwoods:
Redwoods #30 - #46 along the east side of the existing parking lot have scaffold limb
growth which extends approximately 6-7 feet west of the trunk edges of the trees. The
trees are located approximately 8-feet east of the existing curb line and 5-8 linear feet
east of the proposed second story parking structure footprint. Therefore, minimal pruning
will be required to clear the proposed structure. Piers will be placed throughout the
existing parking lot area, upon which the new floating concrete parking deck will be
mounted (personal communication, Chang Architecture, 11/9/06).
3 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (6S0) 697-0990
sAf~
~)~ W~!~~f,N~~~i~~~
ASCA Registered Consulting Arborist #401
,~
~~.~
...-................."'.,.
""...,. ,,,"'..........._,,,
ISA Certified Arborist #WC-3172
The extent to which pruning might be required to create a "construction corridor" between
tree canopies and the east edge of the deck footprint is not known at the time of writing.
Also note that the new parking deck will block western sun exposure to the redwoods,
possibly reducing photosynthesis and overall vigor.
Redwoods #47, #49 - #80, and #101 - #107 (with the exception of redwoods being
removed, if any) will require pruning either as 'shearing pruning' or as 'drop crotch
pruning' to remove scaffold limbs back to forking lateral branches in order to clear the
proposed parking structure footprint. These trees along the north edge of the property
have much better scaffold limb extension than do the specimens along the east side of
the lot, extending out as much as +1- 15-linear feet southward from the trunk edges or
more in some cases. It is assumed that this growth is due to the trees' southern exposure
to sunlight. The parking structure will encroach within +1- 5-7 linear feet of the trunk
edges of these trees. Therefore, pruning to achieve the required airspace will be very
significant, even if a construction corridor space is not accounted for.
If a construction corridor of4-5 feet in width is required to allow for steel scaffold erection
around the perimeter of the parking structure, then severe shearing pruning of these
redwood specimens may need to be performed all the way in to branch attachments
along the main trunks. This would reduce the photosynthetic capability of the trees by
reducing the "live crown ratios" or percent of living canopy height (currently about 100%)
to possibly 60-70% depending on the elevation of the proposed parking deck.
The parking structure is expected to block the southern sun exposure currently enjoyed
by these trees, possibly reducing their vigor.
e) Specimen Trees:
Specimen trees as defined by the City of Cupertino include all oaks (Quercus), California
buckeyes, big leaf maples, deodar cedars, and blue atlas cedars of certain specified
diameters measured at 4.5-feet above grade.
As per this definition, there will be zero specimen trees affected or removed under the
proposed parking structure and retail development site plan as shown on the tree location
map.
2. Assignment
The author was originally requested to tag and assess all trees that were adjacent to or
within the footprints of the proposed retail and parking structures as per the Chang
Architecture site plan dated 6/27/06. All trees were tagged with racetrack shaped
aluminum tags numbering "1" through "123" except for two trees A and B which can be
considered trees #124 and #125 (see two marked up tree location map sheets scanned
into this report).
4 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
6"t{3
~)~ ~~!~~,r,N!:~;,jg~R
ASCA Registered Consultino Arborist #401
,~
~~.~
...._.._..'._, '~_"''''~ 'or
~, ",.. .,.". "'J'", _.......,;.
I SA Certified Arborist #WC-3172
The author was further requested to prepare a written arborist report complete with tree
data charts (see attached) and protection recommendations as applicable for a site plan
submittal to the City of Cupertino planning department. .
The report was revised on 1/21/07 to take into account the January 2007 site plan
revision which impacts a larger number of trees in the southwest comer of the site than
the original 2006 site plan, and again in June 2007 per request of the City Arborist.
Twenty-six (26) additional trees were added to the survey at the request of the City
Arborist on 6/5/07.
3. Observations and Discussion
London Plane Trees
London plane trees (Platanus X acerifolia) in both the north and south sections of the site
survey appear to be specimens of cultivars that are not resistant to either powdery
mildew or sycamore anthracnose.
The plane trees being removed as part of the proposed site plan project are easily
replaceable due to their fast growth. Note also that the specimens being removed are of
quite small trunk diameter when compared to older trees such as the coast redwoods or
evergreen ash (see tree charts for details). Only the 'Columbia' plane tree variety should
be used in future plantings due to this tree's ability to resist infection by both powdery
mildew and anthracnose.
Coast redwoods
The coast redwoods on the east side of the survey area exhibit much less scaffold limb
growth toward the existing parking lot than do those specimens along the north edge of
the site facing highway 280. It is not clear why this is so. Use of a Lincoln soil moisture
meter in the soil surrounding trees along the east side appears to confirm that the
irrigation system is active and providing good soil moisture to the trees.
There is a significant 'gradient of decline' noticeable from redwood #41 to redwood #51
where the trees are arranged in a linear gradient from 75% overall condition rating (good)
to 15% (very poor) respectively across a distance of only 100-feet. The author postulates
that highway 280 air and/or water pollution and/or a heat island effect is causing this
decline.
Interestingly, the remaining redwood specimens along the north side of the site along
highway 280 range in overall condition from good to very poor with no discernable
pattern. Most of the trees along this north side exhibit very good scaffold limb extension
southward over the existing parking lot and into the proposed project area. This southern
exposure receives good sunlight radiation, and will be shaded out due to the presence of
the proposed parking deck. The overall effect this shading will have on redwood tree
vigor is not known. Coast redwoods are somewhat shade tolerant.
5 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
6 AI t.f
~~ ~~!t~f,N~~~ig~~
ASCA Reaistered Consulting Amorist #401
,\\.
~~~
..........,..,.."...,,,,,.-0'
"'"'' ....,. "",..;..~,.."
ISA Certified Arborist #WC-3172
I have proposed removal of all redwood specimens with 'very poor' overall condition
ratings (25% or less). Removal of these trees would create holes in the existing wall of
foliage that screens this north portion of the site from highway 280, creating gaps in the
visual (psychological) barrier against the noise and pollution. Note that the existing width
of the coast redwood row is not great enough to attenuate noise from traffic (various
published Dept. of Transportation sources). Therefore, removal of trees from this row
would probably not significantly increase noise entering the site plan area.
The significant to severe level of pruning required to clear the site plan area along the
southern sides of the redwoods in this row facing highway 280 may negatively affect the
trees' health and structure (trees #47, 49-80).
Note on irrigation: Irrigation to coast redwoods during summer and fall must be continued
in some form, whether it is through use of an irrigation pipe or hose system, water trucks,
or a tow-behind water tank with pump/spray apparatus.
Evergreen Ash
This is a' heavy water user much like coast redwood. The tree is native to Mexico.
Branch breakage strength is rated 'medium weak' on a scale from weak to strong
(Selectree database, CalPoly website). Limbs overhanging the outdoor eating area may
or may not be a concern.
The tree is susceptible to foliar anthracnose similar to that affecting Modesto ash in the
Bay Area (personal observations), though the specimens at this site appear to be in good
health as of the date of writing. I did note that the ash specimens had been improperly
pruned such that all inner and lower live wood and foliage was stripped out from the main
stems and large scaffolds, effectively "lion tailing" them. This creates a photosynthesis
and weight imbalance which is difficult or impossible to correct, permanently disfiguring
the trees and lowering their overall condition ratings significantly.
Evergreen ash is considered a high root damage species which causes infrastructure
cracking and heaving (various sources and personal observation). Therefore, precautions
must be taken when building the proposed retaining wall adjacent to these trees. These
trees already have significant woody root damage due to repeated mowing of the turf
grass adjacent to the trunks which may preclude their retention in the landscape. The
extent of root tissue decay is not quantified at this time, though follow-up analysis via use
of a Resistograph device could confirm locations and extent of decay or incipient decay in
the root systems.
6 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5=-tf 5
~jb Walter Levison'
r CONSULTING ARBORIST
A\.
61~
...-."..........-..,.....
"~'..; ,'_A.'. ""BM ""'~Y.
ASCA Registered Consulting Arborist #401
ISA Certified Arborist #WC-3172
Additional tree assessment per City Arborist's item #5 dated
5/24/07:
· Item #5a: Impacts to the eight ash trees (newly tagged trees #116 through #123)
appear to be less than significant to slightly significant, assuming we can modify
grading to achieve at least 8-10 linear feet of separation between tree trunks
and the grading limits at the west edge of the proposed retail structure. This limit
would be at or just east of the edge of existing lawn which extends eastward from
the tree trunks.
· Item #5b: One London plane tree specimen (newly tagged tree #115) will be
removed due to conflicts with the retail development.
· Item #5c: There are no impacts to the seven newly tagged ash trees #108
through #114 expected, unless existing pathways and/or lawn are removed and
replaced in this area.
· Item #5d: There are no impacts to the seven newly tagged redwoods #101
through #107 expected, unless new utilities are trenched into the subgrade in this
area.
· Item #5e: Three newly tagged trees #98 through #100 will need to be removed
due to parking lot reconfiguration at this location. Trees #98 and #99 are smaller
specimens of coast redwood in good overall condition. Tree #100 is a smaller
specimen of London plane tree in fair overall condition (see attached tree data
charts).
4. Recommendations
A. Proiect Arborist: An ASCA registered consulting arborist or (SA certified arborist shall be
retained by the property owner to consult on an as-needed basis. This person shall be
known as the "project arborist"or "PA". The PA shall be responsible for initial signoff of
any tree protection, and may monitor tree maintenance and irrigation as applicable.
Construction supervisors may call on the PA to advise on matters such as root pruning,
supplemental irrigation systems, construction conflicts, etc.
B. Prunina: In as much as possible, all pruning of existing coast redwood specimens shall
be conducted in accordance with the ANSI A300 standard for tree care operations -
Tree, Shrub, and Other Woody Plant Maintenance - Standard Practices (Pruning) 2001
edition.
All pruning shall be performed by, or under direct supervision from an ISA-Certified
Arborist. Where forks to lateral branches exist, scaffold limbs shall be pruned back to
laterals as per ANSI "reduction. ..to decrease....spread" item 5.6.4 on page 6 of the ANSI
pruning standards. **
7 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5~V'
~J}J 1Y~lt~f,NH;:lg~~
ASCA ReQistered ConsultinQ Arborist #401
'\X.
~~.~
"'.... ,,~_. ..,' ,:.,." .. .. . .
....-:<,.......,....."...,...,
ISA Certified Arborist #WC-3172
See vendor list below in this report for Bay Area tree care companies.
If possible, "narrow 4-foot wide" scaffolding shall be utilized for the parking deck
construction work instead of standard 6-foot wide scaffolding such that pruning of the
southern sides of trees #49-#80 is minimized.
**Contact the project arborist andlor city arborist if any trees will require shearing pruning
all the way back to the branch attachment collars.
C. Tree Protection: Chain link panels shall be affixed together with wires and mounted on
moveable concrete block footings to form a wall of protection along the south sides of
trees #49 through #80 and #101-#107 prior to machinery arrival on site. Signage shall
be affixed to this chain link fencing, one sign every 20-linear feet, stating "Tree Protection
Fence: Do Not Move or Remove Without Written Approval From Project Arborist".
D. Tree Removals: Fifty-three (53) specimens will be removed due to site plan conflicts
(trees #1-29, 48, 81-84, 85-87, 88-100, 115, and trees A and B) as per the January
2007 site plan revision (see two tree location map scans in this report).
The author recommends that trees #50, 51, 52, 55, 60, 71, 80, 103, and 105 also be
removed due to very poor overall condition ratings.
Note that tree #91 is recommended to be removed due to high risk of failure (preliminary
determination based on visual assessment only)
In his letter dated 5/24/07, the City Arborist has suggested that trees #60 and #105 be
removed, but that we might attempt to provide improved growing conditions to the other
redwoods in very poor overall condition. Ultimately, city staff and commissioners have the
final word on whether specimens in very poor condition can be removed or not.
E. Irriaation: Maintain all existing irrigation systems at current or better output levels around
all ash, redwood, and London plane trees being retained throughout the proposed site
plan project period.
If the existing irrigation system(s) islare severed or turned off for any reason during the
site plan development period, then supplemental irrigation shall be applied at a frequency
and volume to be determined by the project arborist (PA). Typical irrigation for heavy
water users such as ash or coast redwood is approximately 1 X weekly throughout the
year, at a volume approximating 5-gallons per inch of trunk diameter per tree (depending
on trunk diameter, species, weather, and other factors). Because the redwoods are in
very close proximity to one another, the aCtual rate will probably need to be determined
by the PA. Note that this is an appropriate irrigation volume for the ash specimens as
well.
Supplemental irrigation can be provided using a water truck or tow behind tank/sprayer
rig.
8 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
541
~jb Walter Levison
r CONSULTING ARBORIST
ASCA Registered Consulting Arborist #401
,~
~~~
~_. ..-..... .....'.....' -..
.....,,., ;'~'. ...............-'.
ISA Certified Arborist #WC-3172
F. Fertilization: It mayor may not be beneficial to provide this fertilization to coast redwood
specimens along the northeast and north boundaries of the site (adjacent to the proposed
parking deck). For the purposes of this report, the author assumed that no subgrade
activity would be required for installation of this parking structure other than drilling of the
pier holes in the existing asphalt parking lot where minimal root disturbance is expected
to occur. Excessive pruning of the redwood specimens mayor may not warrant
fertilization of these trees (to be determined by PA).
Fertilization should be performed via soil injection prior to commencement of the site plan
project. Preferred material is Doggett 32-7-7 Injectofeed slow release tree fertilizer, or
Greenbelt 22-14-14. Application shall be at standard arboricultural rates as per ASNI
A300 fertilization standard and as per the ISA Best Management Practices - Tree and
Shrub Fertilization companion publication to the ANSI A300 fertilization standard.
See vendor list below for Bay Area tree care companies.
G. Other Tree Maintenance & Protection:
Cabling and Bracing:
Tree bracing and/or cabling is recommended to be installed in ash tree #84 if this tree is
retained (tree #84 is currently proposed to be removed as per 2007 revision of the site
plan). This work shall be performed by a qualified tree care company in accordance with
the ANSI A300 standard for tree care operations - Support systems a. cabling, bracing,
and guying (part 3, 2000). See vendor list below for Bay Area tree care companies.
Trunk Buffers:
Trunk buffers may be required to be installed around the trunks of ash tree specimens
being retained adjacent to the proposed retaining wall work at the southwest corner of the
site (ash trees #116 through #123).
9 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
6416
~)~ 1\'~!t~r,N~~~j~~~
ASCA Reqistered Consultinq Arborist #401
j~
~~~
...-"..............,-.>.,....
-: ,......,." ,......'. ... ;,...,......~"
ISA Certified Arborist #WC-3172
H. Site Plan Details:
i. Root Barriers (if applicable): Install an herbicide impregnated root barrier
such as 'Biobarrier' along the proposed retaining wall edge to prevent
intrusion by root growth from the root systems of adjacent trees (ash,
etc.) with known high root damage characteristics.
ii. Scaffolding: If possible, utilize narrow 4-foot wide scaffolding between
the proposed parking deck and the northern boundary redwood
specimens #49 through #80 as noted in the pruning recommendation
item above.
iii. Grading: Grading limits at the west end of the proposed retail
development should be altered if possible to allow for a separation of at
least 8-10 linear feet between (the trunk edges of ash tree specimens
#116 through #123) and grading limits. This will minimize impacts to the
trees.
1 0 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
6 ;-i./ q
~lb Walter Levison
r CONSULTING ARBORIST
A~
.t;l~"
ASCA ReQistered ConsultinQ Arborist #401
ISA Certified Arborist #WC-3172
o II ~ '"
~ :;0
i ... m :,. CXI
g );! Ol
;:; ,. (,.,
I r= (.J
Q I
"@ ..
vcr.
L___ ...
...
--<2.. ___ ;,.
! -:
...
Z
:>
AJ ....
-I
I
-I
)>
Z.
--f
)>
-
..-..
-3
3
'-V ~ "-
, 0
~~
~N
OJ 0 I
CDO
)>(/)
00
:::::0'
fTl'l
(/)--r
::'EO
)>0
~z
'0
A.
/
/'
./
I' "
! I
""
:'}
-""\. @ -1/,/
8' SIDEWAl,K EASMd]r j{ .
PER 589 f..kJ AND 47' 10
'-',. /
'.... //
\:4'
@
PUBLIC SERVICE E..<\SEMi:N r /
;:>E.R 589 M 3 I\:'JO 4-
12 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5'51
~)~ W~!~~f,N~~~i~~~
ASCA ReQistered Consulting Arborist #401
I~
~~.~
"'........'........H"..'..
.,...,-,..,.............<...."
ISA Certified Arborist #WC-3172
6. Photographs
London plane tree specimens in the
northwest portion of the site that are to be
removed due to conflicts with the
proposed parking structure.
Coast redwood row of trees #30-#46
along the northeast portion of the site.
Minimal pruning may be required to be
performed on these trees to clear the
proposed parking structure footprint.
13 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5":5~
.)p ~~!~ri,J:~~i~~R
ASCA Registered Consulting Arborist #401
Side view (looking west) of the coast
redwoods in the row of trees #47 - #80,
showing scaffold limbs extending
southward over the existing parking lot
that will need to be sheared or drop
crotch pruned back to forking laterals to
clear the proposed parking structure.
'\~
L4.~.
.!5::~.;:\~:.
(SA Certified Arborist #WC-3172
(Left of Sidewalk): Eastward view of
the five evergreen ash specimens #88
-'#92 along Stevens Creek Boulevard.
. 14 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5"'53
~)p ~~!~~~N~~~i~~~
ASCA Registered ConsultinQ Arborist #401
A\
~~~
A._. ....'.N ';,-... ...\. ,'-'
..".",.....................,.
I SA Certified Arborist #WC-3172
Northward view of the southwest corner
of the property where a proposed retail
structure and outdoor seating area will be
located.
An example of the trunk buffer and chain
link fence Best Management Practice.
The tree is wrapped with 10 layers of
orange plastic (2-inches thick), then
overlain with 2"X4"X8' boards, then either.
wrapped again or simply affixed with duct
tape on the outside.
1 5 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5' ,,6 tf
~J~ ~~!~~;, N !-~;,ig~m
ASCA Registered Consulting Arborist #401
J\\.
.^!:l.~~,
ISA Certified Arborist #WC-3172
7. Consultant's Qualifications
o ASCA Registered Consulting Arborist #401
o Millbrae Community Preservation Commission (Tree Board)
2001-2006
o ASCA Arboriculture Consulting Academy graduate, class of 2000
o ISA Certified Arborist #WC-3172
o B.A. Environmental Studies/Soil and Water Resources
UC Santa Cruz, Santa Cruz, California 1990
o Peace Corps Soil and Water Conservation Extension Agent
Chiangmai Province, Thailand 1991-1993
o Associate Consulting Arborist
Barrie D. Coate and Associates
4/99-8/99
o Contract City Arborist to the City of Belmont
5/99-present
Continued education through attendance of arboriculture lectures and forums sponsored by The
American Society of Consulting Arborists, The International Society of Arboriculture (Westem
Chapter), and various governmental and non-governmental entities.
(My full curriculum vitae is available upon request)
16 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
6 .,55
~)p ~~!~~,r,N~~~i~~Pr
ASCA Reqistered Consultinq Arborist #401
,\\.
~l\.
""",,"''''''''''',.
"'..., . '.'. .....-. .""",~
ISA Certified Arborist #WC-3172
8. Bay Area Vendors
Tree Moving Services:
Joe Ornaz Trees of California P.O. Box 13189 (408) 264-3663
-trees moved bv hand onlv Covote, CA 95013
Mr. John Service @ Valley Crest 8501 Calaveras Road (925) 862-2485
Sunol, CA 94586
Tree Movers of Mountain View
-can transplant, acquire, ship, and install trees (650) 968-6117
-trees moved bv mechanical soade onlv. -trees must normallv be <12"DBH
Sources of Replacement Trees:
Hecker Pass Specimen Trees Hecker Pass Road (408) 842-2121
Mr. Bill Miller Gilrov, CA 95020
Pacific Nurseries-wholesale only 2099 Hillside Blvd. (650) 755-2330
Colma:, CA 94014
Valley Crest Tree Company 8501 Calaveras Road (925) 862-2485
Sunol, CA 94586
East Bay Nursery 2332 San Pablo Ave. (510) 845-6490
Berkelev, CA 94702
Boething Treeland Farms (Wholesale to the Trade 2923 Alpine Road
Only. Huge selection of common and hard to find tree (650) 851-4770
soecies1 Portola Valley, CA 94028
Tree Movers of Mtn View (650) 968-6117
Peninsula Air Spade Contractors Who Perform Tree-Friendly Air Excavation
Michael Younq, Urban Tree Manaqement {6501321-0202
Bill Patchett, Treescaoes (Burlinaame) l650\ 574-5354
Matthew Kidd (6501 298-8937
(888) 969-8733 or
Arborwell Neil Woolner cell (925) 260-
6655
Ian Geddes Tree Care (see below)
Advanced Tree Care {see below1
Tree Maintenance
Advanced Tree Care- Rob Weatherill 1650\566-9539 or 839-9539
Arborwell Also contact Neil Woolner Main Office 1 (888) 969-
cell {9251 260-6655 8733
Area Custom-- Ron Walker (6501 969-7076
Bill Plateman 650.595.5135
Bob Yamane-- Noonan's Tree Care Redwood Citv 650.367.8818
BiotaTech-Brendan Nelson Cell 14081639-2189
Chris Hall-- West Coast Tree Care South Bay 408.379.1442
Dan Hoskins 650.322.4400
DouQ Anderson South Bav 408.378.2261
GiI Mitchell South Bay (4081 929-3040
Henry Ardalan "City Arborist" Woodside Mobile (650) 222-1771
Ian Geddes Tree Care Saratoaa (408) 374-8233
James Scott Los Gatos 14081 370-2089
Kevin Raftery Palo Alto (650) 428-8733
Lane Kiloatrick 650.941.0240
17 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5"'Sb
~)~
Walter Levison
CONSULTING ARBORIST
,\'\
~~ }...
..._........''"~;, -", .
,.-,-" ..-.. "'..~. '''- ".
ASCA Registered Consulting Arborist #401
ISA Certified Arborist #WC-3172
Mark O'brien - no brush haulina Menlo Park (650 327-0450
Mayne Tree Expert Co. - Richard Huntington & Kevin San Carlos 650.593.4400
Kielty
McCarthy Tree Specialties Menlo Park 650 367-7552
Michael Youna- Urban Tree Manaaement Santa Clara 650 321-0202
Nature First - Jeremy Nama & Mimi Scoppettone South Bay 831 562-8233
Randy Harris-Artistry in Trees Mill Valley (Marin County) 415 388-2931
John Stepp Mountain View 650 940-1452
The Care of TreesfTreescapes East Bay 510.638.0781
Torrey Young & David Nelson
(The above sources have been known to provide high-quality arboriculture services in the past. They are not guaranteed or
endorsed by the author.)
9. Assumptions and Limiting Conditions
Any legal description provided to the consultant/appraiser is assumed to be correct. Any titles and ownership to any
property are assumed to be good and marketable. No responsibility is assumed for matters legal in character. Any and all
property is appraised and evaluated as through free and clean, under responsible ownership and competent
management.
It is assumed that any property is not in violation of any applicable codes, ordinance, statutes, or other government
regulations.
Care has been taken to obtain all information from reliable sources. All data has been verified insofar as possible;
however, the consultant/appraiser can neither guarantee nor be responsible for the accuracy of information provided by
others.
The consultant/appraiser shall not be required to give testimony or to attend court by reason of this report unless
subsequent contractual arrangements are made, including payment of an additional fee for such services as described in
the fee schedule and contract of engagement.
Unless required by law otherwise, the possession of this report or a copy thereof does not imply right of publication or use
for any other purpose by any other than the person to whom it is addressed, without the prior expressed written or verbal
consent of the consultant/appraiser.
Unless required by law otherwise, neither all nor any part of the contents of this report, nor copy thereof, shall be
conveyed by anyone, including the client, to the public through advertising, public relations, news, sales, or other media,
without the prior expressed conclusions, identity of the consultant/appraiser, or any reference to any professional society
or institute or to any initiated designation conferred upon the consultant/appraiser as stated in his qualifications.
This report and any values expressed herein represent the opinion of the consultant/appraiser, and the
consultant's/appraiser's fee is in no way contingent upon the reporting of a specified value, a stipulated result, the
occurrence of a subsequent event, nor upon any finding to be reported.
Sketches, drawings, and photographs in this report, being intended for visual aids, are not necessarily to scale and should
not be construed as engineering or architectural reports or surveys unless expressed otherwise. The reproduction of any
information generated by engineers, architects, or other consultants on any sketches, drawings, or photographs is for the
express purpose of coordination and ease of reference only. Inclusion of said information on any drawings or other
documents does not constitute a representation by Walter Levison to the sufficiency or accuracy of said information.
Unless expressed otherwise:
a. information contained in this report covers only those items that were examined and reflects the conditions of
those items at the time of inspection; and
b. the inspection is limited to visual examination of accessible items without dissection, excavation, probing, or
coring. There is no warranty or guarantee, expressed or implied, that problems or deficiencies of the plants or
property in question may not arise in the future.
18 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
5 .-57
~)~
Walter Levison
CONSULTING ARBORIST
1\\
~{~
...-...".",..'.-...;....,..
,,,...,,,,.....,,....."'......,,
ASCA Registered Consulting Arborist #401
(SA Certified Arborist #WC-3172
Loss or alteration of any part of this report invalidates the entire report.
Arborist Disclosure Statement:
Arborists are tree specialists who use their education, knowledge, training, and experience to examine trees, recommend
measures to enhance the beauty and health of trees, and attempt to reduce the risk of living near trees. Clients may
choose to accept or disregard the recommendations of the arborist, or to seek additional advice.
Arborists cannot detect every condition that could possibly lead to the structural failure of a tree. Tree are living organisms
that fail in ways we do not fully understand. Conditions are often hidden within trees and below ground. Arborist cannot
guarantee that a tree will be healthy or safe under all circumstances, or for a specified period of time. Likewise, remedial
treatments, like any medicine, cannot be guaranteed. .
Treatment, pruning, and removal of trees may involve considerations beyond the scope of the arborist's services such as
property boundaries, property ownership, site lines, disputes between neighbors, and other issues. Arborists cannot take
such considerations into account unless complete and accurate information is disclosed to the arborist. An arborist should
then be expected to reasonably rely upon the completeness and accuracy of the information provided.
Trees can be managed, but they cannot be controlled. To live near trees is to accept some degree of risk. The only way to
eliminate all risk associated with trees is to eliminate the trees.
10. Certification
I hereby certify that all the statements of fact in this report are true, complete, and correct to the best of my knowledge and
belief, and are made in good faith.
Signature of Consultant
6/5/07
Attached: Tree Data Charts
19 of 19
Site Address: 10100-10200 N Tantau, Cupertino
Walter Levison @ All Rights Reserved
Version: 6/5/07
Registered Member, American Society of Consulting Arborists and Member of the International Society of Arboriculture
Phone/Fax (650) 697-0990
~"'5~.
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"2 "2 u; -= "C :;:-
...~ ...
>c~ > "C c_~ l!! oll!",li! c ~
~-[~ o ... c """Gloot = 0 m~
,.., E 0 GI ~cP~. Co .c::lOlCU
GI Q) = E 511 @c:! E c: e V) ~ 1i~~~ f!E.5O Notes
l!! !a..= ... ::> E ~caUJ< 13....!!~ ...e. GI"C1ijo
I- .!!8 .,!.!!!.o 1-._ Q) oz~ .c ~U)a:~ 05O::~
0 O.c OJ o -
0 0 l!! 0 'ijj e.
l- I- .5 ::J:
London Plane
1 X 7.8 Tree 35/20 60/50 55% Cultivars of the plane tree species at this site are
(Platanus X Fair susceptible to powdery mildew and anthracnose.
acerifolia)
London Plane
2 X 7.8 Tree 35/20 60/50 55%
(Platanus X Fair
acerifolia)
London Plane
3 X 6.2 Tree 25/15 55/45 49%
(Platanus X Poor
acerifolia)
London Plane 20%
Tree
4 X 5.1 (Platanus X 20/10 30/20 Very Mainstem broken or topped.
acerifolia) Poor
London Plane
5 X 5.3 Tree 25/15 55/50 52%
(Platanus X Fair
acerifolia)
London Plane
6 X 6.5 Tree 35/20 60/55 56%
(Platanus X Fair
acerifolia)
London Plane
7 X 6.3 Tree 30/15 55/45 49% Canopy lopsided west (phototropic). Shaded from
(Platanus X Poor redwood #8.
acerifolia)
London Plane
8 X 7.2 Tree 30/20 60/60 60%
(Platanus X Fair
acerifolia)
Coast Redwood 80% Limbed up to 6-ft above grade (AG). Good twig density
9 X 11.8 (Sequoia 45/15 80/80
sempervirens) Good and extension.
~
,
~
Page 1 of 15
Site: 10100 -10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"'5l 'C 'jj) it: 'C :e-
.. ....~ ...
> c~ > 'C c_~ l!! olll!!",lIl c ~
~.!!!tl o .... C .>0:...... ~~.~~
"" EO" c ti @ci ~.."",.. CL ~=CDQ)
.. .. CL._ .. ~ E E c e f/) -:- ~'t).Eae Notes
.. ~~Sl< :;:.5- cu"C.....o
......l;: .... :::> E ~~.~~ :lJ2'liic o:S~':"
t= j!~8 .c
j!.!!!.o c.c (.) f/) m ~v.iO::~ (.) e.
0 o ~ u Q) e.
..... ..... .E ~
Coast Redwood 75%
10 X 11.5 (Sequoia 45/15 75/75 Good Same as #9
sempervirens)
Coast Redwood 80%
11 X 13.8 (Sequoia 50/15 80/80 Good Same as #9
sempervirens)
Coast Redwood 75%
12 X 12.2 (Sequoia 45/15 75/75 Good Same as #9
sempervirens)
London Plane
13 X 5.2 Tree 25/8 30/30 30% Topped/broken apical meristem. Canopy lopsided west.
(Platanus X Poor
acerifo/ia)
London Plane 25%
14 X 6.1 Tree 30/10 25/25 Very Canopy lopsided west. Deformed scaffold~ and apical
(Platanus X meristem.
acerifo/iaJ Poor
London Plane
15 X 6.7 Tree 35/15 60/50 55%
(Platanus X Fair
acerifo/iaJ
London Plane
16 X 5.5 Tree 35/10 45/45 45% Canopy lopsided south.
(Platanus X Poor
acerifo/iaJ
London Plane
17 X 8.5 Tree 40/20 60/55 59% Canopy lopsided south.
(Platanus X Fair
acerifo/iaJ
London Plane
18 X. 7.1 Tree 30/20 60/50 50% Canopy lopsided southwest.
(Platanus X Fair
acerifo/iaJ
tJ\
~
~
Page 2 of15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"'C "'C UJ = "'C :;:-
... G> ~.;, '"
,.. c~ ,.. "'C 5-;~ Q) l!! ~1!cn~ c ~
~-[~ o ~ c .:.::G>~ E~.~~
"*' E 0 G> 5 ~ @)~ 0. ..c- ::I CD CI)
G> ... -fi E EEc:E: U) - ~ t).5"if!. Notes
l!! !epl;:: ...:5- cu",o.....o
.8!8 ~ ::s E .=.!!! g: "" g '" .~~ :!:s~g og~":"
I- .8.!!.o .c
u Q.c UZCI) g) CI) '";" u e.
0 0 l!! u 'Qj e.
l- I- .5 :I:
London Plane
19 X 6.3 Tree 30/15 45/45 45% Canopy lopsided southwest.
(Platanus X Poor
acerifoliaJ
London Plane
20 X 7.5 Tree 35/20 50/50 50%
(Platanus X Fair
acerifoliaJ
London Plane
21 X 7.3 Tree 35/20 50/55 55%
(Platanus X Fair
acerifoliaJ
London Plane
22 X 8.0 Tree 35/20 60/55 57%
(Platanus X Fair
acerifoliaJ
London Plane
23 X 7.0 Tree 35/20 49/50 50%
(Platanus X Fair
acerifolia)
London Plane
24 X 9.1 Tree 35/30 55/55 55%
(Platanus X Fair
acerifolia)
London Plane
25 X 9.8 Tree 35/30 50/50 50%
(Platanus X Fair
acerifolia)
London Plane
26 X 8.1 Tree 35/30 55/60 57%
(Platanus X Fair
acerifolia)
London Plane
27 X 9.0 Tree 35/30 55/60 57%
(Platanus X Fair
acerifoliaJ
~
\
G"
-
Page 3 of 15
Site: 1 01 00 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
al "C in lI;= "C :2
Gl tlI
> c~ > "C ~"'! c_~ l!! oest!cng c ~
~ .!! .u o ~ C .;x::S"II:t' .. ~ ~ g'~
'* E 0 Gl ~Gl:;:,Gl Q. ;;:::JC>G>
Gl Gl Q..- Gl;;E 5 ~ @C! E t:: E C/) -:- _ 1:).5 ';/!. Notes
Gl :;.= CP"'C;O
~GlC;::: ~ :::J E ....lQcn< g ...!1:! ~ :B21Uc::> 55&!6
.= .2:18 .z:-
.2:So t-._ Gl uz~ C> :cu;rx~
O.z: U -
u u Gi
0 0 l!! e.
t- t- .5 :I:
Coast Redwood 70%
28 X 12.3 (Sequoia 50/15 70/70 Good Moderate live twig density/extension. .
sempervirens)
Coast Redwood 70%
29 X 12.3 (Sequoia 50/15 70/70 Good Same as #28
sempervirens)
Coast Redwood 75% Canopy conflicts with proposed garage structure footprint.
30 13.5 (Sequoia 55/15 75/75 Good Gold flux at branch collar indicates possible
sempervirens) Botryosphaeria fungus infection.
Coast Redwood 80% Canopy conflicts with proposed garage structure footprint.
31 13.3 (Sequoia 55/15 80/75 Good Possible Botryosphaeria infection (gold flux at branch
sempervirens) collars).
Coast Redwood 80%
32 15.3 (Sequoia 60/15 80/80 Good Canopy conflicts with proposed garage structure footprint
sempervirens)
Coast Redwood 80% Canopy conflicts with proposed garage structure footprint.
33 16.0 (Sequoia 60/15 75/80 Good Possible Botryosphaeria infection (gold flux at branch
sempervirens) collars).
Coast Redwood 80% Canopy conflicts with proposed garage structure footprint.
34 12.7 (Sequoia 5015 80/80 Good Possible Botryosphaeria infection (gold flux at branch
sempervirens) collars).
Coast Redwood 80%
35 16.0 (Sequoia 60/15 80/80 Good Canopy conflicts with proposed garage structure footprint
sempervirens)
Coast Redwood 80%
36 13.6 (Sequoia . 60/15 80/80 Good Canopy conflicts with proposed garage structure footprint
sempervirens)
Coast Redwood 80%
37 13.9 (Sequoia 55/15 80/80 Good Canopy conflicts with proposed garage structure footprint
sempervirens)
Coast Redwood 75% Canopy conflicts with proposed garage structure footprint.
38 13.7 (Sequoia 55/15 75/75 Good Possible Botryosphaeria infection (gold flux at branch
sempervirens) collars). Note that apical meristem is deflected off vertical.
~
0.....
~
Page 4 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
al al en ~ "'tl :c-
...
> c ~ > "'tl ..."'! 5-;~CD l!! oiSe(l)~ c ~
~-[~ o ... C .>o:G>...,. l! ~ g'~
"*' E 0 G> 5 ~ @c! Q. .c::>C1G>
G> G>;;E EE~e II) - ~ 1:>'5 c.t Notes
G> !cuC;::: ...!!.. ~-g1i~
t= ~!8 ... ::> E ~cacn< a ....~~ :l!2'l;io
~~o 1-._ G> .c 08D:e.
O.c UZII) CI :I:D)O::~
0 r=. ~ 0 'Qj e.
I- .5 :I:
Canopy conflicts with proposed garage structure footprint.
Coast Redwood Limited scaffold limb extension (due to drought? Pollution
39 13.6 (Sequoia 55/15 75/75 75% from highway 280?). There seems to be a gradient of
Good increasing tree decline as one moves closer to highway
sempervirens) 101, indicating that air pollution may be having a
significant negative effect on the health of the redwoods.
Coast Redwood 70%
40 13.7 (Sequoia 55/15 70/70 Good Same as #39, plus some foliar dieback.
sempervirens)
Coast Redwood 75% Foliar dieback. Trees north of here are lower and lower in
41 14.2 (Sequoia 55/15 75/75 Good terms of their overall condition ratings, apparently due. to
sempervirens) air pollution.
Coast Redwood 70% Foliar dieback. Canopy conflicts with proposed garage
42 14.2 (Sequoia 55/15 70/70
sempervirens) Good structure footprint
Coast Redwood 70% Foliar die back. Canopy conflicts with proposed garage
43 13.9 (Sequoia 55/15 70/70
sempervirens) Good structure footprint
Coast Redwood 69% Foliar dieback. Canopy conflicts with proposed garage
44 13.9 (Sequoia 55/15 69/69
sempervirens) Fair structure footprint
Coast Redwood 69% Canopy conflicts with proposed garage structure footprint.
45 13.9 (Sequoia 55/15 69/69 Fair Possible Botryosphaeria infection (gold flux at branch
sempervirens) collars). Foliar dieback.
Coast Redwood Gold flux indicates possible Botryosphaeria infection.
46 11.1 (Sequoia 45/15 60/60 60% Canopy conflicts with proposed parking structure. Tree is
Fair growing in shade of surrounding larger specimens
sempervirens) (stunted growth).
Coast Redwood 50% Poor twig density and extension. Canopy extends well
47 32.0 (Sequoia 70/35 50/50 Fair over existing parking lot, and conflicts with proposed
sempervirens) parking structure.
London Plane
48 X 7.7 Tree 45/30 60/55 58% Canopy conflicts with proposed garage structure footprint
(Platanus X Fair
acerifio/ia)
~
~
~
Page 5 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
~
~
.~
'*"
..
..
~
'"0
..
~ c:-
~-aii
.....-=
..;t:: '"
.QUI 0
0-1.)
I-
"5l UI
> '"0
o ... '"
EO"
.. .;:; E
... ::> E
~..!!.o
~ ~
=
...ob
..v:.!!';'
2 ~ @ci
I-.!l! III <
0.<:
I.)
.E
20.0
x
5.9
'" ...
o-;~ CD
EEC:S
g ~ .~~
C,,) CI)
'"0
to ~
.. .<:
l5.. .., l!! UI :;:1_.'" ~
CI) -:- .;:;::> 01" <ii ~ OI~
~E ftit5~c.t ~:o~g
.J:: ep2cao >cCG-
.~ ::I:Q)~~ 08Q:e,
::I: e.
Notes
Coast Redwood
(Sequoia I 60/15 I 60/60
sempervirens)
Coast Redwood
(Sequoia I 15/7 I 15/15
sempervirens)
Coast Redwood
(Sequoia I 55/20 I 15/15
sempervirens)
Coast Redwood
(Sequoia I 50/12 I 25/25
sempervirens)
Coast Redwood
(Sequoia I 40/10 I 50/50
sempervirens)
Coast Redwood
(Sequoia I 70/20 I 45/40
sempervirens)
Coast Redwood
(Sequoia I 70/15 I 15/15
sempervirens)
Coast Redwood
(Sequoia I 70/20 I 30/30
sempervirens)
Coast Redwood
(Sequoia I 60/10 I 60/60
sempervirens)
Coast Redwood
(Sequoia I 75/35 I 80/80
sempervirens)
Coast Redwood
(Sequoia I 75/20 I 40/30
sempervirens)
Page 6 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
49
50
51
52
53
54
55
56
57
58
59
x
20.5
x
17.9
11.7
22.5
x
19.0
21.4.
10.2
est. 24"
19.4
60%
Fair
15%
Very
Poor
15%
Very
Poor
25%
Very
Poor
50%
Fair
43%
Poor
15%
Very
Poor
30%
Poor
60%
Fair
80%
Good
35%
Poor
Canopy conflicts with proposed garage structure footprint.
Moderate twig density and extension.
VP twig density/extension. Canopy conflicts with
proposed garage structure footprint
VP twig density/extension. Canopy conflicts with
proposed garage structure footprint
Moderate twig density and extension. Canopy conflicts
with proposed garage structure footprint
Poor twig density and extension. Canopy conflicts with
proposed garage structure footprint
VP twig density and extension. Canopy conflicts with
proposed garage structure footprint
Poor twig density and extension. Canopy conflicts with
proposed garage structure footprint
Moderate twig density and extension. Canopy conflicts
with proposed garage structure footprint
Good twig density and extension. Canopy conflicts with
proposed garage structure footprint
S-trunk form. Poor twig density and extension. Canopy
conflicts with proposed garage structure footprint
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"C .
CD -g III ~ "C :c
> c- > "C ...It'! m
'It: g..!!! tl o ... c """CD.. c_ ~ ~ecn~ c _
CD E 0 CD 5~@~ gCD~CD a. .e=m4U ~~.~~
! ~e adS e e c e rn -
2! ;:.~ ...1:)1:0
I- .2l!S ... ::> e .=.!!/ 1-< ~ ....!!! ~ 1i ;l1l" ~"C 'tQ ~ Notes
.2l.!2.o .c 2...0 050::0
o ~ C.c oz~ en :J:li.i0::~
0 0 'CD o ~
l- I- ... .E :J: S!-
Coast Redwood 5%
60 X 14.3 (Sequoia 65/5 5/5 Very Very poor twig density and extension.
sempervirens) Poor
Coast Redwood 57%
61 20.0 (Sequoia 75/25 55/60 Moderate twig density and extension. Canopy conflicts
sempervirens) Fair with proposed garage structure footprint
Coast Redwood 50%
62 10.9 (Sequoia 60/10 50/50 Tree is stunted in shade of surrounding specimens.
sempervirens) Fair Moderate twig density and extension.
Coast Redwood 75%
63 28.5 (Sequoia 75/35 75/75 Good twig density and extension. Canopy conflicts with
sempervirens) Good proposed garage structure footprint
Coast Redwood 75%
64 est. 22 (Sequoia 75/35 75/75 Good twig density and extension. Canopy conflicts with
sempervirens) Good proposed garage structure footprint
Coast Redwood 70%
65 21.9 (Sequoia 70/30 70/70 Good twig density and extension. Canopy conflicts with
sempervirens) Good proposed garage structure footprint
Coast Redwood 65% Moderate to good twig extension and density. Canopy
66 22.0 (Sequoia 70/35 70/65 conflicts with proposed garage structure footprint.
sempervirens) Fair Assume apical meristem has broken off.
Coast Redwood 60%
67 12.2 (Sequoia 65/20 60/60 Moderate twig density and extension. Canopy conflicts
sempervirens) Fair with proposed garage structure footprint
Coast Redwood 55% Apical meristem deflected. Moderate twig density and
68 20.7 (Sequoia 70/20 60/50 extension. Canopy conflicts with proposed garage
sempervirens) Fair structure fOQtprint
Coast Redwood 40%
69 7.8 (Sequoia 35/10 40/40 Stunted in shade of tree #70. Moderate twig density and
sempervirens) Poor extension.
Coast Redwood 60%
70 34.5 . (Sequoia 80/35 60/60 Moderate to good twig density and extension. Canopy
sempervirens) Fair conflicts with proposed garage structure footprint
\J\
~
0\
Page 7 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
-g ~U) ~ -g:c
>c- > "'C...u1 C Co) CD oi:SiID U C _
_ o.!! -n 0 0 i -'I::.!!.qo ~ 0 -; ~ Q) is. ~ & = ~.2 afit.
~ ~ ~ii: ~ ~ ~ 2 ~ ~~ ~ ~.i ~ ~ ~ ~ ~,g ~ ~ ~ i ~ Notes
I- GI'1;ilS GI.!!.o I-.!!!GI ozu~ i3, ~...~ooo~o
.o_u .0 ~ o"fi (,) U) ._ ~(f) "';'" (,) -
~ :=......E :! S!.-
Coast Redwood 20% Poor twig density and extension with epicormic shoots
71 X 27,0 (Sequoia 75/30 20/20 Very arising. Canopy conflicts with proposed garage structure
sempervirens) Poor footprint
Coast Redwood 3001 P tw' d 't d t 'C fl' t 'th
72 16.3 (Se uoia 75/20 30/30 10 oor Ig ensl y an ex enslon" anopy con IC s WI
q, ) Poor proposed garage structure footprint
sempervlrens
Coast Redwood 7001 Mdt t d tw' d 't d t ' C
73 16.7 (Se uoia 70/25 70/70 10 0 ~ra e .0 goo Ig ensl y an ex enSlon, , anopy
q, ) Good conflicts With proposed garage structure footprint
sempervlrens
Coast Redwood 7001 Mdt t d tw' d 't d t ' C
74 19.7 (Se uoia 75/25 70/70 10 0 ~ra e ,0 goo Ig ensl y an ex enSlon, , anopy
q, ) Good conflicts With proposed garage structure footprint
sempervlrens
Coast Redwood 4001 P t d t t 'd 't d t ' C
75 9.7 (Se uoia 65/10 40/40 10 oor, 0 m~ era e wig ensl y an ex enslon. , anopy
q, ) Poor conflicts With proposed garage structure footprint
sempervlrens
Coast Redwood 68% Moderate to good twig density and extension, Moderate
76 17.6 (Sequoia 80/20 70/60 F ,0 scaffold limb extension, Canopy conflicts with proposed
sempervirens) air garage structure footprint
Canopy conflicts with proposed garage structure footprint.
C t R d d Extends southward farther than any other redwood
77 28.5 oa(~e ~o:oo 85/35 80/80 80% sp~c!men in this row (~bout 12-linear feet over th,e
q, ) Good eXisting asphalt), Pruning to clear proposed parking
sempervlrens ' ,
structure may have negative Impact on health/structure of
the tree. Drop crotch type pruninq may be beneficial.
20 5/ Coast Redwood 75% Good twig density and extension, Extends far out over
78 8 '0 (Sequoia 70/30 75/75 G ~ existing asphalt parking lot. Canopy conflicts with
. sempervirens) 00 proposed garage structure footprint
Coast Redwood 60%
79 6.7 (Sequoia 35/12 60/60 F ,0 Stunted in shade of surrounding specimens,
, ) air
sempervlrens
Coast Redwood 25% P t' d 't d t 'c fl' t 'th
80 X 22.3 (Se uoia 80/25 25/25 Ve oor wig ensl y an ex enslon., anopy con IC s WI
q, ) P ry proposed garage structure footprint
sempeNJrens oor
U\
~
~
Page 8 of 15
Site: 10100 -10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"C 'i c;;- =: "i :c
CD ...u1
> c~ > "C c_~ l!! olll!!",g c ~
"*' ~-[~ o ... c ...."''''" c. ~ ~ g'~
E 0 CD ~~@~ ~CDbCD .c=mcu
CD '" = E E c: e VJ ~ ::: 1) .5 ;j!. Notes
!Q)C;: ';:I~ Cb"C;:;O
l!! ... ::s E 1= .!! III <( IS ....!!! ~ g!21Go >cco..-
I- 1l!S 1l.!!.o J:: 08D::!:i
OJ:: oZb,l m :E:U)a:~
u u 'a;
0 0 l!! e.
l- I- .E I
London Plane 25%
81 X X 6.0 Tree 80/25 25/25 Very Poor twig density and extension.
(Platanus X
acerifolia) Poor
London Plane
82 X 8.1 Tree 45/20 60/60 60% Canopy lopsided east (phototropic).
(Platanus X Fair
acerifolia)
South side of root crown has a girdling root along 1/3 of
the circumference. Tree has been heavily limbed up or
"lion tailed", removing most inner and lower live stems.
83 X 19.8 Evergreen ash 55/30 60/40 50% Tree irrigated indirectly from sprinklers at nearby turf.
(Fraxinus uhdei) Fair Root system would be severed during development of the
retail area. The retainable root plate radius is within the
Hayes threshold minimum of 5-feet radius, and would not
maintain adequate structural stability.
Roots are invading the surrounding turf lawn. Roots
damaged on grade from repeated mowing. Same
conditions as tree #83 above. Tree has codominant
mainstem crotch with included bark (embedded bark: a
structural defect) at 14-ft above grade. Tree if retained
would require cable installation by a qualified tree care
84 X 23.4 Evergreen ash 60/45 60/35 47% company.
(Fraxinus uhdei) Poor
Hayes minimum root plate radius is 5'-9" to maintain
structural stability assuming <33% of buttress roots are
severed. Given location of retail footprint, it is likely that
root system will be severed at +/- 3-4 linear ft out from
trunk or less. Tree is to be removed as per 2007 site plan
revision.
London Plane
85 X 9.6 Tree 45/25 60/60 60%
(Platanus X Fair
acerifolia)
0"\
\
0'
~
Page 9 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"'5l "'5l Ii> 4:: "'C :c
...~ ..
> <::~ > "'C c_~ l!! ~e",~ <:: -
~ ~ ts o .. <:: ~.s" e ~ lr~
- e 0 Gl ~~'ge CL .c::JaG)
Gl f! ~ce Gl:5E <:: QI @ci (I) - ~tL5~ Notes
l!! ~.~ 1Il c( :;:>~ CD "C.. 0
.!~8 .. ::s E e".!!:;lg z: ""2"liio ~g~"':
I- ~.!!..o Cz: 8z~ CI ~i'i)O:~ o e.
0 0 'cu
0 0 l!! e.
l- I- .5 :I:
London Plane
86 X 9.8 Tree 45/25 60/60 60%
(Platanus X Fair
acerifolia)
London Plane
87 X 14.4 Tree 50/30 60/60 60%
(Platanus X Fair
acerifolia)
Two codominant mainstems at 7-ft above grade.
Mounded on soil berni. Roots damaged on grade from
repeated lawn mowing. Trunk leans south due to
phototropic tendancy toward sunlight. Tree has been
Evergreen ash 50% Iiontailed to remove inner and lower stems, permanently
88 X 22.5 . (Fraxinus uhdei) 50/40 60/50 Fair downgrading the health and structure of the tree.
Outdoor seating area construction may destabilize the
tree u.nless at least 6-7 linear feet of root zone can be
retained as a "no dig" zone north of the trunk edge. Tree
is to be removed as per 2007 site plan revision.
Same as tree #88 above, except no codominant
mainstem system. This tree has girdling roots on the
south side of the root crown that encompass
Evergreen ash 45% approximately 25% of the trunk circumference which is
89 X 17.6 (Fraxinus uhdei) 50/40 60/40 Poor within acceptable limits as per Hayes.
Outdoor seating area construction may destabilize the
tree unless at least 7.5 linear feet of root zone can be
retained as a "no dig" zone north of the trunk edge. Tree
is to be removed as per 2007 site plan revision.
'"
~
<$:)
Page 10 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"C 'il Ii) 4:: '1:l :c
Gl ...~ <II
> c- > "C I::_.g l!! oae!Cfti c _
"" ~ .!! 1S o ... c ~.s""" . Q. ~ ~ g'~
CD E 0 CD c CD @C) ~ ~~ ~ en - :S :0 C) Gl
CD Q..- l!! 'S ~ ;:.e. _ u.5~ ~-g~~ Notes
l!! "'CD!;: ~.~ g:<
.!!s ~ <II.S! ~ .c :!2'l;io
I- .!~o C.c uZJ; C) :J:u;tX~ 08ll::e.
0 {!. ~ u 'Qi 0
I- .5 ::J: -
Same as tree #88, except codominant mainstems fork at
10-feet above grade. Tension roots (buttress roots on
north side of trunk base) are moderately damaged by
repeated mowing. The actual degree to which these roots
90 X 18.4 . Evergreen ash 50/40 60/45 50% may be compromised is not known at the time of writing,
(Fraxinus uhdei) Fair as this initial assessment was only a visual survey of the
site.
Tree is to be removed as per January 2007 revision of the
site plan due to close proximity of building footprint to
trunk edqe.
Same as tree #88, except no codominant mainstems.
Girdling roots on south side of root crown extend across
approximately 50% of the trunk circumference: past the
threshold for "high risk" designation as per Hayes.
Evergreen ash 37% Tension roots on north side of trunk are severely
91 X X 16.3 (Fraxinus uhdei) 50/40 50/30 Poor damaged by repeated mowing and may be compromised
(not confirmed at the time of writing).
Tree is to be removed as per January 2007 revision of the
site plan due to close proximity of building footprint to
trunk edqe.
All same as tree #88, except multiple codominant
mainstems and girdling root on east side of root crown.
Tension roots appear to be severely compromised due to
Evergreen ash 43% repeated lawn mower damage north of the trunk base.
92 X 18.7 50/40 50/40
(Fraxinus uhdei) Poor Outdoor seating area construction may destabilize the
tree unless at least 7.5 linear feet of root zone can be
retained as a "no dig" zone north of the trunk edge. Tree
is to be removed as per 2007 site plan revision.
London Plane
93 X 10.3 Tree 40/30 60/60 60%
(Platanus X Fair
acerifolia)
U"'\
~
~
Page 11 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"'5l "'Cl Cii" ~ "'Cl ::c
41 '"
>c- > "'Cl ...~ c:_~ I!! olSecn~ c _
~.!!!ts o ... c ~s~ 4 ~ ~ g'~
"*' E 0 41 ~G1::::GI Co .c::JClCD
GI c GI @Cl E I:: e U) -
41 Co._ G1fiE .,,5- 1ij~~~ ~1!~~ Notes
I!! "'41"" ... = E 2~",< ~ "'.~~
I- ~!8 ll..!!.o I- ._ GI .c :!u;~~ 08Cl::e.
O.c oZU) 0)
0 o ~ u 'ijj S.
l- I- ... .5 :z::
London Plane
94 X 8.5 Tree 40/25 60/55 58% Two codominant mainstems at 9-ft above grade.
(Platanus X Fair
acerifolia)
London Plane
95 X 6.4 Tree 30/20 55/55 55% Poor growth/taper compared to surrounding specimens of
(Platanus X Fair the same species.
acerifolia)
London Plane
96 X 9.0 Tree 35/25 60/60 60%
(Platanus X Fair
acerifolia)
London Plane
97 X 9.3 Tree 40/30 60/60 60%
(Platanus X Fair
acerifolia)
Coast redwood 70%
98 X 14.9 (Sequoia 40/12 70/70 Good Moderate live twig density and extension
sempervirens)
Coast redwood 80%
99 X 14.8 (Sequoia 45/15 80/80 Good Good live twig density and extension.
sempervirens)
London plane Moderate live twig density and extension. Two
tree 57%
100 X 9.7 (Platanus X 40/18 60/55 Fair cod om in ant main stems fork at 15-feet above grade in a
acerifolia) wide crotch. Powdery mildew fungus infection.
Coast redwood 37%
101 35 (Sequoia 65/25 35/40 Poor Poor live twig density and extension.
sempervirens)
Coast redwood 35%
102 16 (Sequoia 70/15 37/32 Poor Poor live twig density and extension.
sempervirens)
\)"')
\
~
~
Page 12 of 15
Site: 10100 -10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
al "0 u; ~ "0 :c
cu ~~ '"
> c- > "0 c:_~ .. all!!...&! c _
"" ~.!!! fS o ... c a e ~ g>~
E 0 cu ~ Gl @~ ~cu'l:OI> Etl.~;
cu cu c..._ 01>5 E E I:: E rn - Notes
l!! ...cu"" ..~...< ."E CD"C~O
11:[8 .. ::J E S "'.~ ~ ~.5~g > I:: ca.....
I- ~~o 1-._ cu .s::. 08D::e
O.s::. uZrn CI rn '";"
0 ~ ~ u 'ijj e.
I- .5 :t:
Coast redwood 20% Stunted in shade of surrounding larger specimens. Poor
103 X 11 (Sequoia 45/8 20/20 Very radial trunk growth and poor scaffold limb extension.
sempervirens) Poor Author recommends removal, but city arborist may
require retention of all trees in very poor overall condition.
Coast redwood 50%
104 28 (Sequoia 70/15 50/50 Fair Poor to moderate live twig density and extension.
sempervirens)
Coast redwood 5% Very poor twig density and extension. Tree is almost
105 X 14 (Sequoia 70/5 5/5 Very
sempervirens) Poor dead. Remove per city arborist recommendation.
Coast redwood 57%
106 23 (Sequoia 70/20 55/60 Fair Moderate live twig density and extension.
sempervirens)
Coast redwood 59%
107 25 (Sequoia 70/25 55/60 Fair Moderate live twig density and extension.
sempervirens)
108 20.8 Evergreen ash 50/25 50/40 45% Limbed up on south side. Roots damaged on grade. Bark
(Fraxinus uhde/) Poor inclusion crotch at 9-feet above grade.
109 24.4 Evergreen ash 50/30 50/40 40% Same as #108, but bark inclusion crotch at 6-feet.
(Fraxinus uhde/) Poor Canopy lopsided south.
110 15.3 Evergreen ash 50/30 50/40 40% Canopy lopsided south. Tree limbed up. Bark inclusion
(Fraxinus uhdel) Poor crotch at 9-feet above grade.
Evergreen ash 37% Roots damaged on grade. Canopy lopsided south. One
111 21.9 (Fraxinus uhdel) 50/30 40/35 Poor splitout noted at 7-feet above grade. Tree limbed up.
Trunk leans south.
Evergreen ash 43% Multiple codominant mainstems @8-feet above grade.
112 20.3 (Fraxinus uhde/) 50/30 45/40 Poor Roots damaged on grade. Canopy lopsided south.
Limbed up.
Evergreen ash 37% Trunk leans south. Girdling roots on south side and NE
113 15.3 (Fraxinus uhdel) 50/30 40/35 Poor section. Canopy lopsided south. Roots damaged on
grade. Minor twig dieback noted throughout canopy.
~
,
~
-
Page 13 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
al al Iii' == "t:J :c
....n ...
> c~ > "t:J c_~ l!! o(ll!!...~ c ~
~.!!! ts o ... c QJ...,j ~~ ~~
"*' E 0 QJ ~ a; @)ci ~QJ,=QJ Co .c :s 0) QJ
QJ ~ ~e QJ;;E E c: e In ~ ~U:S~ Notes
QJ ~.~ Xl..( ;>~ CIJ"'C;iO
.= ~~8 .... :s E ~ ....~~ mS&!g OS~~
.!.!!.o .c
C.c <.Jz~ 0) :1:(1) "";' <.J e.
0 o ~ (J "jjj e.
l- I- E ::I:
114 19.8 Evergreen ash 50/35 50/40 45% Roots damaged on grade. Sidewalk berm tree. Girdling
(Fraxihus uhdel) Poor root on SW section. Limbed up.
London plane Twig dieback throughout canopy. Poor to moderate live
tree 40%
115 X 9.3 (Platanus X 35/25 40/40 Poor twig density and extension. Powdery mildew fungus
acerifolia) infection.
Canopy lopsided east. Limbed up. Multiple codominant
116 19.6 Evergreen ash 50/30 40/35 35% mainstems. May need to remove tree if cannot alter
(Fraxinus uhdel) Poor grading plan to allow +/- 8-10 radial feet of root zone
protection east of trunk.
117 18.0 Evergreen ash 50/20 45/40 43% Canopy lopsided east. Limbed up. Multiple codominant
(Fraxinus uhdel) Poor mainstems.
118 19.0 Evergreen ash 50/45 50/40 43% Limbed up. Canopy lopsided west. Two codominant
(Fraxinus uhdel) Poor mainstems at 8-feet above grade.
May need to remove tree if cannot alter grading plan to
119 18.9 Evergreen ash 50/30 50/40 46% allow +/- 8-10 radial feet of root zone protection east of
(Fraxinus uhdel) Poor trunk. Two codominant mainstems fork at 7-feet above
qrade. Canopy lopsided west. Limbed up.
May need to remove tree if cannot alter grading plan to
120 18.0 Evergreen ash 50/40 50/40 45% allow +/- 8-10 radial feet of root zone protection east of
(Fraxinus uhdeJ) Poor trunk. Multiple codominant main stems at 8-feet above
grade. Canopy lopsided west. Limbed up.
May need to remove tree if cannot alter grading plan to
Evergreen ash 40% allow +/- 8-10 radial feet of root zone protection east of
121 19.6 50/45 50/40 trunk. Two codominant mainstems fork in a wide crotch at
(Fraxinus uhdel) Poor 7-feet above grade. Girdling roots noted around entire
circumference of root crown.
Evergreen ash 45% Girdling roots east and north sides of root crown. Limbed
122 20.0 (Fraxinus uhdel) 50/35 50/43 Poor up. Two codominant mainstems fork in a wide crotch at 8-
feet above grade.
t-"\
,
13
Page 14 of 15
Site: 10100 -10200 N Tantau Ave, Cupertino, CA
Tree Data Charts Revised 6/5/07
Walter Levison, Consulting Arborist
"'i "'i u; 4:: "i z
>c- > "C ...~ E:_r,g e olSl!cn~ c _
~.!!!tl o ... c .x: .!! "'Ct ~ I! ~ g'~
'*" E 0 a> ~a>'CCIl 0. :5 ::> Cl a>
a> a> 0..- a>:5 E c a> @Ie) E c E en .-,.. _'tS.5~ Notes
l!! ... GJ.C;::: ~.~ III < ';>!:. GI "0.. 0
ll!S ... ::> E ~ "'"!!!~ :Jl2~g og~<w;
I- ll.!l!.o ..c
C..c oz~ Cl ::t:li) ";" o S?-
o ~ ~ u Oil So
I- .5 ::t:
Two codominant mainstems fork in a bark inclusion type
123 20.9 Evergreen ash 50/30 50/40 47% crotch at 8-feet above grade. Roots girdling on east side.
(Fraxinus uhde/) Poor Canopy lopsided west. Do not grade past the proposed
retainino wall location at +/-10-feet east from trunk.
A X 19.0 Evergreen ash 50/30 50/40 45% Codominant mainstems fork at 10-feet above grade.
(124) (Fraxinus uhdei) Poor Limbed up. Canopy lopsided east.
B X 16.9 Evergreen ash SO/3D 50/40 45% Codominant mainstems at 8-feet above grade. Limbed
(125) (Fraxinus uhdei) Poor up. Canopy lopsided east.
. "'"
,
~
U)
Page 15 of 15
Site: 10100 - 10200 N Tantau Ave, Cupertino, CA
.~..."'....
.;!'.,. . . .....
ARBOR RESOURCES
Exhibit C
Professional Arboricultural Consulting & Tree
May 24, 2007
Aki Honda
Community Development Department
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
RE: 10100-10200 North TantauAvenue, Cupertino
Dear Ms. Honda:
I have reviewed the following documents in connection with the proposed development at
the above-referenced site: [1] the architectural, civil, and landscape drawings mailed to me
on 5/14/07, and [2] the arborist report, dated 1/21/07, by Mr. Walter Levison (the project
arborist on record for this application). I visited the site on 5/17/07 and this letter presents
my comments.
1. The tree protection measures specified within Section 4.0 of Mr. Levison's report
should be adopted as conditions of approval for this project.
2. Mr. Levison's report provides an evaluation of 99 trees located within or in the
immediate vicinity of the proposed retail building and parking garage. The trees are
sequentially numbered as 1-97, A and B, and none are defined as "specimen trees."
3. Of these trees, 49 are identified for removal to accommodate development; they
include #1-29, 48, 81-97, A and B. Of these, six are redwoods (#9-12, 28 and 29),
seven evergreen ash (#83, 84 and 88-92), and the remainder London planes. Based on
their species, size, and/or condition, I find the loss of each would be insignificant.
Note that the project plans do not identify the removal of #28 and 29; if the project
arborist reaffirms they are in conflict, they should, accordingly, be shown on Sheets
PL-1 and C-04.
P.O. Box 25295, San Mateo, California 94402 . Email: arborresources@co1Tlcast.net
Phone: 650.654.3351 . Fax: 650.240.0777 . Licensed Contractor #796763
6,11f
ARBOR RESOURCES
Professional Arboricultllral Consulting & Tree Care
May 24, 2007
10100-10200 North Tantau Avenue
page 2 of3
4. There are seven additional trees recommended by Mr. Levison for removal; they
include #50-52, 55, 60, 71 and 80. Each is a redwood located long the northeast
property line. Tree #60 is nearly dead, while the others appear in significant decline
but not seemingly beyond recovery; if desired, measures could possibly be employed to
promote their vigor.
5. There are 26 additional trees located within proximity of the proposed development
and are subject to root loss or entire removal. They are as follows:
a. Eight evergreen ash along the northwest and west sides of the proposed building
and patios.
b. One London plane within the planter island immediately north of the building.
c. Seven evergreen ash along the south side ofthe building.
d. Seven redwoods beyond or west of tree #81 (immediately east of the garage ramp).
The one with the dead top should be specified for removal.
e. Two redwoods and one London plane immediately south of tree #21 (these trees
will seemingly require removal to accommodate the parking lot reconfiguration.
6. Each of the 26 additional trees should be evaluated and documented by the project
arborist. I also recommend the impacts are assessed, and any protection measures or
design modifications to achieve the survival of retained trees is mentioned.
7. All trees (the original 99 plus the additional 26) and their associated numbers should be
shown on Sheets PI-I, PI-2 and C-04. I also recommend the disposition of each tree is
shown.
P.O. Box 25295, San Mateo, California 94402 .
Phone: 650.654.3351 . Fax: 650.240.0777
Email: arborresources@;comcast.net
. Licensed Contractor #796763
~ --15
ARBOR RESOURCES
Professional Arboricultural Consulting & Tree Care
May 24, 2007
10100-10200 North Tantau Avenue
page 3 of3
8. At a minimum, Section 4.0 and the "Tree Data Charts" of Mr. Levison's final report
should be copied onto a plan sheet, titled Sheets T -1, T -2, etc. (Tree Protection
Instructions) and referenced on all site-related plans of the architectural, civil and
landscape drawings.
9. The "Tree Protection Detail" should be omitted from Sheet C-04. All tree protection
measures, including fencing, must conform to Section 4.0 of Mr. Levison's report.
10. I recommend the irrigation design is reviewed for tree-related impacts prior to being
installed. Any necessary modifications recommended to minimize tree impacts should
be implemented.
Should you have any questions or would like additional information, please do not hesitate
to contact me at your convenience.
Sincerely,
{~
<t
David L. Babby, RCA
Consulting Arborist
P.O. Box 25295, San Mateo, California 94402 .
Phone: 650.654.3351 . Fax: 650.240.0777
Email: arborresoLlrces(~;comcast.net
. Licensed Contractor #796763
6,1/P
I
(
---r'---
- --f:'-
,I'
i"':'"
.,;.
, i
-:. ...,........:a1.o.~.~~________~
J i?l ~ ! I
',",- --~..,;..c. I
>$' C t(i .
\ 'I I, I
I t~,
\: <t
I ,:,.'; o'
f
!~j
"
~
)
,
1$-1
1:-'
"""'" I
\, ....::......
l:
- ,.-~
~,J
,~ P' H [ h ~ If i;! I ,I' r
' ;\ llll:ll~
I 0 i jlli-~l .'::-
I' 1,IN:!',l '1,1 · i'
\ Jt11 \ '~ ~- .,~ ~ Ii,
i
I'
',., ~ ~I-. T I
\ == . L '._)~ , 'r
! I : ,I' II: I ::,
, I:' 11 ; ;:~.
It I ' .,
I ~ :; ~::.=::: ~ : h", ..
,.--~J ~ .-- "L'r- i
\ ,-_1 tr _ [ I . ,,1 ff~.r? ",
1 'I ~ 1!
I = :', ::0::::-': ~ F""-:; i '~,li
l r.; IB,/
~~ ~!i.-: I '/'f/l11I1 ; '/ -' ~/' ,; ,~~ \ l~:'
II ' / 1/ J I ~, ,\
. :II' . ....... I .4,0- J ~j ,-
l'~ I I' ... ~- P L' -,.' '.
. t j .. ~ i "
o III " ~. 'oJ I ~! ,'~
11 '; ,t .
'-' ': ~ ,. r~ 'J' i..
,!I~>>'_ .. ~;}');I
~ ~ I ;j '--:'r-
f -~~'
, \! ';, I 1\ },j
· · .I~' ' I :'.1'
. .\~ '~:. I ~ h",t~~
..... I'~ I ;,f" "'1
~~ /:\1"::; !i
~I 1 l' ill 1~,
. I( l' ~~,.;..,' ~l--: ""-=,
~,,~~ ';' I"
~ "\W. '~ ~l
~"I I , ;t : it
~'1
I '.
, ";. ~\ /
- /~! .~,
I 1 \1
I. l Ii
.~~. ;,
'-
:
.,f}
~
~t
-
'z .. -.
~ ~ I
U I',
-
I ,I
I .:.:...~
i I ~ l7",
-=r_~ r--
I 1!=~
\ L~I~'
K~~
.Ii~
"""""i'....,
_.1 _
I
,t
~ !
i
I I
\ \
=
C._ l~~
, 1
I
.1~
,0
,......
lCO
I~
I
!
I
I
1'1
I ]
" t
, f
'-~'1
. i
I I ~
~ >
f' i,li (1)
J .-
r .' i >
- ...
(1)
c:
I.-
o
.0
:..;"''" j :cf-
(," " [ m m I 1'1 II I~; 1 I
7 ., I
, _ <' ~ \1 1)\ ,:'
"\ 4JlfT7)C1: \\, ~ '
1 .~." t "t ~ ~ 't.
""," ~ ,) · 1 ~Il l~.. I'
! I '
____ ,..___:L I ~
r-; ---.----. F~
, I
5-71
~-'l
<1t>
.l..-
~
@
~
^
< "
'"
NOTE: REFER TO SHEET L -1 FOR PRELIMINARY LANDSCAPE
PLAN FOR PROPOSED PARKING STRUCTURE @ NORTH-EAST
PROPERTY LINE.
/'
t?EB
-lL
(JT"
cs::::s
(JT"
(JT"
u:s
(JT"
I-
I-
EXISTING LAWN TO REMAIN
I-
EXISTING PUBLIC SIDEWALK
I-
I-
o
~..f2.
ij\~
~Q
O~
~~
~~
~~
~
:J
<{
~
Z
<{
~
--==-
{:(
PROPOSED NEW PLAZA.
WALK & H.C. RAMP
EX. BRICK & CONC.
ENTRY PLAZA
EX. 13" DIA. SYCAMORE
/'f
-i-
I
~
/
b
-,
I \
~r' I
.). /
y '\
\
I
o
~1
{
BLVD
o
~--"
o
B~
ff=bMJ
~..
<
o
Z~~
OJ'
&
(X)
I
:------..-
~ CHANG
ARCIDTECTURE
II
I I
I
I
I
, I
125i65T
-I BUIW!NG TO I
-L~~ I Li]i TI ~~~LJ ----.t
j5.59'
CD
3595'
-
-
-
@
~
\'
I o.
j ~ ~
~~
I
I I
I I
I
EXISTING 18"-24" OIA. EVERGREEN I
ASH TREES TO REMAIN I
\
, EXISTiNG PlTTOSPORUM, RHAPHIOLEPIS
& IVY TO REMAIN
I '
~
0:::
o
Z
PROPOSED SALT-FINISH OR BROOM-
FINISH CONC. ENTRY PLAZA. OUTDOOR
PATIOS, AND WALKS WI SCORING >
PATTERN & INTEGRAL COLOR
EXISTING EVERGREEN
ASH TREES (TYP.)
~~~~M~~EL I I I I I I I I
PROPOSED ORNAMENTAL SHRUB ~
Bl,JFFEA (I.E. INOlA HAWTHORNE,
AFRICAN IRIS, NEW ZEALAND FLAX. (
PURPLE FOUNTAIN GRASS. DAYLILY. _ _
LOROPaALUM LILY-{)F-THE-NILE. ETC.)
\
FLOWERING GROUND COVER -+ __
(LE. LAVENDeR LANTANA. SCAEVOLA
'MAUVE CLUSTERS'. OR STAR JASMINE)
., o~
FOCAL POINT ACCENT SHRUBS
<LE. BLUE HIBISCUS. TREE MALLOW.
NEW ~LAND TEA. ETC.)
OBNAMENTAL SHRUB BUFFER J.. j\ f><J j\ l\. ~ A
" /' "./ " ./ I. ./ '-. ' "-
'-- -- .........- --/ ........---- .......... --- ........ ).~_.-'" ..........------ _/ "----'
EXISTING NUMBERED ASH & SYCAMORE TREES TO BE REMOVED (REFER TO EXISTING LAWN . EXISTING PITTOSPORUM EXISTING 18"-24" DIA. EVERGREEN
ARBORISl'S REPORT PREPARED BY PROJECT ARBORIST. WALTER LEVISON) TO REMAIN RHAPHKlLEPIS & IVY ASH TREES TO REMAIN
@ ro,,""N
SCALE: 1"=20' STEVEN S CREEK
'-.i
~-A ,---~
LJ. <r4 \
I
b
t
I
~I
i ' II
I
{:(
~-
----
-
tf5=
SL
Y'$ /
lit l.ALDERBAUGH
r=I ASSOCIATES
Landscape Archileclu'elPlaming
102 Persian Drive, Suite 202
Sunnyvale. CallIornia 94089-1517
(406) 745-7380
~
~
05.23.07 CITY PLAN CHECK RESPONSE
05.15.07 CITY PLAN CHECK RESPONSE
10100 N. Tantau
Parking Structure +
Retail Building
Cupertino, CA
Drawing Titlej
PRELIMINARY
LANDSCAPE
PLAN
A40135
02.22.07
AS NOTED
~
Job #
Date:
Scale:
Drawn By:
Sheet
PL-2
TANTAU RETAIL + PARKING GARAGE
Design Submittal
March 15th, 2007
April 18th, 2007
May 17th, 2007
INDEX
C COVER
ARCHITECTURAL
A1 SITE PLAN
A2 RETAIL FLOOR PLAN
A2.1 RETAIL ROOF PLAN
A3 GARAGE FLOOR PLANS
A4 RETAIL ELEVATIONS
A4.1 GARAGE ELEVATIONS
LANDSCAPE
PL-1 PRELIMINARY LANDSCAPE PLAN
PL-2 PRELIMINARY LANDSCAPE PLAN
CIVIL
C1
C2
C3
C4
TENTATIVE MAP
PRELIMINARY GRADING AND DRAINAGE PLAN
PRELIMINARY GRADING AND DRAINAGE PLAN
TREE REMOVAL PLAN
:lj LOCATION MAP
CHANG
ARCHITECTURE
N. Tantau
Retail Building +
Parking Structure
Cupertino, CA
Drawing Title -
COVER
Job # M0135
Date: 5/17 07
Scale: AS NOTED
Drawn By:
Sheet:
c
, ." I
!.....:
~
_~(E)
~ SIDEWALK
.~~ i (E)
///t~ ~ I LANDSCAPE
~~i
....
"',.
2
137'-11%" FUTURE 20 CAR DECK EXPANSION
t j
"1
I
I
I
I
I
I
I
\----------'
\
\
\
\
\
\
\
\
\
\
\
\
\
\
I
I
PARKING DECK PLAN
(SEE FLOOR PlAN FOR STALL DIMENSIONS)
\
\
\
\
\
\
\
\
\
\
\
,,'0
~
/'0
~
"
/J
,t~
,l",&-
, f!J""
(~. ~~: / q,'4Y
\ ,S"4:~,,,-'~
\ ~~~~:;~: ~~
,;;.li:~l'<
,,; ,J
.. ,:}~'J \
. pI,
,,~"'I
#.$1 \
"if' /,\
'0'" '
~~~ ~'
",&/ f
~! .,
i!r!! ~~
!&.<>-':-
tr. to.
~~':$"
~~ '
. ,
@>-..
CJo C
i3:'i
~; ~
~~ m
~; ~
u"-
~ W
W
e 0::
(.)
@.......,. en
-CJo
iU Z
~.., W
~'" (ij
<'"
~<O
"'~
lilffi ~
",'"
REQUIRED PARKING
NORTH TANTALJ
\
',--- (E)
SIDEWALK
EXIST, OFFICE BUILDING AREA;
REO. OFFICE PARKING'
PROPOSED RETAIL AREA:
REO, RETAIL PARKING:
REO. TOTAL PARKING:
151.321 SF '
...-......-..-.-.. ''''339"'''<<---
530 STALLS
(3. 5 STAllS /1000)
(6 STALLS/1000)
45'-9"
MIN. SETBACK 32'-2"
MAX. SETBACK 59'-5"
Ave. SETBACK 91'-7"/2
1 0.582 SF
SITE PLAN
1
A1
64 STALLS
594 STALLS
SCALE: 1 "=4
PROPOSED PARKING
GRAPHIC SCALE
ON-GRADE SPACES;
NEW DECK SPACES
PROPOSED TOTAL PARKING:
'h..-.J 'I' ':' ~ T
~
500 STALLS
94 STALLS
594 STALLS
( IN FEET )
1 inch :=: 40 fl
z
~~
~-
;;!~
u~
~~
e~~
RETAIL PARCEL AREA:
RETAIL AREA:
FAR:
53.655 SF
(1.23 ACRES)
10.667 SF
2C%
CHANG
ARCHITECTURE
N. Tantau
Retail Building +
Parking Structure
Cupertino, CA
Drawing Title
SITE PLAN
Job#
Date:
Scale:
Drawn By:
~
A40135
5/17/07
AS NOTED
At
/-0ROFILED S~CO
/ -~ALL (P2) i
s~
I
I
I
o
I
I
I
,
o
I
00
i
I'
00
I'
r<')
,...
I
c"
HIGH PARADET
-----rr:- 25' =cJ"""
'-OW PARAPET
-----rr:- 2"2' =cJ"""
ROOF
~f9'.:::o
156 CllapIn UIle
--
CdIfomIG 94Ol0
Tel: 6SO..I4U41S
FGIC 6SO..\40.H41
_ _,~octuro.com
GRADE
EL. O~
GJ CROSS ~~~~~~'~'-0"
13'-8"
~
13'-8"
0"
2'.1.4 "
--h--
I ,~ I' ~ rj r L . f 11'-4" JII. 11'-4" fl.; 11'-4" ~~ 11'-4" m 11'-4" f ' II
2'+4" 2'+4" ! I 2'-4" 2't4"
. I ! PARAPET/~QUIP, I I I I I
Ii: ; : SCREEN ASOVE I I I I I : I
~ - -t- - -H - - + - - -'- - -+ - - - - - - t- - - +- - - - - - -* - - i-J
- I I I I I I I , I i I-
I I I I I,
I I II I r
I L .
I STEEL STEEL ~ ' I I ::
I I / COLUMN I COLUMN \ I I I :
I / I I I \, I I I >k- --'I< N
-----l~--~--El-,' --T--r IjI --1--------"------ --~ I
W 11'-4" : I I: I I I : I r I 11'-4" l f~ N
, I I I ." I ' I
~I' 2'-2" I. I "" 2'-2"
'" I I, I I I I I ! ~l
-I : I I ill I I I I-
I _+__~--_+_-- 1__-+_____-+___1," 1 J
I I I I r- r ~1;r;~J r} N
2'-2" I, I I I I :r! 2'-2"
i I ~SKYLlGHT ::;
ABOVE: !
- - - - - '" -'I< 1.1 - - ~ - -~li-f\--------~--7.-'.,lt - -II -II roo ~ 1 J
11 -4 I !, I \ I I II L 11 -4 '~ N
'j l' I 111\ I,ll . .
00 2'-2".... i I I \ / I' I I '..t 2'-2"
" ,I I I III \ / 1'1 I ,I
::! :: ! L III \I 1,1 I ::
I I I I 1\ I i I
, " I I I \ I ' I ,
f2\----l--- - -- - -- - - _ ~ r- I _ _ _ _ -----LI L ~\" -4+-- _ _ _ _ _ ---t c;'
~I ' {=- 11' 4" I , I I I ,,, -{.
. N B I": ! I I I I I \ I I I 11 -4 ' N
0: .. ... I ~______.::; I ,
"I 2'-2" I ,--------1--------- ----" '_"
:::1 11'-4" 9'-6" I I 9'-6" I 11'-4" '7f2 2
0-+------------ 'I I I {1 I :io
-J.J<-L------..J L_____...J I,
rl I I 'IIL---.----!IIL--------!!t.{: l'
8 '---'--1----' '----------':1 -2" ! ~I
I I I I I
~----------~--~-----------------~-~
'-- LOW CANOPY ABOVE
c--HIGH CANOPY ABOVE
'I ~
-......
-'I<
1r,
I
'"
,
00
I
'"
N. Tantau
Retail Building +
Parking Structure
Cupertino, CA
Drawing Tille
RETAIL
FLOOR PLAN +
SECTION
1
A2.
RETAIL FLOOR PLAN
Job #
Date:
Scale:
Drawn By:
Sheet:
M013S
5/17/07
AS NOTED
SCALE: 1/8"=1'-0"
10,582 GSF
A2
13'-8"
Co
I
i<)
~I
~I
~I
I
0-t----
~I
~
G
13'-8"
q
,------,1,------,
! I -+1 ~I (EL. +25') ~I 1 Hlc----
_ _ i_SCREEN
H~ - - - - - - - - - --- - - - I (EL. +25')
SCREElN I - ---t--- - - -'- - -
IEL t') I '"
1 I
, I
I I
---+---~---L _ ... . _ . _1___f"CEl_.____
I I '
~H~[ ~
I SCR~EN VAC
I (EL. 1+25') 1 SKYLIGHT 1 SC EEN
-- T - -if-------~-l- - - ---t--- - ~t25')
I i I :
II I I
I' I
L' :1 I: 1
I . 11r- STOREFRONTI
I 1 PARAPET
__ - - - _~ /1 (EL ~",,"
I' I~ .~-~--
I' 1 I 1
I i I I r-;-- UPPER
- - --r -I-PARAPE-T- - --
(EL. +25')
13'-8"
GW~
PARAFlET
~ (EL. +22')
G
UPpJR
PARApET
(EL. 1+25')
Co
I
i<)
o
I
'0
L LOWER
PARAPET
(EL. +22')
13'-8" __~ 13'-8" f
Q
13'-8"
13'-8"
E.5
F.5
13'-8"
13'-8"
UPPER
I PARAPET
L (EL. +25')
L__\___--1 ~I~WALL __.J /
\, (ElL. +31')___/
\~ CANOPY
BELOW
LOWER
-----, l PARAPET
: - (EL. +22')
I
I
I
I /--- CANOPY
I / ABOVE
i (El. + 28')
_______-.J
I
L__________________
13'-8"
e
,------,1
~
I
----'!< -:-
----'!<
CHANG
ARCHITECTURE
156 Chopfl L...e
llur1~game
CdifonJlo 94010
Tel: 65Il.340.9415
Fox: 650.340.9641
WeIr www.changcrdTitecture.com
N. Tantau
Retail Building +
Parking Structure
Cupertino, CA
Drawing Title - --
RET AIL
ROOF PLAN
Job#
Date:
Scale:
Drawn By:
Sheet:
A40135
5/17 /07
AS NOTED
A2.1
56'-3"
1
'"
1
I
{
'"
RAMP UP
f8'-5" l
313'-SX.
297' -5"
33 CARS @ 8'-5"
~~J
[:
t r\
/ \
/'
[J
L~.I
\
\
\\ '\
\ \
\ \
\\ \
\\ \'6.
\~ \~-i-,
-S-~ \
;.;.
("1, \
'?.p, \~6" \
U' ,
@ \
0>\ \
~\ \\
\
\ ,
\ \
\\ \
\ \
;;x\'\ \
do.
/:'
STAIR #2
LJ
[]
Nt
I
I
!
I
~l
'-- COLUMN
BELOW
25'-6" 4'-10" 238' 5' 17'
133 CARS @ 8'-6Il 28 CARS @ 8'-6" 1 :2 CARS r
'@ 8'-6"
ell [J Ie I I l~: rJl I I [Ii I I Ie I I [J I l77/lJ I !)
1 ~~
I 2' 25'-6"
I rt~ r ~ro~
STAIR #1
~
"
27'-6"
27'-6"
280' -5''ii.
C2\ GARAGE DECK PLAN
\gJ
94 CARS
SCALE: 1/16"~1'-O"
'0>,
-,
i
I
+-
I
i
~I
I
27'-6"
27'-6"
27' -6"
27'-6"
~
'1
i
L ON-GilADE
CURB
----T----
L DECK ABOVE
1
A3
PARKING BELOW GARAGE DECK
'8
SCALE: 1/15"~1'-O"
'8
\\
\ \
\ \
\\ -'\
-' ,
\ ~ \~u'.
~\'o-.
\:0"., @\
\'? (9,,\
,'$-. \,,\\
\ u,
\\ \
\ \\
\ ,
\
\
\
V
27'-6"
27'-6"
27'-6"
27'-6"
Tel: 6SL.I4O.i41S
fox: eso.340.8841
WtIl:www.cIIGrIQan:IIRedure._
N. Tantau
Retail Building +
Parking Structure
Cupertino, CA
Drawing Title
GARAGE PLANS
Job #
Date:
Scale:
Drawn By:
Sheet:
A40135
5/17/07
AS NOTED
A3
ACCENT
FIN WALL I
BEYOND 0 CD cp
(P2) -l ,
I
I
i
~ PROFILED I
I STUCCO WfLL
(P2)
DIAGONAL METAL
BRACE WITH
STEEL
CONNECTIONS
I
I
~
~PET ,
Y-fC i2'~'T
i<l
~F_
TEL 19' -0"
+ GRADE
EL. 0' -0.
I
.-- RECESSED
I STUCCO WALL
, (P1)
i
=j I I
~:;'1
ALUM.
MULLION
L(P4)
y
I
I
I
o
I
N
N
~ EAST EL~:~?~,_o"
I
I"
1
~
I
I
I
I r- RECESSED
I I STUCCO WALL ,-PROFILED'
I (P2) STUCCO ~P2)
I
1
l'
:~~;l
,
L. ALUM. ElAND VISION GLASS SUN-S~ADE
(P4) i '---- (CLEAR) (P4)
MTL. CANOPY
-- (P4)
0)
; II
CANOPY
BEYOND --;
I
CANOPY
(P4)
~
I
~
!
, RECESSED -. ' PARAtEr ." I I
ST.UCCO WA~L I PABA~ ~ 22'-0 .'1 '
I (p) +--PEL22'-0 t') TR
I i<l ROOF
IIj _ _~OO,~-+- ~C 19'-0"
EL. 19-0
I
,
o
I
N
N
GRADE +
EL. 0'-0"
GRADE
EL."""(i - 0"
,IT
0
I
N
N
,~
I
0)
CD
G
G
G
1_- RECESSED
STUCCO WALL
(P1) ,
PROFILED ---,
STUCCO WALL I
(P2)
I
I
'"
j ,~
i :~~t,J
l'
I
I
I~",'\'~",
",j",,<,',:l;?\l}.'!<.., _~"v
I
I
1._ ~u. .._"..,.
ds
I
f
WEST ELEVATION
SCALE: 1/8"=1'-0"
I STUCCO
I WALL I
(P1)~
@ "~~ I I I
1 I
I
I ~~Wf._,,~1lI1
.- -----rr
lIIBlI1I ~
,;'it~ I L~*lR,::P~F~~<&'@ .,,!!' .,,'~',.--.---i},' ~'" . 'I
'Ii:< ~.. .,', ";~~ ':." ,;;,_.". .. .."" '.".; .. "";,1,"" ", .. ^.,.":,, I
I
jr
(0
i}
~ NORTH ~~~~~:.~~~"
PROFILED rO\
STUCCO ACCENT V
FIN WALL (P2) --, :
\ '
~'~
~
,METAL
ri REVEALS
~r'
~
~
, LI GHT
LOWER I (P4)
CANbPY I
(P4) --.J
G) SOUTH ~E~~;'~?~"
I SPANDREL
'--- GLASS (P3)
rE\ ~ MEDALLION!
Y / LIGHT
METAL / SCONCE
I CANOPY / I DIAGONAL
I (P4) / I METAL BRA ,E
/ I (P4)
w
&t
:@
,\ '.~' "'I
\_~~~
COLOR KEY
(P1) MUSTARD
(P2) TERRA COTTA
(P3) GREEN/GREY
(P4) BLACK
(P5) WHITE
ii:;I~!' af$1
f 0
I
,-- RECESSED
I STUCCO WALL, I
i (P2) I RECESSED --, I
-1- - - -r-- - ---5JUCCQ...'NALL - L--
~ lL~i~T(:'~ (Pll i ·
I ~ II'
~~A~
EL. 28'.::0"1"
,
I RQQL....b..
---+a19'~
, .
, I
O'
Ii
Co
N'
'~~
,,]'~~
o
I
~I
I
I
.I
ELO~~~
,
GlAZl~G MATERiAl KEY
_ VISION GLASS
I
DESCRIPlIlON
CLEAR, DUAL PANE
0)
I
,
ACCENT
FIN WALL
G BEYOND
: r-(P2)
jill.
-~."-~
.-
~
I
SPANDREL GLASS #1 CLEAR, SINGLE-GLAZED, 1/4" WITH OPACIFIER, R-19 INSUL.
~ METAL PANEL 1/4" PANEL, R-19 INSUL.
GARAGE ONLY
CHANG
ARCHITECTURE
DIAGONAL METAL
BRACE WITH
STEEL
CONNECTIONS
(P3)
(P4)
N. Tantau
Retail Building +
Parking Structure
Cupertino, CA
Drawing Title
RETAIL
ELEVATIONS
Job#
Date:
Scale:
Drawn By:
Sheet:
M0135
5/17/07
AS NOTED
A4
---"1
I
I
\
\-------
\
\
\
\ \ ~
\ I;Xl$TING FlI;OWOOD TREES \ TREE NUMBERING CORRESPONDS TO
: ~ BI;REMOVED PER ARBORIST'S\ THE AFlBOFlIST'S REPORT PREPARED, I b
\ REPORT (TYP.) \ BY PROJECT ARBORIST. WALTER LEVISON. /-..; "'-.
\ ' EXISTING FlEDWOO,D TREES \ J
\ TO REMAIN (TYP'>J \
\ \
\ \
\ \
\ \
\ \
~V4.5 ,,~4...:P....4J4.t.....4.0.......~...-VV3BV ~~.......~a.gj.3l.~
;:--" , - 4;) oJ "" ..J .....~. ".- -
\
\
\
\
\
\
TII: _MIS
fax: <<lO.J40.M41
_ _.""~ccm
1C..= ~
c.lIIomIa t40I 0
II
LALDERBAUGH
ASSOCIATES
Landscape ArchileclureIPlanning
102 Persian Drive. Suite 202
Sunnyvale. Calirornia94089-t517
(408) 745-7380
\
.
o
>
-.J
CD
~
W
w
0:::
o
(f)
z
w
>
W
I-
(f)
I
I
I
I
I
-}
I
I
r I
~,/~
NOTE: REFER TO SHEET PL -2 FOR PRELIMINARY
LANDSCAPE PLAN FOR NEW RETAIL BUILDING.
(QJ
05.15.07 CITY PLAN CHECK RESPONSE
10100 N. Tantau
Parking Structure +
Retail Building
Cupertino, CA
Drawing Title -
~(,I
..~ " g.
..
PRELIMINARY
LANDSCAPE
PLAN
NORTH TANTAU
Job#
Date:
Scale:
Drawn By:
Sheet
A40135
~07
AS NOTED
-
JWL
(t SO^" ,.~<o'
PL-1
fXl$TING 18"-24" OIA ,EVERGREEN I
ASH TREES TO REMAIN (
\
ExISTING PITTOSPORUM RHAPHIOLEPlS
,& IVY TO REMAIN
~-'l
<1t>
{1-
@l
{1-
^
< "
"
NOTE: REFER TO SHEET L -1 FOR PRELIMINARY LANDSCAPE
PLAN FOR PROPOSED PARKING STRUCTURE @ NORTH-EAST
PROPERTY LINE.
t;
tl
~
'7,,-0
c:s:=s:
!)-"
!)-"
[:s=s
!)-"
I-
t
EXISTING LAWN TO REMAIN
.:l
I
/
+
\
\~
/
(
I
\
,,/-
/ )/
" ," ~
PRQP()Seo SALT-FINISH OR BROOM- ,,/ '" ~
FINl$.H 0, ONe EN, TRY PLAZA., OUTDOOR~ / " ^ /' ,
PAtIOS. ANO WALKS WI SCORING ~ ~..l\ '/
?\TTERN llNTEGRAL COLOR I "- /""- ra /"
\ ',/ "!~ "/
EXISTING EVERGREEN 82)1( / " . / '\ Q (\ / "_ /
ASH TREES (TYP) "/ "~/\" / /
" ~" / -v /"
\</ y ~~ V94
12"-18" SMOOTH TRQWEL /" /" / ~/ "
OONC. BANOS (TYP,) '>' X /1n" /
" / "/ / 'Z~/" /
PRQPPSEO ORNAMENTAL SHRUB > " )< 'j >( / ~ >" :
61.iFFER (~E,INDIA HAWTHORt'!E. / ,,/ " / ~.A 'x ~
AFPllCAN IRIS, NEW ZEALAND FLAX. ( /. ?<.. ~" ,~. / '
PURPLE FOUNTAIN GRAss. DAYLILY. d 85 / ' / , / ~ V", "_ / _
LOROPETALUM. LlLy-oF-THE-NILE. ETC.), 'JL' '/: '/ ^~. ^
\ '/' /" / " / -
,,/ y' ,,/ " ./ / I -....\
,Jt{l6 /" /" /, /", C I
" " / p:J 'J
FLOWERING GROUND COVER ,.). /
(I.E. LAVENO{;R LANTANA. SCAEVOLA
'MAUVE CLUSTERS'. OR STAR JASMINE) 'v '\
\
o " . I
IC SIDfi#lLK -;
FOC",l P9tNT .-.ccENT SHRlJSS /
(l,e. BLuE HiBISCUS. TREE MALLOW.
rf;W ~ND TEA, ETC.)
'~' NAMENTAL SHRUB BUFFER )\ ^ f'v1 ^ "
'\. /'\ " V"J I. ,/" ^
'" '-./ '....... _.-/ "- ':>11.\ ~/ ,__ '- ___ ......__
......... - . -- --- - - "----- '''--
CXISTlNG NUMBERED A$H& SYCAMQRE if!E.E$ TO BEI'l!;MOveo (Rj;FeR TO EXISTING LAWN 'EXISTING PtTTOSPORUM, EXISTING 18"-24" CIA EVERGREel
ARBORISTSRl:PORT PREPARED BY PROJECT ARBORIST. WALTER LEVISON) TO REMAIN RHAPHlOLEPIS & IVY ,ASH TREES TO REMAIN
a TO ,....
," SCALE: 1"=20' STEVENS CREEK BLVD
EXISTING PUBLIC SIDEWALK
~
'"
I-
/
7
,<
I-
~
\S'~~
G'
O~~
~~
~~
~~
G'
o
~
<(
~
Z
<(
~
-
I.
{1-
I
~
n:::
o
z
PROPOSED NEW PLAZA.
WALK & H.C. RAMP
/
EX. BRICK & CONC.
ENTRY PLAZA
/^
/( "'>
/ /"', ,/ /
// '> v/
/ "v~/
-\
EX. 13" Of A SYCAMORE
~
u
co
-
-
-
@
"
V~
"
o
OJ
V{1-
uJTmTI
-
-
-
rLU,
~
g AD
roF::b ----- ---
.~-
\~~o W\I
CL~
~s 4<SL
x~ \ <
,,"~
CHANG
ARCIDTECTURE
Y5.9:S'
,35.:J9'
j
I
I
I ti
I
--- '---
1 ::sl65
~ BUll' ["1"(- "" I
. ,L~'''" I'-J1
BUILDiNG TIE J
~ 61.19
--, -.--..-. -.,.-----.--.
I ~
I ~
V
I
1 I
I I
I
I
t--~: 44-~
/_..J, ,
I
b
~t
I
rill
I
H==-
-
v~
~w
~
~
LAlDER8AUGH
ASSOCIATES
Landscape ArchilecturelPlanning
102 Persian Drive. Suite 202
Sunnyvale, California 94069-1517
(408) 745-7380
05.15.07 CITY PLAN CHECK RESPONSE
10100 N. Tantau
Parking Structure +
Retail Building
Cupertino, CA
Drawing Title
Job #
Date:
Scale:
Drawn By:
Sheet
PRELIMINARY
LANDSCAPE
PLAN
A40135
~7
AS NOTED
~
PL-2
'"
0
'"
'"
0-
S E
VI 0
0
~~4)(~
~~t:,g~
> -
~~~*g>
OO~~..
Q: .~~a.
:<( '" I I <>
~::I..........O
~~~~.g
~ .!
O~O'O'c:
~::>:g:g&.
-1%1................0
~
I-
Z
W
~
CLW
0::)
.....J
WZ u
Q >~ :j
'<:( W < vi
~o < ~
::)U ~
u
lLJ~< ~~
:> z~~ ~
f= ~<I- ~
'<:( 0::: I- e::: ~
I-- <( 'W u
:z: CL Z a.. VI
lLJ ::)~
I-- ogu ~
Z..- VI
<(0 :::>
..- ~
.....J z
~
<( Ii::
I-
W I.L/
Z
0::: ~
0
0; ! 0; ~
'0 <; ill
u
0 ~ VI ~
..
'0
0
..
c:
0
0;
">
..
Q:
.;
~
SHEET
C-01
OF 4 SHEETS
JOBI: 06-053
Tentative Map
RETAIL & PARKING DEVELOPMENT
JOJOO N. TANTAU A VENUE
Cuperfino~ California
r
r
$125 STE\OIS Gflf:Ek "~'v1)
AA'EA:16.354SQ.H
HE1Gl11,SO'
LOCATION MAP
..T&
VICNTY MAP
1tT&
ABBfEVIA 11ONS:
SUi:;;VEy()r~: U::C;f:~!D:
----,-,-_.,-_._---~~-
AD
BW
CB
DO
os
DWY
(E)
EG
DI
EWAE
EP
IT
FM
Fl
Fil
FS
GII
GR
HP
INV
JT
JP
LO
LF
(N)
PSDE
PSSE
PUE
RIll
so
SDCO
55
SSCO
TW
TYP
W
WI!
AREA ORAIN
BOTTOII OF WAll. ELEVATION
CATCH BASIN
DECK DRAIN
ROOF DOWN SPOUT
DRIVEWAY
EXISTING
EXISTING GRADE
ELECTRICAl IIETER
EMERGENCY VEHIClE ACCESS EASEMENT
EDGE OF PAVEMENT
FINISH FLOOR ELEVATION
FIRE HYDRANT
flOW UNE ELEVATION
FORCE MAlN UNE
FINISH SURFACE ELEVATION
GAS METER
GRATE ELEVATION
HIGH POINT
INVERT ELEVATION
JOINT TRENCH
JOINT POlE
lANDSCAPE DRAlN
UNEAR FEET
NEW
PRIVATE STORII ORAIN EASEMENT
PRIVATE SANITARY SEWER EASEMENT
PUBUC UTIUTY EASEMENT
Rill ELEVATION
STORII ORAIN UNE
STORII ORAIN Cl.EANOUT
SANITARY SEWER
SANITARY SEWER Cl.EANOUT
TOP or WAll. ELEVATION
TYPICAL
OOIIEsnC WATER UNE
WATER METER
AC
APN
QDBfP
ASPHAI. T
I..SSESSOR P;',RCEl, NUMBER
B.ACK FLOW rR[VE.NTQR
80LLt~R[)
BUt:...DING SET8ACK i.-iNE
CATCH BA.5!t\
CEN :[RUNE
CONCRETE.
CjNCRE1E PAQ
DR!vEWt.,'(
f:i.J~C1RI(.A.l. 80X
hEC1"RICftL CABINET
cu:cn~ICAL VAULT
F ACE OF CURB
FIRE DEPARTM[Nl CONNE:cr,ON
nRE HYDRA.N r
GAS METEr.;:
GAS VAl.V[
MANHOLE
MGWTORINC '\"JELL
SLDG
BS:"
CB
CONC
co
ill (8
EO
€V
Fe
FOC
M'H
L...) GM
IN ~~
PROPOSED
PARCEL
f!) MW
PI'
PLTIl
POST iND!CATOR VALVf
PLANTER
POW[R POl.E
PROPERTY LlN[
SQliARf. FEET
STREET UGH;
STREET LIGHT BOX
SiCRM DRAIN MANHOLE:
SANITARY SEiIY'ER CLlANOUT
SANITARY SEViER MANHOLE
7ElEPHONE
TRANSFORh-tER
TRAffiC S!GNI\.L BOX
METER
WATE.R VALVE.
YARD UGH f
DENOTES ENCROACHMENTS
CORRESP01\iDS TO SCHtDULE 8
ro---, PP
~ Pl
SQ. ff
$C
$C.
@ SOWH
@ ssco
@ SShlH
TEL
TRANS
TSO
vr
~ WM
[><JWV
Q: Yl
@
Q)
--
A-.
----
.--
--
-'
60
IAI~UP/
GRAPHIC SCALE
w
~(f)
5:
SITE PLAN
SCALE: 1 "=60'
NOTES:
OWNER:
SAND Hill PROPERTY COIIPANY, CONTACT: JOHN TZE
489 S. EL CAMINO REAL, SAN MATEO, CA
PHONE: (650) ,3<<-ISoo
FAX: (650) i<<-tl652
AP CONSULTING ENGINEERS, CONTACT: TONY PONTERIO
1200 HOWARD AVE, SUITE 202, BURUNGAME, CA
PHONE: (650) 347-4-448
FAX: (650) 347-44-49
GENERAL NOTES - ~RY'EYOR
OIISER\lOD NO OlSCERNllllE EWlENCE OF EARlH NO..,NG WORK.
BUIlDING CONSlRUCnON OR BUilDING AOOnlONS iMTHIN RECENT
MOHmS
OBSER\S) NO DISCERNIBLE E\IIOENCE OF RECENT STREET OR SIDEWAlK
CONSTRUC11QII OR REPAiR_
OBSER\€ll NO 0lsca<N1tlLE E'<1llENCE OF SllE IlElNG USED AS A SOlJO
WASTE DUMP. SUMP OR SANfTARY lAHDFllL
mE EXISTENCE AND LOCA 110N or- All Ul1UllES. PIPES. POlES.
NtD/a< STRUCTURES SHOiM'l ON THIS S1JRIO l\ERE OIITAlNm BY
OBSER\EO E'f1DENCE ONlY. THE paNT OF ENTRY ON $.4JD UnUTlES
CANNOT BE DETERMINED
A1...L FlE1D WEASUREWENTS IiIA TCHED RECORD OItIEHSlOOS WITHIN THE
PRECISION REOUIREllENTS OF ALTA/ACSM SPEClFlCAnONS UNLESS
OlHER'MSE SHO\\N.
APPUCANT /CIVlL ENGINEER:
APN:
EXISTING lAND USE:
PROPOSED lAND USE:
STORM ORAIN:
WATER:
SANITARY SEWER:
TELEPHONE:
GAS a: ELECTRIC:
GARBAGE:
SITE AREA:
316-19-033, 061
P (CG, 0, ML. HOTEL)
P (CG, 0, ML. HOTEL)
CITY OF CUPERTINO
CAUFORNIA WATER SERVICE CO.
CUPERTIHO SANITARY DlSTRlCT
ATI:T
PGa:E
LOS ALTOS GARBAGE CO.
410,200:1: SF
!Nl'Ol1..e.s CO[::&[i-~it~O!NiO~~~ YU SCHIEKm!l..fr:. :0
~.t"iL [J)~$<<:;~trY1Vi~
nTlE ITEMS PER SCHEDULE "8" CF "THE POUCY Of nllE INSURANCE PREPARED
BY FIRST AMERICAN nTLE COIlPANY, UNDER ORDER NO. NC$-l254S6-SC. OAIDl
1BO
"AT1ERS THAT AffECT PARCfL ONE:
(J)MtNINUW DISTANCE OF 60' BETVlEEN ADJACENT BUILDINGS PER K994 OR 1580
(AffECTS FEE PARCEl. NOTHING TO PLOT)
CID SlOEWAlJ( EASEIlENT PER LJ17 OR 1782 (PLOTlEO)
<Zl ELEClRlCAL AND COIolllUNICAnONS EASEIlENT PER L357 OR 17B9 (PLOTlEO)
WATTERS mAT AfFECT PARCEl TWO:
@ RruNQUISHMENT OF ABUTTER'S RIGHTS PER 5889 OR 328 (PlOllED)
@ PUE PER 8069 OR 642 (PlOTlEO)
@ EASEIlENTS PER 589 .. 3-4 (PlOTlEO)
ti8'l UCENSE AGREEWENT FOR IHSTAllAn~ AND WAlNlENANCE OF
~ICA1lONS FAcunES PER K295 OR 1171 (PLOTTED)
Gj) CAR POOl/VAN POOl AGREEIIENT PER DOC. NO. 97J0564 OR (AFFECTS FEE
PARCEl. NOT PlOTTABLE)
(20) MINIMUM DISTANCE Of 60' BETWEEN ADJACENT BUIlDINGS PER K994 OR 1580
~C1S FEE PARCEL. NOTHING TO PlOT)
REAL PROPERTY IN lHE QTY OF CUPERTINO. COUNTY OF SANTA
ClAR.... STATE OF CAUFORN'A. DESCRIBED AS FOlLOWS:
PARCfL l'Mk
PARCEl 1, AS SH~ ~ THAT CERTAIN PARCEl YAP v.HICH
WAS AlED IN 'THE Of'FlCE OF THE RECORER Of SANTA Q..ARA
COUNTY. STAlE OF CAl..IFORNIA ON .lJlY 2'. 1988 IN BOOK 589
OF "APS, PAGES J ANI) 4.
THE PROPERTY HEREON ~BED IS lliE SAME AS THE
PERllNENT PROPERTY AS DESCRIBED IN lIfE POUCY OF nTLE
INSURANCE PREPARED BY RRST AMERICAN TIllE CQWPANY
UNDER ORDER NO. NCS-125456-SC, DATE 180
APN: 316-1S1-033. 061
SI-EET H)E)(:
C-Ol TENTATIVE MAP
C-02 NEW PARCEL GRADING I: DRAINAGE PlAN
C-03 NEW PARKlNG STRUCTURE GRADING I: ORAINAGE PlAN
C-D4 TREE REMOVAL PlAN
1 or 1 ALTA/ACSII lAND ffiLE SURVEY
SITE AfEAS:
-ALL STORM WATER SHALL BE COLLECTED ON SITE AND DIRECTED INTO THE EXISTING STORM
DRAIN SYSTEM. NEW CONNECTIONS Will BE MAOE WHEN NECESSARY.
-SEWAGE WILL BE DISPOSED OF BY CONNECTING TO CUPERTINO SANITARY DISTRICT SYSTEM.
NEW CONNECTIONS WILL BE MADE WHEN NECESSARY.
-WATER SHALL BE SUPPUED FROM THE CITY MAINS. NEW CONNECTIONS WILL BE MADE
WHEN NECESSARY.
-EXISTING UTIUTIES SHALL BE RELOCATED PER THE CITY OF CUPERTINO.
-All CONSTRUCTION SHALL BE IN CONFORMANCE WITH CITY OF CUPERTINO BEST
MANAGEIIENT PRACTICES TO PROHIBIT POLLUTANTS FROM ENTERING STORM WATER SYSTEM
DURING CONSTRUCTION AND IIAINTENANCE.
-ALL CONSTRUCTION SHAll BE IN CONFORMANCE WITH CITY OF CUPERTINO STANOARDS
iWl18 OF_
mE WESTERN lINE Of PARCEL ONE. NOO"2S'16.W,
AS SHO'tIIN ON mAT CERTAIN MAP FlLED fOR
RECORO IN lIfE OFFICE OF THE RECORDER OF
lHE COUNTY Of SANTA ClARA. STATE CF
CAUFORNIA ON .lJL Y 21, 1988 IN BOOK 589 OF
MAPS. PAGES 3-4, WAS TAKEN AS THE BASIS
Of BEARINGS fOR lHlS MAP.
PROPOSED PARCEL =
REMAINING PARCEL TWO =
43,160:1: SF
367,040:1: SF
By graphic plotting only, thla property Is In Zone(s)
~Of the Rood Insurance Rate WGp, Community Panel No.
05=01~960 and is not In 0 = f1~ H~ffec":: :;.te of
telephone coil dotlld 02-10-2006 to the Notional Flood tn...ranee Program
(800--838-6620) we ho.... leomed thl8 community does currenUy porticlpote
In the pl"09J"0f'l. No fWd 8Uf'WI)"fng waa ~fonned to det.-mlne thl. zone and
on elevation certificate may be needed to verify thi8 determination Of" oppty
for 0 'o'Or\ance from the federal Em.-vency Wmogem-.t Ag<<lcy.
ER
CONC RAMP
PARCEL ONE
PER 589 M 3 & 4
10100 & 10200 NORTH TANTAU AVE
AREA: 104,409 SQ. FT.
HEIGHT: 32.7'
TYPE III-N
61
,
,
,
,
, ) V "V <- /
" @ , //
'v/~ OVERHANG ----'y./
PARCEL
410,200
9.4169
TWO
SQ. FT.
ACRES
'.4 Q: CONCRETE
Q: Q: Q: '.4 T
'.4 T
'.4 T
'.4 T
'4PLTR PLTR
'.4 T
CONC WALK
86.33
'.4 T
. .5 T
'.4 T
CONC
'9T~
~
~
~18
8.,;
~..
z
_SIGNa~
1~807 jI
I .cu:< L~I 1.;T~ I I
- - - ..::.T...E.C TEL. BX b~ ~
CP~ - _TEL "1M
--_.~ ~
~ 0 -_.~---'--
TSB ~( 1.7 T - -
_ (E) S
PLTR
1.4T----
TSB 1.5 T
105.60
~
CONC DWY
TEL BX
~
w
z 1_ (f)
s
NEW PARCEL
PRELIMINARY GRADING AND DRAINAGE PLAN
SCALE: 1"=20'
o 20 40
I I ___~
GRAPHIC SCALE
589"59'57"E
159:50~-
I
I
~100 lolls
- Icl SIGN
I
I
~1.
0"
81~
- ~i~
~
I
I
i
. .5
. .6
co
r<)
<.0
CO
. .5
. .8
4.bf4.t ~
~,#!1
S[
R=50.00
L=20.58
~34'39"
RAMP
~~
~
~
o
~
~
:5 E
V) 0
. 0 "
~c;"::i')(,~
:z...~~.
~ oa '-'- .s
-<-<~~g>
00.......
Q: .......Q.
~~.!..!.g
o~"''''.$!
:r::zI<)I<)~
o :; O''O'~
~~~~&.
--D:l................O
r
;i
T
~
co
..0
I:'-
0)
~
I-
Z
Zw
<(~
....10..
a.. 0
....,jW
l.aJ w::>
~>Z ~
<(WW ......
Z 0> en
- <<( ~
~ c:,,::> () ~
a z< .. ~
-~o VI
~Z <(
a (k:<(Z rs
., <:(~~ ~
"- 0.. a::: 0
<( .W
Za.. ~
o :::> ~
~ZOUI.oJ
~ <:( ~ Iii
a 0 ::l
I ~
<(=..... ~
0::: <:( ~
~I-
W ci::
(k: I.oJ
~
o
~~v
WCl
~z
W<(
Vl
<(I")
W
W ~~
Um
500
a:: 10
Wa::
Vlw
ull.
::::i
CD
~
a.
D
JP
~
... I ~ I
.. I
.! ~
" ..
o ~ V) ~
Tl
..
1;
0
R=40.00
L=46.37
6=66025' 21 ..
..
c:
.!!
.!!
>
.
Q:
o
:z
SHEET
C-02
OF 4 SHEETS
JOBI: 06-038
FOUND IRON PIPE
SOT17'36"W 2.35'
FROM RECORD
__~,:",.~T~~10T '1.2T
-1.0 T '1.0 T -1.0 T '1.0 T-.~.9T
:Q SOO
J:1
cf
~
."
#
~
~
~
~&
~",
~~
c:Y~
~ ~~ .
~!<Y I'L 'b~
~!V ~.
q, ~
PARCEL ON
PER 589 M
10100 & 10200
AREA: 104,409
HEIGHT: 32.7'
TYPE III-N
APN: 316-19-061
HAZEL LESTER
,
,
" ~ PL"IR 'V" //
, > ~
" / @) '-
'v/---- OVERHANG -----,
. .4 :(x CONCRETE
:Q :Q :Q . ."
'.4 T
. .4 T . .4 T
. "PLTR PLTR
~
101
CONC WALK
w
Z --.J 1- (f)
5
PROPOSED PARKING STRUCTURE
PRELIMINARY GRADING AND DRAINAGE PLAN
SCALE: 1 "=20'
o 20 40
I I I
GRAPHIC SCAlE
<"l
<=I
<"l
~
:5 E
1Il 0
'0 "
~;;::/')(,~
Z't~~.
~ 0) '-' '- .E
~<~~g'
QO't't.
1I:....'t'tlt
~::Er!..r!...
o~'t't.2
:x:2:........;
o :J '0' '0' c:
~~:2:28.
-CD,-,-O
QII
Z
~1-
~z
W
w~
<'=>Q..
~ 0 1.&.1
~ -I::>
~Wz
0::: > 1.&.1
OW> .
0<(<( ~
o ....u ~
Z,,,-, (.)
~......<( ..0
"'" ZI--Q ~
-Zz -<
<.=> ~ <( I-- :..:
Z e::: I-- a:: ~
a < .1.&.1 fi
~ Q.. z a.. lI)
a:: ::>~
<.=> oou ~
Zo .....
>- or- lI)
a:: <0 ~
~ or- .....
"'" -I 2
Z_ ~
-<
~1-
-JW
We:::
a::
Cl..
(.)
-I
-I
Ii:
L..I
~
o
Ii I Ii I
;;
Q ~ ~
II
.
;;
Q
OJ
c:
.2
.!!
:-
.
II:
.;
z
SHEET
C-03
OF 4 SHEETS
JOB': 06-053
",I'
154.17
FOUND IRON PIPE
APN: 316-19-031 S07'7.J<;"W 2.35.
.,-if .";7, ~~~~~~D.:~~~~'-:i.1T"I:Z' FR~.~C~
"1.4T. 01.4'.
11__00...
~
a.-~"4I.06.
........
r.-a.n
6-er~If.,.
NOTE: 42 TREES TO BE REMOVED
SEE LANDSCAPE PLAN FOR TREE PLANTING
w
z -' 1_ Ul
5
o 40 80
I I I
TREE REMOVAL PLAN
SCALE: 1"=40'
GRAPHIC SCALE
TREE PROTECTION NOTES:
1. PROTECT EXISTING VEGETATION, INCLUDING OVERHANGING BRANCHES AND ROOTS
FROIl COMPACTION AND DAMAGE DURING MATERIALS STAGING AND CONSTRUCTION.
TRENCHING ADJACENT TO AND WlTHtN TREE DRIPUNES TO BE OONE BY HAND TO AVOID
ROOT DAMAGE. IF ROOTS LARGER THAN ONE (1) INCH DlAIlETER ARE ENCOUNTERED,
ALERT LANDSCAPE ARCHITECT. DA"AGE TO ANY ExiSTING PLANTS OR PlANTS TO
RElIAIN ARE TO BE REPLACED AT THE EXPENSE OF THE CONTRACTOR. PROTECT TltEES
WITH FOUR (4) FOOT PLASTIC MESH FENCING AS SHOWN ON PLAN.
6. EXCAVATION SHALl BE OONE BY HAND IN AREAS WHERE TWO (2) INCH AND LARGER
ROOTS OCCUR, AND IN AREAS WITHIN THE DRIPUlIE OF EXISITNG tREES TO REMAIN.
7. ROOTS TWO (2) INCHES AND LARGER IN DIA"ETER, EXCEPT DIRECTLY IN THE PATH OF
PIPE OR CONDUIT, SHALl BE TUNNELED UNDER AND SHALL BE HEAVILY WRAPPED WITH
BURlAP TO PREVENT SCARRING AND EXCESSIVE DRYlHG.
PROTECTIVE rENClNO
2. DO NOT PARK VEHICLES OR STORE ..ATERIALS OR EQUIP..ENT WITHIN THE DRIPUNES OF
EXISTING TREES TO RE..AlN.
3. WHERE IT IS NECESSARY TO EXCAVATE ADJACENT TO EXISTING TREES,
THE CONTRACTOR SHALl USE CARE TO AVOID INJURY TO TREES AND TREE
ROOTS.
4. NO TREE ROOTS GREATER THAN ONE (1) INCH IN DWlETER "AY BE CUT DURING
THE PERFORMANCE OF DEIoIOUTION WORK, INSTALLATION OF UTlUTlES OR CONSTRUCTION
OF FOOTINGS.
5. WHEN TREE ROOTS ARE ENCOUNTERED DURING EXCAVATION, THEY SHALl BE
CAREFULLY UNCOVERED AND THE ADJACENT MATERIAL REMOVED WITHOUT ROOT
DAMAGE, AFTER WHICH THE EXCAVATION SHALl BE IIiI1llEDlATELY BACKRLLfD.
8. WHERE A DITCHING ..ACHINE IS RUN CLOSE TO TREES HAVING ROOTS SIIAlLER THAN
TWO (2) INCHES IN DlA"ETER, THE ROOTS SHALl BE HAND TRI....ED AT THE WALL OF THE
TRENCH.
9. WHERE IT IS NOT POSSIBLE TO AVOID CUmNG ROOTS GREATER THAN ONE (1) INCH IN
DWlETER, THE OWNER'S REPRESENTATIVE SHALl BE NDTlRED, AND THE WORK SHALL BE
OONE ONLY BY A QUAURED ARBORIST. ROOTS OF TREES SHALl BE CUT USING CLEAN,
SHARP PRUNING TOOLS. ROOTS SHALL NOT BE BROKEN OR TORN LEAVING RAGGED
ENDS.
10. CLOSE TRENCHES ADJACENT TO TREES WITHIN 24 HOURS. IF THIS IS NOT
POSSIBLE, KEEP SIDE OF TRENCH ADJACENT TO THE TREE SHADED WITH BURlAP OR
CANVAS.
11. CONTINUAL PUDDUNG OR RUNNING OF WATER IN THE VICINITY OF THE TREE SHALL
BE AVOIDED.
TREE PROTECTION DETAIL
.ImES:
1. PROTECTIVE rElIClIIG SHALL
BE BRtGHT 0_
POLYPROPYLENE FENCING.
2. NOTHING INSIDE THE
DR/PUNE AREA SHALl BE
RAKED, CUT, STORED, OR
OTHERWISE DISTURBED.
NOT TO SCALE
~
C
~
~
:5 E
1Il 0
"
~~:i'><'~
Z....~~.
~ ~ '-'- S
"'C"(~~~
lil':~~X.
~~,.'.,.'.&
O~"""".2
:Z:z"l"l~
8 ~ O'Sl
~;:):g:gQ.
-a:t,-,-o
;i
I-
Z
w
::E
a..
0
Z ...J w
~ w::>
....J > Z (,)
Q W~ ::l
0<( iii'
....J <(~
~ ,-,::>U ~
::>Z<( ~O
0-.....0 ~
~ ~ZZ -<
0::: <( - :loc:
l.t.J <(..... t: t:::
a:: a.. .w ~
Z 0.. (I)
l.t.J OO~ ~
l.t.J Z 0 ~
a:: <(,.... tl
I- 0 ::l
...J,.... ~
<( ~
~
I-
W ~
0::: ~
~
0
.! ! ~ I
0 0
0 ~ "
0 1Il :!
.!
~
..
c
0
~
.
II<
ci
z
SHrET
C-04
OF 4 SHEETS
JOBM: 06-053