Loading...
09. Budget City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: (408) 777-3220 FAX: (408) 777-3366 DEPARTMENT OF ADMINISTRATIVE SERVICES CITY OF CUPEIUINO SUMMARY Agenda Item No. 9 Meeting Date: June 19,2007 SUBJECT AND ISSUE Receive public comments, discuss, and adopt the 2007-08 budget. BACKGROUND The purpose of tonight's hearing is to give the public a final opportunity to comment on the proposed 2007/08 budget before City Council takes action. An in-depth review of the budget was presented to City Council at a budget work session on June 4 and a public hearing was held on June 5. Council discussed the General Fund financial position, reserve levels, departmental operating budgets, and the five-year capital improvement program. RECOMMENDA nON Staff recommends that Council take the following actions: 1. Receive public comments 2. Grant a negative declaration 3. Adopt a Resolution establishing an operating and capital budget for fiscal year 2007/08 4. Adopt a Resolution establishing an appropriation limit for fiscal year 2007/08 Submitted by: Approved for submission: 9zL David W. Knapp City Manager (~L, /~{i, a~(./trJJ. Carol A. Atwood Director of Administrative Services Printed on Recycled Paper RESOLUTION NO. 07-110 DRAFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO ADOPTING AN OPERATING AND CAPITAL IMPROVEMENT BUDGET FOR FISCAL YEAR 2007-08 BY RATIFYING ESTIMATES OF REVENUES TO BE RECEIVED IN EACH FUND AND APPROPRIATING MONIES THEREFROM FOR SPECIFIED ACTIVITIES AND ACCOUNTS AND SETTING FORTH CONDITIONS OF ADMINISTERING SAID BUDGET WHEREAS, the orderly administration of municipal government is dependent on the establishment of a sound fiscal policy of maintaining a proper ration of expenditures within anticipated revenues and available monies; and WHEREAS, the extent of any project or program and the degree of its accomplishment, as well as the efficiency of performing assigned duties and responsibilities, is likewise dependent on the monies made available for that purpose; and WHEREAS, the City Manager has submitted his estimates of anticipated revenues and fund balances, and has recommended the allocation of monies for specified program activities; NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby adopt the following sections as a part of its fiscal policy: Section 1: The estimates of available fund balances and anticipated resources to be received in each of the several funds during fiscal year 2007-08 as submitted by the City Manager in his proposed budget and as have been amended during the budget study sessions are hereby ratified. Section 2. There is appropriated from each of the several funds the sum of money as determined during the budget sessions for the purposes as expressed and estimated for each department. Section 3. The City Manager is hereby authorized to administer and transfer appropriations between Budget Accounts within the Operating Budget when in his opinion such transfers become necessary for administrative purposes. Section 4. The Director of Administrative Services shall prepare and submit to City Council quarterly a revised estimate of Operating Revenues. Section 5. The Director of Administrative Services is hereby authorized to continue unexpended appropriations for Capital Improvement projects. Resolution No. 07-110 Page 2 Section 6. The Director of Administrative Services is hereby authorized to continue appropriations for operating expenditures that are encumbered or scheduled to be encumbered at year end. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 19th day of June 2007, by the following vote: Vote Members of the City Council AYES: NOES: ABSENT: ABSTAIN: APPROVED: Mayor, City of Cupertino ATTEST: City Clerk RESOLUTION NO. 07-111 DRAFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO ESTABLISHING AND ADOPTING THE APPROPRIA nON LIMIT FOR FISCAL YEAR 2007-08 WHEREAS, the State of California has adopted legislation requiring local jurisdictions to calculate their appropriation limits in complying with Article XIII B; and WHEREAS, said limits are determined by a formula based upon change in population, (city or county), combined with either the change in inflation (California per capita income) or the change in the local assessment roll due to local nonresidential construction; and WHEREAS, the local governing body is required to set an appropriation limit by adoption of a resolution; and WHEREAS, the city population percentage change over the prior year is 2.00%, and the California per capita personal income change is 4.42%. In computing the 2007-08 limit, City Council has elected to use the city population percentage change, and the California per capita income change was used, but the Council has a right to change nonresidential assessed valuation percentage when the figure is available. NOW, THEREFORE, BE IT RESOLVED that the City Council ofthe City of Cupertino hereby approves a 2007-08 fiscal appropriation limit of$65,248,148. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 19th day of June 2007, by the following vote: Vote Members of the City Council AYES: NOES: ABSENT: ABSTAIN: ATTEST: APPROVED: City Clerk Mayor, City of Cupertino c c ~ ~ r r-() 7 -#=c( 2007/08 Budget Study Session & First Public Hearing Council Comments . Budget Lowenthal Mahoney Kwok Sandoval Wang Increases 1 Stocklmeir orchard granUmatch requirement $10,000 CIP Res 2 Lawrence Linear Park - move one year ahead to 07/08 and add $500K to budget 500,000 CIP Res 3 Master Plan of the Sports Center - 5 year plan addressing a pool, gymnasium, etc. 35,000 CIP Res 4 Increase Quinlan Fountain site project budget 60,000 CIP Res 5 Install sink on first floor of City Hall 50,000 CIP Res 6 City contribution for Veteran's Memorial 55,000 General** 7 To-be-determined green project 500,000 CIP Res 8 Modify Red Light program to traffic safety and address the tri-school area 50,000 CIP Res 9 Cupertino Day 20,000 General** Total $1,280,000 ** The Proposed budget used the Gen Fund Undesignated Fund balance to provide the money for a good portion of this year's capital projects. Once this Unreserved Fund Balance was used, we funded the remaining CIP projects from the CIP Reserve. If the City Council decides to approve a budget increase in the General Fund operating category, please note that the bottom line effect will be to reduce the crp Reserve b reinstating the Undesignated balance and funding the necessary dollar amount from that reserve. , Please note: Approval of any of the above will reduce your General Fund reserve levels below the $16 Million policy limit. FinancefBudgeU2007-08 budgeUcouncil comments from study session ! . t.v I I '- Sorts Center Pool Pro osals Com . arlson Name Program Typel Start nate Yrs. Experience Proposed MolRent Lease Length Renewal Terfus Proposed Insurance Capital Investment . Use of Existing Enclosure? . 5 yr. Total Rent & Capital Investment Project Cost 5 Yr. Cost to City MaIO Lessons all 15 years $4K/mo. after 7.5 yrs. w! Renewal $250K + up $5.1 million Wants to $250K $600K $350K ages! 5 yrs renewal option after 5 front purchase from abilities! option yrs. DACA, or will disabled after 5 yrs. make provisions for Flexible another if start date needed. Water Swim 20 years $2K 5 yrs. Two options to If $500K $1 million Wants to $570K $600K $480K Babies School. 4 years as renew, for 5 annual gross: aggregate purchase from potential, only owner yrs. each. per incident DACA, or will $2KJmo. is or Start Date: Must give 1 sl yr. will pay make guaranteed. Spring 2007 renewal notice 10% of gross = provisions for (contingent on $30K if at least 1 yr. $50K. another if hitting annual tenant prior to 2nd yr. 20% of needed. gross revenue earns expiration. gross = $ lOOK goals each of 5 $500K 90% of fair 3rd_5th yr. will years) gross rev. market rent the pay $lOOK in each of second each year. 5 yrs. . renewal. If less than $550K/year, NO capital investment YMCA Private! Cupertino $1/mo. for fITst 5 yrs. None specified $30K w! yes Possibly $30,060 $600K $569,940 group SWim YMCA has 5 6mo. Until Board purchase from lessons, all years understanding approval DACA ages/ experience of utility and depending on abilities. bubble costs the cost Flexible start date 6/19/2007 ~i) SpOrts Center Pool Options Facility Type Facility Potential Programs Programs Currently Community Need Construction Cost Pros Cons Components WIthin Proposed Offered? Facili 2-3 outdoor Open court times, No At 1/8/7 goal study session, $100,000 base . Member amenity . No use during inclement courts, benches, leagues, rentals City Council discussed. this (demo/pool filVretum to . Minimal noise/nuisance to weather etc option level swface) neighborhood . Low maintenance $80,000-$100,000 for . Appeals to adult community court construction and amenities Total Cost Estimate: $200,000 plus hathI'OOIm/sto Outdoor court, Basketball, Street Basketball programs are No existing full-length $100,000 base . Member amenity . No use during inclement basketball hoops, Hockey/Roller Hockey, offered via renting school sports court. (demo/pool filVretum to . Would also be used for weather painted hockey In-line Skating and district facilities. Summer Roller Hockey level swface) existing and new P&R lines Dodgeball - drop-in, Roller-hockey Camp uses Camps and In-line Skating programs/would not have to leagues, classes Creekside Parking Lot. Classes would be better $90,000-$130,000 for rent out school facilities In-line Skating uses City served in a contained sport court and.all . Increased appeal to Hall Parking Lot. facility. accessones families-increased SC memberships Total Cost Estimate: $230,000 plus bathrooms/storage Tennis Court for Tennis 17 courts at CSc. 12 are This option was requested $100,000 base . Consistent with the theme of . Already have 17 courts members, classes, lit. by the Cupertino Tennis (demo/pool filVretum to the facility . City Council has expressed and c.amps Club. The City Council did level swface) . Could generate additional they do not support an not ask for a review of this revenue additional court option. $150,000 to convert to tennis court Total Cost Estimate: $250,000 plus sto~restrooms 6/1912007 Facility Type Facility Potential Programs Programs Currently Community Need Construction Cost Pros Cons Components Within Proposed Offered? Facili . 5-8 individual Putting, chipping, and Yes, through our According to the cities Golf $100,000 base . Consistent with the theme of . Noise bays enclosed driving lesson~overs all contractor Deep Cliff Pro, there is a lack of these (demo/pool filVretum to the facility . No structured programs with triple three components of the Golf course types of facilities in the level swface) . New program offerings during winter due to layer mesh game-5-8 individual bays South Bay. . Lessons would provide feeder inclement weather net with steal Additionally participants $120,000 -$160,000 for program into advanced . Ideally a golf facility should be beam would playa round at bays, poles, nets, putting lessons w/pro out at 10C'.ated at BBF Golf Course. construction Blackberry Farm with the swface, and ball retrieval Blackberry farm . net would be golf pro syslem . Many CSC members play 15-30 ft high Total Cost Estimate: golf, could be interested in . putting green $260,000 plus using a lesson facility sto trooms Permanent Skate Park open during The SK8 Mobile is now Requests to staff and City $100,000 base . Would free up parlting at . Noise issues Cement Skate specified hours, classes approx. 5 years old. It is Council for a better skate (demo/pool fUVretum to Creekside and other parks . Safety issues in parking lot Park . nearing the end of it's park and location. level swface) that are used for skating . Compatibility between skaters useful life. . No maintenance costs to and sports center members $210,000-$300,000 for rurrent mobile pieces . Facility would only be used skate park construction during non-school hours . No use during inclement Total Cost Estimate: weather $400,000 plus bathrooms,lsto Outdoor 6 lane Lap swim, coached No Lap swimming available at $ 1.5-2 million for pool, . Consistent with the theme of . City Council had already lap pool, masters workouts, water DeAnza, Freemont High new lockers, office, pump the facility decided against a pool due the men's/women's aerobics, deep water School, and YMCA but it room . Members had asked about construction cost. locker facility, aerobics classes, senior is not a city program access to the DACA pool equipment room, classes, rehabilitation Total Cost Estimate: office programs $2,100,000 Indoor building, Accommodate a variety Basketball and other Yes-city does not have a $250,000 to convert to . Member amenity . Potential decrease in parking full court of youth and adult sports sports related C'aIIlps are full court g}m facility tennis court! demo/pool . Would also be used for basketball, for drop in, leagues, currently offered and city filVretum to level swface existing and new P&R badminton, classes, and camp and school district programs/would not have to volleyball programs. facilities Gymnasium cost is $2-3 rent out school facilities million . Increased appeallo families-increased SC memherships . Consistent with the theme of the facility . Could be used year-round * Replacement amenities and Dog agility course options removed by motion of P&R Commission on Oct 5, 2006. Page 1 of 1 Carol Atwood ~ Subject: FW: First Floor Sink -----Original Message----- From: Terry Greene Sent: Wednesday, June 13, 2007 3:34 PM To: Carol Atwood Cc: Ralph Qualls; Jim Davis; Bob Rizzo; Roger Winslow; Greg Casteel; Carmen Lynaugh Subject: First Floor Sink Carol, following our meeting with you and Ralph, I met with Roger, Bill and Rudy to discuss the options for the sink. Unfortunately they all have serious problems as I've noted below: 1. First floor janitor's closet conversion: won't work because it has a large electrical panel in the same space, a serious code conflict that would not be allowed today 2. Build a recess in the east I west corridor next to the women's rest room: won't work because the adjacent duct work is too large and it would penetrate a One Hour rated wall and violate the code requirements for a required "exit" corridor from Conference Room 100. cannot create an assembly space in an exit path. 3. Use the water fountain recess near the entry to the City Managers offices: won't work because it would violate the code requirement for a required "exit" corridor from the City Managers offices. 4. Somewhere in the Finance Department area: impractical and costly because the slope required to drain the the sink to an existing sanitary drain line, all of which are at the other end of the building, could easily cause the drain line to be 3 or 4 feet below the lower level ceiling and have to run under the lights and over the open cubicles. 5. Along the back (east) wall of Conf Rm 100: if open to the public in the room, unsightly. if enclosed, it will require a top and it will project into the room in an awkward way, but it would be close to the plumbing. One alternative not yet suggested would be to install a dishwasher in the break room and use it. A second alternative would be to "encourage" the meetings that generate dishes that need to be washed to occur in the Community Hall near the kitchen and use the dishwasher there that has never been used since it was opened three years ago. We might also look into a "portable" dishwashing station or cart that could be loaded up and elevatored to the lower level break room. Finally, and as if all of the above were not enough, any solution we come up with has to be ADA accessible and the under counter, height and horizontal space requirements are not simple or small. It might be best to wait until the building reconfiguration takes place in a year or two and incorporate it then. Terry W. Greene, AlA City Architect City of Cupertino 10300 Torre Ave Cupertino, California 95014 650 799 1837 (cell) 408 777 3248 or 408 777 3354 408 777 3333 (fax) terryq@cupertino.orq ~ 6/18/2007 Carol Atwood -!:-l, From: Sent: To: Subject: David Knapp Tuesday, June 12, 2007 7:48 AM Carol Atwood; David Woo FW: -----Original Message----- From: Sandra James [mailto:sandyljames@sbcglobal.net] Sent: Monday, June 11, 2007 8:11 PM To: Kris Wang; Patrick Kwok2; Richard Lowenthal; Dolly Sandoval2; Orrin Mahoney; David Knapp; Ralph Qualls; Rick Kitson Subject: A personal thank you to all of you for your donation of $55,000 toward the Cupertino Veterans Memorial. As you know, I was out of town last week but did work on the group presentation before the City Council. I was quite proud of the team and especially proud of the City Council and staff. Not every city has the vision to encourage their community to work toward a life long monument to the very elements that make our city and country great. You should take great pride in your leadership and ability to work together toward such an all encompassing mission. It is a time when I am quite proud to be a part of this community! I also received a donation of $25,000 today from Prometheus Development and another $5,000 in orders for pavers, including a $1,000 paver from Taylor Woodrow Homes. Our pavers and the messages that families, organizations, businesses and individuals are having engraved on them make the memorial even more poignant and meaningful. I hope that you all will consider being represented on the Walk Of Remembrance, especially those of you who have veterans in your families or are veterans. Michael and I attended the 86th birthday of his step-father on June 5th. We presented him with a paver to be installed on the Walk Of Remembrance designating his WWII, Omaha Beach, D-Day+6 experience. Joe Turoff was overcome with emotion and will attend the dedication on Veterans Day as a World War II vet; we don't have that many left! Please let me know if there are any companies or contacts that you would like me to meet with in the fundraising and "name gathering" effort to complete this monument and of course you know that I will always be available to meet with you to give a current report on our progress. Again, thank you from all of us and all veterans for your compassion, vision and support. Sandy 1 Carol Atwood Page 1 of 1 ~\/L&~'t-'" ~8 From: David Knapp Sent: Tuesday, June 12, 2007 5:25 PM To: City Council Cc: Department Heads Subject: FW: Accident Stats Per request. -----Original Message----- From: Terrence.Calderone@sho.co.santa-clara .ca.us [mailto:Terrence.Calderone@sho.co.santa-c1ara.ca.us] Sent: Tuesday, June 12, 2007 4:07 PM To: David Knapp Cc: Linda Lagergren Subject: Accident Stats Mr. Knapp, I am sending you the information on the accidents associated with Red Light Violations as requested~ I hope that this information will be of value to yourself and Council. I have broken the information down to 2005 and 2006, red light related accidents, total accidents, percentages of accidents that were property damage only, minor injury and major injury. 2005: Total number of Red Light Related accidents = 58 65.5 % = Property Damage Accidents 27.6 % = Minor Injury Accidents 06.9 % = Major Injury Accidents Total number of accidents in Cupertino in 2005 = 535 2006: Total number of Red Light Related accidents =45 (This does not include December accidents for 2006) 75.5 % = Property Damage Accidents 17.8 % = Minor Injury Accidents 06.7 % = Major Injury Accidents Total number of accidents in Cupertino in 2006 = 532 (This does not include December accidents for 2006) The percentages noted above are for the red light associated accidents. The percentages are relatively the same for the total number of accidents throughout the city. They varied by one to three percent, but roughly the percentages are about the same regarding property damage, minor and major injuries. Please let me know if you have any other questions about the numbers above. Thank you, Terry 6/12/2007 .-, ~OOL-. TRI-SCHOOL AREA TRAFFIC AND SAFETY ISSUES DISCUSSION JANUARY 18. 2007 " . 1. THE PROBLEM: Traffic congestion converging at McClellan and Bubb Road during drop-offs or student drivers at Monte Vista High School, Kennedy Middle School and Lincoln Elementary School. Congestion spills over entire area including side streets off Bubb Road and McClellan. McClellan also backs up as far as east of Stelling when De Anza students are present. Problem further compounding by traffic congestion on Rainbow between Stelling and Bubb for drop-offs at Regnart Elementary School. 2. What's been done: Many things over a five year period (see attached) 3. Bottom Line remaining causes beyond City's control . Parent's and high school student drivers continuing practice of driving kids to school in single occupancy vehicles · School District(s) inability, for whatever reason, to provide busing services to elementary and high school destinations · Continuing perception that this problem is somehow the City's sole responsibility 4. Other actions? . Task Force? · Capital projects? What are they and Who pays for it? · Additional Sheriff's staffing for traffic control during peak hours? · Long term solutions.. .are there any that are even feasible? 5. Next Steps. 1. The Monta Vista High School, Kennedy Middle School, and Lincoln Elementary School Safe Routes to School (SR2S) project that . Designed and constructed a dropoff area in the high school's parking area adjacent to McClellan Road . Designed and installed a special accessible sidewalk ramp along the westerly commute to the tri-schools destination . Established a school safety zone along the McClellan Road frontage of Manta Vista High School and Lincoln Elementary School that included a warning beacon to the west and enhanced crosswalks with pedestrian-activated in-pavement lights . Installed other access improvements; 2. Preferential parking zones and the student parking program in the adjacent Monta Vista neighborhood; 3. Provision of seasonal parking privileges for Monte Vista High School students at Blackberry Farm near the high school; 4. Installation of road bumps along Byrne Avenue to help calm the traffic along the street, much of which is generated by the tri-school commutes; 5. In concert with the school administration, adjustment of the Lincoln Elementary School dropoff area and connecting McClellan crosswalk, and provision of a crossing guard; 6. Periodic upgrading of signing and striping in the McClellan Road and Hyannisport, Presidio, and Ft. Baker Drives school areas; 7. Periodic deployment of the radar wagon; 8. Traffic enforcement around the schools, including speed, traffic controlled intersection, lane, and crosswalk encroachment violations; 9. Safe Moves Comprehensive Traffic Safety Program; 10. Altrans program to explore commute alternatives; 11. Sheriff's deputy traffic instruction in the schools; 12. Hyannisport, Presidio, and Ft. Baker Drives parking restrictions; 13. Sheriff's Office Kennedy traffic circulation plan; Carol Atwood w From: Sent: To: Cc: Subject: Nishihara Jeremy [nishiharajeremy@cupertino.k12.ca.us] Friday, June 15, 2007 1 :41 PM Carol Atwood Quon Phil Preliminary Costs for CUSD/Cupertino Transportation Pilot Carol: Superintendent Phil Quon asked me to look into some preliminary costs for the Cupertino Union School District to implement Mayor Wang's tri-school area student shuttle pilot program. As per my voice mail, these numbers are in no way exact, but should provide a good starting point for discussion. Currently, the district maintains a fleet of 40 busses that are used for approximately 30 routes a day. The 10 non-used busses are the older busses in our fleet and are kept as spares in case of a breakdown. Thus we would need to either lease or purchase additional busses to run the shuttle routes. The rough estimates for purchase are: * Mini-bus (16-20 capacity) - $60,000 * Large bus (78 capacity) - $150,000 Leasing or renting a school bus is based on availability at the time and we are still researching cost and the minimum lease length. In addition, the cost for a driver to run the routes in the morning and afternoon would be roughly $3500 per month. This amount includes benefits and assumes a 5-hour workday. Some other information for consideration: * The law states that school age children being transported to and from school require the use of a school bus. This means that if the district was to administer the program, we are required to use a school bus or other certified mode of transportation. * The school district is required to approve all pick-up and drop-off locations. I hope this information is useful in projecting a preliminary cost for Mayor Wang's proposal. It is difficult to really pinpoint the cost of the program without knowing how many busses are need (based on the number of students participating) and the number of pick-up/drop-off points (based on the location of the students). Please let me know if you need any additional information. Sincerely, Jeremy Nishihara Communications Manager Jeremy Nishihara Communications Manager Cupertino Union School District Phone: (408) 252-3000 ext. 323 Fax: (408) 253-8119 Email: Nishihara_Jeremy@cupertino.k12.ca.us 1 Message Page 1 of 1 From: Pamela Moore [Pamela.Moore@library.sccgov.org] Sent: Monday, June 11, 2007 4:10PM To: Carol Atwood Subject: Library Statistics ub ~ Carol Atwood Hi, Carol - I have several numbers for you: According to a monthly report, average number of items checked out at Cupertino Library by Cupertino residents (vs. non-residents who use this library) in 2007 is 61 % ( just a reminder that Cupertino residents also use other SCCo Libraries, such as Woodland - 29% of items checked out were by CU residents) *- As of today, the number of fupertino residents with library cards is 30,517 Of all SCCoLibrary borrowers, 58,103 claimed Cupertino Library as their home library Hope this helps. Pamela Pamela Moore, Interim Community Librarian Cupertino Library . 10800 Torre Avenue, Cupertino, CA 95014 (408) 446-1677 ext. 3322 FAX: (408)252-8749 pmoore@library.sccgov.org Notice: This email message and/or its attachments may contain information that is confidential or restricted. It is intended only for the individuals named as recipients in the message. If you are NOT an authorized recipient, you are prohibited from using, delivering, distributing, printing, copying, or disclosing the message or content to others and must delete the message from your computer. If you have received this message in error, please notify the sender by return mail. . 6/13/2007 Page 1 of2 From: Cervantes, Melinda [Melinda.Cervantes@lib.sccgov.org] Sent: Tuesday, June 12, 2007 11 :22 AM To: Carol Atwood Cc: Pamela.Moore@library.sccgov.org; Richard Lowenthal; Flowers, Sarah Subject: FW: Sunday hours at CU L'D~ Carol Atwood Carol, Please find below the information you requested on the cost of Sunday hours at the Cupertino Library in FY2003/04. . Regards, Melinda *********************************************************************************************************************************; Cupertino Library Additional Hours Funding History . FY 2003-04 was the last time the City of Cupertino paid for Sunday hours. During that fiscal year, the library was in the temporary building, so costs were significantly reduced. Covering a 10,000 sf building is quite a bit different from covering a 37,000 sf or 54,000 sf building. . The cost for operating the temporary building on Sundays in 03-04 was $90,000. At today's costs, that would be $117,000. But, of course, that amount of staff would be inadequate to staff the Cupertino Library today. . The last year of full operation in the old building was FY 2001-02. The Sunday hours that year were 12- 6pm; the City also paid for Monday & Tuesday, 1 Oam-12pm, and Thursday, 6-9 pm at a cost of $288,000. The Sunday hours for the same fiscal year cost $188,000. At today's costs, that would be $261,000 for Sundays only; all extra hours, $431,000. . Based on past calculations, $240,000 for an additional 8-hour day is a good deal. Melinda Cervantes, County Librarian Santa Clara County Library 14600 Winchester Blvd. Los Gatos, CA 95032 TEL (408) 293-2326 FAX (408) 364-0161 EMAIL melinda.cervantes@lib.sccgov.org URL http://www.santaclaracountylib.org NOTICE: This email message andlorits attachments may contain information that is confidential or restricted. It is intended only for the individuals named as recipients in the message. If you are NOT an authorized recipient, you are prohibited from using, delivering, distributing, printing, copying, or disclosing the message or content to others and must delete the message from your computer. If you have received this message in error, please notify 6/12/2007 Page 1 of 1 Carol Atwood Lbr~ From: Linda Lagergren Sent: Monday, June 18, 20074:19 PM To: David Knapp Cc: Carol Atwood Subject: FW: Questions about Saratoga Library -----Original Message----- From: Dave Anderson (mailto:davea@saratoga.ca.us] Sent: Monday, June 18, 20074:14 PM To: Patrick Kwok Subject: Re: Questions about Saratoga Library Dear Vice-Mayor Kwok; I called our local Librarian to find out the information you requested regarding the budget, size and hours of operation of the local library in Saratoga. The County Library does not tally an operational budget for each Community Library. The local personnel budget and the local books/materials budget are tracked for each location, but most other expenditures are not charged to each location-including systems, technology, administration, HR, and so on. Saratoga Library is currently open 58 hours per week. The Saratoga "Friends of the Library" pay for the Library to be kept open on Mondays. The Saratoga library is 48,500 square feet. As a courtesy, I called and left a voicemail message with Dave Knapp to let him know we had communicated. He does that for me when one of my council members contacts him. Regards, Dave Anderson City Manager City of Saratoga 6/18/2007 Dorothy Steenfott From: Sent: To: Subject: Don McCarthy Monday, June 18, 2007 3:43 PM Dorothy Steenfott FW: Budget Info Needed by 3 pm Tues. As per your request. -----Original Message----- From: Colleen Ferris Sent: Monday, June 18, 2007 3:40 PM To: Don McCarthy Subject: RE: Budget Info Needed by 3 pm Tues. ~?C)~~ -~~-ee Q( 10 A hr5-v\ Ve'. U.~ . From the mailing list we have 55% residents, I have not been able to isolate just tennis residents Looking at the court sheets for the last few months I would say the courts are being used 90% of the time with the slow time being around 9 pm -----Original Message----- From: Don McCarthy Sent: Monday, June 18, 2007 11:53 AM To: Colleen Ferris Subject: FW: Budget Info Needed by 3 pm Tues. Importance: High -----Original Message----- From: Dorothy Steenfott Sent: Monday, June 18, 2007 11:31 AM TJ): Don McCarthy Subject: Budget Info Needed by 3 pm Tues. Importance: High Hi Don: For the June 19 budget hearing, Carol needs to know the following: What % of the tennis players at the Sports Center are residents? What is the night time usage for the tennis courts? All used? 50% used? Thanks. Dorothy 1