19342,0
POST THIS CARD NEAR FRONT OF BUILDING
CITY OF CUPERTINO
INSPECTI}aON� DIVISION - JOB INSPECTION RECORD
JOB ADDRESS ! (b Z /\DSC l}-V1�P�tl�'1 UNIT # LOT If
OWNER CONTRACTOR 0.%'4lZt
PIULWTNO.
19342
A
GA'It:G5
CONTROLX
BUILDING PERMIT INFO'
INSPECTION DATE INSPECTOR
NOTE ALL GRADING AND DRAINAGE
`MALL BE INSTALLED TO COMPLY WITH
1HEAPPROVED PLANS AND CITYOE
CUI'EATINO STANDARDS.
ly 1:1 Ll
FOUNDATION/ PIERS
UFERGROUND
JOBDESCRIVHON
P
14�I04tAp , fir„
PAD/SETBACK-CERT -
GARAGE SLABS PREGUNITE
POUR NO CONCRETE UNFIL ABOVE, HAS BEEN SIGNED
UNDERGROUND SLAB -
INSPECTION
DATE
INSPECTOR
PLUM13ING
,
ELECTRICAL.
MECHANICAL- -
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
WOOD FLOOR
PLUMBING
MECHANICAL
ELECTRICAL
- -
FRAMING/VENTS/CLEAR
INSULATION -
'PLACE NO SUBFLOOR UNTIL ABO HAS BEEN SIGNED
ROUGH
PLUMBING
TUBS & SHOWER PAN
MECHANICAL
ELECTRICAL/JACUZZI BOND
FRAMING STAIRS
INSULATION/ VENTILATION
EMERG, EGRESS
SEWER WATER
"COVER NO WORKLINTIGABOVE HAS.BF.EN SIGNED
"
EXTERIOR SHEAR 1-IOLD DOWN
INTERIOR SHEAR/HOLD DOWN
_
-
SHEETROCK/SHEETROCK SFIEAR
EXTERIOR LATH/ W -SCREEN
SHOWER LATH' -
-
'
SCRATCH COAT
NO TAPE OR PLASTER UNTIL ABOVE'•HAS BEEN'SIGNED
NOTE; NO FINAL INSPECTION SHALL BE MADE BEFORE
THE CONSTRUCTION TAXIS PAID' '
FINALS DATE INSPECTOR
SAN.#
ELECT. ENERGY
_
PLUMBING ENERGY
MSCI -1. ENERGY
BUILDING ENERGY
ELECT. FINAL TEST
PLUMBING
GAS TEST
MECHANICAL - -
'
HEATING
ELECTRICAL RELEASE
- "
FI RE DEPT.
GRADE
OCCUPANCY
TEMPORARY APPROVALS
ELECTRIC
GAS
BUILDING - -
OCCUPANCY OF BUILDING IS NOT PERMITTED UNTIL ISSU°X`9CE DATE
DIIILDINC FINAL IS SIGNED BY BUILDING INSPECTOR DEC QI •tat 1
ARRANGE FOR INSPECTION BY PHONING 252-4505 BETWEEN t JJ
12:30 PM AND 4:30 PM MONDAY THROUGH FRIDAY, 24 HOURS clr'
BEFORE REQUIRED INSPECTION. JOB ADDRESS AND
PERMIT # ARE-NFEDED WHEN PHONING. p
IMPORTANT!
PLEASE READ REVERSE SIDE BEFORE CALLING FOR FINAL INSPECTION ISSUED BY: lJ•!I A_l SS L
OFFICE COPY