Loading...
08070043CITY OF CUPERTINO01 BUILDING DivISION PERMITCOMMACTOR I1�iFURMATI01 BUI GAV/DO1cFS TAME CT TBD - TO BE DETERMINED PERMIT NO. 08070043 OWNER'S NAME: PERMrf ISSUE DATE I.,.I.N YUN-CHIAO Y 07/07/2008 NE: SANITARY NO. CONTROL NO, ARCHnECTYENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH LICENSED CONTRACTOR'S DECLARATION Chapmr 9 Job Description o n licensed under vWOm of (cemmcncf by affret 1 upro ng 1 herem N withseeuan ]IXIU) of OO.3.fdw B.sinw Otlmy liccescis in full force and off ll/\ RE -RF T/O DRYROT REPAR RESHT PLYWD NEW ASPHLT ucencCl Lie. N HNGLS NEW GTRS Dam cxrrEcrsDEc` ENRY LLERENA RENWD BUS LIC 7/7/8 #27332 1 ndumand mY plana shall he umd aspublic recasds - Licensed professional OWNER -BUILDER DECLARATION I berebY aRrrn Nal i am exempt form the Co manes license Law for the following wan. (Section WO I.S. Business and professions Cade: Any City Or county which rcquiru a permit in c.w alcor: improve, denmiah. or repair any strac u e ! prior an its issuance, also¢quires the applicant for such permit o file a signed summon that M is licensed pursuant to the provisions of the COntratur'.a License Law (Chapter 9 Sq. Ft. Floor Area Valuation (commencing with Section 7") of Division 3 of the Business and ProRnions Code) or $9150 ! trot he is exempt thesefaum and the buff for the alleged eumptfon. Any violation of 35906005 �fNumber Occupancy Type Section 70313 by any, applicant for a permit subjects the applicant In a civil penalty of not mons Nan five hundred dollua(S0 p 1, u owner of the luopmty, a mY aoPloyw with wage u the'v role emnpenntim, Required Inspections will da the work, and Ne muctore knot lnmaded or ofcvA for sale (Sec. 7064, Budrcu and Pmresaioaa Code Om Conhscmrs Live Law doer Out apply to an owner of propcny who builds or imporwa thereon, and who does sued wart himself or tbtough his own employees. provided thatsach improvements are notinu alcd OrORaed for sale. If. however, the Wilding or improvement Is sold within arm year Of completion. dm Owner. Wilder will have the Wrdan of proving dust he did nm Wild Or improve for purpose of sale.). 0 1. as Owner of the property am exclusively contracting with licensed cenumtars on cotutrutt the proles (Sec. ]Oeq, Businm ant Rossetions Cade:) The Contractors Ii - comas Law does not apply m an owner Of property what Wilda or hnprowa Neuron, and. w W conuacu for such projects with a conwnOn(s) likemed pursunt m the CnntraLmra Likens law. ❑Tun ucmpa undo See ,BBPCIOtbkmaaom Owner Data WORKER'S COMPENSATION DECLARATION I hereby Nan under pemltY Of perjury one of the following declarations: 'have and will maintain aCenificamof Consem on self -insure for Workm'sCompal- su , u prmiMd fu by Smtion 3]000(tW labor Code, fm tie Rr(armm¢ Of Ne wart for which this permit is iasucd. ❑ 1 haw and will maintain WO . Compensation Insurance, as tcgvired by Section 3700of the Lather Cadc. fm the pefmmanu Of Ole wok for which itis permit is issued. ' My Worker's Compensation Insurance carrier and Policy number are: Carrier, policy No.: CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This session need ano W eemPleved if the permit k fou One ltundvddollua (SIM) or less) I vrtify that in the performance a c wO for whh: is permit ssvd.1 thail nm emPlay any pessnin any r t a heel to Nei rkon'Cornprnaumn Ian Of Califo ' Applicant NOTICE TO APP : If g Cc m of Exemption, you should become mbject . rope -don p ssku of the labor Cade you muss forthwith comply with h=iainna or this permit shall W doomed rooked. I CONSTRUCTION LENDING AGENCY I hereby Orion dm Nem k a construction Lending agency for the performance of " the work for which this permit is issued (See. 3097, Civ. C.) Lenders Name Lenders Addw I eatify that 1 haw read Nis application mud sum thss the above inf000mm, is - c moat I agree m comply with all city ant county andboam"' b castale Ian relating in Wilding rnnswcdmn, and hereby mthone, reprosecomwa Of this city to c soups. the above-mandoned property for impaction purpues. (We) agree on saw, indemnify and keep harmless the City of Cupertino againat liabiliiesjudgmen rots and..pc•..1 which may in y ray censor. sgAui said City in consequence d granti g of Nis pamh. APPL U ER NDS AN ILL PLY WITH ALL NON- I by: ,� %" sued Date- Re -roofs I/ sign, "err ppli ons MATERIALa S DlsosuaE Type of Roof Will the applicant or future Wilding receptor stam handle umamriai at defined by the Cupertino Municipal Code, Chapter 9.12, ant the Health and safety Code. Section as 25532(a Yon a All roofs shall be inspected prior to any roofing material being installed. will the applic t or futum building Occupant um equipment or devices which If a roof is installed without first obtaining an inspection, I agree to remove candout air conaminants tu fined by the Bay Arta Air Quality Management all new materials for inspection. �lt ❑yca Nu IIm"toad t hekrequirenentsumkr Chapmr Q93 Of the 'mnulkalNkSarcty. 23317 and 2533u.i urWcrstasW f Ne f roissa acmnr Signature of Applicant Date All roof coverings to be Class 'A" or better g Ow r au m age Dam l CITY OF CUPERTINO • 3 ITEMS OF 3 PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN ........: 35906005.00 DATE ISSUED.......: 07/07/2008 RECEIPT #.........: BS000005353 REFERENCE ID # ...: 08070043 SITE ADDRESS .....: 907 SAGE CT SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 OWNER ............: LIN YUN-CHIAO Y ADDRESS ..........: CITY/STATE/ZIP ...: CUPERTINO CA, 95014-4217 604 ROOF IN -PROGRESS 605 FINAL REROOF RECEIVED FROM ....: DODIE GAINES CONTRACTOR .......: TBD - TO BE DETERMINED LIC # 00096 COMPANY ..........: TBD - TO BE DETERMINED ADDRESS ..........: CITY/STATE/ZIP .... , TELEPHONE ........: • FEE ID UNIT QUANTITY AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR VALUATION 9,150.00 1.00 0.00 1.00 0.00 1BUSLIC FLAT RATE 1.00 110.00 0.00 110.00 0.00 1REROOFRES SQ FEET 29.00 377.00 0.00 377.00 0.00 TOTAL PERMIT ---------- 488.00 ---------- 0.00 ---------- ---------- 488.00 0.00 METHOD OF PAYMENT AMOUNT -------- --------------- REFERENCE NUMBER CHECK 488.00 -------------------- #1885 TOTAL RECEIPT ------------- 488.00 VOICE ID -------- ---------------------------- DESCRIPTION VOICE ID DESCRIPTION 601 ROOF TEAR OFF -------- 602 ---------------------------- ROOF PLYWOOD NAIL 604 ROOF IN -PROGRESS 605 FINAL REROOF CITY of •CUPERTINO CITY OF CUPERTINO REROOF PERMIT APPLICATION APN # Date: G B ' ding d CAQ 12. Owp�is I�iame: �X�d Phone S Contractor:: Phone #. O �6�\( ax #: Cupertino Business License #: Co�gj L' se #: Type of Roof Covering: Existing: Proposed: ❑ Built -Up Roof ❑ Built -Up roof ❑ Asphalt Shingles X Asphalt Shingles ACWood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.B.O. Report # ❑ To be Removed. ❑ Provide Mfgr. Installation Specs. Job Description''—_a,- b+1p Del r-,ID� ��q7.,-1 r,5ke-s� l joj ba4 `p ` 1 N l J Residential Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ a licable include in plan set & the sheet index. Valuation: q I So 0 Comply with Cupertino's Tear -Off Policy: al CITY OF CUPEkTINO CITY OF CUPERTINO REROOF FEESCHEDULE • Number of Squares Fee ID Fee Description Fee Group Permit Type 1REROOFCOM Re -roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 1REROOFRES Re -roof Residential B 1SFDWLR00F I 1BSEISMICRE Seismic Residential B 1RER00FMRES Re -roof Multi -Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1 1BUSLIC Business License B Revised 6/16/08 r1 LJ Community Development Department Building Division City of Cupertino 10300 Torre Avenue • Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department Subject: Re -roofing policy for the City of Cupertino 1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards and manufacturers specifications on re -roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre -inspection and/or tear off approval. 2) In -progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. • 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be paid before another inspection can be scheduled. IMPORTANT: 1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the ab a stated policy on re -roofing. Homeowner's Name: JJC J) e. 1 ,� C, Job Site Address: ( [C 42 . 1. J n Roofing Company Name /V- 0 Applicant's Signature: / 1 Date: • Greg Casteel Building Official Revised 11/2/04 Community Development Department Building Division City of Cupertino 10300 Torre Avenue • Telephone: (408) 777-3228 Fax: (408)777-3333 Building Department REROOF TEAR OFF POLICY You must schedule an inspection for the tear off the day before you wish the inspection to be made. The procedure is to call the Building Division (408) 777-3228 between the hours of 7:30 a.m. and 3:30 p.m. to request a next -day inspection. • 2. When the roof is torn off, the nails have been removed or driven in, and all of the dry -rotted wood has been replaced, you must call the City Building Division. An inspector will be there within one hour. There are special hours for this service: from 7:30 a.m. to 10:30 a.m. and 1:00p.m. to 3:30 p.m., Monday through Thursday and from 7:30 a.m. to 10:30 a.m. and 1:00 p.m. to 2:30 p.m. on Friday. (Note: Building inspectors are on lunch break from 11:30 a.m. to 12:30 p.m. and will not be called during that time. City Hall is closed between 12:00 and 1:00 p.m. daily.) 3. If you call for a tear -off inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be paid before another inspection can be scheduled • Greg Casteel Building Official Revised 8/13/04 a • • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point PywMEMMI TOTAL POINTS 40 points • • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your • projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. 1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 80%= 4 points up to 4 Resource 2. Salvage Reusable Building Materials 4 Resource pts y= 3. Remodel for Mixed Use, Adaptive Reuse, and 2. Use FSC Certified Wood for framing Historic Preservation 4 Resource pts y= 4. Protect Native Soil 2 Resource pts y= 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y= 6. Implement Construction Site Stormwater Practices 2 Resource pts y= 7. Protect Water Quality with Landscape Design 2 Resource pts y= 8. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y= 9. Reuse Matedals/Use Recycled Content Materials 4. Use Web Floor Trusses for Landscape Areas 2 Resource pts y= 10. Install High -Efficiency Irrigation Systems 2 Resource pts y= 11. Provide for On -Site Water Catchment / Retention 2 Resource ots v= B.Foundation 1. Incorporate Recycled Flyash in Concrete 25% Recycled Flyash = 2 points; Add 1 point for every 10% • increase of Flyash, up to 5 points up to 5 Resource pts 0 2. Use Recycled Content Aggregate 2 Resource pts y=yes 0 3. Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0 C. Structural Frame 1. Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts. 0 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=yes 0 4. Use Web Floor Trusses 2 Resource pts y=yes 0 5. Design Energy Heels on Trusses 6' or more 2 Energy pts y=yes 0 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 6. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts ". y=yes 0 b. Wall 3 Energy pts y=yes 0 c. Root 3 Energy pts y=yes 0 10. Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 12. Use OSB a. Subfloors 1 Resource pt Y --yes 0 b. Sheathing 1 Resource pt y=yes 0 • 1. Install Energy -Efficient Windows 2 Energy pts 2. Install Ductwork within Conditioned Space • a. Double -Paned 1 Energy pt y=yes b. Low -Emissivity (Low -E) 2 Energy pts y=yes c. Low. Conductivity Frames 2 Energy pts y=yes 2. Install Low Heat Transmission Glazing 1 Energy pt y=yes J. Heating Ventilation and Air Conditioning 1. Use Duct Mastic on All Duct Joints 2 Energy pts 2. Install Ductwork within Conditioned Space 3 Energy pts 3. Vent Range Hood to the Outside 1 IAQ/Health pt 4. Clean all Ducts Before Occupancy 2 IAQ/Health pts 5. Install Solar Attic Fan 2 Energy pts 6. Install Attic Ventilation Systems 1 Energy pt 7. Install Whole House Fan 4 Energy pts 8. Install Sealed Combustion Units 14. Install Zoned, Hydronic Radiant Heating a. Furnaces 31AQ/Health pts b. Water Heaters 31AQ/Health pts 9. Replace Wall -Mounted Electric and Gas Heaters with 16. Install Heat Recovery Ventilation Unit (HRV) Through -the -Wall Heat Pumps 3 Energy pts 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts 11. Install AC with Non -HCFC Refrigerants 2 Resource pts 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts y=yes 13. Retrofit Wood Burning Fireplaces 4 Energy pts y= • a. Install EPA certified wood stovesf nseds 1 IAQ/Health pt y=yes b. Install/Replace Dampers 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y=yes 15. Install High Efficiency Filter 4 IAQ/Health pts y=yes 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts y=yes 17. Install Separate Garage Exhaust Fan 31AQ/Health ots v=ves K. Renewable Energy and Roofing - 1. Pre -Plumb for Solar Water Heating 4 Energy pts y= 2. Install Solar Water Heating System 10 Energy pts y= 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y= 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points) Up to 18 Energy 6. Select Sate and Durable Roofing Materials 1 Resource pt y= 7. Install Radiant Barrier 3 Energy pts y== L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts 3. Plant Deciduous Trees on the West and South Sides 3 Energy pts 0 favi CITY OF 4UPEkTINO 0 Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department I' SUBCONTRACTOR . �: .: „cru r� �p� �• Zi�17�:irZ���� Cabinets & Millwork I am not using any subcontractors: CLl f Signature Please check applicable subcontractors complete the following information - 60 SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring. Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Til 4P r/Contractor Signature d�� CITY OF OUPEkTINO • • PX, E NED JUL 0 7 2008 Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone(408)777-3228 Fax(408)777-3333 Building Department All Cupertino building permits must meet certain conditions related to maintaining environmental quality and public peace and safety. The two most common. conditions are described below. STORMWATER POLLUTION CONTROL State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and the Santa Clara Valley Water District control stormwater pollution. Educating local residents and businesses and enforcing stormwater pollution control laws are key parts of the City's compliance efforts. Stormwater pollution prevention: It's up to us In northern Santa Clara Valley, storm drains flow directly to local creeks and San Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife dependent on our waterways, for people living near streams and baylands, and for the local water supply. Common sources of stormwater pollution include: • Dripped oil, fuel, and antifreeze from vehicles and heavy equipment; • Construction debris, including dirt, concrete and paint; • Landscaping runoff containing pesticides or weed killers; and • Any material dumped or spilled into streets or storm drains The property owner and the contractor share ultimate responsibility for activities occurring at a construction site and will be held responsible for any environmental damage caused by subcontractors or employees. For more information on construction -related stormwater requirements, see the Stormwater Quality Regulations section of the City of Cupertino web site at: http://www.cur)ertino.org/city government/departments and offices/ environmental services COMMUNITY NOISE CONTROL The basic noise control requirements for construction sites are as follows: • Typical construction work hours are: - Weekdays - 7 a.m. to 8 p.m. - Weekends - 9 a.m. to 6 p.m. • Construction other than street construction is prohibited on holidays. • Residential daytime noise levels from complaint site - 60 dBA • Nonresidential daytime noise levels from complaint site - 65 dBA For more information on noise control, please see Chapter 10.48 of the Cupertino Municipal Code, which can be accessed at http:Z/www.amleaal.comlcur)ertino ca Greg Casteel Building Official