Loading...
08070073a�Z nl- -u e qy"qyO� `p CCC k�LL Yea -zr 2F C' 0 z z0 a>_ lY Li D U_O O E �z CITY OF CUPERTINO- BUILDING DIVISION PERMIT CONTRACTORINFORM TIN, , zfian h. BUILDING ADDRESS: 22565 SALEM AVE LINDY ROOFING CO INC PERMIT NO. 08070073 OWNER'S NAME: PERMIT ISSUE DATE 'PONY GAO 5554 HARVARD DR 07/11/2008 NE; SANRARY NO. CONTROL NO. ARCHI E=NGINEER: BURRING PERiurry MO RE—MOVE EXISTING WOOD SHAKE'BLDG ELECT PLUMB MECH Reep D C:= O O LICENSED CONTRACTOR'S DECLARATION Cham lhcmbyaffof ^^-^ ^^ ^--.lOI3..DesCflpuOn WmlamfftR underpftfessof commencing with Sectionrad oe�fDiv�W�on�Jyof da Bstitteaahq Pro(e�/dons Gode.aM mylicenseu 2e5 I in full forte andforte efrf' License Clnsn Lac.• Den CS=C of Iv s DECLARA ON Ae ebel hedea I undnvand my pial Nall he used ss public rtoNn Licensed Poorecdonal OWNER -BUILDER DECLARATION 1 herehy alRsm that I not mompt from the Conumrmrn IJcense Law far the following mason (Section 7071.5, Business and Professions Code: Any city or county which exporter a pmou to ewlall,KL abR, borrow. demaim. w Rpair my sW=Wm prior to its announce. also, remsims use applicant for such permit to fnk a signed stm man, that he isR¢pored personal to the psori¢iofs of the Cawxtars Lice= Law (Chapter 9 Sq. Ft. Floor Area Valuation (commencing with Section 7000) of Division l of the Business and Profe¢imns Cade) or that he Is exempt therefrom and the basin for the alleged roamptiae Any violation of Sedon 703M by any applicant for a Permit subjects the applicant to a civil Penalty of APN Number Occu ane —Type rot mart Nan lave hundred dollen ($M p y O l,ao rofthepmpmy,ormyemploycrwi0wg mNebmkcamp=don, will do thewodt and the ntructom It nmino:ndrA or offered forsak (Sae. 7(316, Buslt¢as anal publication; Cade: Tub Conummrs Litux Law don net apply in an owner of Required Inspections hu Mproenthuean,aM wW doesatehanded pmpcer wMes, paper ownemployegproNdee m uffearNmugh such impsowmemsartrotineodalwoefiet for ruler. arimgovemem4mldwithinarcyearofcompktiuytheownm- pr however,in b am ase with have de Wfdm of purring that W did rot dull m impmw lw purpo¢ of sale.). le.). ❑ 1, as owner of to propcn, am exclusively contracting with licensed conuacton to construct the project (Sec. 70sd, Business add Prakulans Cade:) The Contrmmr's U. cera Law does not apply to an matter of property who Wilds or improve{ Nemun. and who contacts for such projects with a contrectos(s) licensed puruani as the Conumetoes Lam. Law. Cl lameemptmde See ,BAPCfathurenmd Owner Date WORKERS COMPENSATION DECLARATION 1 hereby anon under penalty of perjury arc of the following &oWeaduns: I ham end will ma fflum a CeeLOcam ofConsent to alf-imam for Wafters Compact. atlon. as provided far by Sccuon 3700 of the Labor Cade, for the Performance of the wofk far which this .it in issued O I lave and will mention Wormers Compensation Insurance, u mquiad by Section 3'7Wofdtc Labw Code, far the pcfframatrceof the work for which dry permit u issued ' My Wormers C pevsador IweapO ori and Policy n Gfrier.-f 7 �l! Policy Na.: � � d� 1 CERTIFlGTE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (Thu se0ae need Inst W completed if the permit is furore hunched dollar (S10t3) or less) 1 coolly dull. in the performance of circ wort far which this Permit is issued I Nall net employ any person in any mannerm as, a became subject rode WafterCompensation taws or California, Date Applicant NOTICE TO APPLICANT: If, afar making this Ccnificate of Esereption, you should Woman Subject to the Wohcra CrumpensNon provisions of the Isha Crate, You moo forthwith comply with each Provisions or this permit shalt W doomed tevoted. CONSTRUCTION LENDING AGENCY 1 hemby a(Rrm Wt der is. canstmcunn lending agency for the perflermemx of the work for which this petit is issued (Sce 3097, Cir. C,) Lenders Name ' Landers Address I ramify the I love mW Ods application and nate one the aboas informed. u marom I agree m comply with all city and crummy tachometer ev and aux laws relating in Wilding construction, and hemby aotWrim mptcxoutivns almost city to cner upon IM aWw-manuoned c (We) indemnify far inspection purpowhich agree to saw. and torp hasmlea the City of Cupertino gaimt st ms It ms, costs and espouses which may in any way menuegilnslsaid City conectimac of A PLIC l%lT of the gaming of this D W IL APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT �) Issued by: EGUTATIONS. / Date / 7 Re -roofs sign ApplicanYCantnnw Date e HAZARDOUS MATERIALS DISCLOSURE Type of Roof Will the applicant ser future Wilding—Purolator, or handle hasafdo s material Md defood by the Copmino Mon ici Code, Chapar 9AZ and the Heald and Safety code, MAll Such25532(a)? ❑Ys e roofs shall be inspected prior to any roofing material being installed. Will the applican ser future Wilding occupant use equipment or dcvicos which If a roof is installed without first obtaining an inspection, I agree to remove air conummu a the inde by Bay Ama Air Quality Management all new materials for inspection. .t�`asNom 0Yca u Ihaw mWthe srMwm 25505.25533 and Me Health &SafctyCadc, Sccdans25NA5,355J3 and ZSSl4.lundwsantl thmif the Wilding I understood th5aftheWilding Y"L / does not currently hew a knanL uses it u ,�`� _ my maponstM1 ittry a floury the oco pan f de awns=hm��^me,prirurmssencomraeeu0cecaraa� Si atureofApplicant Date it 0,2 All roof coverings to be Class'4" or better ow err mases, mac • 2 ITEMS OF 2 CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN .......1: 34212100.00 DATE ISSUED.......: 07/11/2008 RECEIPT #.........: BS000005407 REFERENCE ID # ...: 08070073 SITE ADDRESS .....: 22565 SALEM AVE SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: SylviaM COPY # : 1 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT AMOUNT --------------- 469.50. 469.50 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS • REFERENCE NUMBER -------------------- 3609 VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 605 FINAL REROOF OWNER ............: TONY GAO ADDRESS ..........: 22565 SALEM AVE CITY/STATE/ZIP ...: CUPERTINO, CA 95014-5648 RECEIVED FROM ....: LINDY ROOFING CONTRACTOR .......: RUMFORD, LINDY LIC # 3921 COMPANY ..........: LINDY ROOFING CO INC ADDRESS ..........: 5554 HARVARD DR CITY/STATE/ZIP ...: SAN JOSE, CA 95118 TELEPHONE ........: (408)286-9990 • FEE ID ----- UNIT QUANTITY ---------- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR ---------- VALUATION 15,000.00 ------------------------------ 1.50 0.00 1.50 ---------- 0.00 1REROOFRES SQ FEET 36.00 468.00 0.00 468.00 0.00 TOTAL PERMIT ---------- ---------- ---------- 469.50 0.00 469.50 ---------- 0.00 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT AMOUNT --------------- 469.50. 469.50 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS • REFERENCE NUMBER -------------------- 3609 VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 605 FINAL REROOF CITY:OE CUPERTINO.. REROOF< PERMIT APPLICATION DfrQ 7OD 573 APN # 3�2 2 /� • ,�,1 Date: Building Address: �-�- Owner's Name: Phone #: Contractor: V / /� / Co.Phone L1/1Gl I�OC}7�� 1 Fax#: Cupertino Busines icense #: - Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built -Up Ropf ,..., _, ❑_ ,Built -Up roof. :. . El Asphalt Shing14s Wood Shakes Asphalt Shingles ❑ Wood Shingles ❑ Wood Shakes ❑ 'Wood Shingles '❑ Other (Specify) Number of existing coverings ❑ Other (Specify) ❑ : Provide'I.C.B.O. Report # To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: eMOCI/� ��(S/� /zacs S a!!¢ moa /s��7—cr iv�sa J CL56 .06if 36 Syuarof 0-F n¢ur Lt 19f4_C?lln, cvrv�/Oos� ri�� SG,,h GAS Residential Commercial Fire Zone: Yes No Confirmed with Planning Det. if Valuation: there are any restrictions: LJ I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy: Vabu-m1% CITY OF opPERTINO CITY OF CUPERTINO REROOF FEESCHEDULE Number of Squares Fee ID Fee Description Fee Group Permit Type 1RER00FC0M Re -roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 3 1REROOFRES Re -roof Residential B 1SFDWLROOF 1BSEISMICRE Seismic Residential B 1REROOFMRES Re -roof Multi -Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 0 7 a YO CUPEkTINO CITY OF CUPERTINO REROOF PERMIT APPLICATION 0 APN # Date: Building Address: Owner's Name: Phone #: Contractor: Phone #: Fax #: Cupertino Business License #: Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built -Up Roof ❑ Built -Up roof ❑ Asphalt Shingles ❑ Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.B.O. Report # ❑ To be Removed o Provide Mfgr. Installation Specs. Job Description: Residential ❑ Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ a licable, include in plan set & the sheet index. Valuation: I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy:. Signature • Community Development Department Building Division City of Cupertino 10300"form Avenue Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department Subject: Re -roofing policy for the City of Cupertino 1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards and manufacturers specifications on re -roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre -inspection anQor tear off approval. 2) In -progress inspection approval. 3) 'Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re -roofing. Homeowner's Nar Job Site Address: Roofing Company Name: ROU FlYt<;C� CO Applicant's Greg Casteel Building Official Revised 11/2/04 Date:—?— 0170<L? • E Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 11. Permeable Paving,Note L-1 C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 72polnts D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS1 40 points • E Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. 1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 60%0 = 4 points up to 4 Resource pts 2. Salvage Reusable Building Materials 4 Resource pts y=yes 3. Remodel for Mixed Use, Adaptive Reuse, and 2 Resource pts y=ye: Historic Preservation 4 Resource pts y --yes 4. Protect Native Soil 2 Resource pts y --yes 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 6. Implement Construction Site Stormwater Practices 2 Resource pts y=yes 7. Protect Water Quality with Landscape Design 2 Resource pts y=yes 6. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y=yes 9. Reuse Materials/Use Recycled Content Materials 3 Energy pts y=ye: for Landscape Areas 2 Resource pts y=yes 10. Install High -Efficiency Irrigation Systems 2 Resource pts y --yes 11. Provide for On -Site Water Catchment / Retention 2 Resource ots v=ves B.Foundation 1. Incorporate Recycled Flyash in Concrete 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource 2. Use Recycled Content Aggregate 2 Resource pts y= 3. Insulate Foundation/Slab before backfill 3 Energy pts y= C. Structural Frame 1. Substitute Solid Sewn Lumber with Engineered Lumber 3 Resource pts y=ye: 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=ye: 4. Use Web Floor Trusses 2 Resource pts y=ye: 5. Design Energy Heels on Trusses 6' or more 2 Energy pts y=ye; 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=ye; 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yer B. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=ye; 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=ye: b. Wall 3 Energy pts y=ye: c. Roof 3 Energy pts y=ye; 10. Apply Advanced Framing Techniques 4 Resource pts y --ye! 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=ye; 12. Use OSB a. Subfloors 1 Resource pt y=ye: b. Sheathing 1 Resource pt y=ye; • • • r r r r r r r r r 0 r r r r 0 0 -_ • • • 1 Install Energy -Efficient Windows • a. Double -Paned b. Low -Emissivity (Low -E) c. Low. Conductivity Frames 2. Install Low Heat Transmission Glazing J. Heating Ventilation and Air Conditioning 1, Use Duct Mastic on All Dud Joints 2. Install Ductwork within Conditioned Space 3. Vent Range Hood to the Outside 4. Clean all Ducts Before Occupancy 5. Install Solar Attic Fan 6, Install Attic Ventilation Systems 7. Install Whole House Fan S. Install Sealed Combustion Units a. Furnaces b. Water Heaters 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 10. Install 13 SEER/11 EER or higher AC with a TXV 11. Install AC with Non -HCFC Refrigerants 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 13. Retrofit Wood Burning Fireplaces • a. Install EPA certified wood stovesfnserts b. Install/Replace Dampers c. Install Airtight Doors 14. Install Zoned, Hydronic Radiant Heating 15. Install High Efficiency Filter 16. Install Heat Recovery Ventilation Unit (HRV) 17. Install Separate Garage Exhaust Fan K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 2. Install Solar Water Heating System 3. Pre -Wire for Future Photovoltaic (PV) Installation 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw =16 points) 6. Select Safe and Durable Roofing Materials 7. Install Radiant Barrier L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 2. Install Overhangs or Awnings over South Facing Windows 3. Plant Deciduous Trees on the West and South Sides 1 Energy pt 2 Energy pts 2 Energy pts 1 Enerav of 2 Energy pts 3 Energy pts 1 IAQ/Health pt 21AO/Health pts 2 Energy pts 1 Energy pt 4 Energy pts 31AQ/Health pts 31AQ/Health pts 3 Energy pts 3 Energy pts 2 Resource pts 2 Energy pts 1 IAQ/Health pt 1 Energy pt 1 Energy pt 3 Energy pts 41AQ/Health pts 5 AQ/Health pts 31AO/Health pts 4 Energy pts y=yes 10 Energy pts y=yes 4 Energy pts y=yes Up to 16 Energy 1 Resource pt y= 3 Energy pts y= 5 Energy pts 3 Energy pts 3 Energy pts y=yes CITY OF kXPEkTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department JOB ADDRESS,,,�j (p _ L J PERMIT # n a D 7 0075ME OWNER'S NA: % 0 tiG-a PHONE #6-G)-Qa/0-{o-/q7 GENERAL CONTRACTOR: L_ fi1c&e Roo rrq FAX # C/O f V I am not using any subcontractors: 7- Signature Date Please check applicable subcontractors and complete the followinLy information: Owner/ Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical } Excavation Fencing. - Flooring: Carpeting Linoleum / Wood i ! A; Glass / Glazing Heating Insulation 1 � Landscaping 1 iii Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/ Contractor Signature Date