08060039Y�c
z
z C
aC
az
UC
Ls.F
oa
�z
CITY OF CUPERTINO
-e `=.kspsw rPaRt>f,Ka�a'-P>b A's�iw
BUILDING DIVISIOA PERMIT
AANFQRMATION, w
kC,ONTbAGTOR
BuITN1�gPgaEs�:TAUFFER LN
NULIGHT SOLUTIONS, INC
08PERMR060039NO. ,
OWNER'S NAME;
PERMIT ISSUE DATE
PARTHA BHATLACHARYA
1350 DELL AVE, STE 202
06/05/2008
OryE;
SANITARY NO. CONTROL NO.
(408)369-7447
ARCHITECT/ENGINEER:
BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
0 0 0 0
LICENSED CONTRACTOR'S DECLARATION
Job Description
er of Chapter 9 (commencing
Mrcby grim dent 1 rte li¢nacd under
withSection 70(1)) of Division 3 oftha BusinessaW Pmfessiom Code, and my license is
INSTL 1 SUN TUNNL & 1 FXD 2X3 SKYLIGHT
In"'farce and Uf
,Neo class a Lic. S7,2 -7
NULIGHT SOLUTIONS RENWD BUS LIC 6/5/8
Oats O ComruarrS
ARCHnECI•S DECLARATION
1 undersand my plans shall be used as public records
-
Licensed Pmressional
OW NER-BUIIDER DECLARATION
I hereby affirm that 1 em mempt from tiro ConV ..W, License Law far tM
following moon. (Section 7031.5, Business and Pmfessiom Code: Any city or county
which ruquires a permit to CmnwcL alter. impmve. (Nmol W, W spoor MY SVUCIum
prior to its issuance. abo rtquims the applicant for such permiuo file a signed statement
WeWNlicensed the oflneContractor's Lien:rLaw 9
Sq. Ft. Floor Area
Valuation
pumanuoprovisions (Chapter
Section ]000)ofDivbion3ofBusiness ProfessiomCode)or
$2500
1 (commencing with the and
that he u exempt therefrom and the basis for the alleged exemption. Any violation of
Section 7031.5 by a" applicant for a permit subjects the applicant w a civil Penalty of
36609046.E Number
ane
Occupancy Type
.1 mom than It.Occas
rt hundred dollars (M).
I,asowner of the properry.ormy employeas with wgaastheirmle eompewdon,
Required Inspections
will d0 the Werk. and the SWCWR Is Mt Ntended or Offered for Min (Sce.7W. Business
and Pmfeasiom Cade: The 0munctars Lt. Law does not apply to an on, of
property whobuildaarimproro thereon. and whodoesauch work bounties through his
owa emplayca, pmvided that such improveroeats art not inundeA ara(fened forsake n,
however, the building or improvement is sold within one, yeu of completion, the owner -
builder will have the burden of proving that len did ret build or improte for purpox of
rale.).
El I, u owner of the property. am escluuvely comsa ting with liensed ... b
cmotmct the project (Sec. 70". Business and Pm(essiaro Code:) The Convaemts U.
eeme law does not apply in an owner of property who builds or ire anew s thereon, and.
who contracts for such projects with a coneamor(3) licensed pursuant w the Contractor's
License law.
❑ I am exempt under See. . B B P C for this mason
Owner Dau
WORKERS COMPENSATION DECLARATION
1 k mby affirm under penalty of perjury, one of the following declamtiom:
1 have and will of lar Workeh
-
ce of the
pmvidhi for me Labor,
for by Section37M
Section 3]00 of the kabor Code. for the performance of the
woion, r
wort for which Nu permit is issued.
a
(3 I have and will maintain Workc/s Confrontation Insurance. as mauired by Section
3700.(the labor Code. for the performaneofthe work for which this permit is issued
'
My Work es Compensation Nears. artier and Policy number rte:
Cartier. 5 f. QF GL Policy No.:� 0 1 ") ? f4 -)00-
C P ION FROM WORKERS'
.....
COMPENSATION INSURANCE
(Thu Medea need not be completed if the permit I. fortune Worked dolbm (SIM)
or las)
I certify that in the perpurn. of the work for which ON permit u issued, l shall tet
employ any person in any manner an as w become subject o the Workeri Corepenssdon
Iowa of rahromia. Orion
Applicant
NOTICE TO APPLICANT: If, after making this Certificate or Eaemption, you ahould
become subject to We Worker's Compensation provisions of the faker Cede. You menu
forthwith comply with such pmvialnm W this permit shall be dcmed mmkcd.
I
CONSTRUCTION LENDING AGENCY
I hereby e(Erm that then is a cmuvuctinn lending agenry, for the performance of
du wort rue which this permit u issued (Sc, 3197, Civ. C.)
Lemiers Name
Lenders Addmas
I certify that I have sad this application and raw that the above information is
co TCCL I agree to comely with all city and county Ordinances and stats law totaling w
Wilding construction. and hereby mNorin: mpmxnudw of this city to enter open the
shove -mentioned pmpcny for Impetus
(We) agree to save, indemnify and keep hannlm the City of Cupertino against
; whichpurposes.
and este"•-, which may in any my same against said City
in conse;jnd a of the
in eonxquanec o! the granting of this permle
APPLICANT U DDS AN COMPLY ALL NON -POINT
E ATIG
Issued by: Date
�1
Re-roofs
sienna ofwpplicam2amracwr Dau
HAZ3RDOU5 MATERIALS DISCLOSURE
Type Of Roof
Willy or futMuni building handle h awrial
e.
the Cupertinor,
Co Chapter 9.e2.
u defined by t25 Cupertino MunMpal Code. Chapter 9.12, and the Nealth and Safety
Health and
coda,Section 0Y.2ss32a>7
Yu
All roofs shall be inspected prior to any roofing material being installed.
Will the a licmt ruwm building oaa ant use N t or devices which
Ire i p 4uipmcn
If a roof is installed without first obtaining an inspection, I agree to remove
g
anair conendefine(
eDume'TNm numi cul u deby the Bay Area Air Quality Manascmcnt
all new materials for inspection.
❑Ya
I have ma( the hued ms m under Chapurb.95 afthe Califon
nusHeah"5505. 3533mmcnts
Cade,Soiau25505.2my andi357d.1 undetuan1 thazifdu bolding
mouCu odyy ham a tenant. That i u my mibitity w the eavpant of the
does wt cies
wh
gaimm n wnia u e t r lac dliaw aeon Y.
Signature of Applicant Date
6• a
All roof coverings to be Class's" or better
wr errhoriocd agent Dau
• 3 ITEMS OF 3
•
•
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot:
APN ........: 36609046.01
DATE ISSUED.......: 06/05/2008
RECEIPT #.........: BS000005007
REFERENCE ID # ...: 08060039
SITE ADDRESS .....: 11218 STAUFFER LN
SUBDIVISION ......
CITY CUPERTINO
IMPACT AREA .......
OPERATOR: patg
COPY # : 1
OWNER ............:
PARTHA BHATLACHARYA
ADDRESS ..........:
11218 STAUFFER LN
CITY/STATE/ZIP ...:
CUPERTINO, CA 95014
RECEIVED FROM ....:
MARK E EDWARDS
CONTRACTOR .......:
MARK EDWARDS LIC # 26128
COMPANY ..........:
NULIGHT SOLUTIONS, INC
ADDRESS ..........:
1350 DELL AVE, STE 202
CITY/STATE/ZIP ...:
CAMPBELL, CA 95008
TELEPHONE ........:
(408)369-7447
FEE ID UNIT QUANTITY
---------- ------------- ----------
AMOUNT PD -TO -DT THIS REC
NEW BAL
1BSEISMICR VALUATION 2,500.00
------------------------------
0.50 0.00
0.50
----------
0.00
1BUSLIC FLAT RATE 1.00
110.00 0.00
110.00
0.00
1SKYL<10SF EACH 2.00
734.00 0.00
734.00
0.00
TOTAL PERMIT
---------- ---------- ----------
844.50 0.00
844.50
----------
0.00
METHOD OF PAYMENT AMOUNT
----------------- ---------------
REFERENCE NUMBER
CREDIT CARD 844.50
--------------------
VISA
---------------
TOTAL RECEIPT 844.50
o o&:o v 9
-C CITY OF CUPERTINO
• CUPEkTINO GENERAL BUILDING
•
•
PERMIT APPLICATION FORM
APN # 3 o q o y� . o
Date: / �/O 00
(� l
Building Address:
//a /e .
Mailing Address (if different from building address):
O;° ner's Name:
F6ak,0,a b
Phone #:
(/ cD y - -7
Contractor
Phone: 5/09- 36f - % 51V-
1V-
Fax:
Fax: f/a b' 370 — 3 7 4 3
Contractor License #: 379
Cupertino Business License #:
Contact �� i�
Phone: p 8 _ �G Q _ 7 �S;
Fax: L9 8 ,O — 37 3
Residential Commercial
Job Description:%
Building Permit Info:
Bldg Elect ❑ Plumb ❑ Mech ❑
Type of Construction (Usage Class):
Occupancy Type:
1-A, 1-B [-]If/III/V-A ❑ 11/111 B, IV -HT, V-13kc-
3
Valuation: rTo Square Footage:
Project Size: StandardLar e ❑ Major ❑
Revised 5/21/08
5m,
CITY OF
CUPEkTINO
CITY OF CUPERTINO
GENERAL BUILDING
PERMIT APPLICATION FORM
E
Quantity/Sf
Fee ID
Fee Description
Fee
Permit Type
Group
IGENRES or
1GENCOM
I BTEMPPER
Temporary Building Permit (good for
B
30 days)
1BBOILERI
For the installation or relocation of ea
M
boiler/compressor to & including 3
horsepower, or ea absorption sys to &
incl 100,000 Btu/h (29.3kw)
1 BBOILER2
Installation /relocation of ea
M
boiler/compressor over 3 horsepower
to & incl 15 horsepower, or ea
absorption sys over 100,000 Btu/h
1BBOILER3
Installation/relocation of ea
M
boiler/compressor over 15 horsepower
to & incl 30 horsepower, or ea
absorption sys over 500,000 Btu/h to
'
& incl 1,000,000 Btu/h
1BBOILER4
Install ation/relocation of ea
M
boiler/compressor over 30 hosepower
to & incl 50 horsepower, or for ea
absorption sys over 1,000,000 Btu/h to
& incl 1,750,000 Btu/h
I BBOILER5
Installation/relocation of ea boiler or
M
refrigeration compressor over 50
horsepower, or ea absorption sys over
1,750,000 Btu/h
1 BAPPLOTH
For ea appliance or piece of equip
M
regulated by this Code but not classed
in other appliance categories, or for
which no other fee is listed in this
code.
1 ELECINSP
Other Electrical Inspections (per hour)
E
I MECHINSP
Other Mechanical Inspections (per
M
hour)
IPLMBINSP
Other Plumbing & Gas Inspections
P
(per hour
1MEETINGIHR
Application Meeting
B
•
CGS- .
CITY OF
• CUPERTINO
r
L
CITY OF CUPERTINO
GENERAL BUILDING APPLICATION
FEE SCHEDULE
Quantity/Sf
Fee ID
Fee Description
Fee
,Group
Permit Type
1GENRES or
1GENCOM
ACOUSTICAL
REVIEW
IACOUSFDW
SFDWL/Duplex New
B
IACOUSRESAD
SFDWL/Duplex-Addition/Alteration
B
IACOUSCOM
Multi-Family/Commercial
B
CHIMNEY'S
1CHIMNEY
Chimney
B
1CHIMNEYR
Chimney Repair
B
FENCES
1FENCE>6FT
Non -masonry, over 6 ft in height
B
1 FENCEMAS>6
Masonry, over 6 ft in height
B
FIREPLACES
1FIREPLMAS
Fireplace Masonry
B
1FIREPLFAB
Fireplace Pre-Fabricated/Metal
B
1 FLAGPOL>20
Flag pole (over 20 ft in height)
B
1MODUSTRU
Modular Structures
B
FOUNDATIONS
I FOUNDREP
Foundation Repair
B
] PILECAST
Pile Foundation Cast in place concrete
B
1 PILEDRIV
Pile Foundation Driven (steel, pre-
stressed concrete)
B
3 of 5
ax,
CITY OF
CUPERTINO
CITY OF CUPERTINO
GENERAL BUILDING APPLICATION
FEE SCHEDULE
Quantity/Sf
Fee ID
Fee Description
)Fee
Group
Permit Type
1GENRES or
1GENCOM
RETAINING
WALL(CONCRETE
OR MASONRY
1RETSTN
Standard (up to 50 ft)
B
IRETSP310
Special Design, 3-10' high (up to 50 `)
B
1RETSPIO
Special Design, over 10' high (up to
50')
B
1RETCRB<
Gravity/Crib Wall, 0-10'high (up to
50 ft)
B
1RETCRB>
Gravity/Crib Wall over 10' high (up to
50 ft)
B
SIDING
1 SIDEST/BK
Siding, Stone & Brick Veneer
(interior/exterior)
B
1 SIDEOTHER
Siding all other
B
SKYLIGHTS
1 SKYL<10 SF
Skylight less than 10 sf
B
1 SKYL>1 OSF
Skylight greater than 10 sf or
structural
B
1STAIRS
Stairs -first flight/ea addt'l
B
STORAGE RACKS
1 SRACKS<=8
Storage Racks 0-8' high (up to 100 sf)
B
1 SRACKS>8
Storage Racks over 8' high (up to 100
st)
B
1STUCOAP
Stucco Applications (up to 400 sf)
additional stucco application
B
4of5
SCITY OF CUPERTINO
CITY OF GENERAL BUILDING APPLICATION
• CUPEkTINO
FEE SCHEDULE
Quantity/Sf
Fee ID
Fee Description
Fee
Group
Permit Type
1GENRES or
1GENCOM
1 WINREP
Replacement windows/sliding glass
door (ea 8 windows)
B
1 WINMEWSTR
New Window -structural shear
wall/masonry (includes plan ck fee)
B
IEPERMITFEE
Electrical Permit Fee
E
1 MPERMITFEE
Mechanical Permit Fee
M
1PPERMITFEE
Plumbing Permit Fee
P
1 ELCPLNCK
Stand Alone Electric Pln Ck (hourly)
E
1 MECPLNCK
Stand Alone Mechanical Pln Ck (hrly)
M
1 PLMBLNCK
Stand Alone Plumbing Pln Ck (hrly)
P
1 STPLNCK-(3 HrM`in
when not over counter)
Standard Plan Check (when no E/M/P)
hourly -stand alone
B
1BSEISMICR
Seismic Residential
B
IBSEISMICO
Seismic Commercial
B
1TRAVDOC
Travel & Documentation
B
iBUSLIC
Business License
B
•
5of5
RESIDENTIAL PROJECT COVER SHEET
Assessor's Parcel Number: -2Z'6-Q?—
'6-Q%—Or(/y �b `//
Name of owner. �`� I �� 8 � �C�c�-txJ1>.�L,
Project address. ( tl '�;tjAA�-ryy��
o c z
Contact person( %�<hone. rf g r) D d - 3 / o
Fax. 2, - 379 ?
Net square footage of lot.
C]
Existing Proroosed
Square footage: First floor:
_.._
Second floor: _
Garage:
TOTAL:
�re there at least two 10 foot by 20 foot clear spaces inside the garage. Y O
Is privacy protection planting required for the project? N
On what floor(s) is work being done?
Brief description of work. �� �w a Q",
Code editions 2008 CBC
2008 CPC
Effective 1/1/08
(Y - N)2008 CFC (Y - ND2008 CMC (Y --TN)
(Y - N) 2008 NEC (Y - N)
APPROVED
ri ACCORDANCE WITH THE CITY 01
CUPERTINO CODES AND ORDINANCES
)ATE
tl(/N�$7Dp�
SIGNED
��
This soto!,Des and MUS
alltimes
ne kept on the job at all limas end it is un
and
lawful to make any changes or alteration -
• nn same without written permission fron
the building Popt., City of Cupe tino.
rhe stamping of this pan end .pocilimion,
SHALL NOT be held to pe mil or to be a
P1anRevrewProcess Work Book .vi.sedt/08to I.,b- ,/.
n
C
-3-
0
r
0
oQ
w
0
s
R
0
-1
SCoFrS (n
^ m m
Y
�Z
o.mmmm '
C
W.
A
Lo
g 3 W
0- egg
�
N
�SSamK T
C
m�p1�omm
Rt
mm' m3mm z
R1
a^'c�^o
�
an0
^do'3gS �
m
m'rom�jno 3
JJ��
xmvam��
C
L
mm�^m>m
z
O
�1
fD�3wmm
2D
3o.Onv p
o m m
.
n
n
rpgs . oil -
f
OEL8v
o
O
° N'eai Eo r
o PrA
C
y
N
n
ao a^o
rE
a
Fr
a
trA
N
C
0
7 N
0R oo��^.
r
8A 3�S
o
j
e E n n n
m
5
•
�
�
r
Y
�Z
J
�
J L
5
•
�
�
..tea:.✓
CITY OF
I�MkJINO
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax (408) 777-3333
Building Department
All Cupertino building permits must meet certain conditions related to maintaining
environmental quality and public peace and safety. The two most common
conditions are described below.
STORMWATER POLLUTION CONTROL
State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and
the Santa Clara Valley Water District control stormwater pollution. Educating local
residents and businesses and enforcing stormwater pollution control laws are key parts
of the City's compliance efforts.
Stormwater pollution prevention: It's up to us
In northern Santa Clara Valley, storm drains flow directly to local creeks and San
Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife
dependent on our waterways, for people living near streams and baylands, and for the
local water supply. Common sources of stormwater pollution include:
• Dripped oil, fuel, and antifreeze from vehicles and heavy equipment;
• Construction debris, including dirt, concrete and paint;
• • Landscaping runoff containing pesticides or weed killers; and
Any material dumped or spilled into streets or storm drains
•
The property owner and the contractor share ultimate responsibility for activities
occurring at a construction site and will be held responsible for any environmental
damage caused by subcontractors or employees.
For more information on construction -related stormwater requirements, see the
Stormwater Quality Regulations section of the City of Cupertino web site at:
http://www.culpertino.org/city government/departments and offices/
environmental services
COMMUNITY NOISE CONTROL
The basic noise control requirements for construction sites are as follows:
• Typical construction work hours are:
- Weekdays - 7 a.m. to 8 p.m.
- Weekends - 9 a.m. to 6 p.m.
• Construction other than street construction is prohibited on holidays.
• Residential daytime noise levels from complaint site - 60 dBA
• Nonresidential daytime noise levels from complaint site - 65 dBA
For more information on noise control, please see Chapter 10.48 of the Cupertino
Municipal Code, which can be accessed at http:llwww.amlegal.com/cur)ertino ca/
Greg Casteel
Building Official
RESIDENTIAL PROJECT COVER SHEET
Assessor's Parcel Number: �-b/6,-�`�-OlY 6
Name of owner. ` w -, V ! l Gt
Project address. f ! D
N
Contact person.Mr2t L k % C hone. "e ^ 00 d - 3/ o
Fax. 9`09 :r2eD - 3 -7!2 3
Net square footage of lot
Existing Proposed
Square footage: First floor:
Second floor: _
Garage:
TOTAL: �—
Ore there at least two 10 foot by 20 foot clear spaces inside the garage
Is privacy protection planting required for the project N
On what floor(s) is work being done?
Brief description of work.
Code editions Giso
2008 CPC
Effective 1/1/08
•
P, JX 2
(Y - N)2008 CFC (Y - N)2008 CMC (Y- N)
(Y - N)2008 NEC (Y - N)
Plan Review Process Work Book Page -8-Revised 1/1/08
N
m
�Gy� N
o� O
n
0
N
DQ
I
Co
0
r
0
Dq
oQ
w
MR
0
n
LA
moo ? 0 m
J
O
CZ
am m m o m rn
m
a4 G
c
C
m' w�a3nrn
L
N
>;;mm�ml
----------------
'm � m m ^ <
C
m
Q
_m
O
3: 3mmo�=-
rR
•.
m;3maam�
�.
f
i 4
m
mm 'x
Z
m
a'
x
�a cmc
v
mmm��mm
x m
C
mwmV3: cn�
i
IG)
Z.
w a=
W
m m m
v%im 3 w
X3;3= c1
Oo
2
3a�0a.ra
o O m 0 m m
7n3 ma
401 L
C
� a^ -0
n p '�gv
C
O
�+eai
naP
FB
� � a
a 9 C
O a
e' w
o CIZ
n
H vw
v
w
5„ o,9
X a
Om
n
ao Wao
�
n
s�C
� «3H
m
g Fr a
2
Q
,a
a
b
16 P oG N
n
N
n
r
8 S 3 g
o
n o
e E o
m
n
LA
I1
Gj
F--I
LJ
y
-r�'
J
C• �
F
T
�y
a4 G
c
C
L
�l y
----------------
O
rnA \
I1
Gj
F--I
LJ
y
_ p O
t
r
�v C
C• �
F
T
�y
a4 G
c
C
o m n i
�l y
T-jO
rnA \
Q
_m
N(A
rR
m
�.
i 4
CM OF
OUPERTINO
E
U
Buildi
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax(408)777-3333
artment
JOB
a l 4 ��l S: St PERMIT# e?v ( 0 2, �
OWNER'S NAME: aZ 6Gt f A PHONE # V09 - 36 9- -7/q?-
GENERAL
7siuGENERAL CONTRACTOR: y( SW�� FAX # �-o s 3 -7o -3 -7 -?r
I am not using any
Efate
Please check applicable subcontractors and comnlete tha fnllowino infnrmatinn-
60
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature
Date