Loading...
08080081CITY OF CUPERTINO- BUILDINF DIVISION PERMIT �U1R'A�yQRII)�S.'iUY''. e.� . �t .. L, F, v�.°MF BUILDING ADDRESS: PERMIT NO. 20823 STEVENS CREEK BLVD DRAEGER CONSTRUCTION INC 08080081 OWNER'S NAME: PERMIT ISSUE DATE MATT ESON REALTY SERVICES INC. 605 COMMERCIAL ST 08/12/2008 NE: SANITARY NO. CONTROL NO. (408)536-0420 ARCHITECUENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH 0 (� LICENSED CONTRACTOR'S DECLARATION Job Description I baby affirm the 1 am Beamed under provisions of Chapter 9 (commencing wash Suction 7000. Division 3 ofthe Businw and Prafcadmu Cads,md my licca is RMV MANSARD RF SIDING& REPLC W/NEW JAMES HARDIE in full forte and effmu. ucenm Class Lt..{ SIERRA PANEL 8" O.C. 5, 500SQFT Date 326EeadContractor , ARCHITECTS DECLARATION I understand my plans shall be used as public records Licensed Professional OWNER -BUILDER DECLARATION 1 hereby affirm that 1 em exempt from tha Committees License Law for me following mason. (Sudon 7(D 1.5, Bushman and Profestions Cork: Any city or county which requires • permit to construct, altar, Impto m, demolish. or repair any structure prior to its iasumm. alae requires the applicant for such permit to file a signed statement Load he is licensed to site of the Conssctu's Lima Law (Chapter 9 Sq. Ft. Floor Area Valuation pursuant provisions 55 0 0 0 (commencing with Section 7000) of Division 3 of the Businusand Profusions Code) or that he ]aexempt therefrom and the basis for the alleged assumption. Any violation of Number Occupancy pane y Type Section 7031.5 by airy applicant for a permit subject, the applicant to a civil penalty of tet mom than rave hundred dollars (5500). 3 2 6 3 018 5 . [sIl(5 I, as owner of me pmperty, m my employees wire wages u ftEwle compeadon, wi0do thewark and the swcmum is notkwnded moRercd fwssk(Sw.7044, Buaimos Required Inspections and Profession Code: The Conuacmea Lima Law dew tet apply to an want of property who builds m improve thereon, and who does such work himself ar tluough his own employees. ;sMided thus such impmssmenu art not intended ora@red tarsale If. however, me building or improvements is said within ow year of eomPletion, the owner. Wilder will have the burden of proving that M did ms build or improve far purpose of , vele.). ❑ I. or owner of the property, am cohesively contracting with Recorded contractors to comsat the project (Su. 7044, Business and Profusions Coda:) The Comoacter's U. cove Law dm not apply b an ownu of property who builds or improv thereon, ted. who contracts for such projects with a comm ur(s) licensed pursuant to me Contractor's Lkea Ism. ❑ l ore exempt under See. ,B&PC for thin mean Owner Data WORKER'S COMPENSATION DECLARATION I history eDirm under penalty of perjury ore of the following declandens: I have and will maintain a Cenifrwm of Caant to selbiaun for WaikatoCompen- radon, an provided for by Section 3700 of dm Labor Code, for ma pefomurcs of site - - work for which suis permit is issued. - - ❑ 1 haw and will maintain Warkerh Gmpellastion Insurance, a required by Section 3700 of the Labor Code, for the parf=wce ofthe wosk for which this permit is issued - MyWarkeesCom atian Insurance mmier andli nn saber Cartier. /aj 41es 'W4`' Ii �W L / t CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This Section med notWcomplcmd lithe permit is foranchundred dollars ($100) m lea) 1 terry that in the performance of the work for which this permit is issued. I shall am employ any person in any man erso an m become subject to the Worafss' Compcmmon Lswa of Calif nods, Dem Applicant NOTICE TO APPLICANT: If. after matin{ this CeniOcate of Exemption, you Mould become Subject to the Worker's Compensation provisions of the Isom Cede. you mut, forthwith comply with such provisions or this permit shall Ite deemed rmaked CONSTRUCTION LENDING AGENCY 1 hambyaffirm mat then is• mmu ucirm lerldin{aRmY for Ne perrormancoof the work for which this permit is issued (Sex, 3097, Civ. C.) Lender's Name Leadees Add. 1 certify that 1 haw nod this application and smut Wt the above information Is ' cortew 1 a{rte to comply with all city and county ordinamm and awe laws relating to building construction, and hereby mtha se representatives of this city to enter upon the shave -mandated property for inspection purposes (We) agree to ave, indemnify and keep harmlm the City of Cupertino against IiebiliBe, judgments. cam ad expands which may in any way acame against said City in consuenc of the APPLICANTcUN ERSTANDSranting, of thn D WILL COMPLY WITH ALL NON -POINT Issued by: Date SOURCE REGULATIONS. Re -roofs Type of Roof ShmommerAppliwm/Cm r Dem HAZAA60US MATERIALS DISCLOSURE Will the applicant at forum building uccupantnorc rehandle haaNaw material U deBmd by the Cupertino Municipal Code. Chapter 9.1x, and the Health and Safety Code, xss3x(a)7 CY. JNu Ly All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove It❑Yes Will the applicant or future building occupant a equipment or devices which harsrdous air contaminants as defined by the Bay Aam Air Quality Management all new materials for inspection. icr7 , ❑Yes )(Nu I haw mal the hasardnw material, ne uiremmtsunderChapter6.95oftheCalirm- nkHcalth&SalCLYCO,Sccdom25%5,M533usld25534.lundersmndthmifmc building docs not monetHly have a tenant, the it h my nspoodidlisv to notify de awupant or the nequlmmcds which mwm met priormi ante ar enificateafaman 9� Signature of Applicant Date All roof coverings to be Clrt» ' or better g assRa Owner onuthodv � em Dow ow " CITY OF CUPERTINO • 2 ITEMS OF 2 PERMIT RECEIPT • • Sec: Twp: Rng: Sub: Blk: Lot: APN ........: 32630185.MRS DATE ISSUED.......: 08/12/2008 RECEIPT #.........: BS000005759 REFERENCE ID # ...: 08080081 SITE ADDRESS .....: 20823 STEVENS CREEK BLVD SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 OWNER ............: MATTESON REALTY SERVICES INC. ADDRESS ..........: 20823 STEVENS CREEK BLVD CITY/STATE/ZIP ...: CUPERTINO, CA 95014 RECEIVED FROM ....: DRAEGER CONSTRUCTIO CONTRACTOR .......: DRAEGER,.JOHN EDWARD LIC # 21895 COMPANY ..........: DRAEGER.CONSTRUCTION INC ADDRESS ..........: 605 COMMERCIAL ST, CITY/STATE/ZIP . SAN JOSE, CA 95112 TELEPHONE ........: (408)536-0420 FEE ID UNIT QUANTITY AMOUNT PD -TO -DT THIS REC NEW BAL --------------------------------- IBSEISMICR VALUATION 55,000.00 ---------------------------------------- 5.50 0.00 5.50 0.00 1SIDEOTHER SQ FEET 5,500.00 2759.00 0.00 2759.00 0.00 TOTAL PERMIT ---------- ---------- ---------- ---------- 2764.50 0.00 2764.50 0.00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER CHECK ------------------- 2,764.50 ---------- -- #137494 TOTAL RECEIPT --------------- 2,764.50 i. • • D CUPERTINO CITY OF CUPERTINO GENERAL BUILDING PERMIT APPLICATION FORM 0r U k d UPJ-✓ APN # p I 6D-3 6 �o rn i -S Date: $-12-orb Building Address: TOM-,$ epqGd"ep c�tE��l_ �IJrJ Mailing Address (if different from building address): Owner's Name: Phone#: tGo Rolot62- as - of SIT-( 5%savia Id6• 1. (9rio_g(g2-1t7� Contractor: Phone: 4 n 6. -ria (P-O'+zo 12Atgbl��z CpVSI'7.v�0^t L, Fax: x+06-S3fo-0425 Contractor License #: 1 1 p Cupertino Business License #: 7101S Contact: L. oo "jet _ Z A jo iro L Phone: q os - zo q _ q (o q 4 Fax: `f 0B - c33 fo - 0 Lt 2 Residential to Commercial Job Description: 21ew4oJtF_ r►q,tsqv_o R+oor_ ;�thtJ`r AJ7 9ZW-P14LCr—_ Wir-}{ �C-vl 0-.ahtEs Haa.niC- gir�-'Z24 Pa4JtEL 3" O•C Building Permit Info: Bldg 19 Elect ❑ Plumb ❑ Mech ❑ Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ IUIII/V-A ❑ IUIII B, IV -HT, V -B [.]-- 2 Valuation: ,yySquare Footage: Oct> !,;C; 00 Project Size: Express ❑ Standard Large ❑ Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Points Achieved: For help, contact Build it Green at www.builditgreen.org Revised 7/01/08 CUPEI,TINO 4W CITY OF CUPERTINO GENERAL BUILDING PERMIT APPLICATION FORM Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or IGENCOM 1 BBOILERI For the installation,or relocation of ea M boiler/compressor to & including 3 horsepower, or ea absorption sys to & incl 100,000 Btu/h 29,3kw 1 BBOILER2 Installation /relocation'of ea M boiler/compressor over 3 horsepower to & incl 15 horsepower, or ea absorption ss over 100,000 Btu/h 1 BBOILER3 Installation/relocation of ea M boiler/compressor over 15 horsepower to & incl 30 horsepower, or ea , absorption sys over 500,000 Btu/h to & incl 1,000,000 Btu/h 1BBOILER4 Installation/relocation of ea M boiler/compressor over 30 hosepower to & incl 50 horsepower, or for ea absorption sys over 1,000,000 Btu/h to & incl 1,750,000 Btu/h 1 BBOILER5 Installation/relocation of ea boiler or M refrigeration compressor over 50 horsepower, or ea absorption sys over 1,750,000 Btu/h 1BAPPLOTH For ea appliance or piece of equip M regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this code, 1ELECINSP Other Electrical Inspections (per hour) E I MECHINSP Other Mechanical Inspections (per M hour) 1PLMBINSP Other Plumbing & Gas Inspections P (per hour 1MEETINGIHR Application Meeting B 40 • • CITY OF CUPERTINO CITY OF GENERAL BUILDING APPLICATION CUPEkTINO FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM ACOUSTICAL REVIEW IACOUSFDW SFDWL/Duplex New B IACOUSRESAD SFDWL/Duplex-Addition/Alteration B 1ACOUSCOM Multi-Family/Commercial B CHIMNEY'S 1 CHIMNEY Chimney B 1 CHIMNEYR Chimney Repair B FENCES ' 1FENCE>6FT Non -masonry, over 6 ft in height B 1 FENCEMAS>6 Masonry, over 6 ft in height B FIREPLACES 1FIREPLMAS Fireplace Masonry B 1FIREPLFAB Fireplace Pre-Fabricated/Metal B 1FLAGPOL>20 Flag pole (over 20 ft in height) B 1MODUSTRU Modular Structures B FOUNDATIONS 1FOUNDREP Foundation Repair B 1PILECAST Pile Foundation Cast in place concrete B 1 PILEDRIV Pile Foundation Driven (steel, pre- stressed concrete B 3 of 5 CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEESCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM RETAINING WALUCONCRETE OR MASONRY 1RETSTN Standard (up to 50 ft) B 1RETSP310 Special Design, 3-10' high (up to 50 `) B 1RETSPI0 Special Design, over 10' high (up to 50' B 1RETCRB< Gravity/Crib Wall, 0-1O'high (up to 50 ft B 1RETCRB> Gravity/Crib Wall over 10' high (up to 50 R B SHED -(EACH) Shed Over 120 sq ft B SIDING 1 SIDESTBK Siding, Stone & Brick Veneer interior/exterior B SS.6 O /3 1 SIDEOTHER Siding all other B SKYLIGHTS 1 SKYL<10 SF Skylight less than 10 sf B 1 SKYL>t OSF Skylight greater than 10 sf or structural B 1STAIRS Stairs -first flight/ea addt'l B STORAGE RACKS 1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B 1 SRACKS>8 Storage Racks over 8' high (up to 100 st B 4 of 5 46 • �:....'- CITY OF CUPERTINO CITY F GENERAL BUILDING APPLICATION CUPERTINO FEESCHEDULE 4 Quantity/Sf Fee ID Fee Description Fee Group Permit Type ]GENRES or 1GENCOM 1STUCOAP Stucco Applications (up to 400 sfl additional stucco application B 1 WINREP Replacement windows/sliding glass door (ea 8 windows B 1WINMEWSTR New Window -structural shear wall/masonry includes plan ck fee B 1 EPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1 PPERMITFEE Plumbing Permit Fee P 1 ELCPLNCK Stand Alone Electric Pln Ck (hourly) E 1 MECPLNCK Stand Alone Mechanical Pln Ck (hrly) M 1 PLMBLNCK Stand Alone Plumbing Pln Ck (hrly) P 1 STPLNCK-(3 Hr Min when not over counter) Standard Plan Check (when no E/M/P) hourly -stand alone B / 1BSEISMICR Seismic Residential B 1BSEISMICO Seismic Commercial B 1TRAVDOC Travel & Documentation B 1BUSLIC Business License B 5 of 5 Green Points'Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a 'total points" value to a project to be considered environmentally friendly is • not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for "greening" your project. 1. Recycle Job Site Construction & Demolition Waste ' ' ' ' ' ' ' 0 ' 0 =1 point; 75%= 2 points; 80%= 4 points L. t4t up to 4 Resource pts Salvage Reusable Building Materials 4 Resource pts y=yes 3. Remodel for Mixed Use, Adaptive Reuse, and (For every 10% of FSC lumber used= 2 points, up to 10) up to 10 Resource pts Historic Preservation 4 Resource pts y=yes 4. Protect Native Soil 2 Resource pts y=yes 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 6. Implement Construction Site Stormwater Practices 2 Resource pts y=yes 7. Protect Water Quality with Landscape Design 2 Resource pts y=yes 8. Design Resource•Efficient Landscapes and Gardens 4 Resource pts y=yes 9. Reuse Materials/Use Recycled Content Materials , for Landscape Areas 2 Resource pts y=yes 10. Install High -Efficiency Irrigation Systems 2 Resource pts y=yes 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes B. Foundation 1. Incorporate Recycled Flyash in Concrete • 25% Recycled Flyash = 2 points; Add 1 point for every 10°/ increase of Flyash, up to 5 points up to 5 Resource 2. Use Recycled Content Aggregate 2 Resource pts y= 3. Insulate Foundation/Slab before backfill 3 Energy pts Y= C. Structural Frame ' ' ' ' ' ' ' 0 ' 0 1. Substitute Solid Sawn Lumber with Engineered Lumber J 3 Resource pts 2. Use FSC Certified Wood for framing y=ye: (For every 10% of FSC lumber used= 2 points, up to 10) up to 10 Resource pts 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=ye; 4. Use Web Floor Trusses 2 Resource pts y=ye. 5. Design Energy Heels on Trusses 6" or more 2 Energy pts y=yes 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 8. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPs) a. Floors 3 Energy pts y=yes b. Wall 3 Ener is 9Y P y=yes c. Roof 3 Energy pts y=yes 10. Apply Advanced Framing Techniques 4 Resource pts y=yes 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 12. Use OSB a. Subfloors 1 Resource pt y=yes . b. sheathing '^ 1 Resource pt y=yes ' ' ' ' ' ' ' 0 ' 0 0 llllllii� 1. Use Sustainable Decking Materials 1 Energy of y=yes 2. Insulate Hot and Cold Water Pipes a. Recycled content 3 Resource pts y=ye b. FSC Certified Wood 3 Resource pts y=ye 2. Use Treated Wood That Does Not Contain ChromiumlArsenic 1 IAO/Health pt y=ye 3. Install House Wrap under Siding 1 IAQ/Health pt y=ya 4. Use Fiber -Cement Siding Materials 1 Resource pt Y_ -Yes E. Plumbing 1. Install Water Heater Jacket 1 Energy of y=yes 2. Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 3. Retrofit all Faucets and Showerheads with Flow Reducers 1 Energy pt a. Faucets (1 point each, up to 2 points) Up to 2 Resource pts, b. Showerheads (1 point each, up to 2 points) Up to 2 Resource pts, 14. Replace Toilest with Ultra -Low Flush Toilets (1 point each, up to 3 points) Up to 3 Resource pts 5. Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 6. Convert Gas to Tankless Water Heater 4 Energy pts y=yes 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) Up to 4 IAQ/Health pis B. Install On -Demand Hot Water Circulation Pump 4 Resource pts y=yea r. uecmcai 4 Resource pts 1. Install Compact Fluorescent Light Bulbs (CFLs) 6. Alternative Insulation Products (Cotton, spray -foam) (6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) Up to 4 Energy pts 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 4 Resource pts 5 points) Up to 5 Energy pts 3. Install Lighting Controls (1 point per fixture, up to 4 points) Up to 4 Energy pts 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) Up to 4 Energy pts G. Appliances 1, Install Energy Star Dishwasher 1 Energy pt 12. Install Washing Machine with Water and Energy b. Ceilings -Conservation Features 1 Energy pt 3.Install Energy Star Refrigerator 1 Energy pt 4. Install Built -In Recycling Center 3 Resource pts H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls s s s b. Ceilings 2 Energy pts y --yes 2. Install Floor Insulation over Crawl Space 4 Energy pts y=yes 3. Install Recycled -Content, Fiberglass Insulation with No Added Formaldehyde a. Walls 2 Energy pts y=yes b. Ceilings 2 Energy pts y --yes 2. Install Floor Insulation over Crawl Space 4 Energy pts y=yes 3. Install Recycled -Content, Fiberglass Insulation with No Added Formaldehyde 3 IAQ/Health pts y=yes 4. Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 5. Use Cellulose Insulation a. Walls 4 Resource pts y=yes b. Ceilings 4 Resource pts y=yes 6. Alternative Insulation Products (Cotton, spray -foam) a. Walls 4 Resource pts y=yea o. uaiiings 4 Resource pts y=yes • • r L J. Heating Ventilation and Air Conditioning I1 Use Duct Mastic on All Duct Joints 1. Install Energy -Efficient Windows u �. 2. Install Ductwork within Conditioned Space a. Double -Paned b. Low -Emissivity (Low -E) c. Low. ConductivityFrames i 1 Energy pt y=yes 2 Energy pts y=yes ± 2 Energy pts y=yes 1 Energy pt y=yes 2. Install Low Heat Transmission Glazing J. Heating Ventilation and Air Conditioning I1 Use Duct Mastic on All Duct Joints 4 2 Energy pts y=ye: 2. Install Ductwork within Conditioned Space 3 Energy pts y=yes 3. Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 4. Clean all Ducts Before Occupancy 2 IAO/Health pts y=yes 5. Install Solar Attic Fan 2 Energy pts y=yes 6. Install Attic Ventilation Systems 1 Energy pt y=yes 7. Install Whole House Fan 4 Energy pts y=yes B. Install Sealed Combustion Units 5 IAQ/Health pts y=yes a. Furnaces 31AQ/Health lits y=yes b. Water Heaters 3 IAQ/Health pts y=yes 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 3 Energy pts y=yes 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 11. Install AC with Non -HCFC Refrigerants 2 Resource pts y=yes 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts y=yes 13. Retrofit Wood Burning Fireplaces 4 Energy pts. y=yes • a. Install EPA certified wood stoveslnserts 1 IAQ/Health pt y --yes b. Install/Replace Dampers 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y=yes 15. Install High Efficiency Filter 41AO/Health pts y=yes 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts y=yes 17. Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 4 Energy pts. y=yes 2. Install Solar Water Heating System 10 Energy pts y=yes 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2A kw =12 points, 3.6 kw = 18 points) Up to 16 Energy pts �6. Select Safe and Durable Roofing Matedals--'� 1 Resource pt y=yes 7. Install Radiant Barrier 3 Enerav, ots v=ves L, Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts 3. Plant Deciduous Trees on the West and South Sides 3 Energy pts 0 1. Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 2. Use Low VOC, Water -Based Wood Finishes 2 IAQ/Health pts y=yes 3. Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 4. Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 5, Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 6. Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 7. Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y --Yes 8. Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 9. Use Finger -Jointed or Recycled -Content Trim 1 Resource pts y=yes 10. Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 0 0 1. Select FSC Certified Wood Flooring u 0 0 0 0 0 y=yes 2. Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 3. Use Recycled Content Ceramic Tiles 4 Resource pts y --yes 4. Install Natural Linoleum in Place of Vinyl Ej V --yes 5. Use Exposed Concrete as Finished Floor 4 Resource pts 0 N. Flooring 1. Select FSC Certified Wood Flooring 8 Resource pts y=yes 2. Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 3. Use Recycled Content Ceramic Tiles 4 Resource pts y --yes 4. Install Natural Linoleum in Place of Vinyl 51AQ/Health pts V --yes 5. Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 6. Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes Total olntsvela e: 1 1401 130 57 Total Points Project Received: 1 01 01 0 • G:datalprogsrgreenbuildingguidelineslremodelerslgresnpolntsfina12.12.e4protected.xls A Green Building Plan Check Index of Green Building Points/Categories Example of an Index or Table of GreenPlan Sheet or Page Building Points Categories that must be shown and referenced on the Project Site 9. Install H.E. Irrigation, (details/spec)- unaailon 1. Use 15 % Flyash Concrete, (note) uctural 3. Uses Wood Waist, (See Spec.) S. Use Truss with heels, (detail) 6. B. OSB Sheathing, detail . Finish I. Composite Decking, (Note/Spec.) 4. B. Fiber Cement Siding, ec. tubing 1. Insulate all H.W. pipes, (Note/Spec.) 5. Tankless W.H., (Note/Spec.) 11. A 2500 Gal. Tank, (Note/Spec) ctrlcal 4. E. Ceiling Fens, (Note/Spec.) rliances 1. Energy Star Dishwasher, (Note/Spec.) 3. Ene gy Star Refrigerator, (Note/Spec. er 1. List Green Features on Plans PIZZA= Process Work Book Page -12-Revised 325/08 L-1 S-1 S-2 S-2 S-2 A-3 A-4 P-1 A-2 A3 A3 A-1 Points 2 points 5 points 2 points 2 points 2 oints 2 points 2 points 2 points 2 points 1 p=4:oint 1 taint 1 point 40 points CITY OF �UPEkTINO i • Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department JOB ADDRESS: 20 FZ3 s ev n r Greeff � PERMIT # v o U v �/ OWNER'S NAME: PHONE # GENERAL CONTRACTORS FAX # I am not using any subcontractors: /z"lle, ��� /Z Signature Date Please check applicable subcontractors and complete the following information: Owner/Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date