B 0330 POSTTHIS C NEAR FRONT OF BUILDING
CITY OF ERTt '
PERMITNO 3 30
BDNA GDIVI-
NWLDING PROJECT IDE:VTIFII'ATION
BU ILD IN tk,,NDI S: SAN'ITARI90, APPLICATION SUBMITTAL DA'
�I NER;/NAMR:/. �;. / / . 1 PHONE:,. - _ CONTRACTOR)NAME: / � NOS..
NIC
f••RCI IITEC/ENGINEER: LIC NO: mys - : A :. /'.'r,i ('.� ❑
BUILDING PERMIT INFO
INSPECTIONS DATE INSPEC. ❑ Consultant Fees Paid by Applicant(initial) BLDG ELECT PLUMB MECH
❑ ❑ ❑ ❑
FOUNDATION/PIERS/H.D.S. INSPECTION RECORD
UFER GROUND NOTE: ALL GRADING AND DRAINAGE JOB DESCRIPTION
RESIDENTIAL
PAD/SETBACK-CERT SHALL BE INSTALLED TO COMPLY WITH ❑SFDWL ❑KITCHEN REMODEL.
THE APPROVED PLANS AND CITY OF CIADDITION ❑PLUMBING RE PIPE
GARAGE SLABS/PREGUNITE CUPERTINO STANDARDS. ❑MULTI-UNIT ❑STRUCTURAL.
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED MODIFICATION
TO ARRANGE INSPECTION ❑INTERIOR ❑CHIMNEY REPAIR
UNDERGROUND/SLAB 1'1'�Y"7+SO PM) IMPROVEMENT SWIMMING POOLS
❑BATH REMODEUREPAIR (]DEMOLITION
PLUMBING 777-3228 M DAY TO FRIDAY 24 HOURS BE- ❑OTHER
ELECTRICAL F QUIRED INSPECTION. JOB ADDRESS TCT_
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED AND PERMIT#ARE NEEDED WHEN PHONING.
COMMFR IA
PLUMBING ATTENTION CONTRACTORS: ❑NEW BLDG/ADDITION ❑DEMOLITION
MECHANICAL NO PERSON(S)SHALL PERFORM WORK ON ❑TENANT ❑FOODSERVICE
THIS JOB SITE WITHOUT BEING IN COM- IMPROVEMENT
ELECTRICAL PLIANCE WITH WORKERS'COMPENSATION QOTHER
FRAMING VENTS INSURANCE REQUIREMENTS.
INSULATION
PLACE NO SUBFLOOR UNTIL ABE HAS BEESIGNED INSPECTION SPECIAL INSPECTION REQUIRED ❑ DATE INSP
OVN
ROOF SHEATH/DIAPHRAM � 69q� J5-
PLUMBING
TUBS&SHOWER PAN
MECHANICAL
1 iLECTRICAL/POOL BOND
FRAMING/STAIRS/E.EGRESS
INSULATION/VENTILATION
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED
EXTERIALSHEAR/HOLD DOWN `L 95
INTERIOR SHEAR/HOLD DOWN
SHEETWROCK/SHEETROCK SHEAR
EXTERIOR LATH/W-SCREED
SHOWER LATH
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED
SCRATCH COAT P
SEWER/WATER
TEMPORARY APPROVALS
OCCUPANCY
ELECTRICAL
GAS
FINALS
GAS TEST
GRADE
FIRE
HANDICAP
ELECTRICAL
PLUMBING
j '.ECHANICAL
ENERGY
VISUAL FINAL ONLY CERTIFICATE OF OCCUPANCY❑
BUILDING IMPORTANT: ISSUANCE DATE
OC CUPANCY OFBUILDING IS NOT PERMI ED PLEASE READ REVERSE SIDE BEFORE
UNTIL BUILDING FINAL IS SIGNED BY BUILDING CALLING FOR FINAL INSPECTION!!
INSPECTOR.
ISSUED NY'
APPLICANT'S POSTING COPY