08020187 •
CITY OF CUPERTINOXAa'+«+a t*sa+e A"tiTad,+r'^"v
BUILDING DIVISION PERMIT CONT CTORINIE~ORMA.TIO�I .
,ay.,kSy ,..;, ,'j'1„mss. y,r' 1 .,. . .. s.” 'ry.a ai
PERMIT NO.
BUILDI2r3trSTONEBRIDGE ST AMERICAN KITCHEN Sc BATH 08020187
•
OWNER'S NAME: . - PERMIT ISSUE DATE
JOHN & MICHELLE KAPLAN 1758 JUNCTION AVE #D •
02/28/2008
Eo SANITARY NO. CONTROL NO.
(408) 436-8151
ARCHITECT/ENGINEER: BUILDING PERMIT INFO
BLDG ELECT PLUMBMECH
•
0 C C 0
00 'LICENSED CONTRACTOR'S DECLARATION Job Description
i U F I hereby affirm that I am licensed under provisions of Chapter 9(commencing
te4 witSection 7000)ofDivision 3ofdeBusiness and Professions Code,and mylicenau BTHRM RMDL, NON-STRUCTL & INCLD ELEC,MECH, PLMBNG
m in full force and e t.
tlj' Leena Clays Lk.N_5 L` UMllfLi 1805Q
;,-:o Dale 'I a Contractor
N Nkbtft3sH
ARCHITECTS DECLARATION
i
I understand my plans shall he used as public records
-6
C Licensed Professional
OWNER-BUILDER DECLARATION
)Ft M 0 1 hereby affirm that 1 am exempt from the Contractor's License Law for she
-o o following reason.(Section 71131.5,Business and Professions Code:Any city or county
SS fi which requires a permit to onstr alter,improve,demolish,or repair any suunure
--i prior to its issuance,also requires the applicant for such permit to file a signedswemem
ss< that hcencin licensedpursuantto 7(he provisions of the Contractor's License Law(Chapter 9 Sq.Ft. Floor Area Valuation
`$1-$ (commencing with Section 7030)ofDivisionr of the Businesand Professions Code)or $20000
e - that he u exempt therefrom and the basis for the alleged exemption.Any Notation of
Section 7031.5 by anynt for a permit subjects the applicant a civil penalty of A Number •
Occupancy Type
not more Nan five hundredred dollars(5500). 34213014 ,
O 1,as owner of the property.or my employees with wages as their sole compensation.
will do the work.and the strumae is not intended or offered for sale(Sec.7044,Business Required Inspections
and Professions Code The Contractor's License Law does riote ns apply to an owner of q P
pmpeny who builds or improves ther an,and who does such warkhimselfor through his
hone however,
the buildinprovided i improvement
improvements within
inner intended completion.etmd roe o n r-
buildvecthebvebrdenrovemvngthatdedidnoueu or impvthe owner-
builder will have the burden of proving that he did not build or improve for purpose of ` I\\r11\V{1TIII1I1 (.A'y� /(j\
seas). L1 -"� 111111111171 /rl tl�/f^P\�Fy\\\\U\
❑I,as owner of the property am exclusively contacting with licensed contractors 0 ll�`
connect the project(Sec.7044,Business and Professions Code:)The Contractors L4 /
cense Law does oat apply to an owner of property who builds or improves thereon,and, "`fff---
who contracts for such projects with a contactor(a)licensed pursuant to the Contractor's
RY
Licence Law.
S)
❑I am exempt under Sen .B&P C for this reason
Owner Dam
O _..
WORKERS COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations
❑I have and will maintain a Certificate of Consent to self-Insure for Workers Compen-
sation,as provided for by Section 3700 of the Labor Code.for the performance of the
work for which Nis permit is issued.
I have and will maintain Worker's Compensation Insurance,as required by Section
3700 of the Labor Code.for the performance of the work for which this permit is issued •
My Workers Compensation Insurance
rannlce artier and Policy number u: �s
Canfer.,,S1 Cr t' 104Policy No.:30�75"2L
CERTIFICATE OF EXEMPTION FROM WORKERS' •
COMPENSATION INSURANCE
(fhb section need not he completed If the permit is for one hundred dollen($103)
or less)
I certify that in the performance of the work for which this permit is issued.I shall not
employ any person in any mannerso as to become subject to the Workers'Compensation
Laws of California Date
Applicant
NOTICE TO APPLICANT:If.after making Nis Cenifium of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Code,you mum
0 Z forawith comply with such provisions or this permit shall be deemed'tanked. •
,z_,1'n CONSTRUCTION LENDING AGENCY
Hr.._ I hereby affirm that there is a construction lending agency for the pea rfonnanof
I:4the work for which this permit is issued(Sec.3097,Civ.C.) '
Irl o Lender's Name - - _ -
az Lender's Address
O 0 I certify that I have read this application and sate Nat the above information is
Li. E' correct.I agree to comply with all city and county ordinances and state laws minting to
building construction.and hereby awhorire representatives of this city to enter upon the
N W ahove-mentioned property for inspection purposes. ,
fa, (We)agree to save,indemnify and keep harmless the City of Cupertino against
F lin liabilities.judgments.costs and expenses which may in any way accrue against saidCity .11111111e
U z in consequence of the granting of this permit. ..1.7.--C.---(r---
Ift
1 APP ANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: ¶- Sec£Pt// Date C,.� 0"'
SOU TIONS.
09
-.-m------..-.-m------.. I" 'Re-roofs /
•
Signature a Appliapea
HAZARDOUS MATERIAISDISCLOSURE Type of Roof
Will the applicant or future building occupant store or handle b nd
aous material
as defined by the Cupertino Municipal Code,Chapter 9.12,and the Health and Safely
Code.Section 25532(0?• �1a( All roofs shall be inspected prior to any roofing material being installed.
❑Yu, Y
Wits the applicant or future building occupant use equipment er deem which 'If a roof is installed without first obtaining an inspection,I agree to remove •
emit hazardous air contaminants as defined by the Bay Arca Air Quality Management all new materials for inspection.
District?
❑Yes Pit
I have read the hazardous materials requirements under Chapter 6.95 ofd e Califor-
nia Health&Safety Code,Sections 25505,25533 and 25534.1 undersand that if the building ,
�rentiy ha. rant.that it isnotify thenx
my responsibility to opant of the
met prior to issuance ora froom of Occupancy. Signature of Applicant Date
'
— All roof coverings to be Class"B"or better
v•, or authorized agent Date
CITY OF CUPERTINO
• 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg
COPY # : 1
Sec: Twp: Rog: Sub: Blk: Lot:
APN • • 34213014 .00
DATE ISSUED • 02/28/2008
RECEIPT # • BS000004045 •
REFERENCE ID # . . . 08020187
SITE ADDRESS • 23030 STONEBRIDGE ST
SUBDIVISION
CITY • CUPERTINO
IMPACT AREA
•
OWNER • JOHN & MICHELLE KAPLAN
ADDRESS • 23030 STONEBRIDGE
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-5641
RECEIVED FROM • JOE J MARTENBERGH
CONTRACTOR • WARTENBERGH, JOE LIC # 21316
COMPANY • AMERICAN KITCHEN & BATH
ADDRESS • 1758 JUNCTION AVE #D
CITY/STATE/ZIP . . . : SAN JOSE, CA 95112
TELEPHONE • (408) 436-8151
•
FEE ID UNIT QUANTITY • AMOUNT PD-TO-DT THIS REC NEW BAL
1BSEISMICR VALUATION 20, 000. 00 2 . 00 0. 00 2 . 00 0. 00
1REMRESBAT SQ FEET 180. 00 429 . 00 0. 00 429 . 00 0. 00
1STPLNCK HOURS 1. 00 122 . 00 0. 00 122 . 00 0. 00
TOTAL PERMIT : 553 .00 0. 00 553 . 00 0. 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
CREDIT CARD 553 . 00 VISA
TOTAL RECEIPT : 553 . 00
•
080201e-1
G D CITY OF CUPERTINO
ADDITION/REMODEL
• CUPERTINO PERMIT APPLICATION FORM
APN#3 a( ao f Lit
DO Date: 2_2_9' 6 S
Building Address:,Mei 23o30 STo N6 gyp, P 3
Mailing Address (if different from building address): (� Q —7
Owner's Name: TO VNV1 * 1 ^ \L1 Q,\It N ��� Phone# : 1 I.O U 725 V 5 /
Conntrracttoor:� 4 ^ lJ IV I 1/\ Phone#: '11'1O C ,..„.15h B 1 5 1
A rgiz I c N) .�--fcke vl -+ gafrk Fax #: 1,6D 4) Lf (7 fl 15 3
C ` Contractor License#: 513535
0 Cupertino Business License #: G 1 3 \
Contact: Phone#: Lf 0 5 ?38 30\ Z
%lim; ,•,; )6e, SVVV,5
Fax #:
Building Permit Info: 3/0 0,0-v.v.-boa, 1..p,,,x,a12.4
Bldg: ❑ Elect. E Plumb. El Mech. jEr Hillside ❑
"'lob Description:
Addition (adding sq footage):
What is being remodeled? j
/e �U f evv`m ALA M1tM s----f-n,..."t'1xYC
0."31/43"C Jtj p1
Remodel Includes Re-Roof: Yes ❑ No El If yes list number of squares
Remodel Includes Structural: Yes ❑ No ,❑'
Square Footage:
Addition: Porch: Deck: Garage: Detached Attached
Remodel: Kitchen Bath 113°.“ Other
Type of Construction (Usage Class): Occupancy Type:
1 FR, 11FR El11, 111, V-1HR [I] [0
11, 111, 1V V-N [0.----- nn
' l ---_-3
Valuation: Z0noo Please check this box if the project is a
1 u second-story addition ❑ •
Green Building Check list must be completed and
ttached to the plans. Green Building Points Achieved: O._**For Office Use Only***
Over-the-Counter 111
•
I CITY OF CUPERTINO
0, ADDITION/REMODEL
CUPEII,TINO FEE SCHEDULE •
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
ADDITIONS 1R3SFDADD
PLLONGRNGR Long Range PL
Planning/Residential
1R3INSP Dwellings Inspections B
I R3PLNCK Dwellings plan check B •
IR3REPINSP Dwellings Repeat B
Inspection
1R3REPPLNC Dwellings Repeat Plan B
Check
1R3HINSP Dwellings Hillside B
inspection
1 R3HPLNCK Dwellings Hillside plan B
check
1R3HREINSP Dwellings Hillside B
Repeat Inspection •
1R3HREPLNC Dwellings Hillside B
Repeat Plan Check
1R3ALTINSP Dwellings Alternate B
Materials Inspection
1R3ALTPLNC Dwellings Alternate B
Materials Plan Check
1PCESS Cesspool P
1PPRSEWG Ea. Private Sewage P
Disposal System
1PRSEWER Sewers P
1BPSPRINK Lawn Sprinkler/Backflow P
IBPWSVCS Main Water Service P
IBSEISMICRE SeismicResidential B
DECKS 1R3SFDADD OR
IR3SFDREM
1DECKWOOD Deck (Wood)-Each B
(Each) •
1DECKRAIL Deck Railing-Each B
(Each)
CITY OF CUPERTINO
•
ADDITON/REMODEL
• FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
GARAGES 1R3SFDADD OR
1R3SFDREM
1GARDTW<=1K Wood Frame up to B
1,000 SF
1GARDTM<=1K Masonry up to 1,000 SF B
BCONSTAXR Construction Tax Res •
(new detached garage)
PATIO'S OPEN 1R3SFDADD OR
1R3SFDREM
1PATIOWOOD Wood Frame up to 300 B
SF
1PATIOMETAL Metal Frame up to 300 B
SF
1PATIOOTHER Other Frame up to 300 SF B
PATIO'S CLOSED 1R3SFDADD OR
1R3SFDREM
•
1PATIOENCLW Enclosed Wood up to 300, B
SF
1PATIOENCLM Enclosed Metal up to 300 B
SF
1PATIOENCLO Other Enclosed Patio up B
to 300 SF
1COVPORCH Porch Covered-Each
(Each)
1REROOFRES Residential Re-roof Each B
100 SF
REMODELS 1R3SFDREM
1REMRESKIT Kitchen Remodel up to B (Deduct "$"for ea plan
300 SF check)
1REMRESBAT Bath Remodel up to 300 B «
?O • SF
1REMREOTH Other Remodel up to 300 B as
SF .
REMODEL PLNCK.
• ( 1STPLNCK(1-3 for Standard Plan Check B NOT FOR OVER THE
remodel) COUNTER PLAN CKS.
3 of 3
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE •
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
WINDOW/SLIDING 1R3SFDREM
GLASS DOOR
1 WINREP Replacement windows B
(ea 8 windows)
1WINNEWNSTR New Window (non- B
structural)
1 WINMEWSTR New Window(Structural B
Shear Wall/Masonry)
1WINBAYSTR Bay Window (Structural) B
SKYLIGHTS 1R3SFDREM
1 SKYL<10 SF Skylight less than 10 sf B
1SKYL>1OSF Skylight greater than 10 B
sf or structural
ISTAIRS Stairs-first flight/ea addt'l B
H .
IEPERMITFEE Electrical Permit Fee E
1MPERMITFEE Mechanical Permit Fee M
1PPERMITFEE Plumbing Permit Fee P
1ELCPLNCK Stand Alone Electric Pln E
Ck (hourly)
1MECPLNCK Stand Alone Mechanical M
Pln Ck (hourly
IPLMPLNCK Stand Alone Plumbing P
Pln Ck(hourly)
•
1BSEISMICRE Seismic Residential B
I TRAVDOC Travel &Documentation B
1BUSLIC Business License B •
4 of 3
AMERICAN KITCHEN AND BATH - BATHROOMS BY HANS.
1758 Junction Ave # D San Jose Ca. 95112
• Ph. 408-436-8151 Fax 408-436-8153 Cell 408-313-4972
February 18 2008
Bathrooms and closet remodel estimates for John and Michelle Kaplan.
23030 Stonebridge Cupertino Ca. 95014 408-725-8574 Kaplanmw@comcast.net
Remove existing bath tub, shower pan, tile walls, flooring, cabinets, toilet, water closet and shower walls,
doors, bath tub framing, lights box, wall paper and accessories. APPR°V�()
Remove debris from premises and prep. N ACCORDANCE WITH THE CITY U'
Framing repairs upon removal of existing walls. cUPERTINO CODES AND ORDINANCES
Install wood blocking for wall mounted sinks.
Frame half wall shower area's. TE
Frame for seat, shower door and grab bar and shower door supports.
Move bath tub and shower plumbing locations as needed. SIGNEU
Install and test customer supplied bath tub and drain kit. This set of p
ians�atrons MUS'
Replace shower mixing valve and shower head. Customer to supplyrit>ttliiteon the iob at ancese a alteration
Install mixing valve and tub spout. Customer to supply fixture. lawful
to make any ermission iron
Move plumbing for sink locations as needed. on same without written p ertinm
Move heater outlet location as needed. Me building Dept., city of Cup
The stamping of this plan and specrficatioai
Move and add light switch locations as needed. gHALL N07 be held to Parmit or to be
Move and add light fixture locations to be centered on sinks. approval of the violation of any provrsi a
Install gfic protected electrical outlets and move to desired location. fin r City Ordinance or gate Uw4
Supply and install Panasonic Wall Mounted Bathroom Fan FV-08WQSt.'Allowance$190
Supply and install decora style switches and outlets. «rr
• •
Supply and install dedicated circuit for electrical outlets as needed per building code. -
Supply and install water resistant wall boards in bath tub shower area. 1
Sheet rock repairs on walls and ceiling as needed. �r u
Texture bathroom walls and ceiling. t=71J5
Primer and paint bathroom walls, ceilings, trim and door. 2 Coats Kelly Moore. Color of choice. c=== ,
Supply and install K-Stone shower walls 78" from floor, with seat, cap piece and corner combo: n^ n
Install customer supplied shower trim on completion.
Install and grout customer supplied floor tiles in standard pattern.
Supply and install linen cabinet. Allowance$1,400
Install customer supplied faucets for sinks. n
Install customer supplied wall mounted hanging sinks on different heights.
Replace drain, stops and supply lines. Customer to supply decorative kits.
Supply and install new heat register and door stop. O ,
Supply and install painted wood base boards in bathroom.
Install customer supplied tp holder, towel bars, light fixtures, mirrors and medicine cabinet.
Install customers toilet on completion. New seal, stop and supply line included.
Supply and install Eurostyle SEI600-60 shower door enclosure with buttress panel. Allowance$1,000
Handling of building permit and scheduling of inspections. Permit cost not included.
Remodel total including fan, cabinetry, K-Stone, shower doors labor and all needed building supplie . �►
Remove wet bar ducting, cabinetry and office wall fabric, doors and molding. r. 1 .
Remove debris from premises and prep. jet ittee ' . -0
Cap plumbing supply lines, drain and vent. ®108
Frame for new wall between closet and office area.
Minor electrical repairs as needed.
® Install new ducting for air intake with to registers on opposite walls.
Sheet rock, tape and primer office wall to be ready for wall paper.
Sheet rock, texture and paint repairs as needed in closet.
Primer and paint inside closet area.
Install shelf in closet area.
•
8'5 - 3'6
10'5 E)\
0
Co
co
• L r
e o
5'
14'5
•
'�UOfPQ-�^` ��4�jove S S� eifi
•
• k 8'5 1 3'6
C
000000000000
Via de�5 nfi
• S. 1
0
5'
14'5
LIVING AREA
179 sq ft
•
•
Green Points Rating System for Remodeling Projects
• Due to the diversity of remodeling project types,assigning a"total points"value to a project to be considered environmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project. .
sae ',PUT Resources Energy IAD1Health
23030 0 Ei' 19 ' 501'\
1.Recycle Job Site Construction&Demolition Waste, .
'65%,=1 point;759;= 2 points;B0%.='4 pbints • u up to 4 Resource pts D
2.Salvage Reusable Building Materials • 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
• Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 •
6.Implement Construction Site Stormwater Practices . 2 Resource pts y=yes 0
•
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
•
8.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
•
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
•
. 11.Provide for Dn-Site Water Catchment/Retention 2 Resource pts y=yes 0
0 0 0
B.Foundation
1.Incorporate Recycled Flyash in Concrete
• 25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes- 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes_ 0
0 0 0
C.Structural Frame
try SSutietitute Solid Sawn Lumber with Engineered Lumbar r.—
. i 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. D
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6'or more• 2 Energy pts y=yes • 0
6.Use Finger-Jointed Studs for Vertical Applications• 2 Resource pts y=yes • 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
' 8.Use Recycled Content Steel Studs for Interior Framing • 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
I a.Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12.Use OSB
• a.Subfloors • 1 Resource pt y=yes 0
b.Sheathing 1 Resource pt y=yes • 0
. 0 0 • 0
IIJPWT Resources Energy IAD/Health
.. - : or n a .
1.Use Sustainable Decking Materials •
a.Recycled content 3 Resource pts y=yes 0
b.FSC Certified Wood 3 Resource pts y=yes 0
2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAD/Health pt y=yes 0
3.Install House Wrap under Siding 1 IAOMealth pt y=yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
•
0 0 0
E,Plumbing
1.Install Water Heater Jacket 1 Energy pt y=yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0 •
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
4.Replace Toilest with Ultra-Low Flush Toilets
(1 point each,up to 3 points) Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAOMealth pt y=yes 0
• 6,Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 •
7.Install Water.Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAO/Health pts. 0
6.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
U U U
I-.tlecrrICHl
1.Install Compact Fluorescent Light Bulbs(CFLs) .
(6 bulbs=2 points, 10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to •
5 points) • Up to 5 Energy pts. 0
3,Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
U 0 0
G.Appliances
1.Install Energy Star Dishwasher 1 Energy pt y=yes_ 0
2.Install Washing Machine with Water and Energy
Conservation Features 1 Energy pt y=yes 0
3.Install Energy Star Refrigerator 1 Energy pt y=yes- 0
4.Install Built-In Recycling Center 3 Resource pts y=yes_ 0
U 0 0
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
•
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
B.Install Recycled-Content,Fiberglass Insulation with
No Added Formaldehyde 3 IAOMealth pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation .
a.Wails • 4 Resource pts y=yes 0 •
b.Ceilings 4 Resource pts y=yes 0
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes 0
D.Uelungs 4 Resource pts y=yes 0
. 0 0 0
INPUT Resources Energy IAD/Health
-rrtn.Owe
• 1.Install Energy-Efficient Windows
a.Double Paned 1 Energy pt y=yes 0
b.Low-Emissivity(Low-E) 2 Energy pts y-yes 0
' c.Low,Conductivity Frames 2 Energy pts y=yes .0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0
0 0 0
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All Duct Joints 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes D
4.Clean all Ducts Before Occupancy 2 IAO/Health pts y=yes 0
5.Stall Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
8.Install Sealed Combustion Units
a.Furnaces 3!AO/Health pts y=yes 0
b.Water Heaters 3 lAQMealth pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps • 3 Energy pts y=yes 0 , •
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
• 13.Retrofit Wood Buming Fireplaces
a.Install EPA certified wood stovesrnserts 1 IAQ/Health pt y=yes • 0
b. InstalVReplace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 IAQ/Health pts y=yes . • 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAD/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3IAQ/Health_pis_ y-yes _ _.___ 0
0 0 0
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes • 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0 .
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4,Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 My=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials ' 1 Resource pt y=yes 0
7.Install Radiant Barrier 3 Energy pts y=yes 0
• 0 0 0
L.Natural Heating and Cooling .
•
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 •
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
• 0 0, 0
•
INPUT Resources Energy JA011ieallh
. n•oor r 'ua tyan• ns es
1.Use Low/No-VOC Paint 1 IAO/Health pts y=yes 0 •
2.Use Low VOC,Water-Based Wood Finishes 2 IAOMealth pts y=yes 0
'3.Use Low/No VOC Adhesives 3 IAO/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6IAO/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAO/Health pts y=yes 0
7.Seal all Exposed Particleboard or MDF 4 IAO/Health pts y=yes 0
B.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yas 0
9.Use Anger-Jointed or Recycled-Content Trim • 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAO/Health pts y=yes 0
0 0 0
H.Flooring
1,Select FSC Certified Wood Flooring 8 Resource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0
3,Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAO/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
0 0 0
• Total Points Available: 0 1401 1301 57 •
Total Points Project Received: 01 01 0
• e:date/progstgreenbulldngguldellneslremodelere/greenpolntsfina12.12.D4protecled.xls
•
•
ISiCommunity Development
- . ' 10300 Torre Avenue
Cupertino CA 95014
•
Telephone(408)777-3228
'tCl O Fax(408)777-3333
UPERJINO
Building Department
All Cupertino building permits must meet certain conditions related to maintaining
environmental quality and public peace and safety. The two most common
conditions are described below.
STORMWATER POLLUTION CONTROL
State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and.
the Santa Clara Valley Water District control stormwater pollution. Educating local
residents and businesses and enforcing stormwater pollution control laws are key parts
of the City's compliance efforts.
Stormwater pollution prevention: It's up to us
In northern Santa Clara Valley, storm drains flow directly to local creeks and San
Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife
dependent on our waterways, for people living near streams and baylands, and for the
local water supply. Common sources of stormwater pollution include:
• Dripped oil, fuel, and antifreeze from vehicles and heavy equipment;
• • Construction debris, including dirt, concrete and paint;
• Landscaping runoff containing pesticides or weed killers; and •
• Any material dumped or spilled into streets or storm drains
The property owner and the contractor share ultimate responsibility for activities
occurring at a construction site and will be held responsible for any environmental
damage caused by subcontractors or employees.
For more information on construction-related stormwater requirements, see the
Stormwater Quality Regulations section of the City of Cupertino web site at:
http://www.cupertino.org/citv government/departments and offices/
environmental services
COMMUNITY NOISE CONTROL
The basic noise control requirements for construction sites are as follows:
• Typical construction work hours are:
- Weekdays - 7 a.m. to 8 p.m.
- Weekends - 9 a.m. to 6 p.m.
• Construction other than street construction is prohibited on holidays.
• Residential daytime noise levels from complaint site - 60 dBA
• Nonresidential daytime noise levels from complaint site - 65 dBA
For more information on noise control, please see Chapter 10.48 of the Cupertino
Municipal.Code, which can be accessed at http://www.amlegal.com/cupertino ca/
•
Greg Casteel
Building Official
AMERICAN KITCHEN AND BATH - BATHROOMS BY HANS.
• 1758 Junction Ave # D San Jose Ca. 95112
Ph. 408-436-8151 Fax 408-436-8153 Cell 408-313-4972
February 18 2008
Bathrooms and closet remodel estimates for John and Michelle Kaplan.
23030 Stonebridge Cupertino Ca. 95014 408-725-8574 Kaplanmw@comcast.net
Remove existing bath tub, shower pan, tile walls, flooring, cabinets, toilet, water closet and shower walls,
doors, bath tub framing, lights box, wall paper and accessories.
Remove debris from premises and prep.
Framing repairs upon removal of existing walls.
Install wood blocking for wall mounted sinks.
Frame half wall shower area's.
Frame for seat, shower door and grab bar and shower door supports.
Move bath tub and shower plumbing locations as needed.
Install and test customer supplied bath tub and drain kit. N
Replace shower mixing valve and shower head. Customer to supply fixture. P
Install mixing valve and tub spout. Customer to supply fixture. " N
Move plumbing for sink locations as needed. \ N
Move heater outlet location as needed. 0
Move and add light switch locations as needed. Ir'
Move and add light fixture locations to be centered on sinks.
Install gfic protected electrical outlets and move to desired location.
Supply and install Panasonic Wall Mounted Bathroom Fan FV-08WQ1. Allowance$190
• Supply and install decora style switches and outlets. s�
Supply and install dedicated circuit for electrical outlets as needed per building code.
Supply and install water resistant wall boards in bath tub shower area.
Sheet rock repairs on walls and ceiling as needed.
Texture bathroom walls and ceiling.
Primer and paint bathroom walls, ceilings, trim and door. 2 Coats Kelly Moore. Color of choice.
Supply and install K-Stone shower walls 78" from floor, with seat, cap piece and corner comb pq
Install customer supplied shower trim on completion. a .n
Install and grout customer supplied floor tiles in standard pattern.
Supply and install linen cabinet. Allowance$1,400
Install customer supplied faucets for sinks. ..4
Install customer supplied wall mounted hanging sinks on different heights. /
Replace drain, stops and supply lines. Customer to supply decorative kits.
Supply and install new heat register and door stop.
Supply and install painted wood base boards in bathroom.
Install customer supplied tp holder, towel bars, light fixtures, mirrors and medicine cabinet.
Install customers toilet on completion. New seal, stop and supply line included.
Supply and install Eurostyle SEI600-60 shower door enclosure with buttress panel. Allowance$1,000
Handling of building permit and scheduling of inspections. Permit cost not included.
•
Remodel total including fan, cabinetry, K-Stone, shower doors labor and all needed building supplies.
Remove wet bar ducting, cabinetry and office wall fabric, doors and molding.
Remove debris from premises and prep.
Cap plumbing supply lines, drain and vent.
Frame for new wall between closet and office area.
Minor electrical repairs as needed.
•
Install new ducting for air intake with to registers on opposite walls.
Sheet rock, tape and primer office wall to be ready for wall paper.
Sheet rock, texture and paint repairs as needed in closet.
Primer and paint inside closet area.
Install shelf in closet area.
•
8'5 H - 3'6
10'5 -
O
0
in
co
C �
• -
0 0
5'
14'5
•
Nc--WOe8cre w' \i*NN
• cox&&p.}- above S 4k,
No Al R2ctfAc)
k 8'5 1 3'6
O� 10'5 'N
gib 1 1 ccip>
0000_I=I0000
-0
- - -- -
.
•
(6 )
H� 0�
SAC-3/4k Sot tr\--\-- \ t\('&S
' (� s, \k-
,
1c,Nc
5 oal( L �p vn i voi-e N4vh ova
� � ' �l� &-Y1Sor f
14'5
•