Loading...
080701293[0Z' n?y 2��ppp eeF� J�FU aLLN ar.D� s`_sic se ZY 5c 5 C zC F41 a� Uz UO_ C 0z CITY OF CUPERTINO € e '�'�.�'-'. '*1LTy� ...,' n ' '*, "' ` BUILDING' DIVISION PER T .� o1�?i Ry' f�FO ON } BUILDING ADDRESS: 101.81. STONYDALE DR GIA CONSTRUCTION INC PERMIT No. 08070129 OWNER'S NAME: PERRMrr ISSUE DATE PI!IIIEYRA VICTOR AND PAGALLO GIU 1645 EBERHARD ST 07/23/2008 NE: SAN17ARY NO. CONTROL NO. ARCHITECT/ENGINEER: BUILDING PERMIT INTO RE -RF 1/2CDX PL YWD 3 L BLDG ELECT PLUMB MECH LICENSED CONTRACTOR'S DECLARATION Campeau 22 Job Description P . 1 bmoby affirm that 1 w Ikmtsed under Pmvivons of (mmmeucing NN sectio, 7") Division 3 of ban Business and Prof oro[od2e ,nd my license is -of in full force and eQy` / Liana (lass Lk. N Das Cenuadw ACHIECTS DE ItAnObl 1 understand my plans Nall be used as public mood" Licensed Prefeasioml OWNER -BUILDER DECLARATION I hereby affirm but I am Csompt from be Cenumlors License Law for the following mason. (Section 703 1.5, Business and Pmfwsions Code: My city or county wthkit requires a Penult An mnLNe4 alai. ImpmVe, demolish. w repair my structure print An its tebLKC. shoo MrOjime des Applicant rot IDCh Permit m file, elglmd 5t,mmmt that he is licensed putmant M Has provisiom of she C.M.W. License Law (Chap. 9 Sq. Ft. Floor Area Valuation (commencing with section 7000) of Division 3 of Ne Business And Professions Code) or dist he H Concept therefrom and than basis foe Me alleged exemption. My violation of APN Number Occupancy e P Y �'P SaMon 70313 by ury,ppliare for a permit subjtw the applicun m a civil penalty of an ve hundred dollar (Sf W). rot mart NO ❑ 1, a owner Cf the poprsry, w mY wploym wW wage u Ness sole CompmaMm, Required IDSpections will ao tbowwt Me a rot hmLnded a offered boa, Bassi s Act apply a r of and Profmsiom Code: TW Ce law does rot apply lf rt owner of Co an Com and who does suchworkhimselfalthrough his themor. and property, who buildsntimprovesch ownemployee,prnNdcd Mutvemimpmvemmtsarcnet orewpffuW Int sale U. improvements !weer+. the weyearofmceovefie.Iboowrcs- see ntampovemantYmid edid builder aria have the Wrdan of proving that bo did rot WiW w improve foe puryoe of aved s+kJ. ❑ I- As went a the property, w eulmively contract., with licensed m ICAMOM to cwts neat Ne pmlm (See 7(sth, Businm and Pmfesdotu Code:) The Cmoxmrs La - mase law does not apply An an owner of property who Wilda or improve dtemon, and. who contracts for such projects with a cont actors) licensed pursuant At the Canuactoe3 L1cmse taw. , ❑ I un ezmnp Molar See .B k PC for this masun Owner Data WORKERS COMPENSATION DECLARATION 1 hereby alnum order peultY of perjury ow of the following trtluatiem: I have and will ammus n • Certificate of Convent to self-imum for Worker. Co rinse, sanum, As providod for by Section 3700 of the labor Code. Int the performance Of the ' work for white this permit is Wood. ❑ I have and will maintain Wohera Compensation inswana. u q.imd by Section 37W ofthe Labor Code. for the performmce or the work fwwhich this permit u Ismael. ' My Workers CComMema . Wmrance caniw and Polley n reftur am: . Cartier. yC Y� (F YC�t IJ 11 Policy No.: GO rt --1 ) / CERTIFlGTEOF EMPTION FROM WORKERS' COMPENSATION INSURANCE (This session used rot W Completed lrNe permit is fwone hundred dollar (SIM) or lest) 1 Cudfy Net lo the pwformanm of that wort foe which this Permit is Wined. l shall Can employ Any perms in any Ammer. As As berme subject no the Worker'Comprrulon laws of Caliendo, Das Appllcart N=CE TO APPUCA rT: If. after making Nis Cenifios of Batsmen.. you shook, become subject m than Workers Compensation previsiwu of be Labor Code. You most forthwith comply wish such povinom or this permit shall W dmmW revoked. CONSTRUCDON LENDING AGENCY I Wmby afrnm this Nem is a mnswcdon lending agency for the prfwmance of the wants for which Nis permit is Wood (Sm. 3097, Civ, C.) Lorem's Name Lender. Add. I mrdfy that I have real Nis application W ass that the above informant. is coneet. I agree te comply with alt city and county oNlnantts and Suss laws relating to building construction, and hereby autherim reprmenudvos of this city to enmrupa n the abowba,judgm patent foe immawhich epmctien (War) agrCC m eve, indemnify and kcp harmless the City of Cupertino against and mp�se whichmgin any wsy.mxue Against said City may liabilitie,Judgmenen no APPLI AN'r NDER TAN of Algp WILL APPLICANT UNDERSTANDS AN WILL COMPLY WITH ALL NON �. G 2 Issued by:6 -POINT SOURREGULATIONS. " Date �a3R Re -roofs angio Srgnu ApplueanUCemnsbr patote HAZARDOUS MATERIALS DISCLOSURE Type of Roof Willy orfutor Auntie hauNam material ureWill C pertant As dented by be Cupertino de. C]uantstom no MuniciW I Code. Chap. 9.11. aM Me Health aM Safety Code. Setllon zs63zU>T M 32(.)? ❑Ym 10 No All roofs shall be inspected nor to an roofs material being P P- Y g g installed. Will be applicant or future building occupant use equipment or device which If a roof is installed without first obtaining an inspection, I agree to remove thvatLnus air conumlmnu as defied by be Bay Area Aur QwlbY Management all new materials for inspection. DurrictT ❑yes EdNu I have mW be huaNmunusriais requirements under Clu iW6.93ofMsC,lifor- nis licalthk Sarmycade.Smiwts2y50d.25+37 am125534. I MndisorW thedifMs building does not cwmndy have a Meant. them it is my mapomihility m ratify Me oecupanl of be mgMWC which rrrgpieJiasManmrr.cenirRoQOCC �� Signature of Applicant Date l 7 I o All roof coverings to be Class '1�" or better Owner enuNemtO agent Dow • 2 ITEMS OF 2 CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN ......... 32637020.00 DATE ISSUED.......: 07/23/2008 RECEIPT #.........: BS000005553 REFERENCE ID # ...: 08070129 SITE ADDRESS ...: 10181 STONYDALE DR SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 METHOD OF PAYMENT ----------------- CREDIT CARD TOTAL RECEIPT : AMOUNT --------------- 287.20 --------------- 287.20 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS REFERENCE NUMBER -------------------- american ex VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 605 FINAL REROOF OWNER ............: PEREYRA VICTOR AND PAGALLO GIU ADDRESS ..........: 10181 STONYDALE DR CITY/STATE/ZIP ...: CUPERTINO, CA 95014-1056 RECEIVED FROM ....: GIA NGG CONTRACTOR .......: GIA NGO LIC # 28332 COMPANY ..........: GIA CONSTRUCTION INC ADDRESS ..........: 1645 EBERHARD ST CITY/STATE/ZIP ...: SANTA CLARA, CA 95050 TELEPHONE ........: (408)858-6316 • FEE ID ---------- UNIT QUANTITY ----- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR ----- VALUATION 12,000.00 -------------------- ---------- 1.20 0.00 1.20 ---------- 0.00 1REROOFRES SQ FEET 22.00 286.00 0.00 ---------- 286.00 0.00 TOTAL PERMIT ---------- ---------- 287.20 0.00 287.20 ---------- 0.00 METHOD OF PAYMENT ----------------- CREDIT CARD TOTAL RECEIPT : AMOUNT --------------- 287.20 --------------- 287.20 VOICE ID DESCRIPTION -------- ---------------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS REFERENCE NUMBER -------------------- american ex VOICE ID DESCRIPTION -------- ---------------------------- 602 ROOF PLYWOOD NAIL 605 FINAL REROOF CITY OF • CUPERTINO CITY .OF CUPERTINO REROOF PERMIT APPLICATION 4o7ola9 APN # 0 ab, 0" Date: —1 115 I OB l Building Address: J 161 SOON Owner's Name: Phone #: (408 ) V1c-ToR pEICY `-13D — om4 Contractor: _ Phone #: Fax -7 Cupertino Business License#: p � Con ctorL see #: D t) z Type of Roof Covering: Existing: Proposed: ❑ Built -Up Roof ❑ Built -Up roof ❑ Asphalt Shingles V"�Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ' ❑ Wood Shingles ti Other (Specify) �AT.I ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.B.O. Report # ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: I C `c 1N de, `� b 13 L IL -47ts c t a S Ai - Residential Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, include in plan set & the sheet index. `(�J Valuation: I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy: • 67-t /�� k 7/1 g A T Signature 11W �'r;-a CITY OF CUPERTINO S REROOF CUPERTINO FEE SCHEDULE Number of Squares Fee ID Fee Description Fee Group Permit Type 1REROOFCOM Re -roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 1RER00FRES Re -roof Residential B 1SFDWLR00F 1BSEISMICRE Seismic Residential B 1RER0OFMRES Re -roof Multi -Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 Community Development Department Building Division City of Cupertino 10300 Torre Avenue . Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department Subject: Re -roofing policy for the City of Cupertino 1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards and manufacturers specifications on re -roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following'steps are required: 1) Pre -inspection and/or tear off approval. 2) In -progress inspection approval. 3) Final inspection approval. a) Spark arrester installatiomI . 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can lie performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum�of 1/4 " per foot slope and demonstrate that there is no ponding. i 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re -roofing. Homeowner's Nar Job Site Address: Roofing Company Applicant's Signature: Date: I © 8 � Greg Casteel Building Official Revised 11/2/04 (V2 • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below a B. Site 9. Install H.E. Irrigation, (details/spec)` L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 oints G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 loint P. Other 1. List Green Features on Plans A-1 1 point TYMMAMEM TOTAL POINTS 40 points • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a "total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. 1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 80%= 4 points up to 4 Resource 2. Salvage Reusable Building Materials 4 Resource pts y= 3. Remodel for Mixed Use, Adaptive Reuse, and 2 Resource pts y --yes Historic Preservation 4 Resource pts y= 4. Protect Native Soil 2 Resource pts y= 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y= 6. Implement Construction Site Stormwater Practices 2 Resource pts y= 7. Protect Water Quality with Landscape Design 2 Resource pts y= S. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y= 9. Reuse Materials/Use Recycled Content Materials 3 Energy pts y=ye: for Landscape Areas 2 Resource pis y= 10. Install High -Efficiency Irrigation Systems 2 Resource pts y= 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y= B.Foundation 1. Incorporate Recycled Flyash in Concrete 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource 2. Use Recycled Content Aggregate 2 Resource pts y= 3. Insulate Foundation/Slab before backfill 3 Energy pts y= C. Structural Frame 1. Substitute Solid Sawn Lumber with Engineered Lumber. 3 Resource pts y --ye,, 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber,used = 2 points, up to 10) up to 10 Resource pts 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=ye: 4. Use Web Floor Trusses 2 Resource pts y --yes 5. Design Energy Heels on Trusses 6' or more 2 Energy pts y=ye: 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=ye: 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=ye! 8. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=ye: 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=ye! b. Wall 3 Energy pts y=ye: c. Roof 3 Energy pts y=ye; 10. Apply Advanced Framing Techniques 4 Resource pts y=ye: 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=ye; 12. Use OSB a. Subfloors 1 Resource pt y=ye b. Sheathing 1 Resource pt y=ye • • • r r r r r r r r r 01 0 r r r r 0 0 -_ -_ • • • 1. Install Energy -Efficient Windows • a. Double -Paned b. Low -Emissivity (Low -E) c. Low. Conductivity Frames 2. Install Low Heat Transmission Glazing J. Heating Ventilation and Air Conditioning 1. Use Duct Mastic on All Duct Joints 2. Install Ductwork within Conditioned Space 3. Vent Range Hood to the Outside 4. Clean all Ducts Before Occupancy 5. Install Solar Attic Fan 6. Install Attic Ventilation Systems 7. Install Whole House Fan 8. Install Sealed Combustion Units a. Furnaces b. Water Heaters 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 10. Install 13 SEER/11 EER or higher AC with a TXV 11. Install AC with Non -HCFC Refrigerants 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace • 13. Retrofit Wood Burning Fireplaces a. Install EPA certified wood stoves/inserts b. Install/Replace Dampers c. Install Airtight Doors 14. Install Zoned, Hydronic Radiant Heating 15. Install High Efficiency Filter 16. Install Heat Recovery Ventilation Unit (HRV) 17. Install Separate Garage Exhaust Fan K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 2. Install Solar Water Heating System 3. Pre -Wire for Future Photovoltaic (PV) Installation 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points) 6. Select Safe and Durable Roofing Materials 7. Install Radiant Barrier L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 2. Install Overhangs or Awnings over South Facing Windows 3. Plant Deciduous Trees on the West and South Sides 1 Energy pt 2 Energy pts 2 Energy pts 1 Energy pt 2 Energy pts 3 Energy pts 1 IAQ/Health pt 21AQ/Health pts 2 Energy pts 1 Energy pt 4 Energy pts 31AQ/Health pts 31A0/Health pts 3 Energy pts y=yes 3 Energy pts y=yes 2 Resource pts y=yes 2 Energy pts 1 IAD/Health pt 1 Energy pt 1 Energy pt 3 Energy pts 4IA0/Health pts 5 IAQ/Health pts 31AQ/Health ots 4 Energy pts y=yes 10 Energy pts y --yes 4 Energy pts y=yes Up to 18 Energy 1 Resource pt y- 3 Energy pts y= 5 Energy pts 3 Energy pts 3 Energy pts Community Development Department Building Division City of Cupertino 10300 Torre Avenue • Telephone: (408) 777-3228 Fax: (408) 777-3333 Building Department REROOF TEAR OFF POLICY 1. You must schedule an inspection for the tear off the day before you wish the inspection to be made. The procedure is to call the Building Division (408) 777-3228 between the hours of 7:30 a.m. and 3:30 p.m. to request a next -day inspection. • 2. When the roof is torn off, the nails have been removed or driven in, and all of the dry -rotted wood has been replaced, you must call the City Building Division. An inspector will be there within one hour. There are special hours for this service: from 7:30 a.m. to 10:30 a.m. and 1:00p.m. to 3:30 p.m., Monday through Thursday and from 7:30 a.m. to 10:30 a.m. and 1:00 p.m. to 2:30 p.m. on Friday. (Note: Building inspectors are on lunch break from 11:30 a.m. to 12:30 p.m. and will not be called during that time. City Hall is closet) between 12:00 and 1:00 p.m. daily.) 3. If you call for a tear -off inspection and the job is not ready, you will be charged a re -inspection fee of $176.18. The re -inspection fee must be paid before another inspection can be scheduled • Greg Casteel Building Official Revised 8/13/04 4 CITY 0 OCUPEkTINO • 0 Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 Building Department JOB D G6 f . DRESS:S �, PERMIT # 090-70104-1 OWNER'S NAME: p{- cce c PHONE # 2 ( 1-( g GENERAL CONTRACTOR: p r FAX # I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: Owner/ Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/ Contractor Signature Date