Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
S 2404pool ICAMTTO FILL IN INFORMATION WITHIN RFn LINES - USE BALL POINT PEN ONLY
BUILDING
CITY OF CUPERTINO
PLUMBING IV
BUILDING DIVISIONAPPLICATION/PERMIT ^ I/,DING
PERMIT NO.
"-OITryT'eA(-//LT1�
BUILUINGAWRESS:
SANITARY NOPPLICAI'IO�N.S:.UATBMl.DATE
oo
WNER'S
S LEND
RNAME:NIC
CONTROL#ON
E:1
/ `7
�OARENG EE V
DURESS
PH :
-
BUILDING PERMIT INFO—
IT87 PLUMB _ MECH,
Bc✓LUG�J/ rLfJi
'
❑ Consultant Fees Paid by Applicant (Initial)
. LICENSED CONTRACTOR'S DECLARATION
1 hereby affirm mal I am licensed under provisions of Chapmx 9 (coact Bing
with Seinien9000of Divis' Sof the Busthessa d Prof 'o �dc,a my licenee ie
In full fit" nd once
QTY ;.L `ELECTRIC PERMIT FEE t
..
JOB DESCRIPTION
RE EN IAL:
DWI, ❑ KITCHEN REMODEL.
PERMIT ISSUANCE
APPLIANCES -RESIDENTIAL
License Ci Lic.N
Dam Contmctnr
El ADDITION El PLUMBING REPIPE
❑MUL'I'1-UNIT
MODIFICATION
[I INTERIOR L1 CHIMNEY REPAIR
IMPROVEMENT ❑SWIMMING POOLS
ARCIII'1'ECT'S DF.CL
lundersmm ry ensxhnll be need us publle Beards
pgNE1,S
UP'10200 AMPS
I Kersul Pnefwsional
201-1000AMPS
OWNEUBUILDER DECLARATION
I hmreby air.—that 1 oro exempt from IM1e Contractors Llcema Law far aha
following rweon. (Section 903L5, Business and Professions Cede. Any city or tummy
El BATH REMODEURIFAIR (]DEMOLITION
❑ OTHER _
OVER IUUt1AMPS
SIGNS ELECTRICAL
'which nyutres a permit to construct, aRu, ingrzovc, demolish, or repair any nmcmre
,to, b; its issuance, also reymreuheappliaz t buttoM1 pvmit to file ndgned statement
SPECIAL CIRCUI C/MISC.
tl,.r he i, licenseda tt he lootionns ofth Contractor s License L ICEpter9
ondurnmeraing W1hSection 9000 of Division 3 ofth Rosiness ad Protestants Code) (it
that he's exempt therefrom and IM1e has,z lot the alleged excitation Any violation of
Sermon 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of
TEMP ME' IHR OR POLE INS' I�
COMMERCIAL
NEW BLDG/ADDITION ❑ DEMOLITION
❑TENANT ❑ FOOD SERVICE
POWER DEVICES
not hon, than Eve hundred dollars ($500
L94as owner of the property, or my employees with wages as their solo campcnsation.
will dome work, and the limtnreIsad, intended or Witted Battle (So,. 7044, But nes,
and Profesdons Code: The Contractor's License Law does not apply to an owner of
Lia own employees, provided that such improvements em not intended ar offered for
hispoicirtyown who builds or improves thsuch o and who docs such tints dedm, of (red For
none ycaroftvrovetinnhe
sn1e.11;hower will haveofpemenl thatheaur-
r -builder will have Ilam burden u1 proving that he did not built[ or improve for
cover
IMPROVEMENT
❑OTHER
SWIM M ING POOL ELE' IC
OUTLETS - SWI �S- FIXTURES
NEW RESIDENT EL � SQ FT,
SQ. IT. FLUOR AREA $ISp. PC.
-7- 3
'1 DOTAL
re
acosale.).
1, as ownund the property, am exclusively P museum, with ,)oohed contractors to
draw a Nap not (See, o an Business and rly Wh Mui Cade) TM1c Comrador, Li-
Lawdoeunatapply man Withacafpmperty whosedporinnprothe Corton,and
who wntradx for such projects with uean¢eaor(s)liunsrd pnnuunlm the Gmmcem's
who
3
� � • y �% �{.)f.S
L/'
�
QTY. �., .PLUMBING PERMIT FEE
-
License law.
PERMIT ISSUANCE
W -
❑IamexemptunderSeo, , B A, P C for this reason
ALTER -DRAIN S, VENT- WATER (EA)
VALUATION w
3o'1 6 ,oI/
Dam
Owner
' WORKER'S COMPENSATION DECLARATION
I M1cmby affirm under pcnaltynrp jury one or tho following dwlwauans:
I bastard willmanti i. o Ccdifrte of Cnnscmmself-insure for Workers Camped-
BACK FLOW PROTECT. DEVICE
DRAINS- FLOOR ROOF, AREA. CONU
STORIES
YYPECONSTRUCGON
sion, as provided f bySection 3900 of the Labor Code. for the Irl 'e of the
..,k for Whichtti p t d.
FIXTURES PER TRAP
❑1have J Will morimain Workers Conipat' Insurance as pointed bySection
3700ol the Labor Code,f the ps, formianosol he workfor ecti hth p rrcft isisst cd.
GAS EA. SYSTEM -1 INC. 4 OU'I LETS
OCC. GROUP APN
GAS- EA. SYS'I EM -OVER 4(EA)
My Workers n{tatmtton Ran nc d Policy numher car
Carrier: -
'EXE ) 1'
COM PENSA'1'IONINSUR CE
OREASEIINUUSTRI. WAS'1'EINTF.RCEPI'OR
o- e i
RUBINGOIVISIODf m
GREASETRAP
,WEB- RY-S MEA. 11'.
1.
PI.ANCHEC P
L I � ©
(Thissecnan y�a{�y�t(yJa py}y},t/�I t y c hundred dollar, ($100)
of less.) �[M1 P 0,6WT 1A
IecnifY thntm pc 11111115555 [ Iddd t spo,mit is Lreucd,lshnll
Ton employ any person in any manner so is to become subject m the Workers Compen-
' sation Laws of California, Date
Applicant IGRA
ENERG F r t
`' a TER {EATER WNM�'1'/ELF.CTR
RJ ,E
j NO'T'ICE TU APPLICANT: If, after nmhng this Certificate of itu mpuon, you sI Id
t beeime subject m the Warker'n Compensation Provisions of the Labor Code you Bun
s forthwith comply wont such ProvAlansor this permit shall bedeemW revoked.
V,'AI'R Y9 Ea�Vf AT
WATHR SERVICE
SDI
- NEW RE SI DENTIAL ELMB. Q. FII
CONSTRUCTION LENDING AGENCY
I hereby aRrmntat there is it construction lending agency lin the perromnanec of
the work for which this pennhls issued (Sec 3097,Civ. C.)
PAID
Date Rupp
"
l
TOTAL:
Larder's Naim
Leaders Address
TOTAL .
BUILDING PBB
SEISMIC FEE
I I certify that I factorize his application and sWm that the above informannn is
j e rrect. I agree to comply with all city and county ardinanees and state laws relating to
building construction, and hereby authonW, representahvcs of thin city to anter upfm the
-
,QTY. MECHANICAL PERMIT FEE
f above-mentioned property far inspection puppies.
(We) agree m snva, Indemnify and keep harmless the City of Cupertino against
habilities,judgancia redistrict expenseswhich may in any way name egninstsuid City
PERMIT ISSUANCE
1 6i
L'hF.CfRIC P'
ALOES OR ADDTO MECH.
PLUMBING't
in consequence of "the graining of this period.
APPLI ANT UNDERSTANDS AND WILL COMPLY WI' CI ALL N -POINT
AIR HANDLING UNI 'I'(TO 10,000 CEM)
MECHANICALF
S( ]IREGULATI
�"
AIR HANDLING UNIT (OVF,R 10,000CFM)
CONS'HRUCTIO :1'AX
EXHAUST HOOD(W/UUCP)
HOUSING MURt IONIII
S lgmltareo Appllwnl ahmpol Dn
HAZARDOUS MATERIALS DISCLOSURE
Will the applicant or furore building ocou,nI.,a a or handle ficndomadmerial
as defined by he Cupertino Municipal Codes Chapter 9. 12, and he Health and Safety
Cuda. Section 255320)?
ElYe, G/11
HDA'DNG UNI'I(TO 100,000 RTU)
HEATING UNIT (OVER 100,000 BIU)
PAID Date Receipt#
VENTILATION I-AN(SINGLE RE SID)
WIII the applicant or forum building ceeupent use equipment car devices which
ren haznrdnm air contamlnanls uq dellaed by the Bay Area Air Quality Management
BOILER (311P OR 100,000 BTU)
L
HOILER-COMP(OVER IW,UIp H' IT)
is
DislridP
❑vas LLL2
AIR CONDITIONER
ISSUANCE DATE
^ i"1 �1
2- 7
-
I have read the hazardous mamrials re9mrmnents undo, Chapter 6.95 of the Cult-
martiuJIVIald, A, Safety Code Sopron, 25505 25533 d 25534 J emill that if the
bmf Ld ncu��$$!G�I 1 ntthlt Y .pcasib'lyt ilYt coca pont
o I .. ofa� v 'O
Beman or,
NEW RESIDENTIAL MECH. SQ. FT.
TOTAL:
.
ISSUED BY:
17-
Owns car nl ale
ul-rlGt
ADDITIONAL PERMIT FEES f i
BUILDING PROJECT IDENTIFICATION
1
BUNILDI..
NP R1' A
FEE SUMMARY
BUILDING '3j6
CONiF Ac* as —�
N{ I
�+
PLAN CHECK
FEE O o
rONToNrnncroNs 1L1� { -0�
2
on i M�
CY oNs
SEISMIC FEE ^1
DTV. ELECTRIC PERMIT FEE
EpeV
ELECTRIC I�
UTLETS- SWITCHES -RECEP
LIGHTING FIXTURES
PLUMBING
APPLIANCES - RESIDENTIAL
Z Z
PANELS
SIGNS
F: O
SIGNS TRANS.
SPECIAL CIRCUIT
METER OR POLE INS.
PERMIT VALIDATIONEMP.
ISSUANCE DATE
LU >
SERVICE CHANGE
CL 0
CITY. PLUMBING PERMIT FEE
1
ELECT.
❑
I
NECK
U O
BACK FLOW PROTECT. DEVICE
�J
o
DRAINS -FLOOR, ROOF, AREA,COND.
LL I-
GAS-EA.SYSTEM-11NC.40UTLETS
GAS - EA. SYSTEM - OVER 4(EA.)
INDUSTRIAL WASTE INTER.
0
LAWN SPRINKLERS - OVER 5 (EA.)
SEWER -SANITARY -STORM EA. 200f1/
WATER HEATER W/VENT
a
}
WATER TREATING EQUIP.
TOTAL
z
'a
APPLIANCE
AIR HANDLING UNIT (TO 10=C.F.M.)
AIR HANDLING UNIT (OVER 10CCO C.F.M.)
i.
I
I
HEATING UNIT (OVER 100,000 B.T.U.)
,
•
j
BCH LER COMP Io�+ too.000 Brul see ceE SCN.
TOTAL
f
ADDITIONAL PERMIT FEES f i
BUILDING PROJECT IDENTIFICATION
VALUATION
2 0O0
BUNILDI..
NP R1' A
FEE SUMMARY
BUILDING '3j6
CONiF Ac* as —�
N{ I
�+
PLAN CHECK
FEE O o
rONToNrnncroNs 1L1� { -0�
2
on i M�
CY oNs
SEISMIC FEE ^1
DTV. ELECTRIC PERMIT FEE
EpeV
ELECTRIC I�
UTLETS- SWITCHES -RECEP
LIGHTING FIXTURES
PLUMBING
APPLIANCES - RESIDENTIAL
MECHANICAL /
PANELS
SIGNS
TOTAL JJ -/
7Jt „O
SIGNS TRANS.
SPECIAL CIRCUIT
METER OR POLE INS.
PERMIT VALIDATIONEMP.
ISSUANCE DATE
MOTORS SEE FEE SCH.
SERVICE CHANGE
TOTAL
CITY. PLUMBING PERMIT FEE
BLDG.
❑
ELECT.
❑
vw.
NECK
ALTER -DRAIN & VENT -WATER IEA.1
BACK FLOW PROTECT. DEVICE
�J
o
DRAINS -FLOOR, ROOF, AREA,COND.
FIXTURES - PER TRAP
GAS-EA.SYSTEM-11NC.40UTLETS
GAS - EA. SYSTEM - OVER 4(EA.)
INDUSTRIAL WASTE INTER.
LAWN SPRINKLERS - 1 INC 5 V.B.
LAWN SPRINKLERS - OVER 5 (EA.)
SEWER -SANITARY -STORM EA. 200f1/
WATER HEATER W/VENT
WATER SYSTEM
WATER TREATING EQUIP.
TOTAL
GTY, MECHANICAL PERMIT FEE
ALTER OR ADD TO MEER.
APPLIANCE
AIR HANDLING UNIT (TO 10=C.F.M.)
AIR HANDLING UNIT (OVER 10CCO C.F.M.)
EXHAUST HOOD (WITH DUCT)
HEATING UNIT (TO 100,000 B.T.U.)
HEATING UNIT (OVER 100,000 B.T.U.)
VENTILATION FAN (SINGLE)
BOILER -COMPO HAD, 100,000 B.T.U.)
BCH LER COMP Io�+ too.000 Brul see ceE SCN.
TOTAL
v;
fi
)
Brian Kangas FmIk
EnOfn??rs • Sorvpynrs • Plannprs
March '1, 1999
960069-50
Chuck Schoenberger
O'Brien Group
2001 Winward Way, S6iie 200
3dn lvfdwo, CA 94404
Subject: Oak Valley — Foundation Verification
Dcdr Chuck,
�-
-iI-e--.
Or. Mach 30, ;999 we performed a field sari ey of the location of the foundation forms for the bul!din s
being constructed on Lot 5-12. Lot 5.13: Lot 5.14 and .Lot 5-I of the 7tk VaUzy project in Cupertino.
The results of that surve} clearly show that the location of the fcundaticn fonu are consistent and in
conformance with the design location of tic buildin:rs, as said locations are s`tcwn on the plans prepared by
our fires.
This letter is intended to provide you with the verification of those units oer ou. survey. It there arc any
UMLIF LILMINN L'UlIN1111%) 11191 !MAUI. pIUJ�L UU IIL1L lZiLAII LU Ldll.
Sincerely,
,6
SKIAN KANGAS FOU --.K
Bradley A. Biibo P.L.S. 61,11
Project Stanger
survey Depatvncnt
BRADLEY A. B'LBO'"
EP 3i3IM
N.c. 0:41
540 Pr:ce Avenue • Radwood Circ, CA 94063 . ;65014E253Ou =AA (550) 4OZ•5399
zoizo'd zttzcte ON, :{F a ROD NEiK,0 _L GM0 NOW 66-Oi-�y1
•
•
zK.HII b:HIAnM� FVU.X
Brian Kangas Faulk
Engineers . Surveyors . Planners
March 31, 1999
960069.50
Chuck Schoenberger
O'Brien Croup
2001 Winward Way, Suite 200
San Mateo, CA 94404
Subject: Oak Valley — Foundation Verification
Doer Chuck,
t PD. 3U1 F' G, ,`
On March 30, 1999 we performe of the location of the foundation forms for the buildings
being constructed on Lot S• 14 and Lot 5.1 S of the Oak Valley project in Cupertino.
Tire results of that survey clearly show that the location of the foundation forms aro consistent and in
conformance with the design locaricn of the buildings, as said locations aro shown on the plans prepared by
our firm.
This letter is intended to provide you with the verification of diose units per our survey, If there aro any
other questions concerning dint location, please do not hesimm to call.
Sincerely,
BRIAN KANGAS FOULK
'-adley A. Bilbo P.L,S, 6141
Fi oject Manager
Survey Doporument
BIVI)LEY P. 61 00 1 "
EXP. 3/91/02 J
♦ No. 6141 tee%
940 Price Avenuo a A+!dar41d Cin(. CA 64063 . I85014U.6300 a PAC 10501 Q2.VM
ENGINEERING WEST INC.
OBSERVATION CHART
10/18/99 OAK VALLEY DEVELOPMENT CUPERTINO, CA,
' (1) LOT 6 PLAN 216 LOT 7 PLAN 5C
DID NOT OBSERVE PIERS,
*(2)DBL SIDED SHEAR WALLS
•(3) FLR. NAIUNG
11
_y
Joe t4
LATE
?onsu/ting Engineers and Scientists . 3� 3t -'F 9 caro •Ana r
PROJECT
425 ROLAND WAYoK a /�r, cid
KL
42 ba4�
OAAND, CA 94621 L CA,*a
(510) 568.4001 ! n
/+ CON TOR OWNER
0 nr ryy_yNS2 `hr 3r 0-1 'cI,1
P I WEATHER ,EYP. .:. iQ�at AM
late Ir'1 1 -r 11 3119G9 l�;Z-���e 4 fa rf1.... /' .ylj'&t - PM
PREBEM AT TE
burs Charged To PrOiect Nuclear Derteity Teets r u /•l -u /' `
ied Task Number TAl 1 Concrete Cylinders' t'
'HE FOLLOWING WAS NOTED:
lscr �h` tiofsS/i
1n � Fr r r . PLC EZ 4,,1r .
ti9eI-
5
4/le1t SFII Cie yl 1 1r 't -M InG�T+��-
4
e,e-
G ✓'G �u r � t r• � �n 't 'T�'tP f�
I COPIES TO
7'1ci` r .'CH /---' lr
FO[[�D
SIGNED r'
y
O'BRIEN �q
Le GROUP
'm Jim Ripley(SMTp:rlpleydg(�pacbell.netJ
It: ; Monday, March 08, 1999 2:26 AM
ject: PAT BURKE
OAK VALLEY
Burke
Valley
rano, CA
�'L�t
FINAL PLANNING SIGN OFF
'encs: Linear parkway planting.
DATE << 169 ;.
ntings within the linear park are consistent with the landscape + Com/
uction documents prepared by this office and reviewed by the city. SIGNATURE
rch 1998 and conform with the preliminary approval doumenls.
A. Ripley
Design Group, Inc.
•
SIIITF. 200, SAN MATEO, CALIFORNIA 94404.2473 TRLEPHONE (650) 377.0300
• COAST Insulation Contractors, Inc.
1086 N. 11th St. • San Jose, CA 95112
l J
U
INSULATION CERTIFICATION
This is to certify that insulation has been installed in conformance with the current energy regulations,
California Administrative Code, Title 24, State of California, the building located at:
SITE ADDRES$'k;.,
FLOORS:
Manufacturer OWENS CORNING
Thickness/Type tf� W1�y R -Value Wa , P
EXTERIOR WALLS:
Manufacturer OWENS CORNING Thickness/Type 312 R -Value
CEILINGS:
BATTS: Manufacturer OWENS CORNING Thickness/TypeJ2- AD'/ R -Value 3g I P
BLOWN: Manufacturer OWENS CORNING Thickness/type 15tL R -Value
Weight/Bag 35 Sq. Ft. Covered -Rq2 # Bags Used O
AIR INFILTRATION SEALANT��� INSTALLED: YES Ex NO F7
GENERAL CONTRACTOR CJrfjk. .f7 6A§4 LICENSE #
BY: TITLE: DATE
COAST INSULAT ON CONTRACTORS, INC. (�c LICENSE # ,-2 _
BY: TITLE: fes? DATE:
J?041 a to/�3oNus
DoT 5-13
INSTALLATION CERTIFICATE (page 1 of 4) — CF -6R
Site Address Permit Number
astallation certificate is required to be posted at the building site or made available for all appropriate inspections. (The
information provided on this form is required; however, use of this form to provide the information is optional.) After
completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at
,occupancy, per Section 10-103(b).
,HVAC SYST .MS:
Heating Equipment
Equip. qof Etncieney Duct Duct or Heating Heating
Type (pkg. CEC Certified Mfr Name Identical (AFUE, ete.)t Location Piping Load Capacity
.7f?G1eeloy"L /DS&aK /7m/2. 2
3AMI-cGI
tio3o _' /o l a&Ah"/G M zg, 1,3 V
1. >_ reads greater than or equal to.
1, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more
efficient than that specified in the certificate of compliance (Form CF -IR) submitted for compliance with the Energy
Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for
manufactured devices (from the Appliance Efficiency Regulations or Part.6), where applicable.
W`�'
Signature, Date Installing Subcontractor (Co. Name)
OR General Contractor (Co. Name) OR Owner
WATER HEATING SYSTEMS:
Distribution If Recir- At of Rated' Tank EM- External
Heater CEC Certified Mfr Type (Sid, culalion, Identical Input (kW Volume ciencys Standbys Insulation
Type Name R Model Number Point-nf-Use) Control Type Systems or Btu/hr) (gallons) (EF, RE) Lou (%) R -value
2 For small gas storage (rated input or less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list Energy Factor.
For large gas storage water beaten (rated input of greater than 75,000 BtWhr), list Recovery Efficiency, Standby Lou and Rated Input
For Instantaneous gas water heaters, list Recovery Efficiency and Rated Input.
Faucets & Shower Heads:
All faucets and showerheads installed are certified to the Commission, pursuant to Title 24, Part 6, Subchapter 2, Section
1, the undersigned, verify that equipment listed above my signature: 1) is the actual equipment installed; 2) is equivalent
to or more efficient than that specified in the certificate of compliance (Form CF -1R) submitted for compliance with the
Energy Ejiciency Standards for residential buildings; and 3) the equipment meets or exceeds the appropriate requirements
for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable.
Signature, Date
�OPY TO: Building Department
Building Owner at Occupancy
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
Z6?Zl
o
Cooling Equipment
Equip. CEC Certified Compressor g of
Efficiency Duct
Cooling
Cooling
Type (pkg. Unit Mfr Name and Identical
(SEEM etc.)' Location
Duct
Load
Capacity
.7f?G1eeloy"L /DS&aK /7m/2. 2
3AMI-cGI
tio3o _' /o l a&Ah"/G M zg, 1,3 V
1. >_ reads greater than or equal to.
1, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more
efficient than that specified in the certificate of compliance (Form CF -IR) submitted for compliance with the Energy
Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for
manufactured devices (from the Appliance Efficiency Regulations or Part.6), where applicable.
W`�'
Signature, Date Installing Subcontractor (Co. Name)
OR General Contractor (Co. Name) OR Owner
WATER HEATING SYSTEMS:
Distribution If Recir- At of Rated' Tank EM- External
Heater CEC Certified Mfr Type (Sid, culalion, Identical Input (kW Volume ciencys Standbys Insulation
Type Name R Model Number Point-nf-Use) Control Type Systems or Btu/hr) (gallons) (EF, RE) Lou (%) R -value
2 For small gas storage (rated input or less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list Energy Factor.
For large gas storage water beaten (rated input of greater than 75,000 BtWhr), list Recovery Efficiency, Standby Lou and Rated Input
For Instantaneous gas water heaters, list Recovery Efficiency and Rated Input.
Faucets & Shower Heads:
All faucets and showerheads installed are certified to the Commission, pursuant to Title 24, Part 6, Subchapter 2, Section
1, the undersigned, verify that equipment listed above my signature: 1) is the actual equipment installed; 2) is equivalent
to or more efficient than that specified in the certificate of compliance (Form CF -1R) submitted for compliance with the
Energy Ejiciency Standards for residential buildings; and 3) the equipment meets or exceeds the appropriate requirements
for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable.
Signature, Date
�OPY TO: Building Department
Building Owner at Occupancy
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
r1f;K. 3_..1 7y1Z 10 L':171'I :3R_=11i I HI i!G ,z FOULK
Brian Kangas fouik
6n01aeers . Surveyors • Planners
March $1, 1999
960069-50
Chuck Schoenberger
O'Brien Group
20DI Wlnward Way, Suite 200
San Mateo, CA 94404
Subject: Oak Valley — Foundation Verification
Dear Chuck,
HID. 301 F.2•'2
On March 30, 1999 we performed a field survey of this location of the foundation forms for the buildings
being cottsiructed on Lot 5.12, Lolt. -l31 Lot 5.14 and Lot 5-15 of the Oak Velloy project in Cupertino,
The results of that survey clearly scow that the location of the foundation forms are consistent and in
confonrance with the design location of the buildings, as said locations arc shown on the plans prepared by
our firm.
This letter is intended to provide you with the verification of diose units per our survey. If there are any
other questions concerning that location, please do not hesitate to call.
Sincerely, 1hND Sego
• r ' u �p
=' eluDLer A. caao �
BRIAN KANGAS FOULK * EXP. 3/91/02
0-adley A. Blibo P.L.S. 6141 if, No. 6141
; i eject Manager qrf FO��
Survey Department SOF ChO
940 Price Avenmt a R, dvauid Cin(. CA 64063 . (650)482.6300 . FAX B5Di 462 -TM