Loading...
20061 20062 20082 20 (4) or D&M CONSULTING ENGINEERS, INC. ?'! Geotechnical/Environmental/Materials Testing F A URS CORI'ORAfION CCIMPANV January 29, 2002 Permits: 20061, 20062, 20082, 20106, Project No.: 0001437 20125, 20129, 20130, 20133, 20135, 20136 Prometheus Real Estate Group, Inc. 350 Bridge Parkway Redwood City, California 94065 ATTENTION: Ms. Christine A. Weaver SUBJFCT: Progress Report No. 22 for Construction Observations and Materials Testing (Special Inspection) Services; Lake Biltmore Apartments, 10159 South Blaney Avenue, Cupertino, California Ladies and Gentlemen: As requested, D&M Consulting Engineers, Inc. (dba D&M/Terratech) is providing construction observation and materials testing (Special Inspection) services for the subject project. Specific items observed and/or tested for the subject project are presented on our technicians' daily field reports (attached). These observations and/or tests have been performed as requested,.in general accordance with the requirements of the project plans, the project struciural test and'inspections schedule, and the requirements set forth in the Uniform Building Code. Our services'performed during the period of January 11 through January 24, 2002 are listed.below. No services were requested or performed during the period of November 9, 2001 through January 10, 2002. Laboratory test results are reported under separate cover as the tests are completed. Our services during the identified time period included: • Observation of previously completed shear wall diaphragm nailing. The work observed during the reporting period was, to the best of our knowledge, in conformance with approved project plans and applicable standards of workmanship at the time of completion, except as noted below. f OPEN EXCEPTIONS January 11, 2002 — Nails at building 11 need to be set. Blocking needed at windows.at buildings II, JJ, HH, LL and MM. March 22, 2001- Due to clearance issues, holes for two epoxy-set,holdown,bolts,.were drilled slightly off vertical. The holes broke through the side-6f the stem wall above.the slab.. This requires the review of the project engineer. 0001437(502R0026)gr Page I of 2 Copyright 2002 D&M Consulting Engineers,Inc. January 29,2002 3194 De La Cruz Blvd.,Suite 19 Santa Clara,California 95054 408 297 6969 Tel 408 297 7716 Fax December 18, 2000 — Shear wall, floor and roof diaphragm nailing incomplete. Work was reported to have been reinspected by the city building inspector on or about January 26, 2001. November 26, 2000 — One epoxy-set anchor bolt had embedment limited to 9 inches due to conflict with reinforcing steel. Project plans indicate 16 inch embedment requirement. This requires engineer's review. LIMITATIONS As our client, please recognize that construction monitoring is a technique employed to reduce the risk of deviations from the approved plans from becoming incorporated into the completed project without appropriate engineering review and approval. Provision of construction monitoring by D&M/Terratech's field personnel is not insurance, nor does it guarantee construction of any type. Even with diligent monitoring, some construction defects may be missed. In all cases, the contractor shall retain sole responsibility for the quality of work, for adhering to plans and specifications and for repairing defects, deficiencies or omissions, regardless of when they are found. We have performed our services in a manner consistent with the standard of care and skill ordinarily exercised by firms of our type practicing under similar conditions at this same time and locality. However, we do not undertake the guarantee of construction nor production of a completed project conforming to the project plans and specifications. No warranty is expressed or implied. Our services were limited to those documented in our attached reports. We appreciate the opportunity to work with you on this project. If you have any questions concerning our observations or test results, or require additional information, please do not hesitate to contact us at your earliest convenience. Sincerely, D&M CONSULTING ENGINEERS, INC. A URS CORPORATION COMPANY President/Principal Engineer Attachments: daily field reports (3 pages) cc: Trident Construction City of Cupertino 0001437(502R0026)gr Page 2 of 2 Copyright 2002 D&M Consulting Engineers,Inc. January 29,2002 IP D&M CONSULTIN NGINEERS, INC. 10 A URS CORPORATION COMPANY PLYWOOD NAILING(INNSjP'E7CTION REPORT DATE: 01 / (-,U� t - PROJECT NO. \—�( Time Arrived: ,y,� Time Left: PROJECT : ��/'—l'_ ''r S Job Time: Travel Time: CONTRACTOR: Tf�—IUE� Total Time: Mileage: PERMIT NO.: -S Q�'�-aW Expenses: DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other TYPE OF DTL. NO. BUILDING PbU4'l tT 69C'AYfO1V'^ C) DESCRIP. NAILING DRWG. NO. COMMENTS A t t 3 1 L—� Ca of 0-7-'-0 ru, (0 i NOTES:-yU)4 L L SCTl AIAILC ) .- 6LDq 149 4YC4-Cr- / S Af�T AA/ 6,ic&.- � 1 P t d w'HL- (AJ rA,) w/ Tl r n�tr 1+otef A'-L- I& n6 C — l}0 D A}-T U!1 Ajy3C'W / & W Z ,✓r}7 L Cr -0 the best of my knowledge, the abovS SN Aperformed in accordance with the approved plans, specifications, and regulatory requirements. Superintendent/Representative: e/ Al Inspector: � 3- 1365 lkmdee WaY•Son Jose, CA 95112 12 Thonuo (A,en., Wut •Munteret; CA 9+940 (408)297 6969 7e1•(408)297 7716 Fax (831)372 3716 Tel•(X311372 7481 Fn,r DAILY PROGRESS REPORT 7 Project No. 1., D&M CONSULTING ENGINEERS, INC. Page % of / r A uas C(IrrN)RA,W,u cr,n,rnw Report Sequence No. Date/Day /-All-oz, �L-P . Project Name Weather Project Address Purpose of site visit Project activity since last visit — Project activity today Comments continued ❑ Equipment in use Client Superintendent Phone Contractor Foreman Phone Copy to Print Full Name 1365 Pander Wai •San Jas,. CA 95112 12 TAumns 0"ens Wac•Manterer. CA 91940 WON)297 6969 7i•l•(403)297 7716 6ttr (8.31).372 3hri lel• (83/) 372 7481 Fa' FORM 360-(Rev.7/99) f D&M CONSULTINCONGINEERS, INC. • A URS CORPORATION COMPANY II g PLYWOOD NAILING INSPECTION REPORT DATE: e (_ O U PROJECT NO. .7� Time Arrived: (( Time Left: PROJECT :�_•�� - 5 �(.� J Job Time: .t^ ,1� �� Travel Time: CONTRACTOR: _ �( Total Time: Mileage: PERMIT NO.: Expenses: DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other BUILDING f 6j l LeCATf6R h'C1 , DESCRIP. TYPE NAILINGG DRWG. NO. COMMENTS 0L'L • L G c.l Qi Y u rm eY4Y rc�7 NOTES: -o the best of my knowledge, the above bov WAS WAS NOT performed in accordance with the approved plans,specifications, and regulatory requirements. Superintendent/Representative: Inspector: �f 1, �%,� Us�3,/GI J ' aWjG &fi5H /L)(H C:4 7 Zile 1365 14mdet'Nur•San Jose, CA 9J I12 12 77romas 0%,ens War•Monterey, CA 91940 (408)297 6969 Tel•(408)297 7716 Fax (8.31)372 3776 7el•(8311 372 7481 l'ar