Loading...
R-5114 (2) PERMIT R_ 5114 APPLICATION FOR CITY OF CUPERTINO NUMBER INSPECTION DIVISION PERMIT EXPIRATION REROOF PERMIT (408) 777-3228 PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. BUILDING ADDRESS /�� t� 1 c/-7-LC„) ►[ �1,� RESIDENTIAL ?S COMMERCIAL OTHER OWNER'S . l ,q HAZARDOUS FIRE AREA NAME Q Yglo Du�rv� YES ❑ Ifyes-lunderstand Nala ClassA roof assembly is required. rL[� VD p re No If EXISTING(ROOF COVERING PHONE ADDRESS::7-l` "� D/O�t_�.V�N6�Sr�C' "'� - PHONE Zra q ��l �— NUMBER OF EXISTING COVERINGS CONT RACT/OqS ; 450 NAME (+�..NAIGSA -_6- n�1r3CTOBEREMOVED P ARETAINED ADDRESS 7Zg7 �JO(6LN AIX �`'�• �(�-j�7J TYPE OF ROOF COVERING CITY aZIP L� / Icy[ EXISTING PHONE ` ,"1 U ^®��� BUILT-UP ROOF ❑ LICENSE NUMBER �Jr�� ASPHALT SHINGLES ❑ LICENSED CONTRACTORS DECLARATION 1 hereby affirm that I am Ilcensed under provisions of Chapter a(commencing with Section WOOD SHAKES 7000)of Division 3 of the Business and Professions Code,and my license Is In full force and effect. 55q ¢¢ OD SHINGLES ❑ License Class G `7� Lip.Number Date 0 _C 1� Contractor�A)A ;5ll M.Wp1j(n OTHER(SPECIFY) ❑ OWNER-BUILDER DECLARATION PROPOSED I hereby off urn that I am exempt from the Contractors License Law for the following reason. (Sac.7031.5,Business and Professions Code: Any city or county which requires a permit to construct,alter,Improve,demolish,or repair any structure,prior to Its Issuance,also requires the BUILT-UP ROOF Elapplicant for such permit to file a signed statement that he Is licensed pursuant to the provisions of the Contractors License Law(Chapter g(commencing with Section 7000)of Division 3 of the Business and Professions Code)or that he Is exempt therefrom and the basis for the alleged ASPHALT SHINGLES ❑ exemption.Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars($500).): E]1, SHAKES I,as owner of the property,or my employees with wages as their sole compensation,will do ❑ the work,and the structure Is not Intended or offered for sale(Sec.7044,Business and Profes- sions Code:The Contractor's License Lew does not apply to an owner of property who bullds or Improves thereon,and who does such work himself or through his own employees,provided that WOOD SHINGLES ❑ such Improvements are not intended or offered for sale.ll,however,the building or improvement Is sold within one year of completion,the owner-builder will have the burden of proving that he did OTHER (SPECIFY) yy not build or Improve for purpose of sale.). ❑I,as owner of the property,am exclusively contracting with licensed contractors to construct the project(Sec.7044,Business and Professions Code:The Contractors License Law does not PROVIDE I.C.B.O.REPORT NO. apply to an owner of property who builds or Improves thereon,and who contracts for such projects with a contractors)licensed pursuant to the Contractor's License Law. PROVIDE MFGR.INSTALLATIQN SPECS. El am exempt under Sec. ,B 6 P.C.for this reason D Owner Date APPLICATION DATE VALUATION PERMIT FEE WORKER'S COMPENSATION DECLARATION 1 hereby affirm under penalty of perjury one of the following declaration: -11 have and will maintain a Certificate of Consent to sell-Insure for Worker's Compensation, �u� '� BUI as provided for by Section 3700 of the Labor Code,for the performance of the work for which thisC/.Lrx, Poll la issued. -N �♦ rtH(IN 1l //ys//''�/!/W(('// ��IJl,have and will maintain Worker's Compensation Insurance,as required by Section 3700 of (, t Vf LU ( S81S C ih8 La for Cotle,for the performance of the work for which this p rmit Is Issued.My Worker's Compensation Insurance cart er and.PYllcy numberr,are: ON Total Carrier C7� c0�NYt"poliJp No. 2496_% � PERMIT AUTHORIZATION DATE CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE N.C.O (This sectlon need not be completed If the permit is for one hundred dollars($100)or less.) I certify that In the performance of the work for Ich Ihla p rmpJla Issu shall not employ any person In any manner so as to become auble to ma w a com�n La�pf call- All roofs shelf be inspected prior to any roofing terial being forms. (J installed. If a roof is installed without first obtaining an Date —6 Applicantinspection,I agree to remove all new materials for inspection. NOTICE TO APPLICANT: If,after making this Certificate of Exemption,you should become Applicant understands and will subject to the Workers'Compensation provisions of the Labor Code,you must forthwith comply PP comply P Y with all non Point with such provisions or this permit shall be deemed revoked. sour regulations. I certify that I have read this application and state that the above Information Is correct.I agree to comply with all city and county ordinances and state lave relating to building construction,and Al ofc erlrlQs IOA�as"C"or better. hereby autli representatives of this city to enter upon the above-mentioned property for In. ) C/—y/' spection purposes. [' (We)agree to save,Indemnify and keep harmless the City of Cupertino against liabilities, a '� judgments,costs and expenses which may In any way accrue against said City In consequence of the granting of this permit. SIGNATURE OF APPLICANT DATE PRE-INSPECTION: PLYWOOD: IN-PROGRESS: INSP. DATE INSP. DATE INSP. DATE TEAR OFF INSPECTION: BATTENS: FINAL: INSP. DATE INSP, DATE INSP. DATE NOTE: OSHA APPROVED ACCESS TO ROOF SHALL BE PROVIDED FOR INSPECTION OFFICE COPY • SUBJECT: REROOFING POLICY FOR THE CITY OF CUPERTNO BUILDING DEP.ARTMENT PRIOR TO ISSUANCE OF PERMIT AND INSPECTION PHASE. 1. Prior to permit issuance, you must agree to comply with U.B.C. standards and manufacturers Spec's on reroofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the reroofing is completed. 3. All types of roof shall be inspected prior to any roof being installed. 4. In order to receive a final,you must complete steps 1,2, and 3. 1,) Preinspection or tear off approval. 2.) In progress inspection approval. 3.) Final inspection approval. a.) Operable smoke detector verification b.) Spark arrestor installation • 5. If plywood is installed,a plywood nail inspection is required. 6. If any roof is applied without first obtaining an inspection, you will be required to remove all new material down to the sheathing and a building inspector will inspect all sheathing at that time. WE UNDERSTAND THE ABOVE POLICY ON REROOFING AND WILL C01LY WITH THE POLICY r �tv,� n�11JCv Ho-,vtEO�V, RS NAME: yt ADDRESS: REROOFING COb1PANY NAME: AI°oeiAr�� t�z tNCs CO, f �NC APPLICANIMS SIGNATURE: CITY OF CUPERTINO BUILDING DEPARTMENT • RerooBwinword