Loading...
07-093, Cal-West AGREEMENT CIlY OF CUPERTINO 10300 Torre Avenue Cupertino. CA 95014 408-777.3200 NO. BY TIllS AGREEMENT. made and entered into this Lday of Aupst. ~ by and between the c.....S6,6 CUPERTINO (Hereinafter referred to as CITY) and Name (1) Cal-West (2) Address P.O. Box 612035 City San Jose Zip 95161-2035 Phone B 408.923.1313. F 408.923.1115 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties bereto agree as follows: CONTRACTOR sball provide or furnisb the followinl specifled services and/or materials: Remove two (2) 18 poles, including solar panels, remove the foundations to 14 inches below grade, fill in removal area and concrete cap walk area, protect and deliver salvaged poles and solar panels to the Traffic Signal Shop at 10981 Franco Court. EXlUBITS: The following attached exhibits hereby are made part of this Agreement: Exhibit A "cost estimate" and Exhibit B "RFQ." TERMS: The services and/or materials furnished under this Agreement shall commence on AU2ust 10.2007 and shall be completed before AU2ust 30. 2007 COMPENSATION: For the full performance of this Agreement, CI1Y shall pay CONTRACTOR.: Amount not to exeRd $%.993".46 - California Labor Code, Section 1771 requires the payment of prevailing wages to all workers em~lo ed on a Public Works contract in excess ofSl,OOO.OO. ENTERED GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and all damage and liability due to negligence, errors and omissions, including all costs of defending any claim,'caused by or arising out of the performance of this Agreement. City sball not be liable for acts of Contractor in performing services described herein. Insuruee. Should the City require evidence of insurability, Contractor shall file with City a Certificate of Insurance before commencing any services under this Agreement. Said Certificate sball be subject to the approval of City's Director of Administrative Services. Non-Diserimlnattou. No discrimination shall be made in the employment of persons under this Agreement because of the race. color, national origin, ancestry, religion or sex ofsucb person. hlterest of CODtnctor. It is understood and agreed that this Agreement is not a contract of employment in the sense that the relationship of master and servant exists between City and undersigned. At all times, Contractor sball be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement. Contractor certifies that no one who has or will have any financial interest under this Agreement is an officer or employee of City. Cb...... This Agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACf Co..oRDINATOR and representative for CI1Y sball be: NAME Vicki Guapo DEPARTMENT Public Works This Agreement shall become effective upon its execution by CIlY, in witness thereot: the parties have executed this Agreement the day and year first written above. CONTRACTOR.: By 16" bt t~ *,. \.t. ~ e-/J :It.. Title ftnl~6;.i\ Soc. Sec. # APPROVALS CITY OF CUPERTINO'~ . By ~~.: - Tit- Asst. Director of Public Works XPENDITURE DISTRIBUTION 110-8602-7014 $2,993.46 08/06/2007 08:58 408-923-1115 CAL WEST LIGHTING PAGE 01 i . d= ... _1_- August 6, 2007 tb ~'Q., e-~oJ- · Subject Removal of two (2) Type-1-B poles and Solar Panels from abandoned Lighted Crosswalk '(h .. systenl$1ooatecf at Bubb Road & Hysnnl8port Drive and dell..-er to Franco Ct Signal Shop. cr+ Attn: VICki Guapo City of Cupertino Dept. of Public Works 10300 Torre Awnue Cupertino, CA 9501~55 File: 74, 009.17 Dear Ms. Guapo, Cal-West propo_ to do the follOwIng: 1. Coordinate with City Representative about Job Date and Time Schedule 2. Saw-cut and remove two (2) 5')(5' section of concrete sidewalk 3. RemoVe two (2) existing Type-1-B poles and Solar Panels 4. Jack down and demo two (2) exi8ting Type..1-B foundations 5. CooR2Inate With City Representative tor delivery of materials to Franco yard 6. Pour back and finl8h oonorete flags in sidewalk 7. Set up PfOI)Gr lane closures .. necessary 8. InstBlladvanced ~Ing signs as needed 9. Clean up any associated deblis In ares 10. Con1act and communicate With City of jOb completion before departure of City Tolal for this job: $ 2,993.46 CITY OF CUPERTINO Authorizing SignatureC~ /~-::--.........- " Print Name ~::::A-v \9 <5711.. LMA ~ Titte~cv~~ CjV'L &~c,. Date f,' 107 CAL-WEST UGHTING & SIGNAL Lri-C-r Craig H. Geis Jr. President L PO Box 612035 + San Jote, CA96161-2035 Phone: (408) 923-1313. Fax: (408) 923-1115+ license No. 841901 BX&ma A ~~oo II CUPERTINO City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408.777.3243 FAX: 408.777.3333 vickig@cupertino.org REQUEST FOR PRICE QUOTATION (RFQ) CITY OF CUPERTINO City RFQ NO.: 07-7400917 Project: Remove 1 B Poles File: 74,009.17 Location: Bubb Road / Hyannisport Drive Date: 2 August 2007 Reason for Request: Owner initiated, request removal of two (2) IB poles, which supports solar panels for an in pavement lighting system. The system was removed due to non-conforming use at a controlled intersection. We are requesting a cost estimate including all labor, tools, and equipment necessary to perform the following, yet not limited to. Description of Work: 1. Remove of two (2) 1 B poles, including solar panels, remove the foundations to 14 inches below grade, fill in removal area and concrete cap walk area, protect and deliver salvaged poles and solar panels to the Traffic Signal Shop at 10981 Franco Court. The City will perform the inspection at no cost to the Contractor. However, we do require a twenty-four (24) hour notice before move in and for inspection. And lastly, this community follows California Storm Water Best Management Practice. By: Date: ..( tl..1c A Cl- (' Senior Traffic Technician Traffic Shop No.: 408.777.1366 Mike Vandeveer, Traffic Signal Maintenance M# 408.497.5327 Cameron Corry, Traffic Signal Maintenance M# '08.497.5198 BXBIB1TB requestjor_quote.doc