Loading...
ERC 04-09-03Community Development Department Cupertino, CA 95014 (408) 777-3308 APPROVED MINUTES OF THE REGULAR MEETING OF THE ENVIRONMENTAL REVIEW COMMITTEE HELD ON April 9, 2003 Committee Members: Jason Chou for Ralph Qualls Charles Corr David Knapp Steve Piasecki Dolly Sandoval Committee Members absent: Ralph Qualls Staff present: Gary Chao and Colin Jung Staff absent: Glenn Goepfert APPROVAL OF MINUTES: March 12, 2003 ACTION: MOTION: SECOND: ABSTAIN: VOTE: Motion to approve the March 12, 2003 minutes Steve Piasecki Charles Corr 5-0 NEW ITEMS: Application No.: Applicant: Location: Z-2003-01, TM-2003-01, U-2003-02 (EA-2003-03) Jeff White (Prometheus) 7310 Rainbow Drive, A-E The following items were discussed: Trees: 93 trees on site, 33 are proposed to be removed. o Required planting: 6 - 48" box Coast Live oaks Relocation Program required. o 40 - demolished o 55 - new units BMR Units: 20% of the project is required to be BMR units. The additional 15 units make up the 20%. Storm Drainage: Analysis required [] Traffic Impacts: Parking and Traffic analysis required o New stop sign required at the driveway exit along Rainbow Drive and sidewalk access from the project site to Rainbow Drive. ACTION: Recommendation for a Mitigated Negative Declaration with the following mitigations: 1. Trees: The applicant is required to plant 6 - 48" box Coast Live Oaks to replace the removed specimen oak and cedar trees. The arborist report has identified specific tree projection measures that will be included in the project conditions as well. 2. Storm water drainage: A storm water drainage study is required and shall be completed as part of this project prior to the Planning Commission Public Hearing. Specific mitigation measures identified in the drainage study shall be included as conditions of the project to the satisfaction of the Director of Public Works Depmhnent. 3. Relocation program: The project is required to provide a relocation program with provisions to relocated existing apartment residents to other comparable apartment units within the Cupertino Union School District. 4. Below Market Rate units: The project is required to provide 20% BMR units. The applicant is demolishing all 40 units and proposing 15 additional new units for a new total of 55 units. 20% will be taken from these 15 additional new units resulting in 3 BMR units. 5. Traffic Impacts: The applicant is required to install one new stop sign at the driveway exit along Rainbow Drive and sidewalk access from the project site to Rainbow Drive. The applicant is required to submit a traffic analysis discussing potential traffic impacts. These finding identified in the analysis shall be implemented as conditions of the project to the satisfaction of the Director of Public Works Department. 6. Parking: The applicant is required to submit a parking analysis that shall be reviewed and approved by the Director of Community Development prior to the Planning Commission Public Hearing. MOTION: Steve Piasecki SECOND: Charles Corr ABSTAIN: VOTE: 5 - 0 Application No.: Applicant: Location: EXC-2003-01 (EA-2003-04) Li-Sheng Fu Mercedes Road (APN #342-22-045) The following items were discussed: The proposed project is 4,400 square feet. Trees: The oak trees currently on the property are being retained. Parking: 6 parking stalls are required. Retaining wall heights. ACTION: Recommendation to continue to the next regularly scheduled meeting and the applicant to meet with staff to review the retaining wall heights and the grading and drainage plan. MOTION: Steve Piasecki SECOND: Charles Corr ABSTAIN: VOTE: 5 - 0 Application No.: Applicant: Location: CP-2003-01 (EA-2003-02) City of Cupertino (Capital Improvement Plan) Citywide This item was removed from calendar. ACTION: MOTION: SECOND: ABSTAIN: VOTE: This item was removed from calendar Respectfully submitted, Kiersa Witt Administrative Clerk G/planning/erc/actionrninutesO40903