08040141 (2) CTTY OF CUPERTINO sea. , .,., K
BUILDING DIVISION PERMIT. eC0]�_ '.Rt1.C� (3R`T
kM ..J mF i ro�. S. ,C?.
BUILDING ADDRESS: PERMIT NO.
20741 CELESTE CIR A PERFECT CLIMATE 08040141
OWNER'S NAME: PBRh11TLS5UBDATE
NIKKI MUSSO 8375 BRENTWOOD BLVD STE B 04/21/2008
NE: SANITARY NO. CONTROL NO.
(408) 861 9545
ARCHITECT/ENGINEER: BUILDING PERMITINFO
BLDG ELECT PLUMB MECH
0 0 0 0
30o LICENSED CONTRACTOR'S DECLARATION Ib Description
I hmeby of on that I me licensed under previatans O0acr1 of Chapter 9(commencing p
with Section]pkl)efDivhlon 3 o the Business and Profcusiom Code,ane my became is RMV/RPLC EXSTNG FURNC & AC 2 . 5 TON 60K BTU
^ in full Tome and e!f^ct. 1S 00Z Lice so Cl L Lk.N
F Dow Contrxmr
q ARCHITECTS DECLARA770N
eTW 1 understand my plans Moll he used es public meet&
]y
g tad
Licensed Professional
5 OWNER-BUILDERm Ce Contractor's
C< 1 mason.
.Bien o n 1 am exempt from the CmionsCo :Anse law for Jct
0 4 following mason.(Soudan 7031.5,Business Business ane professions Cale:Any city or county
$ which equlm a pemit m uirswc4 alxn hnprow,hpac , file
repair any.vucmm
iy priormslicauenec,alaant to roa thovisios of for mode Pemtt mie a Law(Chapter
(cothat IN mmencing
wait pursuant to the of Diatom of the Conuiness l.kcnxlaw(C o4c)or Sq.Ft. Floor Area $6934 Valuation
��( 3 think W exempt
therefrom
ad of Division 3 of al Buseged e".rW on.Any
CMe)of 6 9 3 4
S the io b emmps themlrom at Ile bash for the cis the exemption.Any itviolist
Wally
of
Section ID31.5 five
any applicant rer.permit subjects the applicant lo.civil penalty of Number Occupancy Type
not mm Nan five hundred dollars(5300). 3265 6999 .'�(7'
❑I,M owlxr of the pmpmty,m my employe"with"Son sadmirmle eampemadon, '
will do lkwork,and Nesuuctum Isnotimmuled or offered forsale(S".RM4,1husines
and Prof"siom Cade:TTIe Conuscmla License Law does net apply In,an owner of Required Inspections
property who builds or ins prow dmaroon,and who does such wart himself m through his
we employees,provided thalsoeh improvements we notincended oraffered for Wa IL
however,the building or improvement is mrd within me year ofcompletion,Ne owner.
Wilder will haw the burden of proving that k did not build or improve for Purpose of
soh.).
❑1,as owntr of the property,as exclusively conmaing with Iicnmd rnnuxlms to
comtmcl the project(S".]OM,Business and Professions Cade:)The Cmmctor'.U-
mem Law den not apply m an own"of property who holm.or improves Nemoe.and
who contracts for such projects with a contrsctor(0 ltc med personal to the Conuxmrs
License Law.
❑1 an exempt under See ,B B.P C for this rossan
Owner Dam
WORKER'S COMPENSATION DECLARATION
40 1 hereby Lawn under pemlly of perjury an of the following deck ndurc:
❑1 Mw and will matnuin a Cmifi"m of Coeenl m self-imum ran Woflue Campcn-
Minn,u provided for by S=on M of the Labor Cade,for W Pat....of the
wart for which this permit is issued.
ISYIhan ane will maintain Worker's Compression Imunnm,an matutred by Section -
of the Law Cade.for the performance of Na work for which this Permit is Issued.
My Wmia%pCossad
mpan In..."tiand ler PPolicynumber me:
Cartier,ejC/ f Oa,a,a,iA),,y l"a—b Policy No.:(V12 A 00^,& "d t
CERTTFICATE OF HEMP ION FROM WORKERS'
COMPENSATION INSURANCE
(Thbae"ion mod not becmnpleted itis permit Is formC hundmddoilm($NO)
err less.)
1 sonify that in the performance of the work for which this Perris is issued.)shall not
wnploywy person to my manner so as m Women subject to to Worken'CmpemNm .
Law.of California.Data
Applicant
NOTICE TO APPLICANT:If,after malting this Ceniftmle of Emmption.you should
become subject in the WmIcces Compensation provisions of tha labor Coda you am
Q 0 fw1with comply with such provisions n NM permit shall tan m
deemed ated.
.Zy CONSTRUCTION LENDING AGENCY
Fr 1 Manby affirm that them to.wastauctim lending.S.ay for the performance f
a> Ne work for which des permit b issued(Sec.309'1,Civ.C.)
W Q Undoes Name
z Lcndres Addrms '
[,)Q I costly that I have mud this application and sum that the.bow infa matim is
�y F correct.I agree to empty with at[city and county ardinamns and sum laws relating to
QU building consumation,and hereby authadm representative of Nb city to enter upon the _
ahuve-nowdomd property for inspection purpmes.
lF^.t pt (We)agree to mw,indemnify ad kap hnmlw the City of Cupmdna again,
tito IiabillJ",judgmanm.costs and experus which may in any way warm Msim,said City
V in consequence of the Senting of this permit.
APPLIC (UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: Date
SOUR LATIONS��, c��
�� 24f--y-0? Re-roofs
Sgnalum of ApplicanuConummr — Data
HAZARDOUS MAT EI S DIAY s–aosuae Type of Roof
Will the applicant m future building occupentatm whandle hazardous material
as defined by the Cupertino Municipal Code,Chapter 9.13,and the Health and Safely
Code,S"uon 25532(.)? /� All roofs shall be inspected prior to any roofing material being installed.
❑Y" 7o
Will the applicant or future building occupant tax mpidwcnt or device which If a roof is installed without first obtaining an inspection,I agree to remove
mit hazardous air contaminant as dermad by the Bay Area Air Quality Management all new materials for inspection.
District?
❑Yon
I have mW the heath amim ala requirements undcrChaun S.95ofNe Calilm,
nb HmINJr SefmyCede,Secemu 25505,25533 and 25534.1 umlmund thelirthe building - /j 7-
does
does not Jy haw a meant Net It is my responsibility m notify Je occupant of Ne
require hich must nen rlemuan.ora Certificate of Occupancy. Signature of Applicant Date
y of-ems
Owner or abthdrimagent DamAll roof coverings to be Class'1?"or better
'
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is
• not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project.
INPUT
rte Resources
1.Recycle Job Site Construction&Demolition Was a
65%=1 point;75%= 2 points;80%,=4 points up to 4 Resource pts 0
2.Salvage Reusable Building Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
8.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1 1 1
B.Foundation
1.Incorporate Recycled Flyash in Concrete
• 25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes c in 0
1 1 1
C.Structural Frame cy
1.Substitute Solid Sewn Lumber with Engineered Lumber 1 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood kJoists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"or more is y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications y=yeS 0 ;+
7.Use Engineered Studs for Vertical Applications OR 1 4Rascqurce pts y=yes 0
B.Use Recycled Content Steel Studs for Interior Fra pQ 2 Ree!o rce is
'�e�' p y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors
�' Y-yes 0
b.Wall
3 Energy pts y=yes 0
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
ra.
se OSB
Subfloors 1 Resource pt y=yes 0
Sheathing 1 Resource pt y=yes 0
1 1 1
INPUT Reqources Energy AG/ricalth
Ln xter Orr IT11,19 fl
1.Use Sustainable Decking Materials
a.Recycled content 3 Resource pts y=yes 0 •
b.FSC Certified Wood 3 Resource pts y=yes 0
2,Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAQ/Heahh pt y=yes 0
3.Install House Wrap under Siding 1 AQ/Health pt y--yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt Y--yes 0
1 1 1
E.Plumbing
1.Install Water Heater Jacket 1 Energy pt y--yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showarheads(1 point each,up to 2 points) Up to 2 Resource pis. 0
4.Replace Toilest with Ultra-Low Flush Toilets
(1 point each,up to 3 points) Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts Y_—Yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAO/Health pts. 0
B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
r.enecmcin
1.Install Compact Fluorescent Light Bulbs(CFLs)
(6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to •
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
1 1 1
G.Appliances
1.Install Energy Ster'Dihwasher 1 Energy pt y=yes 0
2.Install Washing Mach ne with Water and Energy
Conservation Featu es 1 Energy pt y=yes D
3.lnstall Energy Star Refrigerator 1 Energy pt y=yes 0
4.Install Built-In Recycling Center 3 Resource pt's y--yes 0
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts Y--yes 0
b.Ceilings 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
3.Install Recycled-Content,Fiberglass Insulation with
No Added Formaldehyde 3 IAQ/Health pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts Y_—Yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0
b.Ceilings 4 Resource pts y=yes 0
6.Alternative Insulation Products(Cotton,spray-foam) •
a.Walls 4 Resource pts y=yes 0
o.uenings 4 Resource pts y=yes 0
1 1 1
INPUT Resources Energy AWHealth
in owa
Install Energy-Efficient Windows I
• a.Double-Paned - ( 1 Energy pt y=yes 0 _
�b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.'Low.Conductivity Frames. 2 Energy pts y=yes 0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
FfUse Duct Mastic on All Duct Joints 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts Y--yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
S.Install Sealed Combustion Units
a.Furnaces 31AO/Health pts y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0
7.Install Radiant Barrier 3 Energy pts y=yes 0
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
I 1 1
•
. n oor r ue ry an n a es
1.Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 •
"3.Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
7.Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y=yes 0
8,Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Tim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 31AQ/Health pts y=yes 0
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5,Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
1 1 1
Total Points Available: 1 1401 1301 57
Total Points Project R 10 0 0
G:datalpmgsrgrsenbuildingguldelines/ramodelerstgreenpointsf nal2.12.e4protededads
•
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B. Site 4 9. Install H.E. Irrigation, (details/spec)' L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11.A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 oint
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 40 points
Plan Review Process Work Book Page A2-Revised 3/25/08
• CITY OF CUPERTINO
6 ITEMS OF 6 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec: Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 32658999 . 00
DATE ISSUED. . . . . . . : 04/21%2008
RECEIPT #. . . . . . . . . : BS000004533
REFERENCE ID # . . . : 08040141
SITE ADDRESS . . . . . : 20741 CELESTE CIR
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : NIKKI MUSSO
ADDRESS . . . . . . . . . . : 20741 CELESTE CIR
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : EDWARD A GREGORY
CONTRACTOR . . . . . . . : SMITH, BYRON E LIC # 21144
COMPANY . . . . . . . . . . : A PERFECT CLIMATE
ADDRESS . . . . . . . . . . : 8375 BRENTWOOD BLVD STE B
CITY/STATE/ZIP . . . : BRENTWOOD, CA 94513
TELEPHONE . . . . . . . . : (408) 861 9545
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 6, 934 . 00 0 .70 0. 00 0.70 0. 00
1EPERMITFE FLAT RATE 1. 00 40 .79 0. 00 40.79 0. 00
1MPERMITFE FLAT RATE 1. 00 40 .79 0. 00 40.79 0 . 00
1MRRAA UNITS 1. 00 61 .19 0. 00 61.19 0 . 00
1PPERMITFE FLAT RATE 1. 00 40 .79 0. 00 40.79 0. 00
1TRAVDOC FLAT RATE 1. 00 40 .79 0. 00 40.79 0. 00
---------- ---------- ---------- ----------
TOTAL PERMIT 225 . 05 0 . 00 225 . 05 0. 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
---------------- --------------- ---------
CREDIT CARD 225 . 05 MC
---------------
TOTAL RECEIPT 225 . 05
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------------------- -------- -----------
505 FINAL ELECTRICAL 507 FINAL PLUMBING
508 FINAL MECHANICAL
•
Community Development
10300 Torre Avenue
✓' Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
WUPEkTINO
Building Department
JOB ADDRESS: �n � n�s� ^L`r PERMIT #
OWNER'S NAME: r z U(s so �d PHONE # ;DP :>66- 1.-3 Y
GENERAL CONTRACTOR: AgalCl, %4v-- FAX # , "- ,S,6,- iYVC
I am not using any subcontractors: Y-2%-dam
Signature Date
Please check applicable subcontractors and complete the following information:
60 SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
T'
• ¢�- 2(-O�
Owner/Cortfactor S e Date
e Community Development
10300 Torre Avenue
G £✓` Cupertino CA 95014
.y Telephone(408) 777-3228
CITY OF Fax(408) 777-3333
UPEIJTIN0
Building De artment
JOB ADDRESS: PERMIT #
OWNER'S NAME: r as so PHONE # YUP' 366— 'S3 y
GENERAL CONTRACTOR- e� (� �� FAX # V(G
I am not using any subcontractors: Y_Z -ate
Signature Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum,/ Wood
• Glass / Glazing r
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering %
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
t,
Owner/Con\!Ifactor Sla Date
Green Building Plan Check
Index. of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below 11
4'
B. Site 9. Install H.E. Irrigation, (details/spec)" L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 point
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 40 points
avk
21 ?000
r
mt ICE CO
•
Plan Review Process Work Book Page-12-Revised 3/25/08
�0 7y/(.e�es /e. 6 pis
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project.
rte
1.Recycle Job Site Construction 6 Demolition Waste ~
65%-1 point;75%= 2 points;BO%=4 points up to 4 Resource pts 0
2.Salvage Reusable Building Materials ! 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants 8 Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
8.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9,Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yesi 1 0
1 1 1
B.Foundation
1.Incorporate Recycled Flyashin Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
1 1 1
C.Structural Frame
1.Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
T Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a. Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c. Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications _ 3 Resource pts y=yes 0
12.Use OSB _
a.Subfloors 1 Resource pt y=yes 0
• b.Sheathing 1 Resource pt y=yes 0
1 1 1
114pul Resources Energy A01HDatth
. xter or n s
1.Use Sustainable Decking Materials
a.Recycled content 3 Resource pts y--yes 0 .
b.FSC Certified Wood 3 Resource pts y=yes 0
2.Use Treated Wood That Does Not Contain ChromiumlArsenic 1 IAQ/Health pt y--yes 0
3.Install House Wrap under Siding i IAQ/Health pt y=yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
1 1 1
E.Plumbing
1.Install Water Heater Jacket 1 Energy pt y--yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y--yes 0
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
4.Replace Toilest with Ultra-Low Flush Toilets
(1 point each,up to 3 points) Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0
8.Install On-Demand Hot Water Circulation Pump 4 Resource pts y--yes 0
r.erecaicai
1.Install Compact Fluorescent Light Bulbs(CFLs)
(6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) Up to 4 Energy pts. 0 •
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
1 1 1
G.Appliances
1.Install Energy Star Dishwasher 1 Energy pt y=yes 0
2.Install Washing Machine with Water and Energy
Conservation Features 1 Energy pt y=yes 0
3.Install Energy Star Refrigerator 1 Energy pt y=yes 0
4.Install Built-In Recycling Center 3 Resource pts y--yes 0
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts Y_—Yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
3.Install Recycled-Content,Fiberglass Insulation with
No Added Formaldehyde 3 IAQ/Health pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0
b.Ceilings 4 Resource pts y--yes 0 •
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes 0
o.t:eilings 4 Resource pts y--yes 0
1 1
n ows
ft.Install Energy-Efficient Windows
j
ouble•Paned1 Energy pt y=yesw-Emissivity(Low-E) 2 Energy pts y=yesw.Conductivity Frames 2 Energy pts y=yes 0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Masfic on All Duct Joints _� 2 Energy pts y--yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 7 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts Y--yes 0
B.Install Sealed Combustion Units
a Furnaces 3IAQMealth pts y=yes 3 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes .� 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
71.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stovesnseds 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 41AQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials J 1 Resource pt y=yes 0
7.Install Radiant Barrier 3 Energy pts y=yes 0
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
1 1 1
INPUT Resources Energy AOIlioalro
. n oor r ua lty en n e ea
1.Use Low/No.VOC Paint 1 IAQ/Hsalth pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 •
3.Use LowRJo VOC Adhesives 3 IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AO/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Hsalth pts y--yes 0
7.Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y=yes 0
8.Use FSC Certified Matedals for Interior Finish 4 Resource pts y--yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y--yes D
10.Install Whole House Vacuum System 3 IAQ/Health pts y--yes 0
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0
2.Use Rapidly Renewable Floodng Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yesl 0
1 1 1
Total Points MaMaVel r 1401 130 57
Total Points Project Received: 1 01 to 0 0 •
G:data/progsrgraenbuildingguidelineshem e r enpoln ne12.12. 4pmtected.tls
•