Loading...
19593 (3) POST THIS CARD NEAR FRONT OF BUILDING 19.4F"g" NUN,8ER CITY OF CUPERTINO INSPECTION DIVISION • JOB INSPECTION RECORD PERMIT EXPIRATION JOB ADDRESSa4lt' �(wao UNIT# _LOT# PERMIT EXPIRES IF WORK OWNER CONTRACTOR IS NOT STARTED WITHIN INSPECTION DATE I INSPECTOR INSPECTION RECORD 180 DAYS OF PERMIT ISSU- FOUNDATION ANCE OR 180 DAYS FROM NOTE: LASTCALLED INSPECTION. LIFER ALL GRADING AND DRAINAGE SHALL BE-INSTALLED PREGUNITE TO COMPLY WITH THE APP_ROV D CITY OF PERMIT VALIDATION CUPERTINO STANDARDS. GARAGE SLABS / POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED �vAEAil� L' UNDERGROUND /SLAB PLUMBING ELECTRICAL oy ISSUANCE DATE MECHANICAL ecus ELECT. PLG. nnecR. 1/ ❑ ❑ ❑ DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING PERMIT WOOD FLOOR INFORMATION VALUATION��/I vaaVALUATION SIFT. PLUMBING MECHANICAL PERMIT To ELECTRICAL FRAMING STORIES TYPE CONSTR. INSULATION UCC GROUP RES UNITS PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED ROOF NOTE:NO FI P.SHALL BE MADE BEFORE SO,FT FLOOR AREA TOTAL ACREAGE DIAPHRAGM THE CONSTRUCTION TAX IS PAID BUILDING USE ROOF SHEATHING saes IND cory PB ow.. El 1:1 APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED FINALS DATE INSP. L L L ASSESSORS PARCEL NO. ROUGH SAN.# PLUMBING ELECT.ENERGY TRACT No. PARCEL No TUBS B SHOWER PAN PLUMBING ENERGY MECHANICAL MECH.ENERGY ELECTRICAL BUILDING ENERGY ACC DATE ACC.FILE NO FRAMING ELECT.FINAL TEST zorvwc ENG,SITE No. INSULATION PLUMBING GAS TEST GAS FIRE SPRINK ENERGY T-]G MECHANICAL ?,�cpL YE] NL Y L NL COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING FTOO D zoNE A.Luc. EXTERIOR SHEAR ELECTRICAL RELEASE INTERIOR SHEAR FIRE DEPT. L N� L N❑ SHEETROCK GRADE FEE SUMMARY EXTERIOR LATH BUILDING BUILDING INTERIOR LATH TEMPORARY APPROVALS SCRATCH COAT ELECTRIC PLAN CHECK GAS FEE NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE OCCUPANCY OF BUILDING IS NOT PERMITTED UNTIL BUILDING FINAL ISSIGNED BY BUILDING INSPECTOR. MICROFILM ARRAN E FOR INSPECTION BY PHONING 252-4505, ELECTRIC • o� CIN%WOAKING DAY BEFORE REQUIRED INSPECTION. PLUMBING Z PLEASE GIVE JOB ADDRESS WHEN PHONING. MAY 1 2 19OZ PERMIT FOR EXPIRATION DATE - MECHANICAL CITY Ur CUY.. IMPORTANT! CONST.TAX PLEASE READ REVERSE SIDE BEFORE TOTAL CALLING FOR FINAL INSPECTION. APPLICANTS POSTING COPY IlMCEoao When calling for FINAL INSPECTIONS, the following occurs prior to the release of utilities: • The Building Department coordinates the request for final inspection with the following City departments, as required, to assure that the site/building complies with the requirements of these departments. 1. BUILDING: Complies with all building code requirements. 2. ENGINEERING: a. New driveways, sidewalks, curbs, gutters completed. b. Lot fine grading to drain or bond posted. c. New water system in operation. d. New sewer system in operation (Sanitary District). e. New streets paved, with sewer manhole and valve boxes raised to grade. Sewer cleanout at property line to grade. f. New subdivision lot corners set. 3. FIRE: a. Fire hydrants properly installed and operating. b. Fire sprinkler system properly installed and tested. c. Fire alarm systems completed and tested. d. Fire extinguishers installed, dated and tagged. e. No parking signs in required fire lanes. f. Restaurants, hood fire extinguishing systems operating and tested. • 4. PLANNING a. Required landscaping and irrigation system installed. b. Paved parking, trash enclosures, exterior light fixtures, etc. c. Documents (CC & Rs, easements, etc.) 5. HEALTH All food handling facilities must meet the requirements of the Santa Clara County Health Department. Upon receipt of approvals in the Inspection Division from all the above departments, gas and electric utilities will be released, and you may then occupy your building. If new owners are attempting to occupy the building for the first time and the utility release has been delayed, check with the contractor who is responsible for meeting all the above requirements of the various departments. BUILDING INSPECTION DIVISION CITY OF CUPERTINO