19593 (3) POST THIS CARD NEAR FRONT OF BUILDING 19.4F"g" NUN,8ER
CITY OF CUPERTINO
INSPECTION DIVISION
• JOB INSPECTION RECORD
PERMIT EXPIRATION
JOB ADDRESSa4lt' �(wao UNIT# _LOT#
PERMIT EXPIRES IF WORK
OWNER CONTRACTOR IS NOT STARTED WITHIN
INSPECTION DATE I INSPECTOR INSPECTION RECORD 180 DAYS OF PERMIT ISSU-
FOUNDATION ANCE OR 180 DAYS FROM
NOTE: LASTCALLED INSPECTION.
LIFER ALL GRADING AND DRAINAGE SHALL BE-INSTALLED
PREGUNITE TO COMPLY WITH THE APP_ROV D CITY OF PERMIT VALIDATION
CUPERTINO STANDARDS.
GARAGE SLABS /
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED �vAEAil� L'
UNDERGROUND /SLAB
PLUMBING
ELECTRICAL oy ISSUANCE DATE
MECHANICAL ecus ELECT. PLG. nnecR.
1/ ❑ ❑ ❑
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING PERMIT
WOOD FLOOR INFORMATION
VALUATION��/I vaaVALUATION SIFT.
PLUMBING
MECHANICAL PERMIT To
ELECTRICAL
FRAMING
STORIES TYPE CONSTR.
INSULATION
UCC GROUP RES UNITS
PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED
ROOF NOTE:NO FI P.SHALL BE MADE BEFORE SO,FT FLOOR AREA TOTAL ACREAGE
DIAPHRAGM THE CONSTRUCTION TAX IS PAID
BUILDING USE
ROOF SHEATHING saes IND cory PB ow..
El 1:1
APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED FINALS DATE INSP. L L L
ASSESSORS PARCEL NO.
ROUGH SAN.#
PLUMBING ELECT.ENERGY
TRACT No. PARCEL No
TUBS B SHOWER PAN PLUMBING ENERGY
MECHANICAL MECH.ENERGY
ELECTRICAL BUILDING ENERGY ACC DATE ACC.FILE NO
FRAMING ELECT.FINAL TEST zorvwc ENG,SITE No.
INSULATION PLUMBING
GAS TEST GAS
FIRE SPRINK ENERGY T-]G
MECHANICAL ?,�cpL YE] NL Y L NL
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING
FTOO D zoNE A.Luc.
EXTERIOR SHEAR ELECTRICAL RELEASE
INTERIOR SHEAR FIRE DEPT.
L N� L N❑
SHEETROCK GRADE FEE SUMMARY
EXTERIOR LATH BUILDING BUILDING
INTERIOR LATH TEMPORARY APPROVALS
SCRATCH COAT ELECTRIC PLAN CHECK
GAS FEE
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE
OCCUPANCY OF BUILDING IS NOT PERMITTED UNTIL BUILDING FINAL ISSIGNED BY BUILDING INSPECTOR. MICROFILM
ARRAN E FOR INSPECTION BY PHONING 252-4505, ELECTRIC
• o� CIN%WOAKING DAY BEFORE REQUIRED INSPECTION. PLUMBING
Z PLEASE GIVE JOB ADDRESS WHEN PHONING.
MAY 1 2 19OZ PERMIT FOR EXPIRATION DATE - MECHANICAL
CITY Ur CUY..
IMPORTANT! CONST.TAX
PLEASE READ REVERSE SIDE BEFORE TOTAL
CALLING FOR FINAL INSPECTION.
APPLICANTS POSTING COPY
IlMCEoao
When calling for FINAL INSPECTIONS, the following occurs prior to the release of utilities: •
The Building Department coordinates the request for final inspection with the following City
departments, as required, to assure that the site/building complies with the requirements of
these departments.
1. BUILDING: Complies with all building code requirements.
2. ENGINEERING: a. New driveways, sidewalks, curbs, gutters completed.
b. Lot fine grading to drain or bond posted.
c. New water system in operation.
d. New sewer system in operation (Sanitary District).
e. New streets paved, with sewer manhole and valve boxes raised to
grade. Sewer cleanout at property line to grade.
f. New subdivision lot corners set.
3. FIRE: a. Fire hydrants properly installed and operating.
b. Fire sprinkler system properly installed and tested.
c. Fire alarm systems completed and tested.
d. Fire extinguishers installed, dated and tagged.
e. No parking signs in required fire lanes.
f. Restaurants, hood fire extinguishing systems operating and tested. •
4. PLANNING a. Required landscaping and irrigation system installed.
b. Paved parking, trash enclosures, exterior light fixtures, etc.
c. Documents (CC & Rs, easements, etc.)
5. HEALTH All food handling facilities must meet the requirements of the Santa Clara
County Health Department.
Upon receipt of approvals in the Inspection Division from all the above departments, gas and electric
utilities will be released, and you may then occupy your building.
If new owners are attempting to occupy the building for the first time and the utility release has been
delayed, check with the contractor who is responsible for meeting all the above requirements of the
various departments.
BUILDING INSPECTION DIVISION
CITY OF CUPERTINO