08. 08-09 Work ProgramOFFICE OF THE CITY MANAGER
CUPERTINO
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
TELEPHONE: (408} 777-3212 • FAX: (408) 777-3366
davek~cupertina.org
STAFF REPORT
Agenda Item Number d
SUBJECT AND ISSUE
Approve the 2008-2009 Work Program.
BACKGROUND
Agenda Date: February 19, 2008
Council met on February 4, 2008 to review the status of the 2007-2008 Work Program and
identify items to be included in the 200$-2009 Work Program.
Council comments have been included in the attached, proposed 2008-2009 Work Program.
Respectfully submitted:
A,~
David W. Knapp, City Manager
8-1
2008 - 2009 Work Program
Project Status Comments
1,-Major Developments'(for a full list of developrnenf activity go.to www.cupertino:or developznentactivity)
A. Cupertino Square (formerly Vallca Fashion Owners of Cupertino Square are Use permit and site and architectural approval
Park) pursuing the private revitalization of for the Wolfe Road and Vallco Parkway
1. Periodic updates to City Council from the center as follows: frontages and the Rose Bowl mixed-use building
Approved but construction hasn't was granted in the Spring of 2005 and the
property owners.
started ownership expected to be under construction in
2. Periodic reports regarding development 1. Retail adjacent to Penney's 2007. The Evershine Group acquired the Rose
approvals. 2. Rose Bowl 140,000 square Bowl and two other "out-pazcels" and Orbit
3. Adherence, if passible, to artist foot commercial and 204 acquired the mall portion of Cupertino Square
renderings presented to Council. residential condominiums resulting in a delay of the planned construction.
3. CPK restaurant in the Sears
4. Analyze the impacts of the parking lot Evershine has met with staff regarding changes
development agreement's expiration. Future Development to the plans while maintaining consistency with
4. Hotel pursuant to the the Council approval. Staff is reviewing the
development agreement changes and expects to bring the amended plans
5. Development on the parcel back to City Council as an information item in
north of Macy's the first quarter of 2008.
Cupertino Square General Manager Orbit is preparing refined elevations of the Wolfe
Mike Rohde has provided periodic Road and Vallco Parkway retail which will be
updates to the City Council. brought to the Council as an informational item
to ensure your agreement that they conform to
the approvals.
Awaiting hotel application from the Evershine
Group and eventual development of plans for the
pazcel north of Macy's.
N
2008/2009 ~;pork Progam (February 7, 2008) ~ Page 1 of 20
2008 - ZU09 tivork Program
Project Status Comments
B. HP Property
G The Oaks
D. Rose Bowl
E. North Vallco Parkway Retail
w
Use Permit application filed for a
121-room hotel and 47,000 square
foot retail/conference center.
Projected public hearings before the
Planning Commission and City
Council in Spring 2008.
Evershine, new owners of the
Rosebowl parcel, aze developing
slightly modified plans with 204
residential units and 100,000 square
feet of retail.
Plans are being developed for
31,400 squaze feet of multiple-tenant
retail space facing Wolfe Road and
Vallco Pazkway, adjacent to the new
garage in front of Penney's.
Developer is requixed to fund and implement a
South Vallco Plan on a parallel track.
2008/2009 Work Program (February 7, 2008) ~ Page 2 of 20
2008 - 2009 Work Program
Project Status Comments
F. California Pizza Kitchen This 6,000 square foot restaurant Islands restaurant, approved at the same time,
was approved in 2006 and building will not be moving forward. The property owner
permits were issued. The time limit is seeking another restaurant in its place.
on the implementing the permit was
extended, but the extension has
expired. New building fees, and
possibly an amended building plan
to conform to the new building code,
will have to be submitted to reinstate
the building permit.
2 ' Caprtal.ImproveEnents and-Plans ~<~
A. Bridge
Mary Avenue Pedestrian Footbridge Phase I completed (grading, fencing
and utility relocation)
Construction contract awarded Nov.
2007. Contractor is underway and
will begin actual construction Feb.
2008.
Bridge completion date is Dec. 2008 Groundbreaking was Jan. 24, 2008.
Final completion Mar. 2009
B. Parks
1. Stevens Creek Comdor Park (Phase 1- Project assigned to Public Works for PS&E at 80% and project transferred from Parks
McClellan Road to BBF Golf Course constzuction. & Recreation to Public Works for construction.
maintenance building) Public outreach regazding environmental
A
im rovements was successfiil.
2008/2009 work Program (February 7, 2008) Page 3 of 20
2008 - 2009 vv ork Program
Project Status Comments
a. This project includes park and trail
improvements.
b. City will enhance outreach efforts in
regards to environmental improvements
and tree replacement.
2. Stevens Creek Corridor Park (Phase 2 -
Go1fCourse maintenance building to
Stevens Creek Blvd.)
Develop Conceptual Plan
Tentative Schedule:
Status, scope and budget report to
Council March 2008.
Completion of final PS&E -- March
2008
Final reviews /permits -Mar. 2008
Advertise for bids -Mar. 2008
Award Contract -May 2008
Construction Complete - Apri12009
Park and Trail Open -May 2009
Following the Award and Start of construction of
the Phase 1-A (Creek restoration) and 1-B
Blackberry Facilities Projects, staff will begin to
devlop the scope and budget for the Phase 2
Project. This generally consists of extending the
trail from the existing golf maintenance Building
(to be demolished in Phase 1-B) across a new
bridge to the west side of Stevens Creek through
the Stockelmeir Orchard, past the Stockelmeir
house and ending at Stevens Creek Boulevazd.
Staff will provide a pzeliminary scope and
projected budget expected for design and
construction in the 2009-2010 CIP.
3. Rancho Rinconada Park
a. Work with County to come up with a Santa Claza CounTy owns a pazcel Staff has approached the Real Estate Manager
plan to move the County Roads and next to Lawrence Expressway for the San Jose Water Company to inquire about
Airports activity off the site and currently used by the Department of the potential. for acquiring land immediately
develop a park. Roads and Airports as a materials adjacent to the Roads & Airports corporation
2008/2009 Work Program (February 7, 2008) Page 4 of 20
2008 - 2009 Work Program
Project Status Comments
storage site. County Roads &
Airports staff have maintained that
this site is critical to their operation.
County Parks has received Board of
Supervisors approval for the San
Tomas Aquino trail master plan,
which identifies this site as
greenbelt.
At this point the timing is uncertain
for acquisition and funding most
likely to be carried over to 2009.
b. Pursue Grants
c. Sterling Barnhart parcels
Acquisition of two parcels at
Sterling and Barnhart is underway
The improvements have been
included in the C1P.
4. Neighborhood Park in the Homestead azea This azea was identified during the
General Plan process as an area
deficient in neighborhood parks.
yard at Doyle and Lawrence Expressway. The
1+-acre San Jose Water Company parcel if
available, could be purchased for a Roads &
Airport yazd expansion, freeing up the creekside
parcel for park development and the extension of
the San Tomas Aquino trail. County pazk
acquisition funds may support this effort.
Staff will endeavor during the 2008-2009 Fiscal
Year to seek grant funding for acquisition and
design and construction as maybe available.
Agreement reached with San Jose Water Co.
Purchase approval to Council Feb. 2008
Planning staff worked with developers of the
Villa Serra project to require a small
neighborhood park approved in conjunction with
the planned expansion of the development. A
preliminary park concept has been developed
and will be presented to the Pazks and Recreation
Commission on February 7, 2008.
2008/2004 ~a'~rk Program (February 7, 2008) Paae 5 of 20
2008 - 2009 W ork Program
( Project ( Status ( Comments (
C. Sports Center Upgrade
Develop a strategy for upgrading the Sports It has been determined that the cost
Center pool and bath house. to bring the pool up to code exceeds
its value to the community.
The pool replacement project was
funded in the 2007/2008 CIP.
D. Quinlan Fountain
Propose project to replace the fountain. A plan to replace the fountain with This project was added to the CIP in May 2007 -
plaza/event space was presented to in the 2007/2008 CIP, though the Council has
the City Council in May 2007. not yet determined the final use of the space.
($250,000).
E. Civic Center Fountain
Investigate Cryptosporidiurn protection Staff, as directed by Council will seek
alternatives to the reconstruction retrofit of the
Fountain and report back to Council during the
Budget discussions for FY 2008-2009
2008/2009 Work Program (February 7, 2008) Page 6 of 20
2008 - 2009 Work Program
Project ~ ~ Status ' Comments
3:.. OrganizattonaI YmgTOVements~
A. E-Services
Bring City Hall to the customer and improve Applications in process: Applications completed:
efficiency of service delivery. On-line permits -May, 2008 E-mail notification of services
1. E-Services Sports Center tennis court/Golf • City Mapguide
Course tee-times -June, 2008 - . Mapguide Inquirer
deemed undesirable per golf
City public records -Aug., 2006
survey & will not be pursued.
• Staff continues to work with ' Webcasting -Sept., 2006
Pentamation to fully implement • On-line Elections page -Oct., 2006
online permitting. Pentamation is . Economic Development -Dec, 2006
developing applications to better • Access Cupertino -May, 2006
coordinate financial and building
permit data. This is the current ' On-line job application -July, 2006
critical path project for the • City projects, bids & RFP's -May, 2007
continued expansion of online • Street sweeping notification -May, 2007
building permitting and • p~~g Citation Inquiries
inspection scheduling.
• Parks & Rec on-line registration -Feb, 2007
• Community Outreach Program -Feb., 2007
• Neighborhood Watch eCap -Mar., 2007
• On-line business licenses -April, 2007
~• On-line Muni Code -June, 2007
• Digital signage -June, 2007
• 3N -Enables City to communicate with tens
or tens of thousands of people, anywhere,
anytime and on any device.
2008/2009 "pork Program (February 7, 2008) P~~e 7 of 20
2008 - 2009 work Program
~ Project ~ Status ~ Comments ~
Tlie City of Cupertino provides abundant public
access to many meetings and city records using
state-of--the-art software programs available
through the City's website.
Through a digital records management program
and an integrated document and video-streaming
program, all users have access to all public
document and video records.
2. Redesign the website Completion scheduled for Dec. 2008 Will include but not limited to:
• Attractive design
• Intuitive navigation
• Content management solution
• Integrated interactive components
• Integration of third-party tools and
databases
2008/2009 Work Program (February 7, 2008) Page 8 of 20
2008 - 2009 Work Program
Project ~ - Status Comments
B. Provide Support for City Attorney Transition Letter of Engagement signed with
Public Management Advisors LLC .
to review and analyze the operations
of the City Attorney's office. Firm
will provide recommendations to
Council in recruiting and filling the
position and other options for
providing legal services. Initial recommendations scheduled to be
available for the proposed FY 2008/2009 budget
deliberations.
C. Fiscal Strategic Plan
Develop along-term solution to reposition the City Reviewed May 2006 and adopted in Substantial progress has been made in the area
to ensure services can be fully supported by conjunction with the 2006/07 of:
revenues collected. budget. • Passage of AB 117 resulted in additional
3. Pursue correction of ERAF percent for TEA The Plan: TEA property tax of $1.35 M/yeaz. Second
funding by Dec., 2007 • defines the financial problem phase of State legislation in process.
• analyzes the structure of the • Council elected not to pursue November
4. Schedule a public hearing to adopt safes as a organization ballot measures for business license Quarry
standard condition on residential development. • identifies opportunities for category; U[JT Ordinance changes &
5. Prepare ballot issues for business license decreasing expenses and azeas of Entertainment tax in July, 2007.
u and utili tax ordinance chan es for
(Q ~) ~ g risk exposure
' New Reserve Policy adopted in October,
November, 2007 election for Aug., 2007 ballot • identifies o ortunities for
Pp 2007.
submission. stabilizing our revenue
6. Perform analysis on entertainment tax and resources.
bring back to Council June, 2007.
2008/2009 Work Program (February 7, zoo8) Page 9 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
.. -; ,
` '.4. PubLc Safety
-~
A.. La~cv Enforcement .
Continue emphasis on Neighborhood. Currently have 183 active Presented introductory Neighborhood Watch
Watch Neighborhood Watch Leaders information to 16 Neighborhood Watch groups
Provide quarterly Neighborhood Watch maps supporting 138 groups. that included 7 new groups and 9 inactive
starting March, 2007. groups. All other groups remain active by
participating in city sponsored Biock Parties,
Emergency drills, and other activities that
promote a spirit of community in a neighborhood
twice a year.
B. Emergency Preparedness
Continue emphasis on Emergency
Response (ER) and Prepazedness
1. Continue expanding of the outreach • Increased from four to five 750 residents trained in CERT.
programs CERT classes/yr.
• Conducted six first aid and 726 residents trained in First Aid and 799 trained
seven CPR classes in CPR.
• Implemented a Disaster Enables community members to participate in
CounciUCitizen Corps Council emergency planning.
• Organized two new Total of 12 neighborhoods trained.
. neighborhood CERT teams.
• Established Medical Reserve Completed
Corp through Federal grant. '
• Conducts on-going EOC drills Provide communication services at community
with Amateur Radio events and established county-wide mutual aid
plan for amateur radio.
2008/2009 Work Program (February 7, 2008) Page 10 of 20
2008 - 2009 Work Program
Project Status ~ Comments
• Offer Kaleidoscope Program 3 Total of 367 students trained to date.
times/year
2. Ensure ER Training for City staff • Providing mandated
SEMS/NIMS/ICS training;
First Aid and CPR to staff.
3. Master database update/custom program . One database for Eliminates redundancy far outreach efforts to be
Neighborhood Watch, Block completed Jan., 2007.
Leaders and Sheriff
4. Pandemic Flu • Provided education to the
public to prepare citizens for
disaster response.
5. Mass Immunizations • Marsha chairing County
committee to work on plan via
committee process only
6. Managing spontaneous volunteers Revise standard forms for city-
. wide use June, 2008
C. Traffic Safety
1. Walkability
Implement "walkable city" concept. Ensure that the concept is present in Examples of recently approved walkable
all City development/redevelopment developments include:
projects. • Oak Park (North De Anna Blvd.)
• Tantau office building
• Whole Foods
°° • Las Pahnas (Stelling Road)
^' • Rockwell Homes Stevens Canyon Road
2008/2009 Work Program (February 7, 2008) Page 11 of 20
2008 - 2OO91~Vork Program
Project Status Comments
• Mary Avenue Bicycle Pedestrian
Footbridge
• Stevens Creek Corridor
$250,000 added for sidewalk improvements.
2. Review traffic safety issues
a. Safe routes to school program Garden Gate safe routes grant funding approved
for $393,000. Design and CEQA underway.
Construction expected Summer 2009.
b. Tri-schooURegnart Traffic The Sheriff s Office, the City, the
Improvements School District, and the residents
continue to work together to
improve the safety of vehicle,
pedestrian, students and reduced
traffic congestion on the primary
roadways around the school.
c. Bring proposal to Council on best use Staff will consider and recommend proposals for
for $300,000 earmarked for traffic traffic safety around schools and present a report
safety around schools (e.g. red light to Council during budget discussions for the FY
running ,lighted crosswalks, flashing 2008-2009 CIP.
speed limit signs, public education,
etc.)
3. Provide pedestrian ramps at required There are two locations that will require
intersections pedestrian ramps and the work will proceed
under the City's current curb and gutter contract
once the sites have been reviewed by the City's
contract attorney for compliance. Estimated
W ~ Completion by June 2008.
2008/2009 Work Program (February 7, 2008) Page 12 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
5: Iiousip g
A. Provide housing opportunities for Cupertino The 2005 GP update and Housing The Santa Clara County Housing Trust Home
workers Element identified sites for Ownership Assistance Program is applicable to
additional housing units. Cupertino teachers and other public service
employees.
The Cupertino Below Market Rate (BMR)
program also gives priority to Cupertino
teachers, public service employees and
Cupertino workers.
B. Teacher housing assistance program
BMR eligibility requirements for Cupertino In May 2006, the Council amended The Commission found the existing fee is
Union School District (CUSD) teachers. the BMR program to give teachers insufficient to offset the impacts of development
in CUSD 2 points credit regardless and recommended increasing housing fees for
of whether they currently work non-residential developments, including
within the Cupertino city limits. commercial development and residential
developments that are too small (6 or fewer
units) to require a BMR unit.
C. Cleo Avenue Affordable Housing In Feb. 2005, the City Council The site can accommodate up to 4 units.
authorized staff to purchase a'/4 acre Preliminary design developed in Spring, 2007.
site on Cleo Avenue from Cal Trans. RFP issued in October 2007. Rezoning of
Staff completed negotiations and the property initiated in January 2008. Use permit
site has been purchased. expected in March 2008. Construction to begin
in late 2008.
°° In October 2007, staff issued a
A Re uest for Pro osals and received
2008/2009 work Progam (February 7, 2008) Page 13 of 20
2008 - 2009 work Program
~ Project ~ ~ Status ~ Comments ~
. BMR Manual Update one proposal from Habitat for
Humanity. The City Council
reviewed and accepted the proposal
at its December 18, 2007 meeting .
Review and update is scheduled for
Spring 2008. ,
taff is in discussion with a consultant to begin
work on the updates.
6. ;Economic Development/Redevelopment
A. Encourage, retain and support healthy Fourteen retail openings including • Recognizing new businesses in new
environment for retail growth Whole Foods, Strike, Cupertino Quarterly electronic newsletter. Summer and
Bakery, Arya, Zales, Harvest, and Fall issues distributed to list of over 200 real
Visique. On track for over 20 estate professionals and community
openings by fiscal year end. stakeholders.
• Sending "Flew Business Welcome Package"
in partnership with the Chamber of
Commerce. 130 packages mailed for 2007.
• Assisting new businesses with
planning/building facilitation - signage, etc.
• Introducing new restaurants to city
employees
E.D. Committee is meeting regularly 10 key initiatives identified with corresponding
and providing input on E.D. work action plan.
plan.
Active outreach to Landlords and • Re-tenanting successes include: Harvest,
brokers to. facilitate re-tenanting, and Great Buffet, Pizza My Heart,
`~ the leasin of new mixed uses ace. Marukai/Daiso, and T.S. Stew House.
2008/2009 Work Program (February 7, 2008) Page 14 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
New leases for Civic Park, Metropolitan, and
Adobe Terrace projects, and lease
negotiations at Montebello.
B. Consider retail in reviewing new development.
Retention efforts include active Initiated Cupertino Restaurant Association
outreach to business owners through beginning with Flint Center mazketing
direct meetings, and Chamber collaboration. First meeting on 1/15/08.
participation.
Beginning preliminary work on .Reviewing plan for conformity with Heart of
Crossroads Streetscape Plan. the City.
. • Bringing planning consultant onboard.
• Conducting preliminary outreach and
developing plan for stakeholder input.
Advise on/facilitate new Worked with over 30 development firms
development projects. expressing interest in the 17-acre HP site.
• Provided input into planning process for
Cupertino Village and Oaks expansion
projects, and Marketplace re-tenanting.
• Advised on Furniture 2000 project.
2008/2009 ~xrork Program (February 7, 2008) Page 15 of 20
2008 - 2009 W ork Program
Project Status Comments
" _7. Planning ; _ -
A. Review the Heart of the City In fall of 2007, staff prepared update Revisions to the Heart of the City plan are being
report to City Council in December prepazed for Planning Commission review in
2007. Spring 2008.
B. Develop Green Building Standards First phase (audit) to be finished Walker Wells worked with Global Green to
Sept, 2007. Estimate completion complete the audit. First phase completed. City
June, 2008 Council adopted a voluntary Green Building
program and will consider mandatory program in
- May 2008. New developed has been encouraged
to "go-green" including Tantau office building
and Cleo Drive Habitat for Humanity project.
C. Prepare a historic preservafion policy In fall of 2007, staff began Staff has met with Helene Davis of the Cupertino
preliminary review and scheduled Historical Society and met with the Board in
meetings with the Cupertino January 2008.
Historical Society.
D. Propose policy for tree topping under property Begin discussion Sept., 2007 and The ordinance amendment is expected to be
maintenance standards ordinance wording is in preparation. heard by the City Council in spring 2008.
E. Put sign code review (to look at being mare
business friendly) on the Planning Commission
work program
2008/2009 Work Program (February 7, 2008) Page 16 of 20
2008 - 2009 Work Program
~ Project ~ Status ~ Comments ~
F. Update the General Plan Housing Element RFP's will be sent to consultants in
February 2008 to prepare the
Housing Element. Community
outreach, preparation of the draft
Housing Element and the beginning
of public hearings will occur
throughout 2008. State law requires that the new Housing Element
be adopted by June 2009.
8 Building Community
A. Continue to offer opportunities and Neighborhood block leader program Disaster reporting, search & rescue, and
programs to promote cultural supports 240 leaders. communication training were among those
understanding and address the needs of our offered to Block Leaders this year.
diverse community The block leaders annual gathering
and recognition is planned for Jan.
- 24, 2008.
Database to streamline community
outreach program participants
(Block Leaders, Neighborhood
Watch Leaders., CERT grads, etc.) is .
completed.
A new project to survey neighbors Block Leaders coordinated supplies checks
basic emergency supplies was during neighborhood block parties and meetings.
administered by the 4ES with About 10 neighborhoods participated.
assistance from a high school
service club.
A new city-sponsored Community Three grants were awarded in 2007.
~ Improvement Grants program
~, awards neighborhoods up to $300
2008/2009 Work Program (February 7, 2008} Page 17 of 20
2008 - 2009 work Program
~ Project ~ Status ~ Comments ~
for new beautification projects,
neighborhood participation
activities, and other projects that
build community and bring .
neighbors together. Grants are given
to neighborhoods represented in the
Block Leader program.
B. Beautification Program Council authorized a Community
Service Day on May 17~'. Don Allen
and Barbara Nunes are directing the
effort.
C. Leadership Cupertino
Bring proposals for restarting program to Compare Leadership Cupertino with other local
Council as part of 2008/2009 budget. leadership programs.
9. Community Organizations
A. Support the Cupertino Historical Society in Staff and the Pazks and Recreation The City re-roofed the Stocklmeir house. The
its effort to create a Center for Living Commission met with the Historical Historical Society has sent a letter to the City
History Society to define a project a majority Manager expressing support for the trail
of the Cupertino Historical Society connecting to Stevens Creek Bivd. so long as the
Boazd will endorse. multi use trail is kept close to the creek with a
footpath through the orchard.
Cupertino Historical Society is no longer
pursuing the Center for Living History.
2008/2009 Work Program (February 7, 2008) Pa a 18 of 20
g
2008 - 2009 Work Program
Project Status Comments
B. Pursue partnership opportunities with the The Safe Routes to Schools projects
three school districts: have proceeded with excellent
1. Traffic and parking cooperation between the City and
2. Teacher housing Monta Vista, Cupertino and Garden
Gate.
We use the new Cupertino field
house as available.
3. School Resource Officers
4. Juvenile Prevention Program
C. Cupertino Day
N
O
Added two crossing guards.
De Anza/City recycling program -
the City gives De Anza used
computers and De Anna refurbishes
them.
City is sponsoring pilot project television
coverage of sports at Cupertino high schools on
public access.
Added second SRO in FY 2004/05 CUSD & FUHSD naw contributes $10,000 each
to this program. Tn addition to School Resource
Officer, Sheriff's Office has added a School
Enforcement Officer.
Contracted with Linda Rios for
Outreach Services
CUSD contributes 50% of the cost of this
program.
Proposal presented to Council as
part of the 2007/08 budget.
Cupertino Day is scheduled for Sunday, May 4~'
and will include open houses at several Parks
and Recreation facilities and the golf course.
2008/2009 work Program (February 7, 2008) Page 19 of 20
Zoos - 2009 tivork Program
Project Status Comments
D. Tank House Renovations began in Summer, Phase One in process to weatherproof structure.
2007. Numerous volunteers have Includes new roof and siding
come forward to participate
including Rotary, Terry Brown, Los
Gatos Roofing, San Jose Water
Company, & Los Altos Garbage
Company.
-10. Go'Green
Develop list of possible projects The voluntary Green Building
program is underway, whereby
anyone getting a building permit has
the opportunity to voluntarily
implement green building practices.
The City Council will evaluate the
voluntary program in May 2008, and
can consider a mandatory program
at that time. Other green programs
identified in the General Plan, or
from other sources, can also be
considered.
2008/2009 Work Progam (February 7, 2008) Page 20 of 20
KIBITs
F~X
BEG
2008 - 2009 Work Program
Project Status Comments
1. 1~Tajor Developments (for a full list of development activity go to }y«~~~~.c~crtino.~r~!dc;~ ~~nlent~ictivity)
A. Cupertino Square (formerly Vallco Fashion
Park)
Periodic updates to City Council from
property owners.
2. Periodic reports regarding development
approvals.
3. Adherence, if possible, to artist
renderings presented to Council.
4. Analyze the impacts of the
development agreement's expiration
Owners of Cupertino Square are
pursuing the private revitalization of
the center as follows:
Approved but construction hasn't
started
1. Retail adjacent to Penney's
2. Rose Bowl 140,000 square
foot commercial and 204
residential condominiums
3. CPK restaurant in the Sears
parking lot
Future Development
4. Hotel pursuant to the
development agreement
5. Development on the parcel
north of Macy's
Cupertino Square General Manager
Mike Rohde has provided periodic
updates to the City Council.
Use permit and site and architectural approval
for the Wolfe Road and Vallco Parkway
frontages and the Rose Bowl mixed-use building
was granted in the Spring of 2005 and the
ownership expected to be under construction in
2007. The Evershine Group acquired the Rose
Bowl and two other "out-parcels" and Orbit
acquired the mall portion of Cupertino Square
resulting in a delay of the planned construction.
Evershine has met with staff regarding changes
to the plans while maintaining consistency with
the Council approval. Staff is reviewing the
changes and expects to bring the amended plans
back to City Council as an information item in
the first quarter of 2008.
Orbit is preparing refined elevations of the Wolfe
Road and Vallco Parkway retail which will be
brought to the Council as an informational item
to ensure your agreement that they conform to
the approvals.
Awaiting hotel application from the Evershine
Group and eventual development of plans for the
parcel north of Macy's.
2008/2009 Work Program (Approved February 19, 2008) Page 1 of 20
2008 - 2009 Work Program
Project Status Comments
B. HP Property
C. The Oaks
D. Rose Bowl
E. North Vallco Parkway Retail
Use Permit application filed for a
121-room hotel and 47,000 square
foot retail/conference center.
Projected public hearings before the
Planning Commission and City
Council in Spring 2008.
Evershine, new owners of the
Rosebowl parcel, are developing
slightly modified plans with 204
residential units and 100,000 square
feet of retail.
Plans are being developed for
31,400 square feet ofmultiple-tenant
retail space facing Wolfe Road and
Vallco Parkway, adjacent to the new
garage in front of Penney's.
Developer is required to fund and implement a
South Vallco Plan on a parallel track.
2008/2009 Work Program (Approved February 19, 2008) Page 2 of ZO
2008 - 2009 Work Program
Project Status Comments
F. California Pizza Kitchen This 6,000 square foot restaurant Islands restaurant, approved at the same time,
was approved in 2006 and building will not be moving forward. The property owner
permits were issued. The time limit is seeking another restaurant in its place.
on the implementing the permit was
extended, but the extension has
expired. New building fees, and
possibly an amended building plan
to conform to the new building code,
will have to be submitted to reinstate
the building permit.
__ __-
T __ -
1. Capital Improvements and Plans _
~-- .~ ~
A. Bridge
Mary Avenue Pedestrian Footbridge Phase I completed (grading, fencing
and utility relocation)
Construction contract awarded Nov.
2007. Contractor is underway and
will begin actual construction Feb.
2008.
Bridge completion date is Dec. 2008 Groundbreaking was Jan. 24, 2008.
Final completion Mar. 2009
B. Parks
1. Stevens Creek Corridor Park (Phase 1 - Project assigned to Public Works for PS&E at 80% and project transferred from Parks
McClellan Road to BBF Golf Course construction. & Recreation to Public Works for construction.
maintenance building) Public outreach regarding environmental
improvements was successful.
2008/2009 Work Program (Approved February 19, 2008) Page 3 of 20
2008 - 2009 Work Program
Project Status Comments
a. This project includes park and trail ~ Tentative Schedule:
improvements. Status, scope and budget report to
b. City will enhance outreach efforts in Council March 2008.
regards to environmental improvements Completion of final PS&E -- March
and tree replacement. 2008
Final reviews /permits -Mar. 2008
Advertise for bids -Mar. 2008
Award Contract -May 2008
Construction Complete - Apri12009
Park and Trail Open -May 2009
2. Stevens Creek Corridor Park (Phase 2 -
Go1fCourse maintenance building to
Stevens Creek Blvd.)
Develop Conceptual Plan
Following the Award and Start of construction of
the Phase 1-A (Creek restoration) and 1-B
Blackberry Facilities Projects, staff will begin to
devlop the scope and budget for the Phase 2
Project. This generally consists of extending the
trail from the existing golf maintenance Building
(to be demolished in Phase 1-B) across a new
bridge to the west side of Stevens Creek through
the Stockelmeir Orchard, past the Stockelmeir
house and ending at Stevens Creek Boulevard.
Staff will provide a preliminary scope and
projected budget expected for design and
construction in the 2009-2010 CIP.
3. Rancho Rinconada Park
a. Work with County to come up with a Santa Clara County owns a parcel Staff has approached the Real Estate Manager
plan to move the County Roads and next to Lawrence Expressway for the San Jose Water Company to inquire about
Airports activity off the site and currently used by the Department of the potential for acquiring land immediately
develop a park. Roads and Airports as a materials adjacent to the Roads & Airports corporation
2008/2009 Work Program (Approved February 19, 2008) Page 4 of 20
2008 - 2009 Work Program
Project Status Comments
storage site. County Roads &
Airports staff have maintained that
this site is critical to their operation.
County Parks has received Board of
Supervisors approval for the San
Tomas Aquino trail master plan,
which identifies this site as
greenbelt.
b. Pursue Grants
c. Sterling Barnhart parcels
At this point the timing is uncertain
for acquisition and funding most
likely to be carried over to 2009.
yard at Doyle and Lawrence Expressway. The
1+-acre San Jose Water Company parcel if
available, could be purchased for a Roads &
Airport yard expansion, freeing up the creekside
parcel for park development and the extension of
the San Tomas Aquino trail. County park
acquisition funds may support this effort.
Staff will endeavor during the 2008-2009 Fiscal
Year to seek grant funding for acquisition and
design and construction as maybe available.
Acquisition of two parcels at Agreement reached with San Jose Water Co.
Sterling and Barnhart is underway. Purchase approval to Council Feb. 2008
The improvements have been
included in the CIP.
4. Neighborhood Park in the Homestead area This area was identified during the Planning staff worked with developers of the
General Plan process as an area Villa Serra project to require a small
deficient in neighborhood parks. neighborhood park approved in conjunction with
the planned expansion of the development. A
preliminary park concept has been developed
and will be presented to the Parks and Recreation
Commission on February 7, 2008.
2008/2009 Work Program (Approved February 19, 2008) Page 5 of 20
2008 - 2009 Work Program
Project Status Comments
C. Sports Center Upgrade
Develop a strategy for upgrading the Sports It has been determined that the cost The multipurpose court (for basketball,
Center pool and bath house. to bring the pool up to code exceeds badminton, etc.) project was funded in the
its value to the community. 2007/2008 CIP.
D. Quinlan Fountain
Propose project to replace the fountain. A plan to replace the fountain with This project was added to the CIP in May 2007 -
plaza/event space was presented to in the 2007/2008 CIP, though the Council has
the City Council in May 2007. not yet determined the final use of the space.
($250,000).
E. Civic Center Fountain
Investigate Cryptosporidium protection Staff, as directed by Council will seek
alternatives to the reconstruction retrofit of the
Fountain and report back to Council during the
Budget discussions for FY 2008-2009
2008/2009 Work Program (Approved February 19, 2008) Page 6 of 20
2008 - 2009 Work Program
Project Status Comments
3. Organisational [mprovements
A. E-Services
Bring City Hall to the customer and improve
efficiency of service delivery.
1. E-Services
Applications in process:
• On-line permits -May, 2008
• Sports Center tennis court/Golf
Course tee-times -June, 2008 -
deemed undesirable per golf
survey & will not be pursued.
• Staff continues to work with
Pentamation to fully implement
online permitting. Pentamation is
developing applications to better
coordinate financial and building
permit data. This is the current
critical path project for the
continued expansion of online
building permitting and
inspection scheduling.
2008/2009 Work Program (Approved February 19, 2008)
Applications completed:
• E-mail notification of services
• City Mapguide
• Mapguide Inquirer
• City public records -Aug., 2006
• Webcasting -Sept., 2006
• On-line Elections page -Oct., 2006
• Economic Development -Dec, 2006
• Access Cupertino -May, 2006
• On-line job application -July, 2006
• City projects, bids & RFP's -May, 2007
• Street sweeping notification -May, 2007
• Parking Citation Inquiries
• Parks & Rec on-line registration -Feb, 2007
• Community Outreach Program -Feb., 2007
• Neighborhood Watch eCap -Mar., 2007
• On-line business licenses -April, 2007
• On-line Muni Code -June, 2007
• Digital signage -June, 2007
• 3N -Enables City to communicate with tens
or tens of thousands of people, anywhere,
anytime and on any device.
Page 7 of 20
2008 - 2009 Work Program
Project ~ Status Comments
The City of Cupertino provides abundant public
access to many meetings and city records using
state-of--the-art software programs available
through the City's website.
Through a digital records management program
and an integrated document and video-streaming
program, all users have access to all public
document and video records.
2. Redesign the website
Completion scheduled for Dec. 2008 Will include but not limited to:
• Attractive design
• Intuitive navigation
• Content management solution
• Integrated interactive components
• Integration of third-party tools and
databases
2008/2009 Work Program (Approved February 19, 2008) Page 8 of 20
2008 - 2009 Work Program
Project Status ~ Comments
B. Provide Support for City Attorney Transition Letter of Engagement signed with
Public Management Advisors LLC
to review and analyze the operations
of the City Attorney's office. Firm
will provide recommendations to
Council in recruiting and filling the
position and other options for
providing legal services. Initial recommendations scheduled to be
available for the proposed FY 2008/2009 budget
deliberations.
C. Fiscal Strategic Plan
Develop along-term solution to reposition the City Reviewed May 2006 and adopted in Substantial progress has been made in the area
to ensure services can be fully supported by conjunction with the 2006/07 0£
revenues collected. budget. • Passage of AB 117 resulted in additional
3. Pursue correction of ERAF percent for TEA The Plan: TEA property tax of $1.35 M/year. Second
funding by Dec., 2007 • defines the financial problem phase of State legislation in process.
• analyzes the structure of the . Council elected not to pursue November
4. Schedule a public hearing to adopt safes as a organization ballot measures for business license Quarry
standard condition on residential development. .identifies opportunities for category; UUT Ordinance changes &
5. Prepare ballot issues for business license decreasing expenses and areas of Entertainment tax in July, 2007.
(Quarry) and utility tax ordinance changes for risk exposure . New Reserve Policy adopted in October,
November, 2007 election for Aug., 2007 ballot • identifies opportunities for 2007.
submission. stabilizing our revenue
6. Perform analysis on entertainment tax and resources.
bring back to Council June, 2007.
2008/2009 Work Program (Approved February 19, 2008) Page 9 of 20
2008 - 2009 Work Program
Project Status Comments
a. Public Safety
A. Law Enforcement
Continue emphasis on Neighborhood Currently have 183 active Presented introductory Neighborhood Watch
Watch Neighborhood Watch Leaders information to 16 Neighborhood Watch groups
Provide quarterly Neighborhood Watch maps supporting 138 groups. that included 7 new groups and 9 inactive
starting March, 2007. groups. All other groups remain active by
participating in city sponsored Block Parties,
Emergency drills, and other activities that
promote a spirit of community in a neighborhood
twice a year.
B. Emergency Preparedness
Continue emphasis on Emergency
Response (ER) and Preparedness
1. Continue expanding of the outreach • Increased from four to five 750 residents trained in CERT.
programs CERT classes/yr.
• Conducted six first aid and 726 residents trained in First Aid and 799 trained
seven CPR classes in CPR.
• Implemented a Disaster Enables community members to participate in
Council/Citizen Corps Council emergency planning.
• Organized two new Total of 12 neighborhoods trained.
neighborhood CERT teams.
• Established Medical Reserve Completed
Corp through Federal grant.
• Conducts on-going EOC drills Provide communication services at community
with Amateur Radio events and established county-wide mutual aid
plan for amateur radio.
2008/2009 Work Program (Approved February 19, 2008) Page 10 of 20
2008 - 2009 Work Program
Project Status Comments
• Offer Kaleidoscope Program 3 Total of 367 students trained to date.
times/year
2. Ensure ER Training for City staff • Providing mandated
SEMS/NIMS/ICS training;
First Aid and CPR to staff.
3. Master database update/custom program • One database for Eliminates redundancy for outreach efforts to be
Neighborhood Watch, Block completed Jan., 2007.
Leaders and Sheriff
4. Pandemic Flu • Provided education to the
public to prepare citizens for
disaster response.
5. Mass Immunizations • Marsha chairing County
committee to work on plan via
committee process only
6. Managing spontaneous volunteers • Revise standard forms for city-
wide use June, 2008
C. Traffic Safety
1. Walkability
Implement "walkable city" concept. Ensure that the concept is present in Examples of recently approved walkable
all City development/redevelopment developments include:
projects. • Oak Park (North De Anza Blvd.)
• Tantau office building
• Whole Foods
• Las Palmas (Stelling Road)
• Rockwell Homes (Stevens Canyon Road)
2008/2009 Work Program (Approved February 19, 2008) Page 11 of 20
2008 - 2009 Work Program
Project Status Comments J
• Mary Avenue Bicycle Pedestrian
Footbridge
• Stevens Creek Corridor
$250,000 added for sidewalk improvements.
2. Review traffic safety issues
a. Safe routes to school program Garden Gate safe routes grant funding approved
for $393,000. Design and CEQA underway.
Construction expected Summer 2009.
b. Tri-school/Regnart Traffic The Sheriff's Office, the City, the
Improvements School District, and the residents
continue to work together to
improve the safety of vehicle,
pedestrian, students and reduced
traffic congestion on the primary
roadways around the school.
c. Bring proposal to Council on best use Staff will consider and recommend proposals for
for $300,000 earmarked for traffic traffic safety around schools and present a report
safety around schools (e.g. red light to Council during budget discussions for the FY
running ,lighted crosswalks, flashing 2008-2009 CIP.
speed limit signs, public education,
etc.l
3. Provide pedestrian ramps at required There are two locations that will require
intersections pedestrian ramps and the work will proceed
under the City's current curb and gutter contract
once the sites have been reviewed by the City's
contract attorney for compliance. Estimated
Completion by June 2008.
2008/2009 Work Program (Approved February 19, 2008) Page 12 of 20
2008 - 2009 Work Program
Project
5. Housing
Status
Comments
A. Provide housing opportunities for Cupertino
workers
B. Teacher housing assistance program
BMR eligibility requirements for Cupertino
Union School District (CUSD) teachers.
C. Cleo Avenue Affordable Housing
The 2005 GP update and Housing
Element identified sites for
additional housing units.
In May 2006, the Council amended
the BMR program to give teachers
in CUSD 2 points credit regardless
of whether they currently work
within the Cupertino city limits.
In Feb. 2005, the City Council
authorized staff to purchase a '/4 acre
site on Cleo Avenue from Cal Trans.
Staff completed negotiations and the
site has been purchased.
In October 2007, staff issued a
Request for Proposals and received
one proposal from Habitat for
The Santa Clara County Housing Trust Home
Ownership Assistance Program is applicable to
Cupertino teachers and other public service
employees.
The Cupertino Below Market Rate (BMR)
program also gives priority to Cupertino
teachers, public service employees and
Cupertino workers.
The Commission found the existing fee is
insufficient to offset the impacts of development
and recommended increasing housing fees for
non-residential developments, including
commercial development and residential
developments that are too small (6 or fewer
units) to require a BMR unit.
The site can accommodate up to 4 units.
Preliminary design developed in Spring, 2007.
RFP issued in October 2007. Rezoning of
property initiated in January 2008. Use permit
expected in March 2008. Construction to begin
in late 2008.
2008/2009 Work Program (Approved February 19, 2008) Page 13 of 20
2008 - 2009 Work Program
Project Status Comments
. BMR Manual Update Humanity. The City Council
reviewed and accepted the proposal
at its December 18, 2007 meeting .
Review and update is scheduled for
Spring 2008.
taff is in discussion with a consultant to begin
work on the updates.
fi. Economic Development/Redevelopment ~~ii
A. Encourage, retain and support healthy Fourteen retail openings including • Recognizing new businesses in new
environment for retail growth Whole Foods, Strike, Cupertino Quarterly electronic newsletter. Summer and
Bakery, Arya, Zales, Harvest, and Fall issues distributed to list of over 200 real
Visique. On track for over 20 estate professionals and community
openings by fiscal year end. stakeholders.
• Sending "New Business Welcome Package"
in partnership with the Chamber of
Commerce. 130 packages mailed for 2007.
• Assisting new businesses with
planning/building facilitation - signage, etc.
• Introducing new restaurants to city
employees
E.D. Committee is meeting regularly 10 key initiatives identified with corresponding
and providing input on E.D. work action plan.
plan.
Active outreach to Landlords and Re-tenanting successes include: Harvest,
brokers to facilitate re-tenanting, and Great Buffet, Pizza My Heart,
the leasing of new mixed use space. Marukai/Daiso, and T.S. Stew House.
2008/2009 Work Program (Approved February 19, 2008) Page 14 of 20
2008 - 2009 Work Program
Project Status Comments
• New leases for Civic Park, Metropolitan, and
Adobe Terrace projects, and lease
negotiations at Montebello.
Retention efforts include active Initiated Cupertino Restaurant Association
outreach to business owners through beginning with Flint Center marketing
direct meetings, and Chamber collaboration. First meeting on 1/15/08.
participation.
Beginning preliminary work on • Reviewing plan for conformity with Heart of
Crossroads Streetscape Plan. the City.
• Bringing planning consultant on board.
• Conducting preliminary outreach and
developing plan for stakeholder input.
B. Consider retail in reviewing new development. Advise on/facilitate new
development projects.
• Worked with over 30 development firms
expressing interest in the 17-acre HP site.
• Provided input into planning process for
Cupertino Village and Oaks expansion
projects, and Marketplace re-tenanting.
• Advised on Furniture 2000 project.
2008/2009 Work Program (Approved February 19, 2008)
Page 15 of 20
2008 - 2009 Work Program
Project Status Comments
7. Planning
A. Review the Heart of the City
B. Develop Green Building Standards
C. Prepare a historic preservation policy
D. Propose policy for tree topping under property
maintenance standards
E. Put sign code review (to look at being more
business friendly) on the Planning Commission
work program
In fall of 2007, staff prepared update Technical revisions to the Heart of the City plan
report to City Council in December are being prepared for Planning Commission
2007. review in Spring 2008, then on to Council June
of 2008.
First phase (audit) to be finished Walker Wells worked with Global Green to
Sept, 2007. Estimate completion complete the audit. First phase completed. City
June, 2008 Council adopted a voluntary Green Building
program and will consider mandatory program in
May 2008. New developed has been encouraged
to "go-green" including Tantau office building
and Cleo Drive Habitat for Humanity project.
In fall of 2007, staff began Staff has met with Helene Davis of the Cupertino
preliminary review and scheduled Historical Society and met with the Board in
meetings with the Cupertino January 2008.
Historical Society.
Begin discussion Sept., 2007 and The ordinance amendment is expected to be
ordinance wording is in preparation. heard by the City Council in spring 2008.
2008/2009 Work Program (Approved February 19, 2008) Page 16 of 20
2008 - 2009 Work Program
Project Status Comments
F. Update the General Plan Housing Element
RFP's will be sent to consultants in
February 2008 to prepare the
Housing Element. Community
outreach, preparation of the draft
Housing Element and the beginning
of public hearings will occur
throughout 2008.
State law requires that the new Housing Element
be adopted by June 2009.
8. Building Communit_yT
A. Continue to offer opportunities and Neighborhood block leader program Disaster reporting, search & rescue, and
programs to promote cultural supports 240 leaders. communication training were among those
understanding and address the needs of our offered to Block Leaders this year.
diverse community The block leaders annual gathering
and recognition is planned for Jan.
24, 2008.
Database to streamline community
outreach program participants
(Block Leaders, Neighborhood
Watch Leaders, CERT grads, etc.) is
completed.
A new project to survey neighbors Block Leaders coordinated supplies checks
basic emergency supplies was during neighborhood block parties and meetings.
administered by the OES with About 10 neighborhoods participated.
assistance from a high school
service club.
A new city-sponsored Community I Three grants were awarded in 2007.
Improvement Grants program
2008/2009 Work Program (Approved February 19, 2008) Page 17 of 20
2008 - 2009 Work Program
Project Status Comments
awards neighborhoods up to $300
for new beautification projects,
neighborhood participation
activities, and other projects that
build community and bring
neighbors together. Grants are given
to neighborhoods represented in the
Block Leader program.
B. Beautification Program Council authorized a Community
Service Day on May 17 .Don Allen
and Barbara Nunes are directing the
effort.
C. Leadership Cupertino
Bring proposals for restarting program to Compare Leadership Cupertino with other local
Council as part of 2008/2009 budget. leadership programs.
9. Community Organizations
A. Support the Cupertino Historical Society in Staff and the Parks and Recreation The City re-roofed the Stocklmeir house. The
its effort to create a Center for Living Commission met with the Historical Historical Society has sent a letter to the City
History Society to define a project a major7ty Manager expressing support for the trail
of the Cupertino Historical Society connecting to Stevens Creek Blvd. so long as the
Board will endorse. multi use trail is kept close to the creek with a
footpath through the orchard.
Cupertino Historical Society is no longer
pursuing the Center for Living History.
2008/2009 Work Program (Approved February 19, 2008) Page 18 of 20
2008 - 2009 Work Program
Project Status Comments
B. Pursue partnership opportunities with
three school districts:
1. Traffic and parking
2. Teacher housing
the The Safe Routes to Schools projects
have proceeded with excellent
cooperation between the City and
Monta Vista, Cupertino and Garden
Gate.
We use the new Cupertino field
house as available.
Added two crossing guards
De Anza/City recycling program -
the City gives De Anza used
computers and De Anza refurbishes
them.
3. School Resource Officers
4. Juvenile Prevention Program
C. Cupertino Day
City is sponsoring pilot project television
coverage of sports at Cupertino high schools on
public access.
Added second SRO in FY 2004/05 CUSD & FUHSD now contributes $10,000 each
to this program. In addition to School Resource
Officer, Sheriff's Office has added a School
Enforcement Officer.
Contracted with Linda Rios for
Outreach Services
CUSD contributes 50% of the cost of this
program.
Proposal presented to Council as
part of the 2007/08 budget.
Cupertino Day is scheduled for Sunday, May 4~'
and will include open houses at several Parks
and Recreation facilities and the golf course.
2008/2009 Work Program (Approved February 19, 2008) Page 19 of 20
2008 - 2009 Work Program
Project Status Comments
D. Tank House Renovations began in Summer, Phase One in process to weatherproof structure.
2007. Numerous volunteers have Includes new roof and siding
come forward to participate
including Rotary, Terry Brown, Los
Gatos Roofing, San Jose Water
Company, & Los Altos Garbage
Company.
---
j
10. Go Green
Develop list of possible projects The voluntary Green Building
program is underway, whereby
anyone getting a building permit has
the opportunity to voluntarily
implement green building practices.
The City Council will evaluate the
voluntary program in May 2008, and
can consider a mandatory program
at that time. Other green programs
identified in the General Plan, or
. from other sources, can also be
considered.
2008/2009 Work Program (Approved February 19, 2008) Page 20 of 20