06050111 (2) Community Development
10300 Torre Avenue
aClOF
Cupertino CA 95014
Telephone(408) 777-3228
Fax(408)777-3333
�UPEI�TINO
Building Department
JOB ADDRESS: _ PERMIT #
I
Oer �i n
OWNER'S N kiDA PHONE #
GENERAL CONTRACTOR FAX #
I am not using any subcontrac rs: l Z�f�SO
ignature Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
• Glass / Glazing
Heating
Insulation .
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
- Tile
O vner/ContractorSignature Date
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
• Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed,a plywood nail inspection is required.
• 6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: I �._ AY-1_7 C11—C11— l tam,�cC
job Site Address: 07?507,5 Cr/[' ke+ V)"CA—i
Roofing Company Name: ,' `J
Applicants Signature: Date; Z-0(0
• Greg Casteel
Building Official
Revised 11/2/04