08070169 (2) CITY OF CUPERTINO
BUILDING DIVISION. PERMIT .CUk�ITRA(:TQRII�I'P'pU�I�Z.MATIOIY: a
BUILDING ADDRESS: PERMIT NO.
10490 CYPRESS DR YOONSIL KAE 08070169
OWNER'S NAME: PERMIT ISSUE DATE
Y )ONS.I:I.m KAE 10490 CYPRESS DR 07/24/2008
NE: SANITARY NO. CONTROL NO.
ARCHITECTIENGINEER: BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
O p LICENSED CONTRACTOR'S DECLARATION
U� w 1 hembr affim the 1 am li¢n¢d under Provisions of Chapt 9(rommencing � Job Description
^z16
whit Vital of Division 3 of the Eastman;and Prorcavom Cods,road my Beene is ADD 460SQ NOT INCLD RE—RF & IS STRUCTURAL
n full Tor¢and effm
ZLiccnn aeras Lk.6
q Dao: ContractorR`9' ARCHITECTS DECLARATION
U 1Ms
uaand my plans shall be oud o public rerords
a
wt; Licensed Pmfenional
OWNER-BUILDER DECLARATION
f T heroby•lir that 1 am...pt from the Contractor's License Law far ale
❑O fallowing moron.(Srsdon 7131.5.Business and Professors Calc:Any city an wooly
K S V which require•permit to construct.cher.improve,dmnalbh.or mpoir any structure
'iiiprior in its issuance,also rcquius the applicmt for such permit to fie airlifted wlemcnt
that he as licenacd pursuant a the provisions of the Contractor's LSccmue Law(Chapt 9 Sq.Ft.Floor Area Valuation
I F`° (commencing with Semon 7000)of Division 3 of the Business;and Profusions Calc)or $45000
y $ the he is exempt th.refrom and W bob for ale slated oaempdon.Any violadan of
SOcdor 7031.5 by any applicant fora porn subjecta the applicant to a civil pcnaltY ofA,pt�7 Number Occu ane T
Ml tae that five hunded doll.(SIM. 31630049 .'rfV- P Y YPe
❑1,o owner orae propury,a mY employs with wages u the'v wk rompenotiro,
willdo tho wart,and the structum b m1 inumd.d air anered forsak(Sec.70x4.Bassoons
and Proloshms Code:Tha Comactm's Lt.Law doe M1.pply to an awns,of Required Inspections
propeay who builds air improv thereon.and who doessuchwmk himaclfor Waugh his
own employee,provided that such improvements art not hounded aralfered forsae.If.
however.the building urimprovromt is sold within ate year of completion.the owner-
builder will have the burden of proving that he did not Wild or improve fm Inorganic of
s -
7o owner of du pro'",,on aclusivelY canvassing with licensed roconscious to
continuum the project(Scc.7(A4,R.I.and Profesiao Cade:)The Cormasar's U.
cube Law d.not apply in in owner of property who builds or improver thareon,and,
who contracts fm such projects with a com actar(s)llcnaud pursuant to am Conoasm's
Lktns law.
❑l am camnpl unk,soer,., �. BB PC F.this noon
Owns Data
WO
Rtrm R'S COMPFNSATON DECLARATION
1 hambY aunder peony of perjury aro of the following dalar.Jans:
I have and will maintain a Ccro ficae orConacnt in YIf-i.for Wmkce.Carolina.
a sion.at provided for by Section 3700 of the Labor Code,fm the pmfomanm at the
wort for which this pcmit is Issued.
Q I have and will maintain Worker's Compeasstion Irwumce.o mguir.d by sccdm '
37W of the LWar Code.fa the performance ofam work fmwhich this petit Is issued.
My Worker's Compevatioe Insurance cams and Policy aumWu an. -
ca .. Policy No.:
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
(This swim reed not W rompked if the p.ml Is fossae handball dollen(5100)
Or 1.)
I«nifY that in the performanm of the work fm which this psmiv is sated.l ehali not
LawsOanypenoninotr mmrero esu Wecome bJKt a the Works'Compcwtim
Laws airay paria.n Doc �lL cid
APPIksom -a '�
NOTICE TO APPLICANT.If..nor making this Ccoifnte of Exemption,you should
become subim as the Warkds Compcasition provisions of the Labor Code,you most
.J,z forthwith comply with such provision or this petit shall N deemed rcvokcd.
CONSTRUCTION LENDING AGENCY
F I Inmby affirm that Hurt is a construction lending agency for the p.rfmmanac of
lYi > the wish for which this pemll is issued(Ser.3097,Civ.C.)
Lender's Name
.7- z Leader's Address
U C) 1 certify that 1 have toad this application and sure that the show infomation it
LL Fram ra 1 Ag0 comply with all city and county odnamv and able laws misting in
OU building Construction,and hemby authadn apesenutives of Una city in enter upon the
L� above-mentioned properly for inspection purpmes.
„ py (W.)ague to saw,indemnify and keep hamlets the City of Cuperlino against
y lbbilitie.judgmeats,onto and espo ms which may in any way accrue gaiast said City
U z A PLIC once of Ne UNDERSTANDS
of this peril. r T
ti APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: Dale - lJ-
SOURCE REGUf.ykTJ /L?�1Pp
�� Re-roofs
Smgnuum air Appl VCmtracmry Date
HAZARDOUS MATERIALS DISCLOSURE Type of Roof
Will the applicant or future building occupant Care orbmdle hoodoua maedal
as dcfmad by the Caperton Municipal Cod..Chaper 9.12.and the H.sith and Safety
Cade.Section 25533(.)?
❑Ye pfNo All roofs shall be inspected prior to any roofing material being installed.
Will the applicmt or futum building Occupant use equipment a dovic n which If a roof is installed without first obtaining an inspection,I agree to remove
I hoodoua air contaminmts as dcrrrcd by the Bay Ara Air Quality Management
D.mic,7 all new materials for inspection.
L
❑Ye 'p No
I havered W ha>,uduur maurialamquinmmtsmmdcr Ch pamS95.NJxCalifm-
Na Fkal”SafsYCcdc,Sections 35505.25533and 25534.IurbensM lunifJe building
dui rmcob ha a tuna Jut it b my repaysibililY m ratify ale eccupmt of Ju
.gaKmmr usitticanapin .-I ar.caJfenaromtpm.y. Signature of Applicant Date
Owmurora odmd...I off All roof coverings to be Class'1�."
s Dow g or better
C
CITY OF .CUPERTINO
• 4 ITEMS OF 4 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . . 31630049 . 00
DATE ISSUED. . . . . . . : 07/24/2008
RECEIPT # . . . . . . . . . : BS000005566
REFERENCE ID # . . . : 08070169
SITE ADDRESS . . . . . : 10490 CYPRESS DR
SUBDIVISION . . . . . . .
CITY CUPERTINO
IMPACT AREA . . . . . . .
OWNER YOONSIL KAE
ADDRESS . . . . . . . . . . : 10490 CYPRESS DR
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : A:-TEAM PAINTING COR
CONTRACTOR LIC #' *OWNER*
COMPANY . . . . . . . . . . : YOONSIL KAE
ADDRESS 10490 CYPRESS DR
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
TELEPHONE . . . . . . . . :
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
--------- ---------- ------- ---------- ---------- ---------- ----------
IBSEISMICR VALUATION 45, 000 . 00 4 . 50 0 . 00 4 . 50 0 . 00
1PLLONGR SQUARE FEET 460 . 00 55 . 20 0 . 00 55 . 20 0 . 00
l.R3INSP SQUARE FEET 460 . 00 1424 . 00 0 . 00 1424 . 00 0 . 00
1.R3PLNCK SQUARE FEET 460 . 00 2270 . 00 0 . 00 2270 . 00 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 3753 .70 0 . 00 3753 . 70 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CHECK 3, 753 . 70 #5007
---------------
TOTAL RECEIPT 3 , 753 . 70
� -0 0 / �9
�W CITY OF CUPERTINO
rd- ADDITION/REMODEL
., CUPEkTINO PERMIT APPLICATION FORM
APN # 3 t ( _ -3 0� n` UlJ n Date: -7/23
7 2 3 103
Building Address: `�
I04qC) C-U#Wlino C4 O/S-z�/V
Mailing Address (if different from building address):
Owner's Name: y Phone#
Zoo✓1 Si/ t-(12 409 -77?-V-Z l
Contractor: Phone#: 4 v g--40* 6 0.�-' S 13B S
AcAvv0.5zL>^e_,- .
Fax #: C6C-P ) Llv - `� ��'�
Contractor License#:
Cupertino Business License#:
Contact: .Roo Ka-0- Phone#: C+U 8 60 9- S4 8 8
`(o,"i S71 (O1� Fax #: 6 Sa — 'L I O
Building Permit Info:
Bld n' Elect. Plumb. ❑ Mech. [[ Hillside ElJob Description:
Addition (adding sq footage):
What is being remodeled (not including addition)?
Remodel Includes Re-Roof: Yes No P�r If yes list number of squares
Remodel Includes Structural: Yes No ❑
Square Footage:,
Addition: Porch: Deck: Garage: Detached Attached
Remodel: Kitchen Bath Other
Type of Construction (Usage Class): Occupancy Type:
1-A, I-B ❑ II/III/V-A ❑ 11/11I B, IV-HT, V-B
Valuation: oo� Please check this box if the project is a
Project Size: Express [�Standard E] Large El Major E] second-storyaddition El
Please complete relevant portion of the Green Building
Checklist & attach it to the application or if applicable, Green Building Points Achieved:
include in plan set& the sheet index.
***For Office Use Only***
Over-the-Counter ❑ Revised 7/01/08
I
CITY OF CUPERTINO
ADDITION/REMODEL
CITY F
CUPEkTINO FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
ADDITIONS 1R3SFDADD
PLLONGRNGR Long Range PL
Plannin esidential
IR3INSP Dwellings Inspections B
IR3PLNCK Dwellings plan check B
1R3REPINSP Dwellings Repeat B
Inspection
1 R3REPPLNC Dwellings Repeat Plan B
Check
1R3HINSP Dwellings Hillside B
inspection
1 R3HPLNCK Dwellings Hillside plan B
check
1R3HREINSP Dwellings Hillside B
Repeat Inspection •
1R3HREPLNC Dwellings Hillside B
Re eat Plan Check
1R3ALTINSP Dwellings Alternate B
Materials Inspection
1R3ALTPLNC Dwellings Alternate B
Materials Plan Check
1PCESS Cesspool P
1PPRSEWG Ea. Private Sewage P
Dis osal S stem
IPRSEWER Sewers P
1BPSPRINK Lawn Sprinkler/Backflow P
1BPWSVCS Main Water Service . P
1BSEISMICRE SeismicResidential B
DECKS 1R3SFDADD OR
1R3SFDREM
1DECKWOOD Deck (Wood)-Each B
(Each) •
IDECKRAIL Deck Railing-Each B
(Each)
• n
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
GARAGES 1R3SFDADD OR
DETACHED 1R3SFDREM
1 GARDTW<=1K Wood Frame up to B
1,000 SF (each)
IGARDTM<=1K Masonry up to 1,000 SF B
(each)
BCONSTAXR Construction Tax Res
(new detached garage)
PATIO'S OPEN 1R3SFDADD OR
1PATIOWOOD Wood Frame up to 300 B 1R3SFDREM
SF
1 PATIOMETAL Metal Frame up to 300 B
SF
1PATIOOTHER Other Frame up to 300 SF B
PATIO'S CLOSED 1R3SFDADD OR
& SUN ROOMS 1R3SFDREM
IPATIOENCLW Enclosed Wood up to 300 B
SF
1 PATIOENCLM Enclosed Metal up to 300 B
SF
1 PATIOENCLO Other Enclosed Patio up B
to 300 SF
ICOVPORCH Porch Covered-Each B
(Each)
REMODELS 1R3SFDREM
1 REMRESKIT Kitchen Remodel up to B (Deduct GI"for ea plan
300 SF check
1REMRESBAT Bath Remodel up to 300 B
SF
1 REMREOTH Other Remodel up to 300 B «
SF
IREMRES2 Remodel Residential B
Greater than 1000 sq ft
1REMRES3 Remodel Residential B
Greater than 2500 sq ft.
3of3
CITY OF CUPERTINO
ADDITON/REMODEL
FEESCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
REMODEL PLNCK
1 STPLNCK(1-3 for Standard Plan Check B NOT FOR OVER THE
remodel) COUNTER PLAN CKS.
1REROOFRES Residential Re-roof Each B
100 SF
WINDOW/SLIDING IR3SFDREM
GLASS DOOR
1 WINREP Replacement windows B
(ea 8 windows)
1WINNEWNSTR New Window (non- B
structural)
1WINMEWSTR New Window (Structural B
Shear Wall/Masonry)
1 WINBAYSTR Bay Window (Structural) B
SKYLIGHTS IR3SFDREM •
1 SKYL<10 SF Skylight less than 10 sf B
1SKYL>10SF Skylight greater than 10 B
sf or structural
1STAIRS Stairs-first flight/ea addt'1 B
1 EPERMITFEE Electrical Permit Fee E
1 MPERMITFEE Mechanical Permit Fee M
1 PPERMITFEE Plumbing Permit Fee P
1 ELCPLNCK Stand Alone Electric Pln E
Ck (hourly)
1 MECPLNCK Stand Alone Mechanical M •
Pln Ck hourl
1PLMPLNCK Stand Alone Plumbing P
Pln Ck(hourly)
4of3
CITY OF CUPERTINO
ADDITON/REMODEL
FEE SCHEDULE
Quantity Fee ID Fee Description Fee Group Permit Type
Sq Ft
1BSEISMICRE Seismic Residential B
1TRAVDOC Travel & Documentation B
1BUSLIC Business License B
•
•
5 of 3
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
Blom
B. Site 9. Install H.E. Irrigation, (details/spec)• L-1 2 points
11. Permeable Paving, Note L-1 __gpoints
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 paints
D. Structural 3. Uses Wood IJoist, (See Spec.) S-2 2 paints
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathin detail S-2 2 Dints
E. Ext. Finish 1. Composite Decking, (Note/Spec.) AJ 2 points
4. B. Fiber Cement Siding, Note/S ec. A-4
__2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal.Tank,(Note/Spec) L-1 10 pints
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4n '
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Enerqv Star Refrigerator, (Note/Spec. AJ 1 oint
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS 40 points
•
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project.
INPUT Resources Energy A011realth
to
1.Recycle Job Site Construction&Demolition Waste
65%,=1 point;75%= 2 points;B0%=4 points - up to 4 Resource pts 0
2.Salvage Reusable Building Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design _ 2 Resource pts y=yes 0
IB.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1 1 1
B.Foundation
1.Incorporate Recycled Flyash in Concrete
• 25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes p
1 1 1
C.Structural Frame
1.Substitute Solid Sawn Lumber with Engineered Lumber 1
�-_- _ _9 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"of more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
6.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c.Roof 3 Energy pts y=yes0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
t2.Use 0SB
a.Subfloors 1 Resource pt y=yes 0
• b.Sheathing _ _ 1 Resource pt y=yes p
1 1 1
114PUT Resources Energy IAO/Health
D. zter mesh
1.Use Sustainable Decking Materials
a.Recycled content 3 Resource pts y=yes 0
b.FSC Certified Wood 3 Resource pts y=yes 0
12.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAQ/Health pt y--yes 0
3.Install House Wrap under Siding 1 IAQ/Health pt y=yes 0
14.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
1 1 1
E.Plumbing
1.Install Water Heater Jacket J 1 Energy pt y=yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y yes D
I3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
4,Replace Toilest with Ultra-Low Flush Toilets
(1 point each,up to 3 points) _ Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0
B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
1 1 1
r.tiecrncar
I1 Install Compact Fluorescent Light Bulbs(CFLs)
(6 bulbs=2 points,10 bulbs_-3 points,12 bulbs=4 points) Up to 4 Energy pts. 0
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to .
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
1 1 1
G.Appliances
1.Install Energy Star Dishwasher 1 Energy pt y=yes 0
2.Install Washing Machine with Water and Energy
Conservation Features 1 Energy pt y=yes 0
I3.Install Energy Star Refrigerator 1 Energy pt y=yes 0
14.Install Built-In Recycling Center 3 Resource pts y=yes 0
1 1 1
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
13.Install-Recycled-Content,Fiberglass Insulation with--
�No Added Formaldehyde 3 IAQ/Health pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0
b.Ceilings 4 Resource pts y=yes 0 •
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes 0
o.Uewngs 4 Resource pts y=yes 0
1 1
- INPUT Resources Energy IAO/Heafth
rndows
• 1.Install Energy-Efficient Windows
a.Double-Paned 1 Energy pt Y--yes 0
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
L c.Low.Conductivity Frames 2 Energy pts y=yes 0
2.Install Low Heat Transmission Glazing 1 Energy of y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
-1.Use Duct Mastic on All Duct Joints _ _. 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0
4.Clean all Ducts BeforaCccupancy 21AQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
B.Install Sealed Combustion Units
a.Furnaces 3 IAQ/Health pts y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9,Replace Wail-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12,Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood sloveshnserts 1 IAQ/Health pt y=yes p
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filler 4 IAQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAO/Health pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points)_ __ Up to 18 Energy pts 0
i6.Select Safa and Durable Roofing Materials 1 Resource pt y=yes 0
7 Install Radfant Barner - - _ - - 3 Energy pts y=yes p
1
L.Natural Heating and Cooling 11111111
1 1
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
1 1 1
•
INPUT Resources Energy A011dealth
M. n oor Av Qua rty an rnrs es
1.Use LowMo-VOC Paint - 1 IAQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0
j3.Use Lownik VOC Adhesives 3 IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6IAQMealth pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses1 IAQ/Health pts y=yes 0
T.Seal all Exposed Particleboard or MDF - - 4 IAQ/Health pts y=yes 0
ii -— - - -- - — -
B.Use FSC Certifi- —ed Materials for Inte- rior—Finish- 4 Resource pts y=yes D
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 31AQMealth pts y=yes 0
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0
2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
1 1
Total Points Aval ale: 1 1401 1301 57
Total Points Project Received: 01 01 0
G:dataiprogslgreenbuildngguidellnestremodelers/greenpantefinal2.12.04prolected.xis
•