19303 (2) POST THIS CARD NEAR FRONT OF BUILDING rEcwrno.
19303
CITY OF CUPERTINO A A A
INSP�EECTION DIVISION- JOB INSPECTION RECORD / / _- I -/
JOB ADDRESS (tea �1?11h l"�-p UNIT# LOT# CATEGOEY CONT ROL# ..
OWNER C CONTRACTOR kP1/�r- COVE( BUILDING PERMIT INFO
INSPECTION DATE JINSPECTOR INSPECTION RECORD a
FOUNDATION/PIERS NOTE ALL GRADING AND DRAINAGE El
UFERGROUND SI IALL BE INSTALLED TO COMPLY WITH JOB DESCRIPTION
PAD/SET BACK-CERT THE APPROVED PLANS AND an OF
GARAGE SLABS/PRECUNITE CIJPERDNO STANDARDS. I
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED
UNDERGROUND/SLAB INSPECTION ATE INSPECTOR
PLUMBING
ELECTRICAL
MECHANICAL
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
WOOD FLOOR
PLUMBING
MECHANICAL
ELECTRICAL
PIZAMINC VENTS CLEAR
INSULATION
iM
PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED
ROUGH
I• PLUMBING
TUBS&SHOWER PAN
MECHANICAL
ELECTRICAL ACUZZI BOND
FRAMING STAIRS 'Z '
INSULATION/VENTILATION Z ' -
EMERG.EGRESS
SEWER WATER
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED
EXTERIOR SFIEAR 1-IOLD DOWN
INTERIOR SHEAR/1-IOLD DOWN
SHEETROCK/Sl IEETROCK SHEAR
EXTERIOR LATIN/W-SCREEN
SHOWER LATH
SCRATCH COAT
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SICNED
NOTE:NO FINAL INSPECTION SHALL BE MADE BEFORE
THE CONSTRUCTION TAX IS PAID
FINALS I D TE INSPECTOR
SAN.#
ELECT.ENERGY
PLUMBING ENERGY
MECH.ENERGY
BUILDING ENERGY
ELECT.FINAL TEST
PLUMBING
GAS TEST
MECHANICAL
HEATING
ELECTRICAL RELEASE
FIRE DEPT.
GRADE
OCCUPANCY
TEMPORARY APPROVALS
ELECTRIC
GAS
BUILDING i
OCCUPANCY OF BUILDING 1S NOT ITT ED ! ISSUANCEDATE
�- BUILDING FINAL IS SIGNED BY UIIILDING INS TOR
ARRANGE FOR INSPECTION BY PHONING 252-4505 BETWEEN NOV 17 1`C J
12:30 PM AND 4:30 PM MONDAY THROUGH FRIDAY,24 HOURS
BEFORE REQUIRED INSPECTION. JOB ADDRESS AND
PERMIT # ARE NEEDED WHEN PHONING. c;
IMPORTANT! =`1 Uy
PLEASE READ REVERSE SIDE BEFORE CALLING FOR FINAL INSPECTION ISSUED BY:
>h�G p�� J
OFFICE COPY