Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
06060194 (3)
REACH Lighting Services 2904 Requa Court Ph: (408)476-5052 San Jose,CA 95148 Fx:(408)694-3106 July 17, 2006 City Of Cupertino ADL 10300 Torre Avenue Cupertino, CA 95014 RE: Inspection Notice for Daphne Liu located at 10428 South Foothill Boulevard, Cupertino, CA 95014 Dear City Inspector, Regarding the Inspection Notice for the above location, Ms. Daphne Liu has asked Reach Lighting Services to inspect and recommend corrections for the following items: 1) Regarding the inspection of rough wiring—outlet covers and receptacles on kitchen countertop and in the 2 bathrooms were removed for inspection. Wirings of the outlets on the kitchen countertop and 2 bathrooms were up to code. Only • new wirings were inspected. Also, fluorescent lights were added to kitchen and the 2 bathrooms as per our recommendation. The following items were not listed on the Inspection Notice but were inspected as per the inspector's (Bob G.) verbal request made over the phone conversation with Reach Lighting Services: ,,Cl)')Exposed wiring for the clothes dryer was inspected. The wiring was disconnected from the panel and no longer charged. (2-� Heater wiring in the attic was inspected and is up to code. C3) An obstacle that was found to be blocking the PG&E meter has been removed. (4-) Permit number for the addition of the 2 bedroom is 06010018. No inspection was conducted in the bedroom as said permit already covers its inspection. If you have any questions and any additional requests, please call Vince To. Sincerely Vince To • Contractor License#848944 * 'IMAWIT PtUMBIRIL ROOTE"IR29"'90 (408)247-2400, 1-866-249-2400, www.smartplumbem.org Lic#825685 oba�-I_q --�nS.-Fri Bora-7; 'p clean out kitchen trap arm (p, Cie p trap o � o. 0 water line o 11t leaking 0 tub drain oVT vent bathroom 1 P trap C" Lavatory vent p ^ drain water line s. distance p lC CGOAa 2' d 1n leaking i, toilet clean out vent tr A4 2 drain © , c leaking P trapp , bathroom 2 jacuzzi drain vent n fittin s o _' �Qrtis •p leakingc drain ,, Lavatory vent , P trap ©,' fittin s Ll " AL4k& ° s C1' �Q • A.S.E. 255 N. Market St. , Suite #220 San Jose, Ca. 95110 (408) 999-7441 Permit # 06010047 RECEIVED PLAN CHECK NUMBER: 06103 .CUP Feb. 1, 2006 PROJECT: Foundation repair FEB 013 2006 10428 S . Foothill Bln__—_ Engineer: Steven C. Chu 408-505-9885 --------------------------------------- DOCUMENTS ATTACHED: VIA- 1 SET OF DRAWINGS HAND DELIVERY ------------------------------------------------------------- Dear Sue: The attached documents were reviewed and cleared by our office. • • .n itCity of Cupertino Building Department Subject: Plan Check Comment Response for 10428 S. Foothill Blvd. Comment No. Response A To the best our knowledge, the existing foundation is the typical spread footing with the bottom with approximately 12" wide. Our detail is to provide a direct replacement for the existing footing. The house has been on the site over 70 years. The settlement would be minimal by now. In addition, cost is the factor not to do any more than what we propose to do on this report. The owner understands the settlement issue. B See revised plan C 12" is the minimum footing depth. However, we will provide • observation during the trenching (see revised plan). It will be our discretion to instruct the contractor excavate deeper for the foundation trench. We try to avoid pier-and-grade beam approach to minimize the different settlement. D Our field observation indicates that there is not concentrated load to the wall footing. However, we will check again during the construction. Cr, 20 SUBMI TTq� / OFFM� • 1001.John Way • Cupertino,CA 95014 • Tel:(408)305-995. Fax:(408)725.13.0 i` December 19, 2005 Ms. Daphne Liu REC F,17i< Subject: Foundation Inspection at J� J _ ; r JAN 0 9 2006 10428 S. Foothill Blvd, Cupertino, CA Dear Ms. Liu, At your request, we visited the subject site to review the existing foundation condition. Due to lack of accessibility to the foundation area, we only looked at the foundation from outside of the house. In addition, we reviewed the inspection report by Edward's Construction. Our review on the report was focused on the foundation portion only. All items other than foundation will be excluded from this report. Here is our conclusion: • The report indicates several deficiencies at the existing foundation. However, there is lack specific how to repair or replace the foundation. • The air epoxy injection at the crack footing is acceptable. This approach will seal the crack and prevent further corrosion to the existing reinforcement. • Regarding foundation anchors, the report does not specify the exact type of anchor for secure the sill plate to the concrete. • For the interior piers, we do not have recommendation at this point. • RECOMMENDATION • The foundation at the right side of the house should be replaced per attached detail S1 • Replace 6'-0" foundation where existing foundation experience excessive settlement. We noticed a 6" settlement at the left hand of the house. This approach will not guarantee to prevent future settlement. However, it provides a positive support for the structure. • Air epoxy injection at all cracks • Install new %2"x 10" wedge anchors @ 48" oc (with 6" embedment) at all existing wall foundations. These anchors only resist the shear force generate by the wind or seismic activity. They will not resist the uplift load due to wind or earthquake load. In Edward's report, section 4, it indicates the anchor bolts will transfer uplift loads to the foundation. This is incorrect. • Additional inspection is recommended when your contractor open the floors and walls. If you have any questions, please feel free to give us call. oQFtOFESS/Op. ,� Sincerely fjQ���aOHUN� Fyi N'No 52160 s� m even C. Chu, MSPE If • Cc: Thomas Liu & Associates 1 10615 John Way . Cupertino,CA 95014 . "I'd(468)505-0985 . Fav(409)725-1150 s1 18" MIN. J< rri 1 DX m0 z V) r-, g " m _T1 N D ;00 ® �0) X Eno m D = N • D < D � r A 6.. r O O C D T O < 0 r (n O m o rm 0 O \ I- N G7 _ I D ^^ Z Z Z Z rn D O Z Z � 0 12 m a a X a = • C) m � � = a � D < c) ® -V ® ® C X F_ � � Z rn rn Zr __j 0) 2 (gl --im RD m N Cp a O o O (n n Ir (E) FTC I Fs ^m (E) FTC _0 �L (E) FTC -(E) FTC _. _. .. O rn I czo I I m m 1~ `- D O ^ rn O m I mO D ?; o i+ c Z'40 m mLo r I I m m )� mOm Ovz I , ^ Fv m � m m^r xm� m l �o o O - rn I21 0 z �71 I' N m rn .TmM `n I < � � �� m O - oZ m KI m � _n I . _< Dm r _H71 -uX o m �' m Z (n r I —(E FTC— I I • m — (E) FTC _r-. (El FTG v y w m = q m .~T,L`�j a L (E) FTC IQQ f o ova oo u�Ul o co o � S' 8, y > FOOTHILL BLVD r _� n d m H 3 �= C; c7 !J f--tt- c v o o . o a p (fix . D N (7 m -� o v m �. o� y rS G ® �✓ H' Ec C1 O O v.l 1 o M cr o 0 o PROJECT TITLE: �1 r9 Ns�/a STEl�EN CH!/ D �� 3 FOUNDATION REPAIR E_�,��`�� cyG ASSOC/.9TES o � N 10428 S. FOOTHILL BLVD W No. 52160 Consulting Engineers N (v Exp. 7� 10615 John Way. Cupertino, CA 95014 m N xo m CUPERTINO, CA 95014 /V) \� Tel: (408) 505-9985 Fax: (408) 725-1350 0 0 m ()" \F E—Mail: SCA®SCConstruction.net m m )au•uol)on!)suo00S@V3S :I!oW-3gb o g Y N 0S£t-SZL (804) :xoj 9966-909 (904) :Ial a� )A/ b1056 VO �ONIla3dn� o r 41OS6 VO 'oul)ladno toM uyof S190t * Z sla9u!6u3 6u!;InsuoO * O929 'ON (3AIS IIIHlOOd 'S Mpol a cn� 5 516/00�5'Sb' 2ti, CII) alvd3a NOIlvaNnod , ; Q 3/�iyJ N�iI�1S o�ssu 11 131111 103rObd a rn o � (n 0 O CO C7 Q m N i • �� W� 8 W G•- 42 W8111H100d GC) o a m = Ez Z _ = LUysw y p J Ol! (3) I V < Ic m rc.• .°1c .O S G LIJZ Dl! 3) Ld� J • I � W arW I I W �w � m ~ `° I > W0 d W In uj m ~ � Z p �I I w wa p W � I I L- X WSW 81 w LJJ V)) � Z Uw I Fwd F(u) ; LLJ OON H II Wv oZ " I I O a- LLI W W 1 OZD a O old (3) O1! (3) U V O O � I O] N W 2 U Z H J ui Z • ® ® D_ ® O ' W Q U) 00 (V 00 „z L :2LLJ W Z Z Z Z �� O 0' Q W Q I (V z N O U J W O J O Q u • JO u J 0 0_ a 3 = -1 aha > w J M cV �O ® �W U U) J !n N x ~ N= Z U W g O eX Q _ � v � vTg m N�- I'7 i 'NIW „8L December 19, 2005 Ms. Daphne Liu • Subject: Foundation Inspection at 10428 S. Foothill Blvd, Cupertino, CA Dear Ms. Liu, At your request, we visited the subject site to review the existing foundation condition. Due to lack of accessibility to the foundation area, we only looked at the foundation from outside of the house. In addition, we reviewed the inspection report by Edward's Construction. Our review on the report was focused on the foundation portion only. All items other than foundation will be excluded from this report. Here is our conclusion: * The report indicates several deficiencies at the existing foundation. However, there is lack specific how to repair or replace the foundation. * The air epoxy injection at the crack footing is acceptable. This approach will seal the crack and prevent further corrosion to the existing reinforcement. 0 Regarding foundation anchors, the report does not specify the exact type of anchor for secure the sill plate to the concrete. ( IVEID P 0 For the interior piers, we do not have recommendation at this point. JAN 0 9 2006 RECOMMENDATION • The foundation at the right side of the house should be replaced per attached detail S I • Replace 6'-0" foundation where existing foundation experience excessive settlement. We noticed a 6" settlement at the left hand of the house. This approach will not guarantee to prevent future settlement. However, it provides a positive support for the structure. • Air epoxy injection at all cracks • Install new V2"x 10"wedge anchors @ 48" oc (with 6" embedment) at all existing wall foundations. These anchors only resist the shear force generate by the wind or seismic activity. They will not resist the uplift load due to wind or earthquake load. In Edward's report, section 4, it indicates the anchor bolts will transfer uplift loads to the foundation. This is incorrect. • Additional inspection is recommended when your contractor open the floors and walls. If you have any questions, please feel free to give us call. S, I atESSin V CHU" Steven C. Chu, MSPE &No 52160 A Lit, Cc: Thomas Liu & Associates P CA0 10615 John Way Cupertino.CA 95014 '1'al:(409)50-9985 rm:(408)725-1.350 Pip i++n'c? f ��i A s✓,ri`Fr -�' iN q� fic,{rte" �. ,5t P Yf c - � $. r +.f1r ..: V ' +i.x rSe}.0i �.Y>�r+b`'3z��v�^Ari,�r1.lt•�.+��� 4Mbnrt!{.urSl�rY ilyryh„ �iz1.�F.{1'/p! 'S.��'�y F” S'JH Efr R 'si, LPROI�fC Olm�V�y��FE� Rdm TO y CUPE�W Assessor's Parcel Number: Name of owner. Project address. / Q 1,4 ] t Contact person. 117 LL e / !r; Phone. Fax. oh'- 15?,P�2 Net square footage of lot. Existing Proposed Square footage: First floor: Second floor: Garage: TOTAL: Are thereat least two 10 foot by 20 foot clear spaces inside the garage? U N Is privacy protection planting required for the project? (Y N • On what floor(s) is work being done? �n+.r ct�/z11f ��• Brief description of work. Code editions:2001 CBC (Y -N)2001 CFC (Y -N)2001 CMC (Y-N) 2001 CPC (Y -14)2001 NEC (Y -N) Effective 11/1/02 DECEIVED JAN 0 11111 Plan Review Process Work Book Page-B-Revised 4/28/04