Loading...
04060047 (4) CITY OF CUPERTINO b / 0 00�2 9 REROOFCITY OF 7 (O . CUPERTINO PERMIT APPLICATION FORM APN# Date: 4NL Building Address: /0 7,2 7 Gia S C. o 1 n/e 0- Owner's Name: Phone#: Contra or: Phone#: License#: v /tile / .S - / Contacf: Phone#: Cupertino Business License#: 0,p oS Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles ❑ Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other(Specify) Q Other(Specify) Number of existing coverings ❑ Provide I.C.B.O. Report# To be Removed ❑ Provide Mfgr.Installation Specs. I Have Read, Understand and Will Comply With Cu ertino's Tear Off Policy: Job Description: / Residential 69L Commercial ❑ Fire Zone: Yes ❑ No ❑ Confirmed with Planning De t. if there are any restrictions: LJ ost of Project: T e of Construction: Occupancy group: -0 c) 0 - Qty. i A 1' e Fee ID Fee Description Fee Group BPERMFEE Bldg Permit Fees BUILDING BENERGY Energy BUILDING BSEISMICRE Seismic Fee Res BUILDING BSEISMICOM Seismic Commercial BUILDING BPLANCHK Plan Check Fee BUILDING BUSLIC Business License BUILDING f� Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408)777-3228 CITY OF Fax: (408) 777-3333 UPEI�TINO Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards and manufacturers specifications on re-roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. . 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. IMPORTANT: 1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: C� Job Site Address: Roofing Company Name: A plican's Signature: Date: `K_"N--Ile c1`-( Greg teel Building Official Revised 1/30/03 Printed on Recycled Paper