Loading...
08070009 (2) CITY OF CUPERTINO `'� BUILDING NVISION._ PERMIT + CO'1�ITRA QR IN ORMt1.T.IO.N," PERMR NO. BUILTf�OdDD, 'NANNA DR TBD - TO BE DETERMINED 08070009 OWNER'SNAME; 1 - PERMIT ISSUE DAIS SUE LIOU 07/01/2008 NE: SANRARY NO. CONTROL NO. ARCHTIECT/EiGINEER: BUILDING PERMIT INFO BLDO ELECT PLUMB MECH (� C= l� X00 LICENSED CDNTRACT R'S DECLARATION Job Description 4 1 hereby anion that l am licensed under pmvisimu of Chapter 9(commencing p .i with Section7")ofDivision 3of the Business andProfessions Code.and myli--u RE-RF CLS A 22SQ INSTL 2"PLY ISO T/0 TAR&GRVL < in full forte and effectIl 'J C is Oxen.Clazs-�Lk.g J RPLC H Dao:��=G O Conuanor GARG SIJ ARCHTIECrSDECLA non ALL DRY ROT FBRBRD PNLS &DETCH gqI undersand my plans shall be mad a public remNs JyU g o G Licensed Professional 3 OWNER-BUILDER DECLARATION < g I Wmby anion Nat I am exempt from the,Contractor's license Law for the ❑O following mason.(Sada.7031.5,Business and Frofte inns Code:Any city or county which require a permit n consoma,slater.improve.demaluh,or mpolr mY summers _lo' prior to its issuance.also require the applicant for such permit W file a signed statement matWulk=owed aursuant to de,movisionsa the Camranars Lee.law(Chap.9 Sq.Ft.Floor Area Valuation E~g (commencing with Section 7(00)of Division 3ofthe Bminetsad P mxxiuu Code)", 14000 — that he is exempt therefrom and the basis for the alleged exemption Any violation of Section 7031.5 by any applicant fora permit mbj.0 the applicant to a civil penalty of Number Occupancy Type not mart than five hundred dollars(55001 3 7 5 2 9 011 . P Y YP 1,as owner of the prop sty,n my employes with wages u their vele compensation, will do thework.and thesuunum isms,imendednraRemA iterate(Sec.7 .Busincw Required Inspections and Profession Cadc The Committers License naw does coe nst apply m an ow xee of q p property who builds or im prove,de4eoM1 and who does sued work hinurlf en through hu own mnploye s.provided tharsuch improvements are notintended or offered forssle ff, however,the building or aprowmem is mid within arc year of conpleuon,the. buildor will have me burden of proving that bo did no,build or improve for purpose of "it.). 1,as owner of the property,am exclusively contracting with liceved con each rs In emu rout the projat(Sec.7014.Business and ProRsdom Code:)The Conuacmrs U. cove law does not apply in an caner of property who Wilds or improves thereon,and. who commets for such projects with a emu amer(s)licensed purmant to the Contractors Lice.Law. (]I am exempt under See .B B P C for this paten Ownv Dau WORKERS COMPENSATION DECLARATION 1 hereby anirm under penalty of perjury one of the following declarations: Ihawahawimaintain•Cedrimmof Cons=niaself-ivurtfor Ws &Compen- sation,as provided for by Section 3700 of de Labor Code.for me peAormance of the work for which this pmmft is issued. ❑1 have and will maintain Worker,Compensation I...as required by Savor 37(10 of the labor Cade.for the per tmosom often work for which this permit is issued. My Worker's mCompensation Wuranee tamer and policy number area': / - Caer.CEL' 4-fv`Tu Polity No.:y -0632169.0". CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (Thu mcum need our W compkmd if the peonit isforanc hundred dollars(SIW) m less) 1 certify that in the performance of the work for which this parrot is,Wooed,1 stall not cmpmy any'permn in any ro.,an az to become mbjct to the Worktn'Compenvtim Laws of California.Doc Applicant NOME TO APPLICANT:If.after making this Cer iEcae of Exemption.you should become subject b tis Worker's Cerepermdon provisions of the Labor Cade,you must .J O forthwith comply with such provisions or this permit shall he damcd mwkcd. Zy CONSTRUCTION LENDING AGENCY 'res 1 hereby Nim thatmere isa.omuuctim km1m,agency for the perfamn eof C the work for which this permit is issmd(Sec.3097,Civ,C.) Q Undoes Name . z Urulces Address U Q I curtly that 1 haw mad this seeieadon and sum tis de above information is IL F corms I agree or comply with all city and county ordinances and suis taws relauog ut .O U Wilding construction,and hereby authorise rtprexnuuves of this city to enter upon the above-mentioned property for Inspection.wugwxs Er„W (We)agree to saw,indemnify+fid tap haoml.the City or Cupertino against f/) in'somi judgmentse trading i ng expevos mit. may in my way urnc agavt said City U? m upnce of time 6,mun6 of mu permit PP UNDERSTAN AN WILL COMPLY WITH ALL NON-POINT Issued by: Date SO EGU ienatne arnppfiandCam r 2 - n� Re-roofs HAZARDOUS MATERIALS DISCLOSURE Type of Roof Will the appliom or future Wilding casement amort or handle handouts materia az dtflned by the Cupertino Municipal Code.Chapter 9.12,ad the Heath and Safety Code,section 15532(,)7 ' 41 ❑Ya U(Na All roofs shall be inspected prior to any roofing material being installed. Will the,applicant fur futum building mcr ant am a roof L installed without first obtainingan inspection,I agree to remove pp g p m Air Qu or devices which p emit hvardoos air mnumimnu u defined by the Bay Arta Air Quality Management all new mat rials for inspection. Dismie'7 C]Y. Nu ve mad lhehvsodws materials recuhemenu under Cleaner 6.95 of the Cnifor. ni al &Safety Cod=.Sccuov2M5.25533and75534.1undc,standmuiflWWilding e tY have cot that' my mobility he nobly de oecuPant of me v mqui mem hie me issu is C, Slg ureofApplicant Date -01 g ���w All roof coverings to be Class'."or better weer o,authonssda em Dam' CITY OF CUPERTINO • 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 37529011 . 00 DATE ISSUED. . . . . . . : 07/01/2008 RECEIPT # . . . . . . . . . : BS000005314 REFERENCE ID # . . . : 08070009 SITE ADDRESS . . . . . : 18731 HANNA DR SUBDIVISION . . . . . . . CITY CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : SUE LIOU ADDRESS . . . . . . . . . . : 18731 HANNA DR CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM . . . . : JOHN FONT CONTRACTOR . . . . . . . : TBD - TO BE DETERMINED LIC # 00096 COMPANY . . . . . . . . . . : TBD - TO BE DETERMINED ADDRESS CITY/STATE/ZIP . . . . , TELEPHONE . . . . . . . . : • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BSEISMICR VALUATION 14, 000 . 00 1 . 40 0 . 00 1 .40 0 . 00 1BUSLIC FLAT RATE 1 . 00 110 . 00 0 . 00 110. 00 0 . 00 1REROOFRES SQ FEET 22 . 00 572 . 00 0 . 00 572 . 00 0 . 00 ------ ---------- ---------- ---------- TOTAL PERMIT 683 . 40 0 . 00 683 . 40 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 683 .40 AMEX --------------- TOTAL RECEIPT 683 . 40 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF • De D-7 000'7 CITY OF CUPERTINO aouv REROOF OF IWUPEkTINO PERMIT APPLICATION APN # Date: Building Address: 1 i 7 31 0-041 Owner's Name: Phone #: 5�.e. L- 0 u Contractor: Tb1_ m Pam�_fFAb) /�CPO )?60Fjnl �SMy Phone O 668 '716 T 50-n Afr1n rZ) Kc! PALo Acro 9Y363 Fax #: 660 �y3�O(o 83 Cupertino Business License #: Contractoricense #: 5JY 16 L Type of Roof Coverin 50 U -�- pETd cH � , EX, t, 0 �IIM / g: Pr PAP,{16G. >�BUilt-Up Roof �l Built-Up roof 7RZA-VMoCriF/EDgi Ih£i� ❑ Asphalt Shingles ❑ Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes /� ❑ Wood Shingles Li Wood Shingles 0-6 Root, COM) ❑ Other (Specify) ❑ Other (Specify) TIS PVC,Sl al L PI Number of existing coverings I a Provide I.C.B.O.Report# / V To be Removed , Provide Mfgr. Installation Specs.61j 5iTE �) k 7EA R. a FF r 170.6 SQ• { HAW-9,0cts� s 1 "YotY Ts0 -Fo Ilowe�6 ` " SB secttir� � r%'�c � 1 Job Description: 'T EARQFFEXlS G1AP tiq fZepkce. aJI dry ro4ecd Fberboxrd P n.e-Is 1`1ea . '2ooPDeo Rep lae� all az /O �1 PPleo iso (;mea rff�wife Pr,�nta �v r 12�DQY Ror F�C1 l" NDE --EB $0 M11 VC SIAlle, L S _4gr l qCA csl Residential X Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, i dude in plan set & the sheet index. Valuation: ' I Have R*, do:tand and Will Co ply with upertino's Tear-Off Policy: Signature CITY OF CUPERTINO . REROOF CUPERTINO FEE SCHEDULE 41 Number of Fee ID Fee Description Fee Permit Type Squares Group 1RER00FC0M Re-roof Commercial B 1COMMLROOF 1BSEISMIC0 Seismic Commercial B 2Z 1RER00FRES Re-roof Residential B 1SFDWLR00F 1BSEISMICRE Seismic Residential B 1700 g6Wf: 1REROOFMRES Re-roofMulti-FamilyB 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 M I Community Development Department Building Division City of Cupertino • 10300 Torre Avenue Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards and manufacturers specifications on re-roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. • 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: p-7 1 p Job Site Address: L O l3 ) 1a4 n a- D Roofing Company Na Di C." Applicant's Signature: Date: t� • Greg Casteel Building Official Revised 11/2/04 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 7polnts 11. Permeable Paving, Note L-1 C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathing, detail S-2 E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS1 40 points • Plan Review Process Work Book Page A2-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is . not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project. A.Site INPUT Resources Energy [AWHealikiiiii 1.Recycle Job Site Construction'&_Demolition Waste 65%=1 point;75%= 2 points;80%'=4 points up to 4 Resource pts 0 2.Salvage Reusable Building Mater aIs 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Qualityvnth Landscape Design 2 Resource pts y=yes 0 8.Design Resource-Efficient Landscapes and Ganiens 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes , 0 10,Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 1 EMO B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of Flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yesF 0 1 1 1 C.Structural Frame 1.Substitute Solid Sawn Lumber with Engineered Lumber' 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3,Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Energy pts y=yes 0 C.Roof 3 Energy pts y=yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 12.Use OSB a.Subfloors 1 Resource pt y=yes 0 • b.Sheathing 1 Resource pt y=yes 0 INPUT ResDurces Energy IAQ�iealth • .Wmdows . 1.Install Energy-Efficient Windows a.Double-Paned 1 Energy pt y--yes 0 b.Low-Emissivity(Low-E) 2 Energy pts Y--yes 0 c.Low.Conductivity Frames 2 Energy pts y=yes 0 2.Install Low Heal Transmission Glazing 1 Energy pt y=yes 0 1 1 1 J.Heating Ventilation and Air Conditioning 1.Use Duct Mastic on All Dud Joints 2 Energy pts y=yes0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y--yes 0 8.Install Sealed Combustion Units a.Furnaces 31AO/Health pts y=yes 0 b.Water Heaters 31AQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y--yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y--yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y--yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 • 13.Retrofit Wood Burning Fireplaces a.Install EPA certified wood slovesfinsens 1 IAQ/Health pt y--yes 0 b. Install/Replace Dampers 1 Energy pt y--yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4 IAO/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 I 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0 7.Install Radiant Barrier 3 Energy pts y=yes 0 1 1 L.Natural Heating and Cooling 1 1.Incorporate Passive Solar Heating 5 Energy pts y=yes p 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0 3,Plant Deciduous Trees on the West and South Sides 3 Energy pts y--yes 0 • 1 1 1 £ Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 SC UPERTINO Building De artment JOB ADDRESS: /973/ M a),n n 0. r-` PERMIT # O OWNER'S NAME: S u PHONE 3 GENERAL CONTRACTOR: A FAX # I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock ile _ Owner/Contra for Signature Date