08070045 (2) CITY OF CUPERTINO
B UILDINb DIVISIC11 PERMIT -"Co -
HS' .`�j
PERMIT NO.
BUI1.91r�GOTE3EARRY WAY ANGELO RAIN GUTTERS 08070045
OWNER'S NAME: PERMITiSUE DATE
WUXI.NG DON 802 WELLINGTON PL 07/07/2008
NE: SANITARY NO. CONTROL NO,
ARCFirTECTYENGINEER: TEAR OFF EXISTING COMP 'BLDG BE��0 GPE0. O
UMBMECH
0 0 0
u O p LICENSED CONTRACTOR'S DECLARATION
z�z 1 Thereby imam that 1 am licensed under provisions of Chmner 9(commenelnj _J Ne$CRption
n<a with Sauon]Of1U)of Oividonlrrh,Butiruss amM Profeadw Codc.aM mY liccnxb
n full tome aMe e': 6 /3 3
Cg Z License _ = Lk.«
q Da¢ Con
n W A HfTECTS DECLARATION
7 I un diamond my plants shall be used as Public moths
�yV
k Liceued Professional
aN3 OWNER-BUILDER DECLARATION
0 f 1 Wrthy a(Rm the I em comet from Use Conuer,Co License law for IW
p O following moon.(Saito Nl I$eusiass and ve,it.oro Code:Any city at county
which reyvires n permit re cores mo eller,improv,demolish,or repair any structure r
i y Prior m its issuance,alsocom requires the inion o for such permit m file ailgad rutemem
e�$< wtnmincingcdpmsvice.mthe DO)aDivisionivisvtrmcctmranm.tu�Law eaap�9 Sq.FC Floor Area Valuation
(cot he IsingwiNSaeioser it ofbs3 ofN,Businexe endon.Any.vi Code)or
r3—
that he b,timet IWrefmm and the bub for Ne illcgcd exemption.Any violation of
Section 70313 by any applicant for a permit subjects the applicant In a civil pcomy of APN Number Occupancy Type
em come Nato five ho.dmd di($50y.
P Y YP
0 1,a ower of the prnputy,or my employees with wage u Neo sole coepensadon,
will do the wort and she structure is not mounted or offered for,ak(Sec.7040,Business
and Prefectuu Cade The Contractors Liceres:Law,does tot apply inan no.or Required Inspections
property who Wildsorimpmws thereon,andwhr dorssoh workhiwellor Wougp his
own employees.provided that such impmsemans..or mounded orrfre ed for sale IL
however,Ne Wilding mimprovement is sold within ow You of completion,he owner- -
buildn will base the Wien of parting that K did rot hdii or improve for purpose or
sae.).
0 1,u owner of rhe property,me eclusivcly contracting with licensed contractors in
consumer the project(Sec.](ld,Business W Pmfesity Code:)The Conhatpo's U. .
ewe law docs eon apply to an owner of pm,.,who Wilds or Mpmses Nemo.,and.
who co.trans for such projects;with a comvac..Ra1 n»,...d pununl no he Convenors
License law.
0 lameemptunderSee .B&PCfor Nb moon
Ow. Dau
WORKERS COMPENSATION DECLARATION
1 hereby same under Timothy of perjury,am of ft following declarations:
1 hate arta will milent.•Certificate ofc...t to self-insure for Waders Compco-
ander,as provided for by Section 3700 of du labor Code,for he performance of the
were for which his permit is issad.
0 I ban and will maintain Workers CompevWtn Worriment,as rryuied by Sccum.
3]lDof du labor Code.for the pe ormanutf Ne work forwbich this Permit b issued
My Worker,Coepeuatitn Inmranm errim and Ptlicynumber am:
Cartier. 9T 77025 . Policy No.:I W_r 8 S ;;�
CERTIFICATE OF EXEMPTION FROM WORKERS
COMPENSATION INSURANCE
(Ddssecbnn need not becompleted if he permit Is foram,hundred dollar($100)
or lou)
I certify that in the Mr..of the wok In,which Nis Permit a imam il,I mall nm
employ any Peron in my manneran as he become subject to f Worker'Compensation
Laws of Ciliromia Dau
Aepliant
NOTICE TO APPLICANT:IL after making this Ccnifieu of Exemption,you should
bccnme subject To he Workers Compensation provisions of We IaWr Code,you most
.J z forthwith comply with such Provisions rr Nb Permit shall W domed naked.
Z O CONSTRUCTION LENDWO AGENCY
[—� Ihereby aare That there is a mnswninn lending agency for Ne Perfurmaae of
l5:
the work for which this permit is issued(Sic.3097,Civ.C.)
WM Q Landers Name
z lrndeN Address
U Q 1 certify Na.Than ted Nis application and mate her thc aWw information i,
1,^' em oM 1 agree To comply with all city and county ordinances and all Iowa mind.,m
.O SC-J^ Wildin5eowrueutn.and bemby suNorice repemnuuvu bribe city to cmuupnn Ne
[f7 ,bow-mmuuod property
curd for inspection puryoxa
gy
TWO)agree he an.indemnify and kap armless Ne City of Cupertino against -
Z inconses.quent Of
granting ea This emiich may in any way acemc against said City
U z inconsequenceor thegramma,of Nb permit.
'-" APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALJ.NON-POINT Issued by: Date
SOU REGULA ONS.
Re-roofs
Signature of ApplicanYCom - Date
HAZARDOUS MATERIALS DISCLOSURE Type of Roof
Wit du applicant or future Wilding acupmustom or Iu min innumerous materist
as defined by the Cupertino Municipal Cade.Chapter 9.12 and du Health and Safety
code.outer 25532(.)] All roofs shall be inspected prior to any roofing material being installed.
Yu
Will the appran. r forum Wilding orcupam use eyuipmcnt or @vies which If a roof is installed without first obtaining an inspection,I agree to remove
it arANaos ilr conuminan.as deficeit by dm Bay Am.Air Quality Management all new materials for inspection.
Dindcn P
0y.
1 haw vat the haradousmamriab myuin:mmu tmkrCbapter635 of ds,Calif..
nbfl.th&SafmyCodc Sa.25505.25511 am125534.1 ungnwM lhatifdre building
dna Imo c dy baa a urmnh that it b my maiinndbility m netify IW uceteanl of dm
requite. hichto par anccrfaCertifietenrOccupnuy. Signature of Applicant Date
ower or atthrrvgd e 7 Dote All roof coverings to be Class'1�."or better
CITY OF CUPERTINO
• 2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN I . . . . . . . : 31602031 . 00
DATE ISSUED. . . . . . . : 07/07/2008
RECEIPT # . . . . . . . . . : BS000005357
REFERENCE ID # . . . : 08070045
SITE ADDRESS . . . . . : 10628 LARRY WAY
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : WUXING DON
ADDRESS . . . . . . . . . . : 10628 LARRY WAY
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : EDWARD GREGORY
CONTRACTOR . . . . . . . : JOHN ANGELO LIC # 30122
COMPANY . . . . . . . . . . : ANGELO RAIN GUTTERS
ADDRESS . . . . . . . . . . : 802 WELLINGTON PL
CITY/STATE/ZIP . . . : CAMPBELL, CA 95008
TELEPHONE . . . . . . . . ; (408) 379-6189
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------- --------- ---------- ---------- ---------- ----------
lBSEISMICR VALUATION 14, 200 . 00 1 . 50 0 . 00 1 . 50 0 . 00
1REROOFRES SQ FEET 26 . 00 338 . 00 0 . 00 338 . 00 0 . 00
---------- ---------- --------- ------
TOTAL PERMIT 339 . 50 0 . 00 339 . 50 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 339 . 50 MASTER CARD
---------------
TOTAL RECEIPT 339 . 50
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ------- --------------- -------- ----------------------------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
•
CITY OF CUPERTINO
d' REROOF
• CUPERTINO PERMIT APPLICATION
007 M0� _
APN # Date:
fCv 02 03/ 00 7 7- Z00 P
Building Address: / 1
/0608 L9/ r Wo
Owner's Name: Phone #:
� v Xin
Contractor: Phone #: .Vq- 3>V (o/��j
� /C) � l
Fax #: VOf— 966- X97 _4"
Cupertino Business License #: Contractor License #:
3 0/ 7 Z 6,( z /Z 3
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
Asphalt ShinglesAsphalt Shingles 30 y
Wood Shakes Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other(Specify) ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.B.O. Report #
❑ To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: ��'f{�cts �;. C D,, 5LI A4 le ,, �Te_-S w�o1Q J 330 ire-/'f
�'tl^-✓74r ��p �� SfS Va�✓L ��2d�
C/4ss A
Residential Kj Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation:
I Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy:
•
Signature
SEIM
CITY OF CUPERTINO
REROOF
CITY OF
CUPEkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BSEISMICO Seismic Commercial B
1REROOFRES Re-roof Residential B 1SFDWLROOF
/ 1BSEISMICRE Seismic Residential B
1RER00FMRES Re-roof Multi-Family B 1MFDWLR00F
1BSEISMICRE Seismic Residential B
1BUSLIC Business License B
Revised 6/16/08
t
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
• Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
• 6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled
IMPORTANT:
1. Flat roofs must have a minimum of 1/4" per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will c'om'ply with the above stated policy on re-roofing.
Homeowner's Name: W U X I t C. ✓ (e
Job Site Address: 10678
Roofing Company Name: /o s
Applicant's Signature: AQate: 7— acA) P
• Greg Casteel
Building Official
Revised 11/2/04
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet Or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
a
B. Site 9. Install H.E. Irrigation, (details/spec)` L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15% Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Enerqy Star Refrigerator, (Note/Spec. A-3 1 point
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 1 40 points
•
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is I
not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your •
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening'your project.
INPUT Resources Energy IAQ/Heafth
A.Site
1.Recycle Job Site Construction 6 Demolition Waste
65%=1 point;75%= 2 points;80%=4 points up to 4 Resource pts 0
2.Salvage Reusable Building Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants 8 Trees 1 Resource pt Y--yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
8.Design Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9.Reuse Matehals/Llse Recycled Content Materials
for Landscape Areas 2 Resource pis y=yes , 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1 I 1
B.Foundation
1.Incorporate Recycled Flyash in Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10% •
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts yayes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts Y= s 0
F;
1 1 1
C.Structural Frame
1.Substitute Solid Sawn Lumber with Engineered Lumber3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y--yes 0
8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12.Use OSB
a.Subfloors 1 Resource pt y=yes 0
b.Sheathing i Resource pt y=yes 0 •
' I.Windows INPUT Resources Enerq� IAG[Heafth
r 1.Install Energy-Efficient Windows
e.Double-Paned 1 Energy pt y=yes 0
b.Low-Emissivity(Low-E) 2 Energy pts Y--yes 0
c.Low.Conductivity Frames 2 Energy pts y--yes 0
2.Install Low Heal Transmission Glazing 1 Energy pt y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
1.Use Duct Mastic on All Duct Joints 2 Energy pts yeses 0
2.Install Ductwork within Conditioned Space 3 Energy pts y--yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y--yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y--yes 0
5.Install Solar Attic Fan 2 Energy pts y--yes 0
6.Install Attic Ventilation Systems 1 Energy pt Y--yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
8.Install Sealed Combustion Units
a.Furnaces 3 IAQ/Health pts y--yes 0
b.Water Heaters 3 IAQ/Health pts y--yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heal Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC ReMgerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stoves/inserts 1 IAO/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pis y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0
7.Install Radiant Barrier 3 Energy pts y=yes p
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes p
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p
1 1 1
•
Community Development
i ^fs 10300 Torre Avenue
Nys- Cupertino CA 95014
Telephone(408) 777-3228
CITY OF. Fax(408)777-3333
*UPEI�TINO
Building De artment
JOB ADDRESS: PERMIT WI D O
OWNER'SNAME: J io (per PHONE # y -a57-2� 7i
GENERAL CONTRACTOR: k),,,& G,W,, 4 FAX #
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
• Linoleum / Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owne /Co acto e Date
N
' l
Community Development
10300 Torre Avenue
r Cupertino CA 95014
-� Telephone(408) 777-3228
*t CITY OF Fax(408) 777-3333
UPEkTINO
Building Department
JOB ADDRESS:
PERMIT03010
O
OWNER'S NAME: � 4 ' - f PHONE # /� - yS7-Z 7i
GENERAL CONTRACTOR: W(,, y" �� FAX #
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the followinginformation:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
` " Plumbing
�. Roofing LA G 2, 3,01 z
Septic Tank
Sheet Metal
theet Rock
Tile
�;27- 2 '
Owneljc_ o i acto e Date